MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in No.07-05/SG-9B-II/2522 Jabalpur, dated:24.10.2017 To As per distribution list Sub: Agenda of 60 th meeting of Operation and Coordination Committee of MP. The Agenda of 60 th meeting of the Operation and Coordination Committee of MP scheduled on 28 th October 2017 at Shree Singhaji Thermal Power Station (SSTPS), MPPGCL, Singhaji, Distt. Khandwa has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded. (R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur vkbZ ,l vks : 9001-2008 ISO: 9001-2008

Upload: lethien

Post on 01-May-2018

229 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC014880, Email-mdtransco.nic.co.in

No.07-05/SG-9B-II/2522 Jabalpur, dated:24.10.2017

To

As per distribution list

Sub: Agenda of 60th meeting of Operation and Coordination Committee of MP. …

The Agenda of 60th meeting of the Operation and Coordination Committee of MP

scheduled on 28th October 2017 at Shree Singhaji Thermal Power Station (SSTPS), MPPGCL,

Singhaji, Distt. Khandwa has been uploaded on the website of SLDC ‘www.sldcmpindia.com’

and can be downloaded.

(R.A. Sharma) Member Secretary, OCC SLDC, MPPTCL, Jabalpur

vkbZ ,l vks : 9001-2008

ISO: 9001-2008

Page 2: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Distribution List 1. The Chief Engineer (Works), MP Power Transmission Co. Limited, Shakti Bhawan, Jabalpur, email-

[email protected]. 2. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593,

2702710 Email- [email protected] 3. The Chief Engineer (Transmission-East Zone), MP Power Transmission Co. Limited, Shakti Bhawan,

Jabalpur. Email- [email protected]. 4. The Chief Engineer (Transmission-West Zone), MP Power Transmission Co. Limited, Indore. 5. The Chief Engineer (Transmission-Central Zone), MP Power Transmission Co. Limited, Bijlee Nagar,

Govindpura, Bhopal, email- [email protected]. 6. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908

Email- [email protected] 7. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-

2660908 Email – [email protected] 8. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-

2664749, Email- [email protected], Email- [email protected] 9. The Chief Engineer (O&M:Hydel), MP Power Generating Co. Ltd, Jabalpur, Fax No-0761-2664749. 10. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected]

[email protected] 11. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected]

[email protected]. 12. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co.Limited,

Jabalpur, Fax No- 0761-2668503, Email – [email protected]. 13. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co.

Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]. 14. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co.

Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]. 15. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email –

[email protected]. 16. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email –

[email protected] 17. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-

2423046, [email protected] 18. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla

Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected] 19. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office,

Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected], [email protected], M-9752415312, Mr.Satyendra Kumar (Dy.CE), Mob.9752415301 (CEDE, WCR).

20. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]

21. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected], [email protected], [email protected].

22. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]

23. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected]

24. The Chief Executive Officer, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old Itarsi, Distt. Hoshangabad, Email – [email protected]

25. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :[email protected]

26. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected]

Page 3: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 59th meeting of Operation & Coordination Committee of MP held on 12TH September 2017 at SLDC, MPPTCL, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/2402 Jabalpur dated 11.10.2017.

[OCC may confirm the minutes]

ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS AUG 2017 TO SEPT 2017. 2.1. Frequency Particulars: During Aug 2017 the system frequency was below 49.9 Hz for 7.2% of time against 11.77 % of time during Sept 2017. The system frequency was above 50.05 Hz for 15.98 % of time during Aug 2017 against 9.73 % of time during Sept 2017. The system frequency was within the IEGC range of 49.9-50.05 Hz for 76.82% of the time during Aug 2017 against 78.50% of time during Sept 2017. The average monthly frequency was 49.99 Hz during month of Aug 2017 and 49.97 Hz during month of Sept 2017. The system frequency did not touch 49.20 Hz during the above period.

