LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS SPECIFICATIONS 2007 FOR: ACRYLIC WATERBORNE YELLOW LEAD-FREE RAPID DRY TRAFFIC PAINT Specification No. B52 Requisition No. Quotation No. Make Model Vendor: Bid Prepared By: Address: Phone: Specification Written By: Tuonci Nguyen pproved By: Javier Robles Approved By: Bob Sch NOTICE: Bidder shall complete right hand column, indicating specific size and/or make and model of all components when not exactly as specified. State AAs Specified@ if item is exactly as shown in left column. Return this questionnaire to the Los Angeles County Purchasing Agent. GENERAL I. DEFINITIONS A. In these specifications the following terms or pronouns are used and intended to be defined as follows: 1. County: Los Angeles County, State of California. 2. Department: Los Angeles County Department of Public Works, 900 South Fremont Avenue, Alhambra, California 91803-1331. 3. Engineer: The Director of the Los Angeles County Department of Public Works or his agent. 4. Purchasing Department: Los Angeles County Internal Services Dept. 1100 North Eastern Avenue, Los Angeles, California 90063 BIDDER'S RESPONSE

Upload: others

Post on 25-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

SPECIFICATIONS2007

FOR: ACRYLIC WATERBORNE YELLOW LEAD-FREE RAPID DRY TRAFFIC PAINTSpecification No. B52 Requisition No. Quotation No.Make ModelVendor: Bid Prepared By:Address: Phone:Specification Written By: Tuonci Nguyen pproved By: Javier Robles Approved By: Bob Sch

NOTICE: Bidder shall complete right hand column, indicating specific size and/or make and model of allcomponents when not exactly as specified. State AAs Specified@ if item is exactly as shown in leftcolumn. Return this questionnaire to the Los Angeles County Purchasing Agent.

GENERAL

I. DEFINITIONS

A. In these specifications thefollowing terms or pronouns areused and intended to be definedas follows:

1. County: Los Angeles County,State of California.

2. Department: Los AngelesCounty Department of PublicWorks, 900 South FremontAvenue, Alhambra, California91803-1331.

3. Engineer: The Director of theLos Angeles County Departmentof Public Works or his agent.

4. Purchasing Department: Los Angeles CountyInternal Services Dept.1100 North Eastern Avenue,Los Angeles, California 90063

BIDDER'S RESPONSE

Page 2: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

GENERAL5. Purchasing Agent: The

Purchasing Agent of Los AngelesCounty or his deputy.

6. South Coast Air QualityManagement District: Theregional agency whichestablishes and enforces therules within its jurisdictionpertaining to air pollution control.Administration Office, 21865 EastCopley Drive, Diamond Bar,California 91765-4182.

7. Antelope Valley Air Pollution Control District: The regionalagency which establishes andenforces the rules within itsjurisdiction pertaining to airpollution control. Antelope Valley,APCD, 43301 Division Street,Suite206, P.O. Box 4038Lancaster, CA 93539-4409

8. Vendor: Each supplier ormanufacturer bidding on theDepartment's traffic paintrequirements.

9. Contractor: The successfulbidder receiving the contract forsupplying paint to theDepartment.

10.Paint: Marking paint or otherPavement marking materialcompatible with Department'sequipment.

BIDDER'S RESPONSE

-2-

Page 3: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

BIDDER'S RESPONSEGENERAL

11. Marking Traffic Paint: Paint thatwill be used for pavementmarkings ordered in 5 gallonsteel pails and 50 gallon 50-55gallon steel drums.

12. Striping Traffic Paint: Paint thatwill be used for pavement stripingordered in 50 gallon - 50-55gallon steel drums and bulk tankscontainers as defined in thisspecification.

II. SCOPE:

This specification describes 100%acrylic polymer type, low VOC, fastdrying, yellow, lead-free, waterbornetraffic paints that can be used onpreviously painted areas, on bituminousand Portland cement concretepavements. This specification coverstwo types of paint:

• yellow striping traffic paint• yellow marking traffic paint

It is the intent of these specificationsthat the furnished paint shall have theconcept of being a "high-build" product.

III. GENERAL

The paint shall be formulated andprocessed specifically for service as abinder for beads, in such a manner as toproduce maximum adhesion, refraction,and reflection. Any capillary action ofthe paint shall not be such as to causecomplete coverage of the beads.

