Lower Thames Crossing Map book 3: engineering plans
Design refinement consultation 2020
Lower Thames Crossing map books
The three map books for the design refinement consultation contain plans of the proposed changes to the project under the following headings:
� Map book 1: General Arrangements (layout plans) � Map book 2: land use plans � Map book 3: engineering plans
These plans show the changes we have made since our supplementary consultation earlier this year and are published for the purposes of this consultation on the project. Following this consultation, we will consider the feedback received and use that to inform our DCO application, which we will submit to the Planning Inspectorate later this year.
The plans run from the A2 in the south to the M25 in the north. Identically numbered sheets in the different map books show the same area, for example sheet 3 shows the A2/LTC junction in map books 1 and 2.
Map book 1: General ArrangementsThe General Arrangements show the proposed layout details of the project including:
� Permanent works; new roads, earthworks and roadside features
� Construction compounds � Environment mitigation; landscaping and tree
planting � Utilities diversions � Development boundary � Open space and replacement land
Map book 2: land use plansThe land use plans show the areas we are seeking powers to compulsorily acquire land or permanent rights. They also show the land we require temporary rights to use in order to construct and operate the project. Areas we may need to purchase
include the land required for the permanent works, temporary works and compensation land.
Permanent worksCompulsory purchase of land or compulsory acquisition of permanent rights will be required for the route of the road, to re-connect local roads and for associated structures like drainage ponds and tunnel control building. In some land parcels, only the acquisition of subsoil will be required.
Temporary worksTemporary use of land is needed for the project’s construction works and to provide sufficient space to do so safely. The plans show land that may be required temporarily for the main construction compounds at the tunnel entrances north and south of the River Thames and at various locations along the route. We will also require permanent and temporary rights over land to divert utilities such as gas pipelines, electricity cables and water pipes. Any land that is only required temporarily will be returned to its previous use wherever possible once construction has been completed.
Compensation landCompensation land may include environmental protection measures such as habitat creation and for flood compensation. This land may also need to be compulsorily acquired permanently or be subject to permanent rights.
Replacement landLand is also included in respect of the replacement of special category land such as open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily acquired permanently or be subject to permanent rights.
Map book 3: engineering plansThe drawings showing the change at Thong Lane over the LTC are plan and profile sheets 3A and 5. These plans show the highway details of the route in plan and profile (level above or below existing ground). The drawings are split into two views with the plan on the top and profile underneath.
The profile gives the road level in relation to existing ground at a given chainage*. An exaggerated scale is used in the profile to help show the differences in levels and gradients of the design. The profile also shows where existing roads and public rights of way cross over or under the route.
This map book also contains updated existing ground levels from chainage 5+500 to chainage 20+250 which were shown incorrectly in the supplementary consultation map book 3. The existing ground level figures were shown shifted north by 250 metres.
No other significant changes have been made to the plan and profile, junction arrangements or cross sections since that presented at supplementary consultation.
All levels are given in relation to the ordnance datum level**. The profile reference level might be different on each drawing.
* Chainage measures the distance along the route in metres
** Above Ordnance Datum level (AOD) is a measurement above mean sea level taken from a reference point at Newlyn in Cornwall.
Large mapsLarge maps that cover a greater area have also been produced which detail the same information.
