LT-V: controlling a pressure control valve
LT-V Applications
Valve opening / closingIsolate sub-networks to control
water circulation Precise measurement of nighttime flow More precise leak detection …
Pressure variationReduce leaks
Normal pressure during the day / reduced at night Output objective (> 85%)
Increase network longevity Reduce excess pressure at night
LT-V: controlling a pressure control valve
LT-V = LT + 1 solenoid output
Specific product:
LT + 1 Latch solenoid output expansion card, 3 wires, 12 V
Compatible solenoid: Bermad S-985-3W
(model compatible with many different models of valve).
Path 1
Path 3
Path 2: Shared
LT-V
LT-V: controlling a pressure control valve
The hydraulic cabling determines the behaviour of the valve
Opening / closing Transfer between two pressure levels pre-set by the operator
Opening / closing
Operating modes
Solenoid
Transfer Day pressure / Night pressure
Solenoid
Day pressure
Night Pressure
Closure of the valve
LT-V: controlling a pressure control valve
Timed One time slot per day Each day, the solenoid switches:
from path 1 to path 3 at xx:xx (day) from path 3 to path 1 at xx:xx (night)
Remote control by WEB LS
On flow The solenoid switches when the flow threshold is exceeded
Configuration of a threshold for average flow Requires a meter or flow meter
Remote control by WEB LS
Timed and flow Control according to time slot and flow
Overrides timed control if flow is higher than configured threshold (e.g.: intervention of fire brigade at night)
Remote control by WEB LS
Control modes