lscc part bill cc form

Upload: v-venkata-narayana

Post on 14-Apr-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 LSCC Part Bill CC Form

    1/2

    Dated Schedule Docket No.

    1

    2

    3

    4

    5 K

    6

    7 D

    8

    (a) G

    (b)

    H

    ( c)

    *

    #

    [PTO

    By Cheque

    Date of handing over of site in case of work, or date of written order to commence supply in case of supply of materials.

    The total figure against item 8 should be tested to see that it agrees with the figure against item 7.

    By recovery of amounts creditable to this work

    I. ACCOUNT OF WORK

    By recovery of amounts creditable to other or heads of

    account work

    Deduct intermediate payment already made as shown in entry "K" of the last Running Account Bill

    ... ...

    Rs P

    Total Payments now to be made as detailed below #

    Deduct amount to be withheld at 71/2 percent of Rs . . .

    Value of items actually measured clause 62(a) and (b) of the preliminary specification of M.D.S.S.

    forming part of the contract, The details of which are given in the attached statement ... ... ...

    Value of measured up additions or alterations executed up-to-date as " authorized extras ", the details of

    which are given in the attached statement ...

    Intermediate payment now to be made ( Items 5-6 )

    Balance i.e., "up-to-date" intermediate payments ( Items 1+2+3-4)

    No. PWA XXI

    LUMP SUM CONTRACT

    RUNNING ACCOUNT BILL

    Name of The Contractor

    [ See Local Ruling 1 and 5 under Article 125 in Section 5 of Chapter III of Andhra Pradesh Account Code, Vol III )

    Cash Book Voucher No.

    Reference to Agreement

    Rs

    *Date of commencement of work

    P

    Name of The Work

    Serial number of this Bill No. and date of his previous bill for this workL.S.C.C.

    Total

    Approximate value of work done up-to-date excluding the items 1 and 2 above . ..

    vvn

  • 7/27/2019 LSCC Part Bill CC Form

    2/2

    1

    2

    )

    )

    **

    *

    **

    STAMP

    as an intermediate payment in connection with contract referred to above.

    Amount in Indian language

    Dated

    Received (Rs Rupees

    Rupees

    II. CERTIFICATES AND SIGNATURES

    I have satisfied myself to the best of my knowledge by * that the value of work

    done up-to-date under item 3 of "I. Account of Work " of this bill is not less than Rs. conformably

    with the contractor's agreement.

    The detailed measurements of authorized additions and alterations up-to-date and of the items of work specified in item of

    Account of this bill are recorded at page of Measurement Book No .

    Dated Signature of the Officer

    preparing the Bill

    Signature of Contractor

    Asst . Exe Engineer (R&B)

    2

    Full Signature of Contractor

    Witness

    Pay (Rs

    Dy. Exe Engineer (R&B)

    III. ACQUAINTANCE.

    Paid by me Cash/ Cheque No. dated

    Dated Signature of the Officer

    authorizing payment

    Rank

    Rank

    The payees acknowledgement should be for gross amount (paid as per item 8 a+b+c) of Account I, both in words and figures.

    Payment should be attested by some known person when payee's acknowledgment is given by mark seal or thumb impression.

    Dated initials of person actually making the payment.

    Here specify the method employed for estimating the nature of work.

    Of not less than that of a Sub-Divisional Engineer.Here specify the net amount payable , vide item (c ) of Account I, both in words and figures.

    vvn