BOILER DEAD AIR SPACE EXPANSION JOINT AIR-
IN-LEAKAGE ISSUES
Solution:
Isomembrane©
Technologies
PIPE LEAKAGE & MINIMUM-WALL ISSUES
TRANSFORMER FIRE Barrier Technology
Solution:
Buried & General Pipe Repair Services
Solution:
Luse Fire & Explosion Impact Barrier and other
Fire Mitigation Technologies
LUSE THERMAL
LTT solves issues common to Electric Utilities & Improves Heat Rate!!!
TECHNOLOGIES
The Isomembrane© Advantage
• Retire In Place—Capital vs O&M Budget
• Recover Lost MW’s• High Payback to cost ratio• Installed & performing 15 +
years• Quick Response Time• No Lead Time for Materials• Minimal Installation Period• “ON-LINE” Repairs
• Reduces Safety Risks• LOI reduction• Stops Air in-leakage• Less outage downtime• Improved Heat Rate• Lower NOx Gases• Lower Mass Flow Rate• Substantial Fly-ash
reduction in dead air spaces• Flexible, Ash tight Seal
Benefits:
The Isomembrane© Advantage
Applications:
Penthouse SealsLT, SH, & RH PendantsSide Wall SealsVestibulesExpansion JointsDead Air SpacesWindboxesSkin Casing CracksNose ArchesGas & Air Ducts Air Heaters and Associated Expansion JointsBoiler Door & Burner Seals
““LTT Proprietary Information”LTT Proprietary Information”
Type: 88 MW C-E Boiler built in 1958
BEFORE: Penthouse damaged side wall casing has been cut out and removed, allowing access to the sidewall tubes and outside wall casing for installation of the Isomembrane© application.
88 MW C-E Boiler built in 1958
AFTER: A typical Penthouse side wall Isomembrane© ash-tight application. Sidewall casing removed, the Isomembrane© attached to the outside wall casing, sealed around the tubes and the inside floor of the penthouse providing a cost effective solution.
Type: 420 MW B&W Cyclone Fired Boiler 1968: Before: Penthouse Super Heat Pendants Air leakage around tubes
After: Isomembrane© Installed tubes sealed
Type: C-E Boiler 250 MW Built in 1954
Before: Upper Dead Air Sidewall Seal and Front
Wall / Roof Tube Seal Box
After: Sealed Side Wall and Front Wall / Roof
Tube Seal Box
Isomembrane© Technology
Degraded Seal Box & Sidewall Seal
Damaged Areas sealed with Isomembrane®
Type: 650 MW Foster Wheeler Unit Built 1975Before: Precipitator Outlet Expansion Joint with lagging damaged with
tear 2’ x 8’Unit operating, ID fan limited with excess vibrations
After: “ On-Line” Application mobilized in less than 24 hours Isomembrane© installed while the unit was ON-LINE.
Type: 360 MW Foster Wheeler Unit Built 1959Before: Air Heater Expansion Joint with dust plate removed for Inside
Isomembrane© application.
After: Isomembrane© installed with dust shield installation.
Isomembrane© Testimonials:These are samples from just the Midwest but we have hundreds nationally.
• Dynegy– “We used Isomembrane© on the SH Outlet and Sidewall seals in the penthouse and can
attribute a gain of 3-4 MW’s as a result.” Plant Manager
• Michigan South Central Power– “We installed Isomembrane© in our penthouse on the Sidewall Seals and SH Inlet
Pendants and eliminated a 20 year old fly ash problem. It lowered our down time to access the penthouse for inspections and maintenance work as well as eliminated the cost for fly ash removal. We also like the rugged look of the Isomembrane© seals on the Expansion Joints, they last longer than the conventional expansion joints we replaced” Plant Engineer
• KCP&L– “We went with the Isomembrane© seals on our Economizer Expansion Joints and could see
a 10 MW increase just from the partial seals as LTT technicians installed the seals on line, it got too hot for them to work on top so they had to come back to finish the job, on short notice during a weekend forced outage” Plant Maintenance & Engineering
• Duke Energy– “LTT has mobilized several times in less than a 24 hour period to keep us running by
installing partial Isomembrane© Seals on our Precipitator Outlet Expansion Joints that work great”. Plant Engineering
• Midwest Generation– “We are very pleased with the Isomembrane© repair on the precipitator and the results we
have received on fan capacity due to the Isomembrane© application. We are able to run the unit at full load, without de-ratings due to fan.” Project Manager
THE LUSE TEAM THANKS YOU FOR THIS
OPPORTUNITY TO SHARE OUR WORLD
WITH YOU. WE REALLY APPRECIATE
YOUR INTEREST AND THE TIME GIVEN US
TODAY
HERE TO HELPJohn Provencher Cell: 708.363.3838 Email: [email protected]
Jim Ford Cell: 630 240-6381 Email: [email protected]
Your information requests receive our highest priority!