The detailed frequency particulars for the month of Aug 2017 and Sept 2017 are enclosed at

Annexure-2.1. The brief detail of frequency profile is given here under:

Month Average frequency

Minimum Integrated frequency over an hour

Maximum integrated frequency over an hour

Instantaneous Minimum Frequency

Instantaneous Maximum Frequency

Aug 2017 49.99 Hz 49.81 Hz 50.10 Hz 49.65 Hz 50.20 Hz Sept 2017 49.97 Hz 49.80 Hz 50.07 Hz 49.62 Hz 50.20 Hz

[Committee may like to note]

2.2 Operational Matters 2.2.1 Operational Discipline : System operated in terms of frequency profile for the months Aug 2017 and

Sept 2017 is as given below for discussion by the committee :

Month % of time Frequency Below 49.9 Hz

% of time Frequency above 50. 05 Hz

% of time frequency within the permissible range of 49.9-50.05 Hz.

Average monthly frequency

No. of times frequency dipped below 49.2 Hz

Aug 2017 7.2% 15.98% 76.82% 49.99 Hz 0 Sept 2017 11.77% 9.73% 78.50% 49.97 Hz 0

[Committee may like to note]

AGENDA FOR 60TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO BE HELD ON 28TH OCTOBER 2017 AT 11:00 AM AT SHREE SINGHAJI THERMAL POWER

STATION (SSTPS), SINGHAJI, DISTT. KHANDWA

Agenda of 60th OCCM of MP 1

Page 4: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

2.2.2 Voltage Profile: During the months Aug 2017 and Sept 2017 the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid:-

Aug 2017 Sept 2017 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Name of observed Observed Observed Observed Sr. 400 KV

Voltage Volt

No. Substation Voltage ag Voltage

Date Date Date Date KV e KV KV KV

1 Indore 421 04.08.17 400 18.08.17 421 01.09.17 401 07.09.17

2 Itarsi 414 29.08.17 396 17.08.17 414 17.09.17 397 07.09.17

3 Bina 417 24.08.17 397 20.08.17 416 22.09.17 400 03.09.17

4 Gwalior 417 19.08.17 385 16.08.17 413 17.09.17 387 13.09.17

5 Nagda 423 25.08.17 404 17.08.17 423 05.09.17 403 07.09.17

6 Satpura 425 25.08.17 405 17.08.17 423 01.09.17 409 07.09.17

7 Birsinghpur 422 02.08.17 408 22.08.17 420 10.09.17 408 15.09.17

8 ISP 427 29.08.17 408 18.08.17 427 01.09.17 420 06.09.17

9 Bhopal 418 29.08.17 401 19.08.17 418 22.09.17 402 15.09.17

10 Ashta 423 24.08.17 406 17.08.17 422 22.09.17 406 09.09.17

11 Pithampur 422 04.08.17 401 06.08.17 420 22.09.17 406 06.09.17

12 Singhaji 426 04.08.17 406 06.08.17 424 02.09.17 410 09.09.17 [Committee may please note & discuss]

2.2.3 Status of Capacitor Banks in sub-transmission system: The updated information of the status of capacitor banks in sub-transmission system as on 30th Sept 2017 as submitted by DISCOMs is detailed below:

[Action: DISCOMS]

DISC

OM

Capacitor bank installed in good condition (No)

Capacitor Banks healthy but not in service due to control ckt problem

Capacitor bank installed but defective & are repairable (No)

Requirement of repair against each unit (No)

Requirement against non-repairable capacitor banks

Capacitor banks already covered under ADB T-V

Balance capacitor banks to be covered in other schemes

600 KVAR

1200 KVAR

1500 KVAR

600 KVA

R

1200 KVA

R

1500 KVA

R

600 KVA

R

1200 KVAR

1500 KVAR

No of 100 KVAR Units

required

600 KVAR

1200 KVAR

600 KVAR

1200 KVAR

600 KVAR

1500 KVAR

EZ 403 142 37 20 12 1 25 05 0 25 - - - - - 77

CZ 5 687 686 0 0 0 0 0 0 0 0 0 0 588 0 0

WZ 627 539 636 18 13 03 22 20 48 177 2 08 - - - 03

Agenda of 60th OCCM of MP 2

Page 5: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

2.2.4 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 30.09.2017 as submitted by MPPTCL is given below:-

[Action: MPPTCL]

2.2.5 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: The various ongoing Transmission Schemes completed during the financial year 2017-2018 (up to Sept 2017) and plan for completion of various ongoing Transmission Schemes for the Year 2017-2018 is enclosed as Annexure 2.2.5(i) and 2.2.5(ii) respectively.

