ls telecomunication cable catalogue
TRANSCRIPT
/67
LS Structured Cabling System
Contents
Overview
Structured Cabling System
1) Copper/Fiber Solution
2) Simple Fast-NetTM MPO Fiber
I
II
/67
2) Simple Fast-Net MPO Fiber
3) Simple ClosetTM
4) Simple PathsTM
5) Simple ViewTM
Supply Record
Attached : Partner Program
III
IV
Overview
LS Cable&System has 2 factories for Structured Cabling System : Korea 1, Vietnam 1
LSC&S in Korea
• 1962, established Korea Cable Industry Co., Ltd.
• 1969, established Gold Star Cable
• 1978, built a Plant in Gumi
(250,800㎡)
LSC&S(Gumi, Korea)
I. Overview
/67
LSCV in Vietnam
• 2010, built a plant in Hochiminh, Vietnam
(17,190㎡)
LSCV(Hochiminh, Vietnam)
(Gumi, Korea)
3
Overview II. Structured Cabling System
Copper cables (C5e,6,6P,6A)
1
Fiber Cables(SM, MM1~4)
2
Copper Patch solutions
(Panel & M/J, P/C)
3
Outlet solution (SMB,F/P)
43
1
/67
(Panel & M/J, P/C)
Fiber Patchsolutions (FDF, P/C)
5SoHo &
Consolidations (Box, Mini Patch)
6
Telecommunication Racks & Grounding
7
6
7
2
5
4
4
Overview II. Structured Cabling System
Entrance Room (ER) &Telecommunication Room (TR)
Main Distribution Area (MDA) &Horizontal Distribution Area (HDA)Next
floor
Copper(C7,6A,6Plus)
1Fiber
(OM3,4)
2
Simple Fast Net™
3Simple GXC™
Patching
4
5 61
4
/67
Equipment Distribution Area (EDA)
Simple Fast-Net™ MPO
5Simple Closet™
(HDR, Cooling Manager)
6
Simple Paths™
7
Simple View™ IPM
8
Simple View™ IIM
9
5
3
5
7
8 9
2
1
6
Category 5 Category 6/6+Category 5E Category 6A Category 7ACategory 7
Product line-up
Category-Based LAN Cable
Clause
Cable structure
• 100Mbps • 400Mbps • 1Gbps • 10Gbps • 10GbpsTransmission
capacity• 40/100Gbps
1998 2002 2006 2010 2012
II. Structured Cabling System
/67
• Add Test- ELFEXT- PSELFEXT
• Uplift RL, NEXT
• Same bandwidth
• Bandwidth(100->250MHz)
• Uplift X-talk
• Insert Separatorto improve internalX-talk
• Bandwidth(500->600MHz)
• Uplift X-talk
• PiMF (Pair in Metal Foil)
to improve X-talk
• Bandwidth(600->1GHz)
• Uplift X-talk, Attenuation
• PiMF(Pair in Metal Foil)
Maindifferences
• 100Mbps • 400Mbps • 1Gbps • 10Gbps • 10Gbpscapacity
• 40/100Gbps
• 4, 25, 50, 100P • 4, 25P • 4P • 4P • 4PNumber of
pair• 4P
• 100MHz • 100MHz• 250MHz• 500MHz
• 500MHz • 600MHzBandwidth • 1GHz
• U/UTP
• F/UTP
• U/UTP
• F/UTP
• SF/UTP
• U/UTP
• F/UTP
• SF/UTP
• U/UTP
• F/UTP
• S/FTP
• F/FTP
• U/FTP
CableType
• S/FTP
• SF/FTP
• Bandwidth(250->500MHz)
• Add Alien X-talk
• Uplift attenuation
• Jacket Spacer & Non-continuous Shield to improve Alien X-talk
6
Balanced/twisted pair copper cablesII. Structured Cabling System
U/UTP Cable• Cat5• Cat5e
• Cat6(Non-filler)
Insulation(PE, FEP)
Pair
PVC/LSZH Jacket
U/UTP Cable• Cat6 (Cross-filler)• Cat6+ (Cross-filler)
Insulation (PE, FEP)
Pair
PVC/LSZH Jacket
Cross Filler
U/UTP Cable• Cat6A
(Dummy)
Insulation(PE, FEP)
Pair
Cross Filler
Jacket Spacer
U/FTP Cable• Cat6A 4P
Outer Sheath
Insulated Conductor
Drain Wire
PiMF
Twisted Pair
PET tape(Optional)
F/FTP Cable• Cat7 4P
Outer Sheath
Insulated Conductor
PiMF
Drain Wire
Al/Mylar Tape
Twisted Pair
/67
F/UTP Cable• Cat5e 4P• Cat6 4P
Insulation (PE)PairEarth wireAl/Mylar TapePVC/LSZH Jacket
• Cat6A 4P
SF/UTP Cable• Cat5e 4P• Cat6 4P
S/FTP Cable• Cat7 4P (PiMF)
Insulation (PE)PairEarth wirePS TapeAl/Mylar Tape
Tinned copper braidPVC/LSZH Jacket
Insulation (Foamed)PairPiMFEarth Wire
Tinned copper braidPVC/LSZH Jacket
SS/UTP Cable• Cat6A
(Segmented Shield)
Insulation(PE)PairCross FillerNon-continuous ShieldPVC/LSZH Jacket
