long-baseline experiments in north america
DESCRIPTION
Long-Baseline Experiments in North America. Maury Goodman ANL NOW 2008 September 2008. Preface: “Long-Baseline” Definition. Dictionary definition of long - “having considerable linear extent in space” Longer than before / Off the site of the accelerator - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/1.jpg)
Maury Goodman, ANLNOW 2008 September 2008
1
Long-Baseline Experiments in North America
Maury Goodman ANL
NOW 2008 September 2008
![Page 2: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/2.jpg)
Maury Goodman, ANLNOW 2008 September 2008
2
Preface: “Long-Baseline” Definition
Dictionary definition of long - “having considerable linear extent in space”
Longer than before / Off the site of the accelerator
Beam -- L >> length of beam pipe YES
Which implies the far detector sees a point source of neutrinos
Physics – L >> E/(2.54 m322 ) ~ 1500km NO
![Page 3: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/3.jpg)
Maury Goodman, ANLNOW 2008 September 2008
3
Preface:[Factors in North America/US]
• National Planning in the US is done by a panel called HEPAP (High Energy Physics Advisory Panel)
• Long-Term Planning is done every few years by subpanels
• A recent innovation is to have a panel called P5 (Particle Physics Project Prioritization Panel) maintain a roadmap.
• The highest priority project in a 2001 report was the ILC (Bagger-Barish Panel)
• The ILC Central Design Group Reference Design Report reported an ILC cost in August 2007. The advertised cost was $6.6B. The estimated US project cost is $21.9B. [These are the same number!]
• Too much ->-> Therefore new study
![Page 4: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/4.jpg)
Maury Goodman, ANLNOW 2008 September 2008
4
P5 report May 29 08 report aka Baltay panel
![Page 5: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/5.jpg)
Maury Goodman, ANLNOW 2008 September 2008
5
Outline
• MINOS a few results
• MINOS+ speculation & opinions
• NOA
• LB DUSEL– Water– Liquid Argon
Thanks to M. Sanchez, H. Gallagher, G. Feldman, M. Diwan, N. Saoulidou, M. Messier, M. Bishai, G. Rameika, R. Svoboda, Y.K. Kim, K. Lesko, B. Fleming, L. Pinella,
![Page 6: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/6.jpg)
Maury Goodman, ANLNOW 2008 September 2008
6
Plusmore baselines…
• To have some more facts in this talk, I’ll mention several things having to do with baseball*.
Fully realizing a large fraction of my audience doesn’t care in the least about baseball
![Page 7: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/7.jpg)
Maury Goodman, ANLNOW 2008 September 2008
7
MINOS
• 484 planes of 4cm strips
SEE DETAILS FROM JUSTIN EVANS THIS AFTERNOON
![Page 8: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/8.jpg)
Maury Goodman, ANLNOW 2008 September 2008
8
NuMI Beam Performance
8
Tot
al P
roto
ns (
E20
)
12 May 2008
![Page 9: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/9.jpg)
Maury Goodman, ANLNOW 2008 September 2008
99
MINOS - m232
Energy Spectrum
Best Fit:|m2| = 2.43x10-3 eV2
sin2(2) =1.00
Eve
nts
/ G
eV
|m2| =(2.43±0.13) x 10-3 eV2 (68% C.L.)
![Page 10: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/10.jpg)
Maury Goodman, ANLNOW 2008 September 2008
10
MINOSOther Analyses
• NC• Atmospheric s• Alternative fits to
oscillations• Time of flight• Search for Lorentz
Violation• Cosmic
• Cosmic shadows, seasonal variations,…
e for 13
Antineutinos for m232
![Page 11: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/11.jpg)
Maury Goodman, ANLNOW 2008 September 2008
11
Cosmic RaysCharge Ratio
• Previously
flat• First rise in Charge Ratio
• Relevant variable is not E by Ecos
• Can be used to measure K+/K- & +/-
• Related to TeV associated production
• Relevant for Neutrino Telescope backgrounds ()
![Page 12: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/12.jpg)
Maury Goodman, ANLNOW 2008 September 2008
12
e Sensitivity for 13
At CHOOZ limit expect 12 νe signal events and 42 background events with 3.25x1020 protons. Use sidebands to study predicted far detector backgrounds.
