los angeles department of water and power water system ...6,752 miles of overhead power distribution...
TRANSCRIPT
Resilient Los AngelesCraig A. Davis, Ph.D., PE, GEWater System Resilience Program ManagerLos Angeles Department of Water and Power
1994 L.A. Water Delivery Services
❖ 159,434 service connection outages❖ 22% of all services ~670,000 residents❖ Deployed water tankers at 15 locations
1994 L.A. Water Delivery Services
Impacts - LADWP Water System
Granada Trunk LineBalboa Blvd G
rana
da T
runk
Lin
e
First Los Angeles Aqueduct
Sec
ond
Los
Ang
eles
Aqu
educ
t
City Trunk Line
Impacts - LADWP Water System
High Speed Channel
Low
er S
an F
erna
ndo
Dra
in L
ine
No.
1
Tailrace
Granada High Tank I/O Lines
LA Reservoir Tower Bridge
What has changed since 1994 Impacting Water System Resilience?
• Technologies and modeling capabilities• Research advancements• Perceptions and understandings of community resilience• Addressing the time component of response and recovery as
part of project mitigation • Understanding that needed performance goes beyond life
safety and must include socio-economic impacts• ShakeOut Scenario drawing attention to value of water
systems• Resilience by Design• Resilient Los Angeles
March 2018
Dec. 2014
What are We Doing?• Resilience Management• Resilience and Sustainability• Performance Based Seismic Design• Crating a Seismic Resilient Pipeline
Network• Resilient Water Supply Task Force• Fire Following Earthquake