-3-

Page 4: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

BIDDER'S RESPONSEGENERAL

The paint shall be well mixed in themanufacturing process and shall beproperly ground when incorporating thepigments in order to conform to therequirements as specified.

The paint shall not liver, thicken, curdle,gel, settle excessively, or otherwiseshow any objectionable properties afterperiods of storage of at least sixmonths; and, at any time during suchperiods, shall be readily remixedmanually to smooth, uniformconsistency throughout.

The paint shall dry on a road surface toa strongly adherent film that will not turndark in sunlight or show appreciablediscoloration with age. It shall be easilyand uniformly applicable withmechanical line-marking equipment andshall have excellent covering properties.The paint shall be suitable for bindingglass beads so as to produce a highlyweather and wear resistant traffic line.

The composition of the paint suppliedshall conform in all respects to allapplicable state and local air pollutionrequirements including, but not limitedto, the South Coast Air QualityManagement District's Rule 1113, andapplicable rules and regulations fromthe Antelope Valley Air PollutionControl District, regarding ArchitecturalCoatings, regardless of the quantities ofpaints delivered.

-4-

Page 5: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

BIDDER'S RESPONSE

The paint must be reflectorized fornight visibility by adding reflectivespheres before the paint dries or sets,by using drop-on or pressurizedmethods.

The reflective spheres shall be evenlydispersed on a wet paint film of 15+ mils(110-115 square feet per gallon) at arate of 6 pounds per gallon. TheDepartment may also opt to apply thepaint at thicker film coverage in thevicinity of 30 mils.

V. COMPOSITION:

Sampling, testing, and inspection of theContractor's products will beaccomplished whenever and whereverpracticable. If the Engineer so elects,the Contractor shall permit suchsampling, testing or inspection at hisplant, and shall furnish suitable spaceand such facilities as may be required.

The paint shall conform to the followingrequirements:

Pigment Yellow al. #65 and/or PigmentC.I. #75. Other Pigments may be addedto meet the Yellow color and opacityrequirements. The paint shall notcontain lead or chromium at levelsabove the limit set.

Total Pigment % by weight ....... 62+2

GENERAL

IV. APPLICATION:

-5-

Page 6: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

GENERAL

Total Vehicle, % by weight - - - - - 38+2

Total non-volatile, (Y0by weight of paint, min. - - - - - - - 77

Total non-volatile, %by volume of paint, min. - - - - - - 60

PH, min. - - - - - - - - - - - - - - - - - 9.5

Viscosity, KU - - - - - - - - - - - - - 80-95

Weight per gallon, lbs min. - - - - - 13.85

Fineness of grind, Min. - - - - - - - 4

Laboratory Dry Time: 77° F,Minutes, Max., ASTM D-711 - - - - 7

Dry through time, (Early Washout),minutes, max. - - - - - - - - - - - - - 125

Field Test, No track time underAmbient conditions, seconds - - 20-90

Volatile Organic Content,grams/lit, Max. (1 lb/gallon) - - - - - 100

Coverage: Square Feetper gallon at 30 Mils Wet. - - - - - 50

VI. DETAILED REQUIREMENTS

The finished paint shall have thefollowing quality requirements:

BIDDER'S RESPONSE

-6-

Page 7: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

GENERAL

Condition in Container: The paint asreceived shall show no livering, skinning,mold growth, petrifaction, corrosion ofthe container, or hard settling of thepigment. Any settling shall be readilydispersed when stirred by hand with nopersistent foaming.

Color: The yellow color shall closelymatch Chip #33538 of the FederalStandard 595b.

Flexibility: The paint shall show nocracking or flaking when tested inaccordance with Federal SpecificationTT-P-1952d, Type II.

Dry Opacity: The minimum contrastratio shall be 0.90 at 5 mils wet.

Daylight Reflectance: The daylightdirectional reflectance @ 15 mil wet ofthe yellow paint shall be between 45-60% when measured in accordance withFederal Test Method No. 141c.

Bleeding: The paint shall have aminimum bleeding ratio of 0.97 whentested in accordance with Federal Spec.TT-P-1 952d.

Scrub Resistance: The paint shall pass1500 cycles when tested in accordancewith ASTM D-2486.

BIDDER'S RESPONSE

-7-

Page 8: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

GENERAL

Freeze-Thaw Stability: The paintshall show no change in consistencygreater than 10% when tested inaccordance with TT-P-1 952d.