(Optional)
7
Product line-up
Fiber Optic Cable Coverage (SM, OM1~4)
R/T* Type(288 ~1152F)
* M/T : Multi Tube* L/T : loose Tube* C/R : Central Ribbon* C/T : Central Tube* R/T : Ribbon Tube
* ABF : Air Blown Fiber* ABC : Air Blown Cable* WB : Water Blocking
288F
432F
864F
L/T* Type(Dual Layer)
RibbonSlot Type
( ~ 1000F)
Counts
ABF*1~12F
ABC* 14~144F
Air Blown
M/T Type( ~432F)
ADSS
Figure-8L/T Type
II. Structured Cabling System
/67
Mini-Flex( ~ 144F)
C/R Type( ~ 432F)
• High Counts Cable• Mass Splicing(Ribbon)• Dry Core Structure
Metro
144FL/T Type
(SZ Stranded)
Micro Cable
72F
48F
24F
Long haul
• L/T Cable• Micro Cable
• Small Size• Light Weight• Easy Fiber Access• Varies Type of Cable
Access
1~12F
Drop Cable(1 ~ 12F)
• Flexibility• Easy Handling• Small Counts• Light Weight
Premise
Indoor Cable(1 ~ 12F)Small
Cable(1+2, 1+3)
BundleC/T Type
ADSSC/T Type
8
Cat6A Cable1. Copper/Fiber Solution
Comparison by size of UTP Cat6AStructure for each product
1st UTP Cat6A Cable
• UL Certificate• Jacket Spacer to avoid Alien X-talk• Diameter: 9.0mm
2nd UTPCat6A Cable
• UL Certificate• H shaped Separator-filler • Diameter : 8.0mm
3rd UTPCat6A Cable
• UL Certificate to be obtained• Non-continuous Shield to block Alien X-
talk• Diameter : 7.0mm
1st : 9.0mm 2nd : 8.0mm 3rd : 7.0mm
/67
General figure
• Diameter : 7.0mm
FTP Cat6ACable
• UL Certificate• Overall core Al tape • Diameter : 7.5mm
S/FTP Cat6ACable
• Delta Certificate• PiMF Structure to enhance Internal
Performance• Diameter: 7.5mm
• Comply with Relevant Internal Standards (ANSI/TIA-568-C.2,
Cat6A ISO/IEC11801 2nd Class EA)
• Guarantee enough Margin /performance of signal
• Applicable to PVC(CMX/CM/CMR/CMP), LSZH(CMX/CM)
Bundle size of 7cables
Diameter
Surface
27mm 24mm 21mm
100% 80% 60%
9
Connector Mechanical Optimization
FCC CFR47 Parts 68 Design simulation
Is there compatibility problem between Jack & Plug?
How long does it provide stabile connection?
���� NO. FCC CFR47 Parts 68 Optimized Design
���� Completed with proper Au coating ���� Development of Insert Pin through Mechanical Simulation
Q
Q
1. Copper/Fiber Solution
/6710
����Optimized Design, through HFSS RF simulation
C6A Connector Transmission Optimization
Internal & Alien crosstalk optimum condition using the HFSS simulation between Modular Plug & Jack
1. Copper/Fiber Solution
Does it meet transmission quality?Q
/67
Clearing external noiseInternal Speed improvement
11
•Optimum design for Internal/External crosstalk noise
•Slim compact design
•Supporting available colors
•Supply high performance
90 degree IDC type
Cat.6A Modular Jack1. Copper/Fiber Solution
/67
•
•Compliant with TIA568.C2 Category 6A
•Supporting T568A & T568B
•Compliant with RoHS
•50u inch gold coating on the inserts
180 degree IDC type
12
Wiring Tool for Worker 1. Copper/Fiber Solution
/67
•Slim type IDC structure to do convenient Wiring
•Saving cost of wiring works
Be HALF time
13
Angled Patch Panel for High density cabling
Angled 48Port Panel
1. Copper/Fiber Solution
1
2
3
No need for Horizontal Management Panel Compatible with the Rack
Keep Patch Cord from exorbitant bending
/67
3
4
5
High Density CablingFast-Net™ Solution
Applicable to Fiber
Double Labels Marking
Fast-Net™ Angled Panel
14
10Giga bit GXC Patch Block
Special design to improve crosstalk
1. Copper/Fiber Solution
/67
MCCP; Micro Capacitive Coupling Pin technology
High Density solution
Packaging with Rack, Management, Entry Panel, etc.
