Lower Thames Crossing Map book 3: engineering plans Design refinement consultation 2020

Upload: others

Post on 22-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

If you need help accessing this or any other Highways England information,please call 0300 123 5000 and we will help you.

Lower Thames Crossing Map book 3: engineering plans

Design refinement consultation 2020

Page 2: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

Lower Thames Crossing map books

The three map books for the design refinement consultation contain plans of the proposed changes to the project under the following headings:

� Map book 1: General Arrangements (layout plans) � Map book 2: land use plans � Map book 3: engineering plans

These plans show the changes we have made since our supplementary consultation earlier this year and are published for the purposes of this consultation on the project. Following this consultation, we will consider the feedback received and use that to inform our DCO application, which we will submit to the Planning Inspectorate later this year.

The plans run from the A2 in the south to the M25 in the north. Identically numbered sheets in the different map books show the same area, for example sheet 3 shows the A2/LTC junction in map books 1 and 2.

Map book 1: General ArrangementsThe General Arrangements show the proposed layout details of the project including:

� Permanent works; new roads, earthworks and roadside features

� Construction compounds � Environment mitigation; landscaping and tree

planting � Utilities diversions � Development boundary � Open space and replacement land

Map book 2: land use plansThe land use plans show the areas we are seeking powers to compulsorily acquire land or permanent rights. They also show the land we require temporary rights to use in order to construct and operate the project. Areas we may need to purchase

include the land required for the permanent works, temporary works and compensation land.

Permanent worksCompulsory purchase of land or compulsory acquisition of permanent rights will be required for the route of the road, to re-connect local roads and for associated structures like drainage ponds and tunnel control building. In some land parcels, only the acquisition of subsoil will be required.

Temporary worksTemporary use of land is needed for the project’s construction works and to provide sufficient space to do so safely. The plans show land that may be required temporarily for the main construction compounds at the tunnel entrances north and south of the River Thames and at various locations along the route. We will also require permanent and temporary rights over land to divert utilities such as gas pipelines, electricity cables and water pipes. Any land that is only required temporarily will be returned to its previous use wherever possible once construction has been completed.

Compensation landCompensation land may include environmental protection measures such as habitat creation and for flood compensation. This land may also need to be compulsorily acquired permanently or be subject to permanent rights.

Replacement landLand is also included in respect of the replacement of special category land such as open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily acquired permanently or be subject to permanent rights.

Map book 3: engineering plansThe drawings showing the change at Thong Lane over the LTC are plan and profile sheets 3A and 5. These plans show the highway details of the route in plan and profile (level above or below existing ground). The drawings are split into two views with the plan on the top and profile underneath.

The profile gives the road level in relation to existing ground at a given chainage*. An exaggerated scale is used in the profile to help show the differences in levels and gradients of the design. The profile also shows where existing roads and public rights of way cross over or under the route.

This map book also contains updated existing ground levels from chainage 5+500 to chainage 20+250 which were shown incorrectly in the supplementary consultation map book 3. The existing ground level figures were shown shifted north by 250 metres.

No other significant changes have been made to the plan and profile, junction arrangements or cross sections since that presented at supplementary consultation.

All levels are given in relation to the ordnance datum level**. The profile reference level might be different on each drawing.

* Chainage measures the distance along the route in metres

** Above Ordnance Datum level (AOD) is a measurement above mean sea level taken from a reference point at Newlyn in Cornwall.

Large mapsLarge maps that cover a greater area have also been produced which detail the same information.

These are:

� Environmental constraints – 1 sheet � Land use – 1 sheet � General Arrangements – 6 sheets

(larger coverage) � General Arrangement (full route) – 1 sheet � Aerial view of the proposed LTC route – 1 sheet