![Page 13: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/13.jpg)
Maury Goodman, ANLNOW 2008 September 2008
13
MINOS plans
Þ Running on FNAL schedule through 2010 ~10e20 pot
Þ We want to continue running s beyond 2010Þ We want to run sÞ A “scenarios” group is devising a plan/proposalÞ Running beyond 2010 seems obvious, but you
never know.
![Page 14: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/14.jpg)
Maury Goodman, ANLNOW 2008 September 2008
14
Baseball
They play almost every day (162-182/year) Many fans appreciate statistics You can understand about 70% of the game in
30 minutes Much that remains is fairly subtle Huge influence - metaphors on English language(MVP, double play, off base, hit it out of the park, pinch
hitter, foul ball, all-star, big league, rain check, …) Most common questions when I take a European to a
baseball game (~40,000)– Why are there no policeman?– What is light beer?
![Page 15: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/15.jpg)
Maury Goodman, ANLNOW 2008 September 2008
15
NOA-Where?Ash River
Minneapolis
Duluth
International Falls
Fermilab
Ash River
Minneapolis
Duluth
International Falls
FermilabAsh River
VoyageursNational Park(shaded brown)
Ash River
VoyageursNational Park(shaded brown)
The Ash River site is the furthestavailable site from Fermilab alongthe NuMI beamline. This maximizesNOA’s sensitivity to the mass ordering.
Off-axis
![Page 16: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/16.jpg)
Maury Goodman, ANLNOW 2008 September 2008
16
NOA designplastic filled with scintillator
An admirer
32-cell extrusions.
The planes alternate horizontal and vertical.
![Page 17: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/17.jpg)
Maury Goodman, ANLNOW 2008 September 2008
17
NOAA significant Issue
• It takes a long time to build & fill• It is desirable to take data before it is complete
Gluing & Structural Engineering challenges
“The problem with plastic is that it is plastic”
![Page 18: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/18.jpg)
Maury Goodman, ANLNOW 2008 September 2008
18
Signal & Background
x-z y-z2.2 GeVe QE CC
1.4 GeV QE CC
12.3 GeV NC
with a 1.2 GeV 0
![Page 19: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/19.jpg)
Maury Goodman, ANLNOW 2008 September 2008
19
NOA – nonzero 13 ?
![Page 20: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/20.jpg)
Maury Goodman, ANLNOW 2008 September 2008
20
NOA – mass hierarchy ?
![Page 21: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/21.jpg)
Maury Goodman, ANLNOW 2008 September 2008
21
NOA – CP ?
![Page 22: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/22.jpg)
Maury Goodman, ANLNOW 2008 September 2008
22
NOA oscillations
• NOA was approved at Fermilab and construction funds were included in the DOE 07-08 proposed budget ($12M first year of $260M)
• Funds also in Congressional budgets, but retroactively zero’d in a December 07 compromise
• P5 report recommended NOA, but not in all funding scenarios.
• A supplemental funding bill in July 08 included $9.2 M for NOA
• It recently passed its (second) CD2 review – not yet signed.
• Hardware & Civil projects that had been delayed are gearing back up.
![Page 23: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/23.jpg)
Maury Goodman, ANLNOW 2008 September 2008
23
Chicago Cubs
• Haven’t won “World Series” since 1908
• 1630 teams• Cubs 4 wins -0 losses
on days that Italy has won the world cup
• 2008- This is the year
![Page 24: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/24.jpg)
Maury Goodman, ANLNOW 2008 September 2008
24
Eamus CatuliiAnno Catulli 00 62 99
![Page 25: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/25.jpg)
Maury Goodman, ANLNOW 2008 September 2008
25
Project X
![Page 26: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/26.jpg)
Maury Goodman, ANLNOW 2008 September 2008
26
Protons at Fermilab
Now
ANU/NOA
Project X
SNuMI
![Page 27: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/27.jpg)
Maury Goodman, ANLNOW 2008 September 2008
27
LHC including Upgrades, Particle Astrophysics (including Dark Matter and Dark Energy)
ILC R&D, EDR, Engineering, Decision, Industrialization, Construction, Running
Proj. X R&DILC cavities &Cryomodules,Overall Design
SNuMI
small
13
NOvA (0.7 MW) (1.2 MW)
larg
e 13
+2 yrs
base
line
+5 yrs
ILC
tiny 13
Precision Phase I Precision Phase II
Sketch of Integrated Plan (Sept. 18, 2007) [Y.K. Kim]
MuoncolliderR&D for future energy frontier colliders
DUSEL
+ Factory
4D cooling + …works
6D cooling + …works
extremely tiny 13
Project X
A Large Detectorat DUSEL
for Neutrinos
andProton Decay
![Page 28: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/28.jpg)
Maury Goodman, ANLNOW 2008 September 2008
28
P5
DUSEL
Project X
ANU
![Page 29: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/29.jpg)
Maury Goodman, ANLNOW 2008 September 2008
29
![Page 30: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/30.jpg)
Maury Goodman, ANLNOW 2008 September 2008
30
DUSEL
![Page 31: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/31.jpg)
Long-Baseline
![Page 32: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/32.jpg)
Maury Goodman, ANLNOW 2008 September 2008
32
3 100kt detectors?