Coupling between
Pin to the couple of
next pin to improve
the crosstalk & RL
performance
15
Cat.6A Certificate of Authentication
UL & KCC Accreditation ETL Accreditation
1. Copper/Fiber Solution
/67
KCC
16
Cat.6+ Cable Performance 1. Copper/Fiber Solution
Items Cat.6 Product (Reelex packing) Cat.6+ product (Reel In Box packing)
Transmission
(RL)
/67
Typical
Cannel performance
ANSI/TIA-568-C.2
NEXT/PSNEXT +3dB more than ANSI/TIA-568-C.2
(Link/Channel)
Characteristics
Plastic Reel
Stable cable damage prevention
� High frequency bandwidth
17
Cat.6+ Connector
Items Cat.6 Cat.6+
Pictures
Typical
1. Copper/Fiber Solution
/67
Typical
Cannel performance
TIA standard TIA/EIA 568C.2Channel (NEXT,PSNEXT,FEXT,PSFEXT) +3dB
more than TIA/EIA 568C.2
Characteristics
• IDC Tin coating 100 micro inch over
• Insert: Au 50uinch Full coating
• Available T568B/A Wiring
• 1GBps Ethernet 802.3 etc.
• Irregularity Insert Pin
• Slim-IDC
• Apply on the SMB, Faceplate, Patch Panel
• Insert: Au 50uinch Full coating
• IDC Tin coating 100 micro inch over
• T568B/A Wiring
• 10G(based on 50M), .1GBps Ethernet 802.3 etc.
18
Cat.6+ Bandwidth Profit
50.0
60.0
70.0
80.0
90.0
Cat.6Plus PL NEXT [dB]
1. Copper/Fiber Solution
/67
0.0
10.0
20.0
30.0
40.0
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0
TIA/EIA 568B.2-1 Cat.6
LS Simple Cat.6Plus
TIA/EIA 568B.2-10 Cat.6A
Insertion Loss [dB]
ANSI/TIA-568-C.2 Cat.6 BW
LS Cat.6Plus BW
시시시시험험험험결결결결과과과과
19
Bundle cable
Product Overview for Per-patching1. Copper/Fiber Solution
1 100% factory terminated & Tested
3 Diverse Color available
2 Six Bundle Patch cord
4 Design to Prevent Kink with central Filler
/67
Patch Panel & Equipment cord
4
5 Easy-Installation in the Panel (Easy-Maintenance)
6 Compatible with Fiber Adapter in a Rack
7 Suitable solution for Data Center
20
Traditional Cabling vs Fast-Net 1. Copper/Fiber Solution
50
60
70
80
90
100
1
2
Saving Patching & Cord Arrangement1
IDC’s Connecting (Termination) 2
Saving the test time3
/67
Time saving 80%more than traditional cabling
10
20
30
40
50
3
4
5
Saving the test time3
Labeling4
Saving time of Pulling Cable5
21
Optical Fiber in Data Center1. Copper/Fiber Solution
• Increase of Fiber products in D/C
•85% of Data Center link is covered within 100m
(Short reach)
• High-bandwidth Multimode Fiber
/67
• High-bandwidth Multimode Fiber
• SMF’s high-cost due to Laser Source
• 40G/100Gbps Transmission rates
• Parallel Systems in IEEE 802.3ba
22
Data Center Structures
4
Short Term Connection
• patch cord
- Interconnect Cable
Zip Cord
Horizontal Cabling
• Distribution / Breakout Cable
1. Copper/Fiber Solution
5
/67
12
3
Rack Modular Panel
1 2
MPO Cassette MPO Cable
3 4
• Riser level’s flame-retardant
Distribution 12F Distribution 36F
Patch Cord
5
23
Zip Cord
Fiber Optic Cable in Data Center
Indoor Interconnect Cable Distribution Cable Break-out Cable
Simplex Cord
Single Unit(under 12C)
Multi unit(over 12C)
1. Copper/Fiber Solution
/67
Duplex Round CordOuter sheathCSMUnit sheathKevlarTight Buffer coated
Breakout 12F
• Fiber Optic Jumper Cord
• 1.6mm ~ 3.0mm diameter
• 2~144 core
• for Indoor & Outdoor
• Easy termination to connector
(simplex interconnect cable)
• Short distance building backbone,
In-building and LAN
(Local Area Network)
Fiber
Kevlar
PVC
PVC
24
•Laser-Optimized Multi-Mode Fiber (LOMMF)
•Precise control of the refractive index profile minimizes modal dispersion,
also known as Differential Mode Delay (DMD).