Page 3: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

Grays

Tilbury

Orsett

M

2

5

Gravesend

Chalk

East

Tilbury

A

2

2

6

South

Ockendon

A1089

Chadwell

St Mary

A2

Dartford

A

1

2

8

M

2

5

A2

A13

A

2

8

2

M25

J2

M2

M25

J30

M25

J29

A127

SHEET 1

SHEET 2

SHEET 3a

SHEET 3

SHEET 5

SHEET 6

SHEET 7

SHEET 8

SHEET 9

SHEET 10

SHEET 11

SHEET 12

SHEET 13

SHEET 14

SHEET 15

SHEET 16

SHEET 17

SHEET 18

SHEET 19

SHEET 20

SHEET 21

Rochester

M2

J1

Linford

North

Ockendon

SHEET 4

A13

H

S

1

LEGEND:

LTC Route

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

PLAN AND PROFILE

GENERAL PLAN

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

01

.d

wg

Page 4: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

LEGEND - PROFILE

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

LEGEND - PROFILE

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

LEGEND - PROFILELEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

1+

00

0

0+

75

0

0+

50

0

0+

25

0

0+

00

0

67

.1

74

.2

82

.5

91

.0

10

3.8

R=5781.8

L=478.5

R=5500.0

L=111.4

L=406.4

P=-5.9%

L=59.4

P=-3.8%

Ls=25.1m

R=510.0m

Ls=86.0m

R=2040.0m

L=76.5m

61

.1

62

.9

89

.7

75

.0

10

2.0

Chainage

Ground Levels

Vertical

Horizontal

Proposed Levels

0+

75

0

0+

50

0

0+

25

0

60

.8

70

.4

70

.8

2

L=340.7

P=-1.6%

R=10593.8

L=421.2

L= 304.6m

Ls=60.9m

R=720.0m

58

.3

63

.5

65

.0

0+

00

0

(L

TC

)

DATUM = +58.5

PROFILE

PLAN AND PROFILE

SHEET 3a

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

06

.d

wg

M2 WB to LTC NB

(3 Lanes)

Local connector

road

0 5 1510 20

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

T

h

o

n

g

L

a

n

e

H

S

1

M

2

M2 WB

LTC NB

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Thong Lane

bridge replaced

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

PLAN

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

M2 WB to LTC NB

slip road chainages LTC chainage

LTC

Gravesend East to

M2 EB (1 Lane)

LTC SB to A2 WB

(2 Lanes)

A2 EB to A2 EB

collector road (2 Lanes)

M2 (2 Lanes EB, 3 lanes WB)

M2 WB offslip to

local connector

road (1 Lane)

C

H

0

+

0

0

0

(

s

l

i

p

r

o

a

d

)

C

H

0

+

5

0

0

(

s

l

i

p

r

o

a

d

)

C

H

0

+

0

0

0

(

L

T

C

)

C

H

0

+

5

0

0

(

L

T

C

)

Thong Lane

M2 WB Off Slip

A2

A2 Collector Road

LTC SB to

A2 WB

Gravesend East

to M2 EB

Page 5: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

LEGEND - PROFILELEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

T

h

o

n

g

L

a

n

e

Thong

MA

TC

H LIN

E

MA

TC

H LIN

E

Tunnel control

building

C

H

1

+

0

0

0

C

H

1

+

5

0

0

CH

2+

000

C

H

2+

500

C

H

1

+

0

0

0

M

A

T

C

H

L

IN

E

M

A

T

C

H

L

IN

E

Thong Lane green bridge

Removable barrier

for emergency

purposes

Tunnel Portal at

CH 2+240

58.5

54.8

49.8

41.9

32.0

22.0

L= 410.5m

P=-1.6%

L=462.9

R=21000.0

L=509.2

67.9

64.2

64.6

62.9

58.6

50.9

1+

250

1+

500

1+

750

2+

000

2+

250

1+

011

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

L=340.7

P=-1.6%

L= 304.6m

1+

000

58

.7

68

.2

PLAN

PROFILE

PLAN AND PROFILE

SHEET 5

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

07

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALE VERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

