m49 motorway - s3-eu-west-1.amazonaws.com
TRANSCRIPT
M49 M
otorw
ay
Wash
Fuel Tank
Storage Area
Kerb line linetype/layerParking bay lines linetype/layerFootpath Edging linetype/layerKerb drain line linetype/layerBNDKDK Kerb line linetype/layerParking bay lines linetype/layerFootpath Edging linetype/layerKerb drain line linetype/layerBNDKDK
10no
.cy
cle sp
aces
Unit
10
2no.
leve
len
try d
oors
14no
. car
par
king
spac
es
30m service yard
M49 M
otorw
ay
47no
. car
par
king
spac
es
50m service yard
3no. dock levellers
2no. levelentry doors
22no. car parking spaces
Unit
11
10no
.cy
cle sp
aces
Retai
ning
wall
Red Rhin
e
Red R
hine
Pum
ping
Stati
on 2
Red
Rhin
e
Unit 9
45m se
rvice
yard
6no.
car pa
rking
space
s
3no.
leve
len
try d
oors
40m
servi
ce ya
rd
12no
. car
parki
ng sp
aces
8no.
car
par
king
spac
es
PumpingStation
Arm
co &
Ped
estri
an h
andr
ail
Slot D
rain
Condenserand armco
Gas Box
Gas Box
Substa
tion
Landlo
rd's
Feed
er Pil
lar
Cond
ense
r
Gas B
ox
Gas B
ox
Fina
l pos
ition
of
foot
path
to b
eag
reed
on
site
10no.cycle spaces
Gabi
on w
all (
dotte
d)sh
own
indi
cativ
ely
Gabi
on w
all (d
otted
)
show
n in
dica
tively
Servi
ce Area
Wash
Fuel Tank
2no. levelentry doors
47.5m service yard
First
Floor O
ffices
Unit 7
Leve
lEn
tryDoor
8no. D
ockLe
velle
rs
38m Se
rvice
Area
Staff P
arking
Balancin
g Pond
60m Se
rvice
Area
13no. Lorry Parking Bays
Leve
lEn
tryDoor
Exist
ingPylo
n
11no. Lorry Parking Bays
Staff P
arking
2no. L
evel
Entry
Doors
Unit 6
Cycles
3no. Dock
Leve
llers
45m Service Area
Unit 5
First
Floor
Offices
Unit 8Level Entry
Door
Staff Parking - 40no. car spaces
35m se
rvice
yard
2no. Leve
l
Entry
Doors
30m ServiceArea
Unit 2
Unit 1
Level Entry
Door
10no. Dock
Levellers
Two
Storey
Offices
Lorry
Park
ing A
rea
2no. LevelEntry Doors
6no. DockLevellers
Unit 3
43m Service AreaSt
aff P
arki
ng
Firs
t Flo
or O
ffice
s
Staff Parking
2no. Leve
l
Entry
Doors
4no. Dock
Leve
llers Unit 4
First
Floor O
ffices
Up to 50m Service Area
Cycles
Cycles
First
Floor
Offices
Staff P
arking
Staf
f Par
king
30no
. car
spac
es
50m
50m First Floor
Offices
Retaining
Retaining
Turning C
ircle
Schedule of AccommodationAll areas are square feet gross internal
Unit B8 Offices Total Parking Site Area1 39,227 2,600 41,827 38 spaces 2.34 acres2 53,633 2,592 56,225 47 spaces 2.68 acres3 59,400 3,500 62,900 51 spaces 2.86 acres4 60,200 3,500 63,700 69 spaces 3.15 acres5 18,850 1,885 20,735 18 spaces 1.16 acres6 44,500 2,500 47,000 29 spaces 2.47 acres7 90,000 4,500 94,500 76 spaces 7.00 acres8 89,500 4,500 94,000 70 spaces 4.87 acres9 29,514 2,103 31,617 32 spaces 2.09 acres10 30,845 2,117 32,962 30 spaces 1.96 acres11 12,489 1,273 13,762 14 spaces 0.99 acres
Total Development 559,228 sq.ft. 31.57 acres
drawn
date
scale
checked
no
drawing
project
client
aja architects llp
Coventry Business Park
T: 024 7625 3200
no. bydate revision
notes
W: www.aja-architects.com
F: 024 7625 3210
COVENTRY CV5 6UB
aja architects llp is a limited liability partnership registered in England No. OC326721
1170 Elliott CourtHerald Avenue
this drawing and design is the copyright of aja architects llp and must not bereproduced in part or in whole without prior written consent. contractors mustverify all dimensions on site before commencing work or preparing shop drawingsIf in doubt ASK.
Where this drawing contains any Ordnance Survey mapping material, it has beenreproduced under license number 100052278.Ordnance Survey © Crown copyright
architectsarchitects
More+Bristol
Preliminary Masterplan
1:2000 @ a1 up
nn 5.10.20
6270 - 1328 Rev C
A 9.10.20 Masterplan updated basedon comments rec'd ML
B 29.10.20 Unit 7 Layout updated MLC 10.11.20 Additional dock added to Unit 6 ML