[Action: Committee may like to note] 2.2.6 U/F and df/dt Relay Operation (i) U/F and df/dt Relay Operation: Frequency did not touch 49.20 Hz during Aug 2017 and Sept 2017.

There was no df/dt operation during the same period. [Action: MPPTCL]

(ii) Defective u/f, df/dt relays: MPPTCL has informed that all the df/dt relays are in operation, where the

U/F relays are not available, the numerical relays programmed for under frequency operation. df/dt relay installed at 220 KV Ujjain, 220 KV S/s Badnagar & 132 KV S/s Chapda is being replaced shortly, except this all U/F stages are in good/healthy working condition.

[Committee may like to note] 2.3 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation to

33 KV feeders : (i) Details of DISCOM wise Power supply given to various domestic categories during the period August

2017 and September 2017 is enclosed at Annexure 2.3(i).

[Committee may like to note]

(iii) Group Allocation to Newly Commissioned existing EHV substations:- The region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.3 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders is given below:-

SN DISCOM Region No of 33 KV feeders for which groups to be allocated

Voltage Class

Capacitor bank installed as on

31.07.17(MVAR)

Capacity Added after Last OCC Meeting (MVAR)

Capacitor banks already covered under ADB T-V

TOTAL CAPACITY AS ON 30.09-17

(MVAR)

Capacitor Bank Installed but

defective & are not repairable (No &

MVAR) 220 KV 100.00 0.00 - 100.00 All in Service

132 KV 1238.00 0.00 - 1238.00 33 KV 4684.50 48.00 - 4732.50 Total 6022.50 48.00 - 6070.50

Agenda of 60th OCCM of MP 3

Page 6: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

01

EAST

Jabalpur 0 02 Sagar 0 03 Rewa 0 04 Total 0 05

WEST Indore 01

06 Ujjain 00 07 Total 01 08

CENTRAL Bhopal 07

09 Gwalior 08 10 Total 15

TOTAL Grand Total 16 Discoms are requested to furnish the details as per list enclosed at Annexure-2.3(ii) in the meeting.

[ACTION : DISCOMs]

ITEM NO. 3 : OPERATIONAL PLANNNING: 3.1 Generating Units under planned outage and proposed maintenance programme: The annual maintenance /outages of thermal generating units of MPPGCL during November 2017 to December 17 is Nil as intimated by ED(O&M:Gen.), MPPGCL, Jabalpur.

[Committee May like to note]

3.2 Proposed shutdown programme of Transmission lines / Transformers: The proposed shutdown of transmission elements for the period 01.11.2017 to 31.12.2017 submitted by MPPTCL is enclosed as Annexure-3.2.

[Committee May like to discuss]

3.3 Long Outages of transmission elements and protections: The status submitted by MPPGCL /MPPTCL are given below:-

Sr. No

Line/Transformer/ etc under long Outage

Outage date Reason Response from Utility

1. 12.5 MVA, 132/66/33 KV X’mer, CGL make Sr. No. 23615 at 132 KV S/s Pichhore

19.05.2016 Transformer failed on

19.05.2016 as intimated by T&C, MPPTCL.

The load is manageable through (1x20 + 1x40) MVA X’mers in running condition at S/s Pichhore. MPPTCL informed that the de-commissioning proposal of this x-mer is sent to CE(P&D) vide U.O.No.1788, dt 06.01.17. further , the matter is atken up by CE(P&D) with CGM(W), Central Discom vide L.No.04-02/PSS/2291 Dt 08.09.17, After receiving approval from competent authority, the transformer shall be de-commissioned. The latest status in the matter may please be submitted by MPPTCL (T&C/P&D) in the meeting.

