Page 1: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

Prepared by : S.Ziarati

Lyan Sanat Puya

8/16/2014

Lyan Sanat Puya Co.

Page 2: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

1

Industrial Automation,

Electrical & Instrumentation

Resume August 2014

Third Edition

Page 3: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

2

Contents:

1. Foreword……………………………………………………………………………………………….. 3

2. Company Data ………………………………………………………..…………………………….. 4

3. Organization Chart ……………………………………….………………………….……………. 6

4. Board of Directors ……………………………………………….…………………….………….. 7

5. Key Personnel ………………………………………………………….………………….……….. 12

6. Capabilities ……………………………………………………………….….………...…………... 13

6.1. Software …………………………………………………...……………….…………………… 13

6.2. Engineering …………………………………………………………………………….………. 15

6.3. Standards ………………………..…………………………………………..……………….… 15

7. Reference …………………………………………………………………………….………….…… 16

7.1. Field of Activities ……………………………….…………….....……………….………… 16

7.2. Carried out projects …………………………………………………………………...…… 17

7.3. Current Projects …………………………...………………………………………………… 18

8. Certificates …………………….………………………………………………….……….......…… 19

Page 4: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

3

1. Foreword

Lyan Sanat Puya Co. has been established in collaboration with

an experienced expert to make use of the scientific potentials

and technical experience.

The focus of our Company is on Electrical and Automation

Control System activities based on innovative creative design

and programming. As the results of previous experiences, our

company is proud of satisfaction of clients during all projects.

Page 5: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

4

2. Company Data

A. Company Name :

LYAN SANAT PUYA

B. Abbreviation :

LSP

C. Company Type :

Private

D. Establishment and registered date :

6 July 2005, Tehran

E. Main business field :

Engineering

Implementation

EPC

MC

Commissioning

F. Field of activities :

Engineering, Implementation, Programming,

Commissioning of Electrical, Mechanical, Process

and Control System in Industries

G. Information: Suite 30, Fl 5, No. 87, Sayeh Bldg,

Allame Tabatabaei Shomali St, Sarv Sharghi Ave, Kaaj

Sq,

Saadat Abad, Tehran 1997863333, Iran

Phone : +98 (0) 21-22068015-7

Fax : +98 (0) 21-22352398

E-Mail: [email protected]

Website: www.lyanco.com

Page 6: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

5

3. Organization Chart

Page 7: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

6

4. Board of Directors

Member of board

A. Member of board and Managing director: Davar Asef

B. Member of board: Hamed Mirfakhraie

C. Member of board: Shahram Zadfallah

D. Davar Asef:

Birth date: April 1966

Field of Study: Power Engineering

Degree: B.S

University Name: Tabriz

Graduated Year: August 1989

E. Hamed Mirfakhraie:

Birth date: January 1975

Field of Study: Hardware Computer Engineering

Degree: B.S

University Name: Tehran Center Azad

Graduated Year: August 1997

F. Shahram Zadfallah:

Birth date: September 1973

Field of Study: Electrical Engineering

Degree: B.S

University Name: Rasht

Graduated Year: August 1997

Page 8: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

7

5. Key Personnel

No

Name Position Educati

on

Year of experie

nce

1 Afshin Attar Project Manager B.S 15

2 Shayan Alaei Technical Manager/Project

Manager B.S 8

3 Hamidreza Yari Technical/Field Service

Engineer B.S 6

4 Saeid Ziarati Technical/Field Service

Engineer B.S 5

5 Pedram

Mirfakhraei

Technical/Field Service

Engineer B.S 5

6 Aria Khakpour Technical/Field Service

Engineer B.S 4

7 Saeid Mirzaei Execution Engineer/Project

Manager B.S 8

8 Malek Amirifar Execution Engineer/Project

Manager B.S 8

9 Puya Aminifar Execution Engineer B.S 4

10 Hossein

Pourtaghi Electrical Engineer B.S 20

10 Bamdad Zareii Project Control B.S 8

11 Vahid Sasanian Project Control B.S 3

12 Mrs. Hosseini Office Manager B.S 10

Page 9: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

8

6. Capabilities

6.1 Software

SIMATIC SIEMENS PCS7

SIMATIC SIEMENS WINCC

SIMATIC SIEMENS WINCC FLEXIBLE

SIMATIC SIEMENS CEMAT

SIMATIC SIEMENS S7

SIMATIC SIEMENS TIA PORTAL

ABB INDUSTRIAL IT

EPLAN

ETAP

AutoCAD

Lighting Calculation (Dialux, Easylux)

Earthing Calculation

MS Office

Visual Studio (VB.net,C#)