These are:
� Environmental constraints – 1 sheet � Land use – 1 sheet � General Arrangements – 6 sheets
(larger coverage) � General Arrangement (full route) – 1 sheet � Aerial view of the proposed LTC route – 1 sheet
Grays
Tilbury
Orsett
M
2
5
Gravesend
Chalk
East
Tilbury
A
2
2
6
South
Ockendon
A1089
Chadwell
St Mary
A2
Dartford
A
1
2
8
M
2
5
A2
A13
A
2
8
2
M25
J2
M2
M25
J30
M25
J29
A127
SHEET 1
SHEET 2
SHEET 3a
SHEET 3
SHEET 5
SHEET 6
SHEET 7
SHEET 8
SHEET 9
SHEET 10
SHEET 11
SHEET 12
SHEET 13
SHEET 14
SHEET 15
SHEET 16
SHEET 17
SHEET 18
SHEET 19
SHEET 20
SHEET 21
Rochester
M2
J1
Linford
North
Ockendon
SHEET 4
A13
H
S
1
LEGEND:
LTC Route
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
PLAN AND PROFILE
GENERAL PLAN
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
01
.d
wg
LEGEND - PROFILE
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
LEGEND - PROFILE
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
LEGEND - PROFILELEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
1+
00
0
0+
75
0
0+
50
0
0+
25
0
0+
00
0
67
.1
74
.2
82
.5
91
.0
10
3.8
R=5781.8
L=478.5
R=5500.0
L=111.4
L=406.4
P=-5.9%
L=59.4
P=-3.8%
Ls=25.1m
R=510.0m
Ls=86.0m
R=2040.0m
L=76.5m
61
.1
62
.9
89
.7
75
.0
10
2.0
Chainage
Ground Levels
Vertical
Horizontal
Proposed Levels
0+
75
0
0+
50
0
0+
25
0
60
.8
70
.4
70
.8
2
L=340.7
P=-1.6%
R=10593.8
L=421.2
L= 304.6m
Ls=60.9m
R=720.0m
58
.3
63
.5
65
.0
0+
00
0
(L
TC
)
DATUM = +58.5
PROFILE
PLAN AND PROFILE
SHEET 3a
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
06
.d
wg
M2 WB to LTC NB
(3 Lanes)
Local connector
road
0 5 1510 20
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
T
h
o
n
g
L
a
n
e
H
S
1
M
2
M2 WB
LTC NB
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Thong Lane
bridge replaced
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
PLAN
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
M2 WB to LTC NB
slip road chainages LTC chainage
LTC
Gravesend East to
M2 EB (1 Lane)
LTC SB to A2 WB
(2 Lanes)
A2 EB to A2 EB
collector road (2 Lanes)
M2 (2 Lanes EB, 3 lanes WB)
M2 WB offslip to
local connector
road (1 Lane)
C
H
0
+
0
0
0
(
s
l
i
p
r
o
a
d
)
C
H
0
+
5
0
0
(
s
l
i
p
r
o
a
d
)
C
H
0
+
0
0
0
(
L
T
C
)
C
H
0
+
5
0
0
(
L
T
C
)
Thong Lane
M2 WB Off Slip
A2
A2 Collector Road
LTC SB to
A2 WB
Gravesend East
to M2 EB
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
LEGEND - PROFILELEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
T
h
o
n
g
L
a
n
e
Thong
MA
TC
H LIN
E
MA
TC
H LIN
E
Tunnel control
building
C
H
1
+
0
0
0
C
H
1
+
5
0
0
CH
2+
000
C
H
2+
500
C
H
1
+
0
0
0
M
A
T
C
H
L
IN
E
M
A
T
C
H
L
IN
E
Thong Lane green bridge
Removable barrier
for emergency
purposes
Tunnel Portal at
CH 2+240
58.5
54.8
49.8
41.9
32.0
22.0
L= 410.5m
P=-1.6%
L=462.9
R=21000.0
L=509.2
67.9
64.2
64.6
62.9
58.6
50.9
1+
250
1+
500
1+
750
2+
000
2+
250
1+
011
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
L=340.7
P=-1.6%
L= 304.6m
1+
000
58
.7
68
.2
PLAN
PROFILE
PLAN AND PROFILE
SHEET 5
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
07
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALE VERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
DESIGN REFINEMENT CONSULTATION
Tunnel
Portal
Tunnel
DATUM = +10.0
Thong Lane green bridge
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
CH
5
+0
00
CH
5
+5
00
CH
6
+0
00
CH
6
+5
00
MA
TC
H LIN
E
MA
TC
H L
IN
E
MA
TC
H L
IN
E
MA
TC
H L
IN
E
Tunnel
Portal
Existing water
course to be diverted
River Thames
MHWS 3.47m
2.1
L=4399.9
5+00
0
5+25
0
5+50
0
5+75
0