DESIGN REFINEMENT CONSULTATION

Tunnel

Portal

Tunnel

DATUM = +10.0

Thong Lane green bridge

Page 6: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

CH

5

+0

00

CH

5

+5

00

CH

6

+0

00

CH

6

+5

00

MA

TC

H LIN

E

MA

TC

H L

IN

E

MA

TC

H L

IN

E

MA

TC

H L

IN

E

Tunnel

Portal

Existing water

course to be diverted

River Thames

MHWS 3.47m

2.1

L=4399.9

5+00

0

5+25

0

5+50

0

5+75

0

6+00

0

6+25

0

6+50

0

6+75

0

-43.7

-40.9

-34.4

-26.9

-19.4

-12.1

-4.8

P=3.0%

L=110.7

P=2.9%

L=191.2

P=3.0%

L=80.6

P=2.9%

L=85.5

P=3.0%

L=624.7

R=16000.0L=741.7

L=30.8R=30000.0

R=18200.0L=19.5

L=18.6R=18200.0

R=5000.0L=4.9

8.7-13.3

-13.3

-1.1

0.1 7.8 7.6 5.2

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

LEGEND - PROFILE

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

LEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

Tunnel Portal at

CH 6+477LTC NB tunnel 3 lanes

LTC SB tunnel 3 lanes

Tunnel control

building

PLAN AND PROFILE

SHEET 8

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

10

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

Removable barrier for

emergency purposes

DATUM=-44.0

PROFILE

PLAN

Tunnel

Maintenance access road

at 7.65m AOD for LTC

flood protection

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Retaining walls to tunnel portal