•Using the Cost effective Vertical Cavity Surface Emitting Laser (VCSEL)
Light Source.
• Support 10Gb/s speed up to 300/550m with 850㎚ VCSELs.
About LOMMF (OM3, OM4)
Wavelength Bandwidth (㎒�㎞)
DMD Test
1. Copper/Fiber Solution
/67
OM1 62.5㎛8501300
200500
n.s.n.s.
OM2 50㎛8501300
500500
n.s.n.s.
OM3 50㎛㎛㎛㎛ (LO)8501300
1500500
2000n.s.
OM4 50㎛㎛㎛㎛ (LO) 8501300
3500500
4700n.s.
FiberWavelength
(㎚)
Bandwidth (㎒�㎞)
OFL BW EMB
* TIA-492AAAX (A,B,C,D)
OM3
OM4
25
• 40Gb/s = 4 x 10Gb/s
• RX 4EA / TX 4EA
• 8 Channels
• 12C MPO Connector
• 100Gb/s=10 x 10Gb/s
• RX 10EA / TX 10EA
• 20 Channels
• 2x12C or 24C MPO
• Connector
Parallel Transmission Systems
40Gb/s Parallel optics 100Gb/s Parallel optics
1. Copper/Fiber Solution
RXRXRXRX
TXTXTXTX
TXTXTXTX
RXRXRXRX
RX 4channels
TX 4channelsMPO MPO
12 1
1 12
RXRX
RXRX
TXTX
TXTX
TXTX
TXTX
RXRX
RXRX
...
...
...
...
...
...
RX 10channels
TX 10channelsMPO
24 1
1 24
/67
unit: [m]Multimode Link Distance Support
Transceiver Designation
Wavelength SourceOM1
62.5㎛
OM2
50㎛
OM3 50㎛㎛㎛㎛
(LO)
OM4 50㎛㎛㎛㎛
(LO)
10GBase-SR
(10Gb/s)
850㎚ Serial
VCSEL33 82 300 550
40GBase-SR4 (40Gb/s)
850㎚ Parallel
VCSEL ArrayNA NA 100 150
100GBase-SR10 (100Gb/s)
850㎚ Parallel
VCSEL ArrayNA NA 100 150
* * IEEE 802.3ba designation* Max 1dB Connection and splice loss for OM4 link
26
Patch Cord
Simple Security Patch Cord
Un-locked Locking!! Key release
Installation Order
1. Copper/Fiber Solution
/67
Accessibility
OperationSecurity
Color
• To prevent from handling by unauthorized person at security demanded site
• To Prevent from any mistake (disconnecting) by installer during operation
• Color distinction on cords as per IT manager at Data Center
27
MPO Solution Diagram2. Simple Fast-NetTM MPO Fiber
Backbone & Workgroup Switch Hub
TX
FDC
MPO Interface Server
/67
MPO Patch CordMPO Fan-out CordModular Panel MPO Cassette
• Pre-terminated MPO Cassette Modular
Panel
• Copper & Fiber Compatible solution
• 12C~96C available
• Pre-terminated Cassette Module
• 12C~24C available
• LC, SC Type possible
• Pre-terminated Cable
• 4C~24C available
• Insertion Loss ≤0.75dB, ≤0.5dB(MM)
• Return Loss ≥45dB
• IEC61754-7, TIA/EIA 604-5
MDF MPO Panel IDF MPO PanelMPO Interface Server & Information Monitor
28
MPO Trunk Cable
•12 Core unit bundle Preterminated Trunk
Cable support (Max 144C)
•SM, MM (OM1, 2, 3, 4) available
•Cable Diameter : 3mm
2. Simple Fast-NetTM MPO Fiber
/67
Flexible cable installation with Round type Cable
Key-up to Key-down polarity (TIA-568-C.3 type A)
Fast Installation withPush-Pull type Connector
Key
29
MPO Cassette2. Simple Fast-NetTM MPO Fiber
Easy ConnectionWith MPO Cable
/67
Easy installation on MPO Panel
Pre-termination
→→→→Time & Cost Saving
LC, SC Type availableSM, MM (OM1, 2, 3, 4)
30
MPO Modular Panel MPO/MPT Modular Panel
MPO Modular Panel2. Simple Fast-NetTM MPO Fiber
Available to insert the cable from side and back by installing gland
19Inch 4U Rack standard mountable 288 Core
MPO to MPO connection : 864Core(12X6X12)
Plastic ring run for easy arrangement
Semi transparency plastic for protecting fiber cabling
/67
Drawer type panel for easy installation
Detachable Front Cable Management
One Screw bolt to open panel cover convenient
High Density & Easy Installation for tray
for protecting fiber cabling
31
MPO/SC Fan-out Cord (SM) MPO/LC Fan-out Cord (OM3)
MPO Fan-out Cord2. Simple Fast-NetTM MPO Fiber
3mm Diameter
2mm Diameter
/67
•Attached Port No. Label for each Fan-out Cord
•To prevent chaos for System configuration
• Product Serial No. management
• Performance & Production Information
32
Data Center Rack Solution
•Rack provides efficient use of space and protection of equipment.
