Page 1: Maaz Ahmad  CV.pdf

Maaz Ahmad

Mobile: +92-315-4991040

E-mail: [email protected]

CAREER OBJECTIVE

Looking for an organization to create value by ambition, innovation, hardworking and smart decision making, where the learning is a never ending process EDUCATION:

B.Sc. Electrical (Telecommunication) Engineering (February 2011) COMSATS Institute of Information Technology, Jinnah Campus, Lahore

PROJECTS & TERM REPORT: Final Year Project

Design of an Evaluation Board for 8051 & AVR MCU’s with ISP Interface Term Reports

Controlling of DC Motor speed using 8051 Microcontrollers

Design of Mobile Sensor Technology

PROFESSIONAL EXPERIENCE: CMPak ZONG: Executive Engineer O&M (November 2014 to Onwards)

Dashboard Preparation for KPIs (Excel/PPTs) o TCH o OMT o FPS o Fueling o Low TCH Cells o Top Outage o 2G/3G/4G Site Down Ageing o Down E1s o VSWR Alarms o PM Progress o Open/Resolved TTs o Monthly / Quarterly Regional/Zone Lead/Cluster Owner Rankings

Projects o Battery Bank Deployment Project o Site CW Maintenance Project o Insourcing Project. o LC Installation Project o DG Overhauling Project o IC Installation Project. o Complete Site Database Project

RAN Complaints Resolution.

CAPEX & OPEX Preparation.

NOC Escalation Rules Management.

Coordination between Inter & Intra Departmental Communication.

Site Commercial On-Air 2G 3G 4G

NOC Escalation Matrix

Complete Site Database Maintenance.

Zones & Cluster Divisions using the MAP Info & Google Earth.

Complaint TT Closures. Achievement:

Saved 6.65 Million by switch off Site and sifting its traffic to other site

Page 2: Maaz Ahmad  CV.pdf

CMPak ZONG: Project Engineer (November 2012 to October 2014)

• SDR 1000 Expansion.

• SDR 500 Swap & Expansion

• SDR 459 Swap & Expansion • SDR 413 Expansion

• Phase III Rollout

• Phase IV Rollout • Equipment Mapping according to configuration.

• TRx Addition and Scratching

• Site Surveys. • E1 Expansion.

• Hard & Soft Expansion.

• Site Quality Assurance. • WO & Access Generation.

• PAT , PAC

• New sites Equipment Installation • Site Commission.

ZTE:

PMO SDR (Technical Support & BSS Engineer) (February 2012 to November 2012)

As a PMO my responsibility is to; • PAT , PAC , FAT , FAC

In addition to this I am also the in charge of

• Equipment Delivery Orders Generation (Web Portal) • Equipment Shipments from China to Warehouse.

• Equipment Delivery from Local Factory to Warehouse

• Spare Parts & New Equipment Management • Inventory Check & Balance.

Phase III & Phase IV Rollout

• New sites Equipment Installation • Site Commission.

• From Nominal to site OnAir

• Nominals,SSI,TSS,TSSR,LA,CIVIL,RFI,TI,MW,OnAir

Achievement: I have closed 102 E1 Expansion for SDR 1000 & SDR 500 both soft and hard on the record time of 28 Days which includes,

• Effective Teams Management • WO & Access Generation

• MRF Generation

• PCM Generation • iBSC Patching

• Far End Patching

• Loop Testing • E1 Soft & Hard Commission

• Media Through site by site to Far end.

• Alarms removal

China Communication Services Commissioning Engineer October 2011 – January 2012

• In CCS I got hand on experience from October, 2011 to January, 2012 on

• E1 Patching on both V3 & SDR,

• 2nd E1 Expansion, • Cutovers from V3 to SDR,

• Media Through Long Haul Sites, Direct Sites & Far End Sites,

• Loop Testing, • Quality Control,

• SDR Commissioning & RRU & 2nd E1 Expansion on LMT

• Net Numen

Page 3: Maaz Ahmad  CV.pdf

NETS International Network & Implementation Engineer April 2011 – July 2011 (3 months)Dubai

Hot Spot (Wi-Fi): I worked from May 2011 to September2011 on the hotspot project i.e. to implement Wi-Fi modules to covers whole of

Dubai. My duty is RF Planning, site surveys, sectorization, channelization, parameters checking, drive test

GPON: NETS International is deploying GPON i.e.FTTH (Fiber to Home).Our work is to implement and deployment of cable from Exchange OLT to Home ONT which includes cabling, splicing and testing. Our duty is to check all that parameters that we deploy.

HONORS, AWARDS, MEMBERSHIPS, SEMINARS, TOUR STUDIES

CCNA (NEST Organization) COMSATS Networking Society.

Zonger Of the Month

ADDITIONAL SKILLS AND EXPERIENCE

Adept at using Kiel ,Cisco Networking Software, Proteus and MS Office

Good in Basic Computer Networking Skills

Excellent communication and interpersonal skills and comfortable with working in a team

NET Numen,PathLoss

INTERESTS

Computer Networking

Cricket

Traveling and Music

REFERENCES

Reference will be furnished on request.