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

River

Thames

MLSW -2.51m

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

Proposed landscaping

feature

MHSW 3.47m

Page 7: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

CH

7

+0

00

CH

7+

500

CH

8

+0

00

CH

8

+5

00

MA

TC

H L

IN

E

MA

TC

H L

IN

E

MA

TC

H L

IN

E

MA

TC

H L

IN

E

Bridleway BR 58

and Coal Road

realignment

Main River

culvert

Station

Road

Tilbury Loop

Railway

course to be diverted

2.1 5.7 7.1 9.3 12.7

14.1

13.0

11.7

P=0.5%

L=244.7

P=1.3%

L=266.9 P=-0.5%R=18200.0

L=454.4

R=20000.0L=169.3 R=18200.0

L=336.2

6+75

0

7+00

0

7+25

0

7+50

0

7+75

0

8+00

0

8+25

0

8+50

0

1.5 3.1 0.5 4.1 11.5

5.2 5.5 5.8

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

LEGEND - PROFILELEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

PLAN AND PROFILE

SHEET 9

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

11

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

Watercourse to

be diverted

Tilbury Loop

Railway

Maintenance access road

at 7.65m AOD for LTC

flood protection

Viaduct over

Tilbury railway

DATUM=-27.0

PROFILE

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

Retaining walls to tunnel portal

S

tation R

oad

Emergency LTC access

EA

Bridleway BR58 and

Coal Road realignment

Main River culvert

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

EA

EA

Page 8: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

LEGEND - PROFILELEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

Muckingford Rd

realignment

11.7

10.6

9.9 9.7 10.1

11.0

12.4

R=3000.0 L=75.0 L=75.0

R=1447.6

L=538.4 R=120000.0L=1597.0

8+50

0

8+75

0

9+00

0

9+25

0

9+50

0

9+75

0

10+0

00

11.5

11.5

10.7

10.1

6.6 7.4 20.5

C

H

8

+

5

0

0

C

H

9

+

0

0

0

CH

9+

500

C

H

1

0

+

0

0

0

M

A

T

C

H

L

IN

E

M

A

T

C

H

L

IN

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

Muckingford Road realignment

EA

PLAN AND PROFILE

SHEET 10

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

12

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

Access to properties

maintained by new road

DATUM=-10.0

PROFILE

False cutting

4m above LTC

False cutting

4m above LTC

False cutting

4m above LTC

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

Access to properties

maintained by new road

PLAN

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

EA

False cutting

4m above LTC

Page 9: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

LEGEND - PROFILELEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

14.3

16.4

18.5

20.5

22.4

23.2

L=150.0 L=1097.4

P=0.8%

L=899.0R=51500.0

L=685.5

10+2

50

10+5

00

10+7

50

11+0

00

11+2

50

11+5

00

15.3

13.6

18.0

21.0

19.7

22.7

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

Hoford Rd

realignment

Public Footpath FP 79

realignment

A128

Brentwood Rd

realignment

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

C

H

1

0

+

0

0

0

CH

10+

500

C

H

11+

000

C

H

11+

500

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

AT

C

H

LIN

E

M

AT

C

H

LIN

E

Brentwood Road realignment

High House Lane connects with

Brentwood Road at new junction to

maintain property access

PLAN AND PROFILE

SHEET 11

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

13

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

DATUM=-10.0

EA

PLAN

PROFILE

Hoford Road realignment

False cutting 4m

above LTC

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

False cutting 4m

above LTC

False cutting 4m

above LTC

False cutting 4m

above LTC

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

Emergency Access Road

Emergency Access Road

EA

EA

Farm Track and Public

Footpath FP79 realignment

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

Page 10: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

22.7

21.5

20.4

19.9

20.2

21.2

22.5

L=165.0R=1030.0

L=165.0L=307.0

P=0.5%

P=-0.5%

L=314.0 R=85000.0L=847.9

11+7

50

12+0

00

12+2

50

12+5

00

12+7

50

13+0

00

13+2

50

23.3

22.6

22.6

24.2

25.8

26.1

28.7

Stanford Road

A1013 realignment

A13 WB to A1089

slip road

A13 WB to LTC NB

slip road

A13

Hornsby Lane

stopped up

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

LEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

LEGEND - PROFILE

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

C

H

1

1

+

5

0

0

C

H

1

2

+

0

0

0

CH

12+

500

C

H

1

3

+

0

0

0

C

H

1

3

+

5

0

0

B

a

k

e

r

S

t

r

e

e

t

H

o

r

n

s

b

y

L

a

n

e

A

1

0

8

9

A

1

3

L

T

C

A

1

0

1

3

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

A13 WB to LTC SB

slip road

LTC 2 lanes SB

LTC 3 lanes NB

Baker Street realignment

with new A1013 junction

PLAN AND PROFILE

SHEET 12

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

14

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

Existing junction

roads maintained

Heath Road realignment

with new A1013 junction

DATUM= +7.0

2 lanes SB through LTC -

A13 Junction

PLAN

PROFILE

False cutting 4m above

LTC

False cutting 4m above

slip road

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Gammonfields Way realignment