•Rack contains servers and networking equipments in the most safe and proper circumstances.
Patch Rack Server Rack
3. Simple ClosetTM
Main Distribution Area (MDA) &Horizontal Distribution Area (HDA)
Entrance Room (ER) &Telecommunication Room (TR)
/67
Zone Distribution Area (ZDA)
Equipment Distribution Area (EDA)
33
High Density Rack Solution
Vertical Cable Manager (VCM) Rack top Equipment Rail Perforated Door
3. Simple ClosetTM
/67
Rack bottom Rack depthextension
Side panel
Power Strip private space
Brackets
Horizontal Cable Management
Shelf
34
Rack Product Line
Model
Vertical OutsideCabling Rack
Vertical InsideCabling Rack
Standard Rack Patch Rack
3. Simple ClosetTM
/67
ApplicationData Center (Server Mounting)
Data Center(Server Mounting)
Telecommunication Room (Equipment Mounting)
Data Center and Telecommunication Room (Patch Panel mounting )
Dimension
Height : 36/40/42/45UDepth : 900/1000mmWidth : 600/700/800mm
Height : 40/42UDepth : 900/1000mmWidth : 600/700/800mm
Height : 40/42UDepth : 950/1050mmWidth : 600/700mm
Height : 36/41/42/45UDepth : 360mmWidth : 600mm
Common Feature
• Front/Rear Door Mountable • Vertical Cable Management Mountable• Horizontal Cable Management Mountable• IEC 297-1,2,3 (Dimension of Mechanical Structure of the 19” Series)• EIA RS-310-D (Specification for Standard Rack)• Steel material Main Frame• The building Earthquake-proof test (Magnitude 7)
35
Main Features
High Perforated Door High Intensity Wheel Stability
• Cost reduction by Hot zone and Cool zone arrangement : Energy efficiency optimization.
• Hot Air backflow prevention.
• Design considering natural airflow : keep of temperature inside the Rack.
• Carrying maximum of 1,000KG / movement possible.
• Possible movement with the mounted Server in time of Rack rearrangement.
• Stability made possible by unification of Rack/Tray and connection support : not affected by outside impact
• High Stability compared to the others because of extra connection Bracket used in
3. Simple ClosetTM
/67
temperature inside the Rack. because of extra connection Bracket used in connection of Racks.
Adjustable Depth Size Adjustable Equipment Rail Exclusive Space for Power-strip
• Insured work space in the rear of Rack and possible addition of Power-strip even with the 850mm server.
• Adjustable front back based on equipment
• RMU Indication.
• No affection to Power-strip even if the server’s size is long.
• 2 Power-strips can be installed in one side.• Easy placement and displacement due to the hook shape of the power-strip.
200mm
Equipmentrail
RMUindication
2*2
36
High Cooling Efficiency3. Simple ClosetTM
Upper-board1
/67
Filler panel
Cold Aisle Hot Aisle
2 Cold aisle front/rear door3
37
①①①① Upper Board ②②②② Filler Panel ③③③③ Exclusive Space for Power-strip
High Cooling Efficiency3. Simple ClosetTM
/67
• Install Upper-Board on the Rack Cold Aisle and block the Cold and Hot air mixing
• Easily open or close and monitor the Cold aisle environment
• Block the Cold air leakage from blank part of Rack
• Rack unit filler panel & Bottom filler panel
• No need specific bolt
• Block the Entrance of Cold aisle
• Protect Cold air efficiency from Hot air
• Keypad available
38
High Cooling Efficiency
Existing rack arrangement Rack arrangement after installed Upper board
3. Simple ClosetTM
/67
• Existing average temperature : 20℃
• Month-Wattage of rack cooling for 400‘s : 328,572 kWh
• Month-electricity charge of cooling per rack : $ 55 / Month ($0.07 per kW)
• Temperature as application of UB : 16℃(7% energy reduction per 1℃)
• Month-electricity charge of cooling per rack : $40 ($15 reduction : 28%)
• Investment payback : 12.5 months
39
Overhead Routing System
•LS Simple Overhead Routing System, Simple PathTM enhances
reliability through bend radius protection and physical protection
•Lighter weight system requires less expensive infrastructure
: PC(Polycarbonate)/ABS, Halogen-free
•Reduces installation cost in ½ time of fiber protection system
•Achieve maximum design flexibility and growth potential.
