● Status Review● Requirement Status and Action-Items● Risk Assessment Comparison● MSD I Plan Review and MSD II Plan● Key Action Items
Overview
● Current State:○ Most requirements ready to move to MSD II○ Some re-evaluated as out of scope
● Major scope change○ Proof of concept prototype○ High level product design
■ Stretch goal for this project iteration
Status Review
● Create two mockups○ Analysis of stability and portability○ Dependant on Optics○ Talking to healthcare professionals
Action Items: Industrial Design
Req. Status: Optical Design
● Optical Subsystem still “black box”● All subsystems dependent on black box
○ High level design in place○ Feasibility must be tested
■ Can use borrowed components
Action Items: Optical Design
● Preliminary testing○ Use borrowed components○ Alter/iterate design
● Budget finalization○ Depends on optics, large cost○ Current needs: ~$2000 + borrowed components
Req. Status: Camera
● Camera/adaptive optics must be selected○ Allow Pedro to move forward
● Control systems can then be evaluated○ Motor controls, speed etc.○ Alignment system can move forward
● Preliminary design has been completed● Some parts already purchased● Will be doing initial testing of RPi, camera module,
and motors over break and first few weeks of MSD II
Req. Status: Electrical Components
Action Items: Electrical Components
● Stepper Motors○ Design mechanism to control stepper motor○ Ensure precision
● System Power○ Ensure RPi can support attached systems
Action Items: Electrical Components
● Items to be Purchased○ 7” Touch screen w/ power supply: Need to order○ Stepper Motors: Order after optical system finalized
● Begin software development and testing of RPi microcontroller
● These requirements are currently out of scope for MSD II○ On our minds during design/build/testing○ Finalize requirements in beta project
Req. Status: Other
● All MSD I deliverables met○ Some deliverable expectations moved to MSD II
■ Passed off of re-evaluation of final goals
● Edge fully updated by Friday 12 Dec. 2014
MSD I Deliverables
● Optical Systems○ Complete Design
■ Pedro returns 19th Jan○ Order Parts
■ Worst lead time
● Secondary Subsystems○ Preliminary testing over break
■ RPi, camera module, motors
○ Parts Ordered or Ready to Order○ Develop/Test to be ready to integrate with Optics
Key Action Items
● Status Review● Requirement Status and Action-Items● Risk Assessment Comparison● MSD I Plan Review and MSD II Plan● Key Action Items
Summary