Page 10: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

9

6.2 Engineering

Basic Design (Electrical – Control System – Commissioning)

Detail Design (Electrical – Control System – Commissioning)

Inspection (Electrical – Control System – Commissioning)

Supervisory (Electrical – Control System – Commissioning)

6.3 Standards

NEC: National Electrical Code

API: American Petroleum

ASME: American Society of Mechanical

DIN: Deutsche Industries Norm (German Institute of Standard)

IEC: International Electromechanical Commission

IEEE: Institute of Electrical and Electronic Engineering

ISA: Instrument Society of America

ISO: International Standard Organization

NEMA: National Electrical Manufacturers Association

Page 11: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

10

7. Reference

7.1 Field of Activities

Management and Implementation of Electrical Control and

Plant Automation

Design of Control System (Network Topology, Hardware,

Panels, Software)

Programming of Control System Software

Contract Management for the Above Activities

Erection and Commissioning, Providing Maintenance During

Operation

Surveillance and Primary Controls During Construction and

Final Stages of Project

7.2 Carried out Projects

Programming and Commissioning; Pre-Blending Hall of Kavir

Kashan Cement

Implementation and Commissioning; Tolidi Firuzkoh Cement

Commissioning of Raw Mill And Cement Mill Departments;

Tehran Cement Replacement

Page 12: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

11

Electrical Design of Capacity Increase Project; Khash Cement, in

Partnership With Developing Group

Commissioning of Cement Plant; Shahr-e Kurd Cement

Control System Design, Purchasing Equipment and

Programming; Lar-e Sabzevar Cement

Contract Management of Electrical and Control

Implementation; Lar-e Sabzevar Cement

Implementation and Commissioning of Electrical and Control;

Ardestan Cement

Programming and Commissioning of Stacker and Reclaimer;

Ardestan Cement

Programming and Commissioning of Stacker and Reclaimer;

Lar-e Sabzevar Cement

Electrical Maintenance; Tolidi Firuzkoh Cement

Electrical Maintenance; Bohruk-e Yazd Cement

Automation Control System Consultant; Naien Cement

Consultant of Project Manager; Venezuela Cement

Electrical and Control Consultant; Jovein Cement

Implementation and Commissioning; Shahrood Sabzevar

Engineering Procurement and Construction; Ilam Cement

Control System Commissioning; Ilam Cement

Commissioning of Electrical, Mechanical and Process; Ilam

Cement

Implementation and Commissioning; Azarabadegan-e Khoy

Cement

Upgrade Design, Programming and Panel Design of Crusher

Department; Venezuela Cement

Page 13: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

12

Design of Automation Control System and Programming; Sadaf

Carbon Black Production

Design of Control System and Programming of Crusher, Stacker

and Reclaimer; Khuzestan Cement

Implementation and Commissioning of Crusher and

Preblending Gallery Departments; Lamerd Cement

Design of Control System and Programming of Crusher and

Cement Silos; Neyzar-e Qom Cement

Control System Design, Purchasing Equipment and

Programming; Majd-e Khaf Cement

Control System Commissioning; Majd-e Khaf Cement

Electrical Erection and Control System Commissioning; Guilan-e

Sabz Cement

Control System Design, Purchasing Equipment and

Programming; Kiasar Cement

Control System Commissioning; Kiasar Cement

Control System Design, Purchasing Equipment and

Programming; Nazdane Green House

Control System Design and Programming; Zarshouran Gold

Plant

Electrical Erection and Commissioning of Electrical, Mechanical

and Process of Material Handling, Ovens, Petrochemical, etc;

Zarand Coke Making Plant – Zarand Iranian Steel Co

Page 14: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

13

7.3 Current Projects

Cooperation with the Client in Production Stage and

Maintenance; Zarand Coke Making Plant – Zarand Iranian Steel

Co

Control System Commissioning; Nazdane Green House

Control System Commissioning; Zarshouran Gold Plant

Page 15: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

14

Certificates:

Page 16: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

15

Page 17: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

16

Page 18: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

17

Page 19: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

18

Page 20: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

19

Page 21: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

20

Page 22: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

21

Page 23: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

22

Page 24: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

23

Page 25: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

24

Page 26: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

25

Page 27: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

26

Page 28: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

27

Page 29: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

28

Page 30: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

29

Page 31: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

30

Page 32: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

31

Page 33: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

32

Page 34: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

33

Page 35: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

34

Page 36: Lyan Sanat Puya Co. · Prepared by : S.Ziarati Lyan Sanat Puya 8/16/2014 Lyan Sanat Puya Co. 1 Industrial Automation, Electrical & Instrumentation Resume August 2014 Third Edition

35