4. Simple PathsTM
/67
Before After
40
Simple Paths Solution
⑩⑩⑩⑩ End Cap
⑧⑧⑧⑧ Outlet Drop
⑥⑥⑥⑥ Vertical Elbow Down
⑥⑥⑥⑥ Vertical Elbow Up8
10
6
6
4. Simple PathsTM
/67
⑨⑨⑨⑨ Outlet Trumpet
①①①①Main Duct
③③③③ Joiner
②②②② Horizontal Cross
④④④④ Horizontal Tee
⑤⑤⑤⑤ 45 degree Horizontal Elbow
⑦⑦⑦⑦ Reducer
1
3
5
7
4
2
9
41
Easy & Fast installation by Simple Paths™
Paths™ Design Paths™ Constructions
Cross Tee
H-Elbow V-Elbow down
4. Simple PathsTM
•Easy assembly without any transformation•Superior tensile, bending, impact strength
Visio or CAD
/67
Ex) Indonesia Data center
V-Elbow up Reducing
Drop Structure
42
Intelligent IPM Solution (Hardware)5. Simple ViewTM
Monitoring Unit
Intelligent PDU
Door Switch
IP NETWORK
Door Switch
Electronic Door Lock
Electronic Door Lock
Keypad
PDU
Monitoring Unit
/67
Temperature & Humidity Sensor
CL - Amp
Power Feed
Temperature & Humidity Sensor
Door LockKeypad
43
Intelligent IPM Solution (Hardware)
Monitoring Unit
Power Strip
Sensors (Temperature)
Sensors (Smoke Detect)
5. Simple ViewTM
/67
Sensors (Humidity)
Sensors (Door)
44
Intelligent IPM Solution (Software)
•Clear, easy to read intuitive screens using
•Automatically discovers supported
1 Easy to use
2 Logging
5. Simple ViewTM
/67
• Individual device log files
•Easily manage inventory and create and save custom reports
•Active alarm
•Automatically updates and display
3 Intelligent Alarm Processing
45
Intelligent IPM Solution (Software)
• Thorough Monitor on numerous Sites through one central server
• Offer of Graphic Monitor
• Support for Visionary Environment, Energy, Security
• SNMP correspondence
• Database Management by MS SQL
5. Simple ViewTM
/6746
LAN
Intelligent IIM Solution (Hardware)
Outlet
Link, Equipment information Patch Panel Link information
5. Simple ViewTM
Simple ViewTM
ManagementSoftware Client Sever
Master
/67
Outlet
Data Link section
Scanner
Panel - Switch
Panel - Outlet
Switch
IP Phone
47
Intelligent IIM Solution (Software)
•Centralized management for unlimited port
•Management by Tree & Drawing
•Visual information
•SNMP communication
•Database through MS SQL
Management Software
5. Simple ViewTM
/6748
Nurikkum Sauare Al Reyami GroupKyungNam LandMark
High-rise Building
• Site : Sangam-dong, Seoul, Korea
• Size : Total 50,000Port (Data/Voice : 40,000, Fiber : 10,000)
• Completed on Dec, 2007
• Remarks : - One of the biggest intelligent
• Site : Dubai and Abu Dhabi
• Solution : Cat 6A & Cat6
• Remarks :- Headquarter building of Al Reyami
Group
• Site: Hanoi, VNM
• Solution : Cat 6 Solution & OM3 FO
• Scheduled on 2011
• Remarks :- 3 x 72 story building
Enterprise III. Supply Record
/67
- One of the biggest intelligent building
- Data & Voice & Fiber intelligent system building
- Management telecommunication room & PDA Solution
49
Hyundai MotorAmerica
Terna Spa( Electrical network national Company)
OrtoRomi Spa
• Site : CA, USA
• Solution : Cat 5E
• 2011, on going
• Remarks :- 1,500 drop for office
• Address : 101 sites in Italy
• Solution : Cat 6 solutions
• Scheduled on December 2010
• Remarks :- key electric network company in the national power market
- Schedule to supply cable and
• Address : Padova, Italy
• Solution : Cat.6A solutions
• Scheduled on December 2011
• Remarks :- Important Italian Farm (Fruit, Vegetable) distribution company in Italy
Enterprise III. Supply Record
/67
- Schedule to supply cable and connectivity
distribution company in Italy- with SS/UTP C6A cable
50
La Stampa Marcom Arabia Ho-Riyadh Sindoh Rico
• Address : Turin, Italy
• Solution : Cat. 6A UTP Solution