6+00
0
6+25
0
6+50
0
6+75
0
-43.7
-40.9
-34.4
-26.9
-19.4
-12.1
-4.8
P=3.0%
L=110.7
P=2.9%
L=191.2
P=3.0%
L=80.6
P=2.9%
L=85.5
P=3.0%
L=624.7
R=16000.0L=741.7
L=30.8R=30000.0
R=18200.0L=19.5
L=18.6R=18200.0
R=5000.0L=4.9
8.7-13.3
-13.3
-1.1
0.1 7.8 7.6 5.2
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
LEGEND - PROFILE
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
LEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
Tunnel Portal at
CH 6+477LTC NB tunnel 3 lanes
LTC SB tunnel 3 lanes
Tunnel control
building
PLAN AND PROFILE
SHEET 8
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
10
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
Removable barrier for
emergency purposes
DATUM=-44.0
PROFILE
PLAN
Tunnel
Maintenance access road
at 7.65m AOD for LTC
flood protection
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Retaining walls to tunnel portal
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
River
Thames
MLSW -2.51m
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
Proposed landscaping
feature
MHSW 3.47m
CH
7
+0
00
CH
7+
500
CH
8
+0
00
CH
8
+5
00
MA
TC
H L
IN
E
MA
TC
H L
IN
E
MA
TC
H L
IN
E
MA
TC
H L
IN
E
Bridleway BR 58
and Coal Road
realignment
Main River
culvert
Station
Road
Tilbury Loop
Railway
course to be diverted
2.1 5.7 7.1 9.3 12.7
14.1
13.0
11.7
P=0.5%
L=244.7
P=1.3%
L=266.9 P=-0.5%R=18200.0
L=454.4
R=20000.0L=169.3 R=18200.0
L=336.2
6+75
0
7+00
0
7+25
0
7+50
0
7+75
0
8+00
0
8+25
0
8+50
0
1.5 3.1 0.5 4.1 11.5
5.2 5.5 5.8
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
LEGEND - PROFILELEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
PLAN AND PROFILE
SHEET 9
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
11
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
Watercourse to
be diverted
Tilbury Loop
Railway
Maintenance access road
at 7.65m AOD for LTC
flood protection
Viaduct over
Tilbury railway
DATUM=-27.0
PROFILE
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
Retaining walls to tunnel portal
S
tation R
oad
Emergency LTC access
EA
Bridleway BR58 and
Coal Road realignment
Main River culvert
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
EA
EA
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
LEGEND - PROFILELEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
Muckingford Rd
realignment
11.7
10.6
9.9 9.7 10.1
11.0
12.4
R=3000.0 L=75.0 L=75.0
R=1447.6
L=538.4 R=120000.0L=1597.0
8+50
0
8+75
0
9+00
0
9+25
0
9+50
0
9+75
0
10+0
00
11.5
11.5
10.7
10.1
6.6 7.4 20.5
C
H
8
+
5
0
0
C
H
9
+
0
0
0
CH
9+
500
C
H
1
0
+
0
0
0
M
A
T
C
H
L
IN
E
M
A
T
C
H
L
IN
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
Muckingford Road realignment
EA
PLAN AND PROFILE
SHEET 10
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
12
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
Access to properties
maintained by new road
DATUM=-10.0
PROFILE
False cutting
4m above LTC
False cutting
4m above LTC
False cutting
4m above LTC
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
Access to properties
maintained by new road
PLAN
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
EA
False cutting
4m above LTC
LEGEND - PROFILELEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
14.3
16.4
18.5
20.5
22.4
23.2
L=150.0 L=1097.4
P=0.8%
L=899.0R=51500.0
L=685.5
10+2
50
10+5
00
10+7
50
11+0
00
11+2
50
11+5
00
15.3
13.6
18.0
21.0
19.7
22.7
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
Hoford Rd
realignment
Public Footpath FP 79
realignment
A128
Brentwood Rd
realignment