Dry Through (Early Washout): A 12-15mil wet film of the candidate paintplaced immediately in a humiditychamber maintained at 72.5°F+2.5°Fand 90%+3 relative humidity shall havea "dry-through" time less than, or equalto 125 minutes when tested inaccordance with ASTM D1640, exceptthat the pressure exerted will be theminimum needed to maintain contactbetween the thumb and film.

Storage Stability: When stored in athree-quarters filled can for a period ofthirty days, the paint shall be in ahomogeneous state with no skinning,curdling, hard settling or caking thatcannot be readily remixed.

No Tracking Time Field Test: The paintshall dry to a no-tracking conditionunder traffic conditions between 1 to 2minutes for striping traffic paint andbetween 3 to 6 minutes for markingtraffic paint when applied at 15+ 1 milwet film thickness when applied atambient temperatures, with 6 pounds ofglass beads per gallon of paint. "Notracking" shall be the time in minutes

BIDDER'S RESPONSE

-8-

Page 9: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

GENERAL

required for the line to withstand therunning of a standard automobile over.the line at a speed of approximately40mph simulating a passing procedurewithout tracking of the reflectorized linewhen viewed from a distance of 50 feet

VII. PACKAGING AND MARKING

All manufactured paint shall be prepared atthe factory ready for application. Quantitiesand sizes of containers shall be asspecified by the Engineer on individualorders.

The paint shall be furnished in containerswhich meet all U.S. Department ofTransportation, Hazardous MaterialsShipping Regulations.

Containers shall be as follows:

a. When 5-gallon containers are specified,they shall be round and have standard fullopen head and bail. Sufficiently sealed24-gauge steel containers, round, lug-typecrimped lid with ring seals and bails,which conform to interstate commerceshipping standards.

b. If 55-gallon steel drums are specified,they must have removable lid and airtightband fasteners.

c. When 250-gallon bulk containers arespecified, they shall be an industrystandard type bulk paint container, with

BIDDER'S RESPONSE

-9-

Page 10: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOSANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

GENERAL

removable lids and air-tight pan fasteners,but must meet all interstate commerceshipping standards and be sufficientlysealed.

All shipping containers must comply withCode of Federal Regulations, Title 49and all other applicable Federal andState Regulations governing their use.The containers and lids must be lined witha suitable coating so as to prevent attackby the paint or by agents in the airspaceabove the paint.

The construction of the container shallallow it to be picked up by a forklift whenapproached from any side. Provisionsshall be made to allow the tanks to belifted from the top and stacked whenempty. Bulk tanks shall comply with U.S.Department of Transportation Regulation57 as it applies. The outside of containersand lids must be silver color stainlesssteel coated white or off-white to avoidexcessive heat build-up when sitting insunlight.

All containers shall be labeled to show thefollowing:

1. Name and address of Contractor.2. Name and product.3. Color of paint.4. Date of manufacture and batch number.5. Purchase order number.6. Precautions concerning the handling

and application of paint in accordancewith the Construction Safety Orders

BIDDER'S RESPONSE

-10-

Page 11: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

GENERALand the General Safety Orders of theState of California.

7. Statement indicating that the contentsfully comply with all rules andregulations concerning air pollutioncontrol in the State of California and theCounty of Los Angeles.

VIII. SAMPLING AND TESTING

A. Qualifying Test

Each Vendor must submit, along withtheir bid, test samples consisting of fourone-quart containers of paint along witha batch formula in weight proportions.The formula shall be in generic termsrather then trade names. Any samplemay be tested. Bids submitted withouttest samples may be considerednonresponsive and may be rejected.

B. Quality Assurance Tests

All paint ordered from the Contractorshall be subject to testing at anytime, atthe Engineer's discretion. Every batchmust be accompanied by two one-quartsamples for all shipments sent within thefirst six months of the contract. TheDepartment reserves the right to acceptor reject a specific batch or batches ofpaint based upon results of such sampletests. The Department also reservesthe right to obtain samples at thecontractor's plant at the time ofmanufacture, and hold up shipment untilsuch tests indicate the paint isacceptable. All paint furnished under

BIDDER'S RESPONSE

Page 12: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

GENERAL

contract shall be identical, insofar aspossible, with the qualification samplesof the paint submitted for laboratory andfield testing under Section VIIIA.