• Scheduled on April 2012
• Remarks : HQ of one of the most important editorial Companies in Italy- Number of outlet ports: 2100- with SS-UTP Cat. 6A cable
• Address : Riyadh
• Solution : 300 Ports (Data : 250, Fiber : 50)
• Schedule : Completed on Apr. 2012
• Remarks : Fully IP Based System
• Address : Xian, China
• Solution : Cat 6 Solution
• Remarks : Sindoh China office
Enterprise III. Supply Record
/67
- with SS-UTP Cat. 6A cable
51
UN Nato Campus SAU Navy SAU Navy
• Address : Vicenza, Italy
• Solution : Cat. 6 F/FTP Solution
• Scheduled on February 2012
• Remarks : Military ApplicationUN Nato campus for US Army
• Address : Riyadh
• Solution : 1200 Data Points
• Schedule : July, 2012
• Remarks : New airport Office
• Address : Damam Navy Training Center
• Solution : 500 Data Points
• Schedule : Sept. 2012
• Remarks :
Government III. Supply Record
/6752
New Delle Alpi StadiumBlack hive building
(City of the arts of Valencia)
Caimap International seaport
• Site : Turin, Piemonte Italy
• Solution : Cat 6+ solution; 960 Fiber Optic SC 50/125
• Scheduled on July , 2011
• Remarks :- New Stadium for Juventus footballclub, great and important project
• Address : Valencia ,España
• Solution : Cat 6 Data
• Scheduled on Jun, 2010
• Site : Bonngdawoo
• Solution : Cat 5e Solution & OM2 Fiber
• Scheduled on Jan, 2010
• Remarks :- 48,000 m2
Commercial/Industrial ComplexIII. Supply Record
/67
club, great and important project- Positioned in Torino commercialcomplex
53
DOOSAN Infracore HANKOOK TIRE POSCO CGI
• Site : Yantai, China
• Solution : Cat 6 solution & Fiber
• Scheduled on July , 2011
• Address : Chongqing, China
• Solution : Cat 6 Data & Fiber solution
• Scheduled on Jun, 2012
• Site : Guangzhou, China
• Solution : Cat 6 Solution & OM2 Fiber
• Scheduled on Jan, 2010
Commercial/Industrial ComplexIII. Supply Record
/6754
Hospital San Carlos Ospedale Bolognini Automobil Club Italia
• Address : Madrid , España
• Solution : Cat6 FTP
• Scheduled on Apr, 2010
• Site : Seriate, Lombardia, Italy
• Solution : Cat 6 Solution & OM3 FO
• Scheduled on October, 2011
• Remarks :- Great Hospital re-building- Use of Fiber optic products
• Address : Rome Italy
• Solution : Cat6 solutions
• Scheduled on February 2011
• Remarks :- one of the most important new hospital in the North East Italy
HealthcareIII. Supply Record
/6755
Hospital San Carlos Ministry of Health Hospitals King Abdullah Medical City
• Address : Madrid , España
• Solution : Cat6 FTP
• Scheduled on Apr, 2010
• Address : Riyadh & Jazan
• Solution : 600 Ports( Data : 500, Fiber :100)
• Schedule : Completed on Sept. 2012
• Remarks : Medical Oriented Network
• Healthcare Management System
• Address : Makka
• Solution : 300 Ports (Data : 250, Fiber : 50)
• Schedule : Completed on May. 2012
• Remarks : Installed all the Network Accessories for the CCU Unit
HealthcareIII. Supply Record
/6756
Ulss n 4 Alto Vincentino Hospital Business
Philippine General Hospital (PGH) Rehabiltation
Tan Tock Seng Hospital & Poly-Clinics
• Address : Thiene, Italy
• Solution : Cat. 6 Solutions
• Scheduled on January 2011
• Remarks:- the most important new hospital in the North East Italy
• Site : Manila, Philippines
• Solution : Cat 5e /Cat 6 solutions ofVoice and Data
• 2010, completed
• Remarks :- It is the biggest hospital in the country with a 1,500-bed capacity.
• Site : Singapore, SGP
• Solution : Cat 6 Solution & OM3 FO
• Scheduled on Jan, 2010
• Remarks :- Hospital project
HealthcareIII. Supply Record
/67
country with a 1,500-bed capacity.