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
C
H
1
0
+
0
0
0
CH
10+
500
C
H
11+
000
C
H
11+
500
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
AT
C
H
LIN
E
M
AT
C
H
LIN
E
Brentwood Road realignment
High House Lane connects with
Brentwood Road at new junction to
maintain property access
PLAN AND PROFILE
SHEET 11
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
13
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
DATUM=-10.0
EA
PLAN
PROFILE
Hoford Road realignment
False cutting 4m
above LTC
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
False cutting 4m
above LTC
False cutting 4m
above LTC
False cutting 4m
above LTC
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
Emergency Access Road
Emergency Access Road
EA
EA
Farm Track and Public
Footpath FP79 realignment
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
22.7
21.5
20.4
19.9
20.2
21.2
22.5
L=165.0R=1030.0
L=165.0L=307.0
P=0.5%
P=-0.5%
L=314.0 R=85000.0L=847.9
11+7
50
12+0
00
12+2
50
12+5
00
12+7
50
13+0
00
13+2
50
23.3
22.6
22.6
24.2
25.8
26.1
28.7
Stanford Road
A1013 realignment
A13 WB to A1089
slip road
A13 WB to LTC NB
slip road
A13
Hornsby Lane
stopped up
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
LEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
LEGEND - PROFILE
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
C
H
1
1
+
5
0
0
C
H
1
2
+
0
0
0
CH
12+
500
C
H
1
3
+
0
0
0
C
H
1
3
+
5
0
0
B
a
k
e
r
S
t
r
e
e
t
H
o
r
n
s
b
y
L
a
n
e
A
1
0
8
9
A
1
3
L
T
C
A
1
0
1
3
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
A13 WB to LTC SB
slip road
LTC 2 lanes SB
LTC 3 lanes NB
Baker Street realignment
with new A1013 junction
PLAN AND PROFILE
SHEET 12
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
14
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
Existing junction
roads maintained
Heath Road realignment
with new A1013 junction
DATUM= +7.0
2 lanes SB through LTC -
A13 Junction
PLAN
PROFILE
False cutting 4m above
LTC
False cutting 4m above
slip road
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Gammonfields Way realignment
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
False cutting 4m above
LTC
Stanford Road A1013
realignment
EA
EA
A13 to A1089 slip road
A1089 to LTC
2 lane slip road
A12 WB to LTC NB
2 lane slip road
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
Hornsby Lane
stopped up
Hornsby Lane stopped up,
access to property maintained
Access to the properties
maintained by new road
Access to the properties
maintained by new road
Access to the properties
maintained by new road
33.1
32.8
31.9
30.7
29.4
28.2
27.0
26.4
R=3200.0L=90.0
R=1635.0 L=120.0 L=850.6
R=100000.0L=318.3 P=-0.5%
L=959.9
P=-0.2%
L=24.9R=46500.0L=139.2R=117000.0
L=474.9
33.1
32.8
31.9
30.7
29.5
28.2
26.9
26.5
0+25
0
0+50
0
0+75
0
1+00
0
1+25
0
1+50
0
1+75
0
1+91
5
Baker Street
Rectory Road
Realignment
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
LEGEND - PROFILELEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
C
H
1
+
0
0
0
CH 0+000
C
H
-
0
+
0
0
0
C
H
0
+
5
0
0
CH
1+
000
CH
1+
500
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
DATUM= 22.0
32.9
32.8
0+00
0
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
PLAN
PROFILE
PLAN AND PROFILE
SHEET 13
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
15
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
Rectory Road
realignment
LTC connection to A13 EB
and Orsett Cock junction 2 lanes
A13 EB 3 lanes
A13 WB 3 lanes
A13 EB 2 lanes
A13 WB 2 lanesWorks tie in
with existing