In the event any paint does not complywith the specification, the Contractorwill be required to replace all remainingin the possession of the Department atthe Contractor's own expense within 30calendar days. This includes allhandling and transportation charges.

IX. RANDOM TESTING

All paint ordered from the Contractorshall be subject to random sampletesting two weeks from the date ofdelivery. Testing by the Engineer will becompleted within 10 days. TheDepartment reserves the right to acceptor reject a specific batch or batches ofpaint based upon results of such sampletests.

Public Works also reserves the right toobtain samples at the Contractor's plantat the time of manufacture, and hold upshipment until such tests indicate thepaint is acceptable.

All paint furnished under contract shallbe identical, insofar as possible, with thequalification samples of paint submittedfor laboratory and field testing. Samplesshall be submitted as stated inPackaging and Marking, Section VII,Pages 9 &10.

BIDDER'S RESPONSE

-12-

Page 13: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

GENERAL

X. ACCEPTABILITY OF PAINT

Acceptability of the paint shall be judgedsolely by Public Works. Decisions shallbe final and in the best interests ofPublic Works.

Xl. SOLVENTS

The Contractor shall furnish the name ofthe appropriate solvents used forcleanup of the paint. If special solventsare required, the Contractor mustindicate the sources, costs, andprecautions in use of the solvents.

XII. DELIVERY

The Contractor shall able to makedeliveries at a minimum rate of 2070gallons per week if requested, until theentire order is completed. The Engineerwill advise the Contractor as toquantities to be delivered. Inability tocomply consistently with the minimumdelivery rates may, at the discretion ofthe Engineer, be cause to terminate theagreement. The Contractor shall furnisha Material Safety Data Sheet (MSDS)with all delivery shipments.

The Contractor has 30 calendar days tomake a delivery. In the event theContractor fails to make the deliveryduring the allotted time, he shall makean assessment payment to theDepartment. The assessment shall befixed at a rate of $100 for each calendar

BIDDER'S RESPONSE

-13-

Page 14: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

GENERAL

day the delivery load is past due.The assessment shall be calculatedat the rate of a load being defined as1,000 gallons. This assessment isnot being imposed as a penalty, butas a fixed sum representing theamount due for the total valueconsideration of the purchaserhaving to compensate for the latedelivery.

If the Purchasing Agent deemsnecessary, the Purchasing Agent mayelect to purchase the same materialfrom another vendor. The Contractorshall pay all additional charges for thepurchase of the material from anothervendor. If at anytime between receipt ofa purchase order and completion of itsdelivery there is cause that would makedelivery completion outside of thecalendar days allowed, it shall be theresponsibility of the Contractor to notifythe Department by fax of the situation.The notification shall be addressed to:

Los Angeles CountyDepartment of Public WorksOperational Services DivisionP.O. Box 1460Alhambra, CA 91802-1460Fax (626) 458-7353

The imposition of the late deliveryassessment shall be at the discretion ofthe Purchasing Agent based upon thecauses cited and the intent to deliver ofthe Contractor. The Contractor's failure

BIDDER'S RESPONSE

-14-

Page 15: LOS ANGELES COUNTY DEPARTMENT OF PUBLIC ... - County of Fresno YELL… · mold growth, petrifaction, corrosion of the container, or hard settling of the pigment. Any settling shall

LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS

BIDDER'S RESPONSEGENERAL

to make this notification shall waive hisright to contest the amount of the latedelivery assessment.

All shipments must be accompanied byproper Material Safety Data Sheets(MSDS). If these documents are notsupplied with the shipment, theshipment may be rejected.

In the event the Contractor fails to meetthese specifications, at the discretion ofthe Purchasing Agent:

• The contract will be canceled orterminated,

• and/or the Contractor will bewithheld from bidding again onthis specification for one year,

• and/or the Contractor mustreplace all quantities of bad paintat no cost to the Departmentwithin 30 calendar days.

The delivery point for all material shallbe the loading or paint dock at theDepartment's Main Warehouse locatedat 1537 Alcazar Street, Los Angeles,California 90033. Imposition of the latedelivery assessment shall be at thediscretion of the Purchasing Agentbased upon the causes cited and theintent to deliver of the Contractor. TheContractor's failure to make thisnotification shall waive his right tocontest the amount of the late deliveryassessment.