57
IFC SeoulBanco Santander(Crystal Building)
Banco Espiritu Santo
• Address : Seoul, Korea
• Solution : Cat 6 SCS Solution
• Remarks : - International Financial Center at Seoul
• Address : Madrid , España
• Solution : Cat 5e Data
• Scheduled on Nov, 2009~Jan, 2010
• Remarks :- New Building of Santander Bank In Madrid
• Address : Porto, Portugal
• Solution : Cat 5 Data & Fiber
• Scheduled on Sep ,2010
Financial III. Supply Record
/6758
IBM Center Songdo Geico Data CenterSingapore Yahoo
Data Centre Project
• Site : Songdo, Korea
• Solution : Cat 6A Solution
• Remarks : IBM center in Korea
• Site : USA
• Solution : Cat 6
• Scheduled on Apl, 2011
• Remarks :- maintenance
• Site : Singapore, SGP
• Solution : Cat 6 Solution & OM3 FO
• Scheduled on Jan, 2010
• Remarks :- SGP Data Center project
Data CenterIII. Supply Record
/6759
Dankuk University Chonan campus
Valencia UniversityKunming the College of
Education Library
• Address : Chonan, Korea
• Solution : CAT 6A Solution
• Scheduled on 2009
• Address : Valencia, España.
• Size : Central building, Medical center
• Solution : Cat6 Data & Fiber Solution
• Scheduled on Aug, 2008
• Address : Kunming, Yunnan, China
• Solution : CAT 5E Solution
• Scheduled on 2009. 05
Education III. Supply Record
/6760
Jumeirah Park VillaNew Park Plaza Hotel
(Westminster Bridge)
Bay Leaf hotel and LPU Culinary Institute
• Site : Dubai, UAE
• Solution : Cat 6 & Fiber
• Scheduled on Feb, 2012
• Remarks :- new residential community in Dubai
• Site : London, UK
• Solution : Cat6 Data & OM3 Fiber
• Scheduled on July, 2009
• Site : Intramuros, Manila, Philippines
• Solution : Cat 6 solutions
• 2011, on-going
• Remarks :- The Lyceum of the PhilippinesUniversity (LPU) is preparing for the opening of their first boutique hotel
Hotel & ResortIII. Supply Record
/67
opening of their first boutique hotel called THE BAYLEAF INTRAMUROS
61
华华华华 Hotel Marriott Hotel THE LIGHT
• Site : Xian, China
• Solution : Cat 6 & Fiber
• Scheduled on Feb, 2012
• Site : Hanoi, Vietnam
• Solution : Fiber & Coaxial
• Scheduled on Nov, 2011
• Remarks :- 450 Rooms building
• Site : Penang, Malaysia
• Solution : Cat 6 & Fiber Solution
• Scheduled on Feb, 2012
Hotel & ResortIII. Supply Record
/6762
RCDD (Registered Communication Distribution Designer)
SCS Design expert (RCDD) approved by BICSI, USA
IV. Partner Program
/67
•Enhancement to understand international standards and technical support to customer
•Supporting Project Design and Approval
63
Training / Warranty ProgramIV. Partner Program
Training
“ LS Simple Warranty, coupled with LS CNS’s strict LS approved SI program, assures the End users of receiving industry – leading Networks anywhere in the world”
LS offers installation & designer modules in compliance with international and local industry standards for the approval of LSI to serve the different layers of clients with different complexities.
The training takes place on the basis of countries at the locally contracted training centers by highly experienced trainers
The frequency of the training is determined by the sophistication of market demands and will be strictly managed by internal LS policy both online (refer to www.lssimple.com) and offline (local training centers).
The trained LSIs will be given certificates based on which they can conduct installations on the different levels of sites with LS-registered products.
/67
the different levels of sites with LS-registered products.
25 Year Warranty
LS SIMPLE warrants to the End User that the Products, which comprise the System, will be free from defects in materials and workmanship design for the duration of the Warranty Period.
The duration of the Warranty period is twenty-five years from the date of Practical Completion of the specified system at the specified site by a LS SIMPLE Certified Installer.
With the 25 Year Warranty at its backhand, LS SIMPLE provides peace of mind to clients who put sense of security ahead of other factors in selection of the network system.
LS SIMPLE warrants to the End User that the System in its installed state will meet the specifications in force at the time of installation at the specified Site for the duration of the Warranty Period of 25 years
64
25 years System Warranty
LS SystemSpecified by End
User
End User appoints approved LSI
LSI completes installation and test 100% of the links
End User confirms use of LS System
patch cords
LSI
Timescale Responsible
IV. Partner Program
/67
LS System sends End User certificate
LSC, LSI and End User store test data and registration details
Complete remedial work
LSI completes Warranty registration, sending this and a soft copy of test results to LSC
End User needs to sign registration
Do all of the links pass
Is the applicationapproved?
LS Simple 4 Wk
LSI Provided with reference number
for warranty
YESNo
YES
YES
65
/67
Thank You
LS Cable&System is ready to provide our customers
with best products and solutions