A13 3 lanes
Orsett Cock connection
to A13 WB
Stanford Road A1013
realignment
A13 WB connection to new
junction and A1089
False cutting 2m above
LTC slip road
Orsett Cock
Junction
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
Earthwork bund 2m
above ground level
Access to the properties
maintained by new road
LEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
LTC NB to A13 EB
slip road
A1089 to LTC
SB slip road
Stifford
Clays Road
realignment
Green Lane and
Bridleway
realignment
23.5
22.8
20.4
16.4
11.9
9.0 8.5
L=125.0R=1200.0
L=125.0 L=120.0R=1030.0
L=120.0L=121.0 L=230.0
P=-1.8%
L=293.5 R=25000.0L=650.0R=35500.0
L=816.5
13+5
00
13+7
50
14+0
00
14+2
50
14+5
00
14+7
50
15+0
00
26.5
26.8
25.5
19.5
14.1
10.7
7.8
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
C
H
1
3
+
0
0
0
C
H
1
3
+
5
0
0
C
H
1
4
+
0
0
0
CH
14+
500
C
H
1
5
+
0
0
0
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
IN
E
M
A
T
C
H
L
IN
E
DATUM = +5.0
PROFILE
PLAN AND PROFILE
SHEET 14
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
16
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
Stifford Clays Road
realignment
Green Lane and Bridleway realignment
LTC 2 lanes with hard
shoulder SB
LTC dual 2 lanes
Retaining wall
False cutting 2m above
LTC
A
1
3
Baker Street
False cutting 2m above
LTC
PLAN
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
Access to the properties
maintained by new road
LTC 2 lanes
with hard
shoulder NB
EA
EA
Mardyke
Golden
sewer
Orsett Fen
sewer
Watercourse and
Access track
10.3
11.6
11.1
10.6
11.6
11.3
R=2200.0
P=0.8%
L=191.0 P=-0.5%
L=43.2 P=0.5%
L=53.7 P=-0.7%R=30000.0
L=390.0
R=40000.0L=400.0 R=30000.0
L=345.0
15+2
50
15+5
00
15+7
50
16+0
00
16+2
50
16+5
00
7.1 4.1 4.1 4.4 3.2 3.9
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
LEGEND - PROFILE
EA Emergency area
LEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
C
H
1
5
+
0
0
0
C
H
1
6
+
5
0
0
CH
1
6+
00
0
C
H
1
5
+
5
0
0
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
DATUM = -6.0
PLAN
PROFILE
PLAN AND PROFILE
SHEET 15
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
17
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
Main River
False cutting
2m above LTC
False cutting
2m above LTC
Main River
Mardyke River and
Bridleway BR219
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Mardyke
Viaduct
EA
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
Earthworks & drainage
M
a
r
d
y
k
e
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
LTC NB
3 lanes
LTC SB
2 lanes
C
H
1
6
+
5
0
0
C
H
1
7
+
0
0
0
C
H
1
7
+
5
0
0
C
H
1
8
+
0
0
0
C
H
1
8
+
5
0
0
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
Footpath and Farm
track FP 136
realignment
8.1 6.5 5.6 5.9 7.4 9.7
L=40.0R=1300.0
L=140.0
P=0.9%L=692.7 R=51000.0L=813.5
17+0
00
17+2
50
17+5
00
17+7
50
18+0
00
18+2
50
5.3 5.7 5.8 7.2 9.3 11.7
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
Emergency AreaEA
LEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
DATUM=-49.0
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
PLAN
PROFILE
PLAN AND PROFILE
SHEET 16
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
18
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
Footpath FP 136 realignment
EA
False cutting
2m above LTC
EA
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
North Road
B186 realignment
The Wilderness
12.1
14.4
16.8
19.1
21.1
22.6
L=150.0R=1440.0
L=1084.2R=150000.0
L=671.6
18+5
00
18+7
50
19+0
00
19+2
50
19+5
00
19+7
50
23.1
R=1442.3
P=0.5%
L=1.8
19+7
50
20+0
0023
.7
18.7
21.1