Agenda of 60th OCCM of MP 4

Page 7: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

2. 12.5MVA X mer, BBL Make (Sr. No.-1428/3) at 132 KV S/s Chapda.

Not intimated X’mer failed

The 12.5MVA BBL make Transformer Sl. No. 1428/3 failed and proposed to be withdrawn from system. MPPTCL informed that the de-commissioning proposal of this x-mer is sent to CE(P&D) vide U.O.No.851, dt 11.08.17. further , the matter is atken up by CE(P&D) with CGM(W), Central Discom vide L.No.04-02/PSS/2291 Dt 08.09.17, After receiving approval from competent authority, the transformer shall be de-commissioned. The latest status in the matter may please be submitted by MPPTCL (T&C/P&D) in the meeting.

3. 160 MVA, 220/132 KV Sr. No. 626452037050 BHEL X’mer at 220 KV S/s Jabalpur

30.09.2016 Tripped on Differential indication.

Transformer dismantled and sent to M/s BHEL for inspection / repairs as intimated by MPPTCL. In 59th OCCM, MPPTCL informed that the transformer is expected to be commissioned by November 2017. Latest status may please be submitted by MPPTCL in the meeting.

4. 50 MVA, 132/33 KV BHEL make X’mer, Sr. No. 2042474 at 132 KV S/s Katni

28.05.2017 Tripped on differential indication.

Representative from MPPTCL informed the committee that X’mer failed within guarantee period and it is being sent to M/s BHEL for inspection/ repair. Representative from MPPTCL informed the committee that the X’-mer has been sent to M/s BHEL, Jhansi for inspection/ repair. MPPTCL informed that another 40MVA BBL transformer Sl.No. 5564/2 commissioned on Dt. 16-10-17.

5. 20 MVA, 132/33 KV EMCO make X’mer, Sr. No. HT-1223-11224 at 400 KV S/s, Katni

22.07.2017 Tripped on differential indication.

MPPTCL informed the that the X’mer is to be replaced by another 20 MVA X’mer by November 2017.

6. 40 MVA, 132/33 KV CGL make X’mer, Sr. No. T-8362-3 at 220kv s/s Ujjain.

22.06.2017 Tripped on differential indication.

MPPTCL informed that the internal inspection of the X’mer is pending due to bad weather. MPPTCL informed that the transformer has been declared failed. Latest status regarding further action (replacement) may please be submitted by MPPTCL in the meeting.

7. 20 MVA, 132/33 KV CGL make X’mer, Sr. No. T-8362-3 at 132kv s/s Sonkatch.

09.06.2017 Tripped on differential indication.

MPPTCL informed that the 33 KV bushings are defective and purchase order for procurement has been placed. MPPTCL informed that the 33KV bushings are received for replacement of defective bushings and transformer shall be charged in a week time. Latest status may please be submitted by MPPTCL in

Agenda of 60th OCCM of MP 5

Page 8: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

the meeting.

8. 20 MVA(16.5/6.6 KV), UAT-A, Unit No. 10, STPS, Sarni 27.05.2017 Due to oil leakage from

B-Phase LV bushing.

MPPGCL informed Work completed. Testing and commissioning will be done when unit is under shutdown

9. 90 MVA (400/11.5/6.6KV) Station X’mer-2, SSTPP, Khandwa

14.09.2016 B Ph. HV side bushing failed

MPPGCL informed that repair work of station transformer is under progress at M/s BHEL, Jhansi. Repair work under progress at BHEL, Jhansi.

10. STPS Unit #9 24.08.2017 GT Burnt

Unit under long forced outage due to GT burnt. MPPGCL informed the committee that Replacement /Purchase work under progress.

11. 400 KV Generator Breaker of Unit # 9 of Satpura 24.08.2017 Fire in Bushing of GT

Replacement completed by Breaker given by MPPTCL, but there is problem in breaker.

12. 400KV transfer bus, STPS, Sarni Aug-17 Problem in Breaker

Replacement completed by Breaker given by MPPTCL, but there is problem in breaker

13. 16 MVA, 132/11KV EMCO X’mer at 132 KV S/s Sanwer.

