lv swbd design problem

Upload: kgggani

Post on 02-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 LV SwBd Design Problem

    1/15

    HK

    ABB

    03-01

    -15

    Low VoltageSwitchboard design

    problems in Hong

    Kong

    Ir C. H. Fung

    Tel 29293701

  • 7/27/2019 LV SwBd Design Problem

    2/15

    Companyname

    -2

    Normal switchboard design procedures !

    n Read the single line diagram / schematic diagram

  • 7/27/2019 LV SwBd Design Problem

    3/15

    Companyname

    -3

    Normal switchboard design procedures !

    n Check the switch Room size

  • 7/27/2019 LV SwBd Design Problem

    4/15

    Companyname

    -4

    n Which supplycompanies will beconnected, HEC or CLP

    n Which IDMTcharacteristic will be

    installed

    n Check the

    specifications

    Normal switchboard design procedures !

  • 7/27/2019 LV SwBd Design Problem

    5/15

    Companyname

    -5

    Normal switchboard design procedures !

    n Code of Practice forthe electricity

    (wiring) regulations

    n Supply rules of theCLP / HKE

    n BS, EN or IEC

    standards

  • 7/27/2019 LV SwBd Design Problem

    6/15

    Companyname

    -6

    Switchboard design : draft preparation

    n Put all the switchgears into the

    cubicles according to the

    schematic diagram

    n A switchboard draft finished

    n Prepare the busbar routing

    according to the schematic

    n

    Note the form of segregationof the cubicles

    n Busbar size, CT chamber,

    KWH location, Change Over

    switch.

    Switchboard Draft before prepare the formal drawings

  • 7/27/2019 LV SwBd Design Problem

    7/15

    Co

    mpanyname

    -7

    Switchboard design: fine tune the design

    n Try to put the switchboard into

    the switch room

    n Clear maintenance access as

    specified in the EMSDs COP(Front = 900mm, Rear =

    600mm)

    n Note the Cable/ Busbar from

    the supply comnpanyn Note the supply cos phase

    sequence

    n Note the CT Chamber size

    and 600mm min. 2600mm

    max AFFL

    C. T. Chamber

    Switchboard in factory

  • 7/27/2019 LV SwBd Design Problem

    8/15

    Co

    mpanyname

    -8

    Switchboard design-3

    n Note the size of the KWH

    meters installation

    n Note the incoming cable

    routing and reserve enough

    space and bending radius for

    cable and busbar entry

  • 7/27/2019 LV SwBd Design Problem

    9/15

    Co

    mpanyname

    -9

    Specification-1

    n 50KA 3sec for 2500A, 2000A, 1600A, and

    1250A busbar and its associated components.

    n 50KA 3 sec for 800A and below is impossible

    n Type Tested Assembly (TTA) to IEC or BS

    standard is hard to comply.n Extension of Busbar at both side of the

    assembly in a small switch room is waste of the

    material and not feasible

  • 7/27/2019 LV SwBd Design Problem

    10/15

    Co

    mpanyname

    -10

    Specification- Functional units

    n Functional Units located between 400mm and

    1800mm AFFL is difficult to comply if the switch

    room is small

    n ACB should be Solenoid operated is for OLD design

    ACB. Nowadays, ACBs are motorised

    n

    Oil Dash-Pots overload protection is applicable tothe ancient ACB or can be found in the Museum

    n Double break Isolator is hard to find in the market

    n

    50KA 1 sec MCCB is impossible to comply

  • 7/27/2019 LV SwBd Design Problem

    11/15

  • 7/27/2019 LV SwBd Design Problem

    12/15

    Co

    mpanyname

    -12

    Specification- IEC 60439-1 Page 1

    n 7 Type Tests

    n Temperature rise

    n Dielectric test

    n Short Circuit Test

    n Effectiveness of the protective circuit

    n Clearance and Creepage distances

    n Mechanical Operation

    n Degree of Protection

  • 7/27/2019 LV SwBd Design Problem

    13/15

  • 7/27/2019 LV SwBd Design Problem

    14/15

  • 7/27/2019 LV SwBd Design Problem

    15/15

    Co

    mpanyname

    -15