23.3
22.5
22.5
23.0
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
LEGEND - PROFILE
EA Emergency area
LEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
C
H
1
9
+
0
0
0
C
H
2
0
+
0
0
0
C
H
1
8
+
5
0
0
CH
19+
500
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
DATUM = +5.0
PLAN
PROFILE
North Road B186 realignment
PLAN AND PROFILE
SHEET 17
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
19
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
False cutting 5m
above LTC
False cutting 4m
above LTC
EA
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
The Wilderness
Footpath
FP 151
Ockendon Road
M25 Carriageway
Proposed Levels
Horizontal
Vertical
Ground Levels
Chainage
21.1
17.4
14.9
13.7
12.4
11.2
10.0
L=49.8R=1020.0
L=120.0L=210.2
L=170.0R=720.0
L=127.5R=2880.0
P=-1.5%
L=301.0
P=-0.5%
L=1011.5R=24500.0
L=478.0
R=10000.0L=95.4
20+2
50
20+5
00
20+7
50
21+0
00
21+2
50
21+5
00
21+7
50
22.6
21.3
23.2
23.3
23.6
23.2
25.6
LEGEND - PLAN
Structure
Retaining wall
EA Emergency area
LEGEND - PROFILE
EA Emergency area
LEGEND - PROFILE
Route Vertical Alignment
Existing Ground Profile
Structure - Bridge
Structure - Underpass
Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649
C
H
2
0
+
0
0
0
C
H
2
0
+
5
0
0
CH
21+
000
C
H
2
1
+
5
0
0
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
M
A
T
C
H
L
I
N
E
DATUM = +4.5
PROFILE
PLAN AND PROFILE
SHEET 18
HE
54
00
39
-C
JV
-G
EN
-S
ZP
_G
N0
00
00
0_
Z-D
R-C
X-0
02
20
.d
wg
0 5 1510 20
SCALE 1:250 (A1)
SCALE 1:500 (A3)
METRES
HORIZONTAL SCALEVERTICAL SCALE
0 50 150100 200
SCALE 1:5000 (A3)
METRES
NOTES
1. Do not scale from this drawing.
2. All dimensions are in metres unless stated otherwise.
3. All levels are in metres relative to the Ordnance Datum.
4. For scheme location refer to Plan and Profile General Plan.
5. Profile uses an exaggerated scale of 1 horizontal :10 vertical
Drawing title
Client
Project
LOWER THAMES CROSSING
DESIGN REFINEMENT CONSULTATION
Client
PROPOSALS FOR
CONSULTATION
Footpath FP 151 realignment
M25 Underbridge
Ockendon Road realignment
with new bridge
EA
LTC NB 3 lanes
LTC SB 2 lanes
Works tie in with
M25 4 lanes
M25 3 lanes NB
Ockendon Road
PLAN
False cut out 5m above LTC
NB - Northbound
WB - Westbound
EB - Eastbound
SB - Southbound
© Crown copyright 2020.
You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence:
visit www.nationalarchives.gov.uk/doc/open-government-licence/
write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email [email protected].
Mapping (where present): © Crown copyright and database rights 2020 OS 100030649. You are permitted to use this data solely to enable you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to copy, sub-license, distribute or sell any of this data to third parties in any form.
This document is also available on our website at www.highwaysengland.co.uk
For an accessible version of this publication please call 0300 123 5000 and we will help you.
If you have any enquiries about this publication email [email protected] or call 0300 123 5000*. Please quote the Highways England publications code PR85/20.
Highways England creative job number BED20 0066
*Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls.
These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored.
Printed on paper from well-managed forests and other controlled sources when issued directly by Highways England.
Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ
Highways England Company Limited registered in England and Wales number 09346363