![Page 33: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/33.jpg)
Maury Goodman, ANLNOW 2008 September 2008
33
LB-DUSELA significant Issue
• It will take a long time to build & fill
• It will be desirable to take data before it is complete One of the arguments for Modular H2O
![Page 34: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/34.jpg)
Maury Goodman, ANLNOW 2008 September 2008
34
![Page 35: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/35.jpg)
Maury Goodman, ANLNOW 2008 September 2008
35
Water or Liquid Argon?
![Page 36: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/36.jpg)
Maury Goodman, ANLNOW 2008 September 2008
36
![Page 37: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/37.jpg)
Maury Goodman, ANLNOW 2008 September 2008
37
On-Axis or Off-Axis?
• On-Axis More flux
• Off-Axis Less Background
• Design a Flexible Beam?
![Page 38: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/38.jpg)
Maury Goodman, ANLNOW 2008 September 2008
38
![Page 39: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/39.jpg)
Maury Goodman, ANLNOW 2008 September 2008
39
One (unofficial) notion of a LB-DUSEL schedule
![Page 40: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/40.jpg)
Maury Goodman, ANLNOW 2008 September 2008
40
DUSEL long-baselineis a vision
The vision requires: (all cost figures MCG rumor quality)– DUSEL ($500M+)– A new beamline at Fermilab ($250M)– Project X ($1B)– A new huge detector ($500M-1B)
None of these currently exist or are “approved”
It is not clear that this fits the funding assumptions of P5, or that it is a community consensus.
![Page 41: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/41.jpg)
Maury Goodman, ANLNOW 2008 September 2008
41
Other ideas
5 kt Ar at SoudanUse Brookhaven’s AGSDetector at 2nd maximum in NuMI beam
◙ Neutrino Factory/Muon Collider
![Page 42: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/42.jpg)
Maury Goodman, ANLNOW 2008 September 2008
42
NOW 2020Intercontinental Long-Baseline
ETC…
JPARC-INO
CERN-INO
FNAL-INO
![Page 43: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/43.jpg)
Maury Goodman, ANLNOW 2008 September 2008
43
Advertisement(s)
• Free monthly neutrino rumor newsletter --~100 lines, send “subscribe” to [email protected] or see http://www.hep.anl.gov/ndk/longbnews/Join ~1600 subscribers.
• Neutrino Oscillation Industry Web Page http://www.neutrinooscillation.org/
![Page 44: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/44.jpg)
Maury Goodman, ANLNOW 2008 September 2008
44
Conclusions
• MINOS is taking data– Results at 4e20, m2
32
– Expected ~ 10e20, 13
• NOA is coming• LB-DUSEL may be next• With regard to planning, (in my humble opinion) we
are overdue for an effective international context• Neutrino fans are in for exciting times• Chicago Cubs fans are looking forward to the 2008
baseball World Series
![Page 45: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/45.jpg)
Maury Goodman, ANLNOW 2008 September 2008
45
Backup
![Page 46: Long-Baseline Experiments in North America](https://reader030.vdocument.in/reader030/viewer/2022032607/56812fbf550346895d954163/html5/thumbnails/46.jpg)
Maury Goodman, ANLNOW 2008 September 2008
46