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

False cutting 4m above

LTC

Stanford Road A1013

realignment

EA

EA

A13 to A1089 slip road

A1089 to LTC

2 lane slip road

A12 WB to LTC NB

2 lane slip road

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

Hornsby Lane

stopped up

Hornsby Lane stopped up,

access to property maintained

Access to the properties

maintained by new road

Access to the properties

maintained by new road

Access to the properties

maintained by new road

Page 11: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

33.1

32.8

31.9

30.7

29.4

28.2

27.0

26.4

R=3200.0L=90.0

R=1635.0 L=120.0 L=850.6

R=100000.0L=318.3 P=-0.5%

L=959.9

P=-0.2%

L=24.9R=46500.0L=139.2R=117000.0

L=474.9

33.1

32.8

31.9

30.7

29.5

28.2

26.9

26.5

0+25

0

0+50

0

0+75

0

1+00

0

1+25

0

1+50

0

1+75

0

1+91

5

Baker Street

Rectory Road

Realignment

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

LEGEND - PROFILELEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

C

H

1

+

0

0

0

CH 0+000

C

H

-

0

+

0

0

0

C

H

0

+

5

0

0

CH

1+

000

CH

1+

500

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

DATUM= 22.0

32.9

32.8

0+00

0

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

PLAN

PROFILE

PLAN AND PROFILE

SHEET 13

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

15

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

Rectory Road

realignment

LTC connection to A13 EB

and Orsett Cock junction 2 lanes

A13 EB 3 lanes

A13 WB 3 lanes

A13 EB 2 lanes

A13 WB 2 lanesWorks tie in

with existing

A13 3 lanes

Orsett Cock connection

to A13 WB

Stanford Road A1013

realignment

A13 WB connection to new

junction and A1089

False cutting 2m above

LTC slip road

Orsett Cock

Junction

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

Earthwork bund 2m

above ground level

Access to the properties

maintained by new road

Page 12: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

LEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

LTC NB to A13 EB

slip road

A1089 to LTC

SB slip road

Stifford

Clays Road

realignment

Green Lane and

Bridleway

realignment

23.5

22.8

20.4

16.4

11.9

9.0 8.5

L=125.0R=1200.0

L=125.0 L=120.0R=1030.0

L=120.0L=121.0 L=230.0

P=-1.8%

L=293.5 R=25000.0L=650.0R=35500.0

L=816.5

13+5

00

13+7

50

14+0

00

14+2

50

14+5

00

14+7

50

15+0

00

26.5

26.8

25.5

19.5

14.1

10.7

7.8

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

C

H

1

3

+

0

0

0

C

H

1

3

+

5

0

0

C

H

1

4

+

0

0

0

CH

14+

500

C

H

1

5

+

0

0

0

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

IN

E

M

A

T

C

H

L

IN

E

DATUM = +5.0

PROFILE

PLAN AND PROFILE

SHEET 14

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

16

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

Stifford Clays Road

realignment

Green Lane and Bridleway realignment

LTC 2 lanes with hard

shoulder SB

LTC dual 2 lanes

Retaining wall

False cutting 2m above

LTC

A

1

3

Baker Street

False cutting 2m above

LTC

PLAN

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

Access to the properties

maintained by new road

LTC 2 lanes

with hard

shoulder NB

EA

EA

Page 13: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

Mardyke

Golden

sewer

Orsett Fen

sewer

Watercourse and

Access track

10.3

11.6

11.1

10.6

11.6

11.3

R=2200.0

P=0.8%

L=191.0 P=-0.5%

L=43.2 P=0.5%

L=53.7 P=-0.7%R=30000.0

L=390.0

R=40000.0L=400.0 R=30000.0

L=345.0

15+2

50

15+5

00

15+7

50

16+0

00

16+2

50

16+5

00

7.1 4.1 4.1 4.4 3.2 3.9

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

LEGEND - PROFILE

EA Emergency area

LEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

C

H

1

5

+

0

0

0

C

H

1

6

+

5

0

0

CH

1

6+

00

0

C

H

1

5

+

5

0

0

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

DATUM = -6.0

PLAN

PROFILE

PLAN AND PROFILE

SHEET 15

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

17

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

Main River

False cutting

2m above LTC

False cutting

2m above LTC

Main River

Mardyke River and

Bridleway BR219

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Mardyke

Viaduct

EA

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

Earthworks & drainage

M

a

r

d

y

k

e

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

LTC NB

3 lanes

LTC SB

2 lanes

Page 14: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

C

H

1

6

+

5

0

0

C

H

1

7

+

0

0

0

C

H

1

7

+

5

0

0

C

H

1

8

+

0

0

0

C

H

1

8

+

5

0

0

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

Footpath and Farm

track FP 136

realignment

8.1 6.5 5.6 5.9 7.4 9.7

L=40.0R=1300.0

L=140.0

P=0.9%L=692.7 R=51000.0L=813.5

17+0

00

17+2

50

17+5

00

17+7

50

18+0

00

18+2

50

5.3 5.7 5.8 7.2 9.3 11.7

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

Emergency AreaEA

LEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

DATUM=-49.0

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

PLAN

PROFILE

PLAN AND PROFILE

SHEET 16

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

18

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

Footpath FP 136 realignment

EA

False cutting

2m above LTC

EA

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

Page 15: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

North Road

B186 realignment

The Wilderness

12.1

14.4

16.8

19.1

21.1

22.6

L=150.0R=1440.0

L=1084.2R=150000.0

L=671.6

18+5

00

18+7

50

19+0

00

19+2

50

19+5

00

19+7

50

23.1

R=1442.3

P=0.5%

L=1.8

19+7

50

20+0

0023

.7

18.7

21.1

23.3

22.5

22.5

23.0

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

LEGEND - PROFILE

EA Emergency area

LEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

C

H

1

9

+

0

0

0

C

H

2

0

+

0

0

0

C

H

1

8

+

5

0

0

CH

19+

500

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

DATUM = +5.0

PLAN

PROFILE

North Road B186 realignment

PLAN AND PROFILE

SHEET 17

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

19

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

False cutting 5m

above LTC

False cutting 4m

above LTC

EA

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

The Wilderness

Page 16: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

Footpath

FP 151

Ockendon Road

M25 Carriageway

Proposed Levels

Horizontal

Vertical

Ground Levels

Chainage

21.1

17.4

14.9

13.7

12.4

11.2

10.0

L=49.8R=1020.0

L=120.0L=210.2

L=170.0R=720.0

L=127.5R=2880.0

P=-1.5%

L=301.0

P=-0.5%

L=1011.5R=24500.0

L=478.0

R=10000.0L=95.4

20+2

50

20+5

00

20+7

50

21+0

00

21+2

50

21+5

00

21+7

50

22.6

21.3

23.2

23.3

23.6

23.2

25.6

LEGEND - PLAN

Structure

Retaining wall

EA Emergency area

LEGEND - PROFILE

EA Emergency area

LEGEND - PROFILE

Route Vertical Alignment

Existing Ground Profile

Structure - Bridge

Structure - Underpass

Contains Ordnance Survey data. © Crown copyright and database rights 2020.Ordnance Survey 100030649

C

H

2

0

+

0

0

0

C

H

2

0

+

5

0

0

CH

21+

000

C

H

2

1

+

5

0

0

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

M

A

T

C

H

L

I

N

E

DATUM = +4.5

PROFILE

PLAN AND PROFILE

SHEET 18

HE

54

00

39

-C

JV

-G

EN

-S

ZP

_G

N0

00

00

0_

Z-D

R-C

X-0

02

20

.d

wg

0 5 1510 20

SCALE 1:250 (A1)

SCALE 1:500 (A3)

METRES

HORIZONTAL SCALEVERTICAL SCALE

0 50 150100 200

SCALE 1:5000 (A3)

METRES

NOTES

1. Do not scale from this drawing.

2. All dimensions are in metres unless stated otherwise.

3. All levels are in metres relative to the Ordnance Datum.

4. For scheme location refer to Plan and Profile General Plan.

5. Profile uses an exaggerated scale of 1 horizontal :10 vertical

Drawing title

Client

Project

LOWER THAMES CROSSING

DESIGN REFINEMENT CONSULTATION

Client

PROPOSALS FOR

CONSULTATION

Footpath FP 151 realignment

M25 Underbridge

Ockendon Road realignment

with new bridge

EA

LTC NB 3 lanes

LTC SB 2 lanes

Works tie in with

M25 4 lanes

M25 3 lanes NB

Ockendon Road

PLAN

False cut out 5m above LTC

NB - Northbound

WB - Westbound

EB - Eastbound

SB - Southbound

Page 17: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily
Page 18: Lower Thames Crossing · open space, or common land which is being compulsorily acquired or in which permanent rights are sought. This replacement land may also need to be compulsorily

© Crown copyright 2020.

You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence:

visit www.nationalarchives.gov.uk/doc/open-government-licence/

write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email [email protected].

Mapping (where present): © Crown copyright and database rights 2020 OS 100030649. You are permitted to use this data solely to enable you to respond to, or interact with, the organisation that provided you with the data. You are not permitted to copy, sub-license, distribute or sell any of this data to third parties in any form.

This document is also available on our website at www.highwaysengland.co.uk

For an accessible version of this publication please call 0300 123 5000 and we will help you.

If you have any enquiries about this publication email [email protected] or call 0300 123 5000*. Please quote the Highways England publications code PR85/20.

Highways England creative job number BED20 0066

*Calls to 03 numbers cost no more than a national rate call to an 01 or 02 number and must count towards any inclusive minutes in the same way as 01 and 02 calls.

These rules apply to calls from any type of line including mobile, BT, other fixed line or payphone. Calls may be recorded or monitored.

Printed on paper from well-managed forests and other controlled sources when issued directly by Highways England.

Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ

Highways England Company Limited registered in England and Wales number 09346363