14.07.16

X’mer taken out from service since 14-07-16

due to aging and no 11KV network at S/S

Committee may like to discuss & MPPTCL is requested to submit the further action plan.

14. 40MVA, 132/33KV, CGL X’mer at 132 KV S/s Chhindwara

19.09.17 -

After internal inspection X’mer declared faulty and is being replaced by 63MVA BHEL transformer by Oct’17. Latest status may please be submitted by MPPTCL in the meeting.

The utility may submit the latest status.

[Action:MPPGCL/MPPTCL]

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF AUGUST 2017 AND SEPTEMBER 2017: The details of actual generation, Schedule from Central Sector, demand etc. are given in the following Annexures: Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of

MPPGCL & NHDC Hydel Units. Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.

[Committee may like to note] ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING AUGUST 2017 AND SEPTEMBER 2017 : There was no major grid disturbance in MP during August 2017 and September 2017. Moreover, the Grid Disturbances and Grid Incidents in MP during these months are given in Annexure 5.

[Committee May like to discuss]

Agenda of 60th OCCM of MP 6

Page 9: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS / TRANSMISSION ELEMENTS:- The present status regarding schedule and commissioning of reactors / transmission elements is as below:-

S.No. 400 KV S/s Size MVAR

Implementing Agency

Expected Date of Commissioning as intimated in last OCC

1. Bus Reactor : ISP 125 MVAR NHDC

Representative from NHDC informed the committee that delivery of all equipment is expected by August 2017. Thereafter erection & commissioning work will be carried out. It is expected that the reactor will be in service by October 2017 as informed by NHDC. Latest status may please be submitted by NHDC in the meeting.

2. Line Reactor on 400 kV Satpura–ISP line at STPS

50 MVAR MPPGCL

In 57th, 58th & 59th OCCM, MPPGCL informed the committee that procurement of line reactor is under tendering stage and expected to be commissioned by Oct, 2017. Latest status may please be submitted by MPPGCL in the meeting.

3. Bus Reactor at SSTPS

125 MVAR MPPGCL

Work will be carried out under PSDF as intimated by MPPGCL. In 56th OCCM MPPGCL informed the committee that purchase tender will be opened on 31.03.2017. In 59th OCC, MPPGCL informed the committee that the Bus Reactor is expected to be commissioned by June, 2018. Latest status may please be submitted by MPPGCL in the meeting.

The latest status may be submitted in the meeting.

[Action: MPPGCL/NHDC]

6.2 Provision of synchronization facility at EHV sub-stations of MPPTCL:- As per Grid Code, the

synchronization facility should be available at all the Power Stations, 400 KV Sub-stations and 220 KV Sub-

stations and 132 KV sub-stations in the path of black start. In last OCC meeting MPPTCL representative

informed the committee that order for 69 no. synchronization trolleys has been placed and 1 no.

synchronization trolley has been delivered for checking and testing purpose at 220KV S/S Barwaha.

In last 59th OCCM MPPTCL informed the committee that the status will be intimated shortly to SLDC.

The status of installation and commissioning of synchronization trolleys at different substations to be submitted

by the MPPTCL. [Action: MPPTCL]

6.3 Ten Daily Reservoir operation table of MPPGCL HPS:- In the meeting held in Regional Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table from WRD and NVDA for their operation of their hydro generators. In last 54th to 59th, OCCMs, request has been made to

Agenda of 60th OCCM of MP 7

Page 10: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

MPPGCL for furnishing the same to SLDC. The Tan Daily programme of hydel power ststions is necessary for planning of Load Generation Balance.

MPPGCL has not submitted the ten Daily Reservoir Operation Table of all the power stations of

MPPGCL for the year 2017-18. It is requested that MPPGCL shall submit the Ten Daily Reservoir Table of all hydel power stations in coordination with NVDA and WRD for optimum utilisation of available water in the reservoirs during real time operation.

[Action: MPPGCL]

6.4 Updation of Recovery Procedure for Western Regional ( WR ) Grid-2007:- WRLDC has informed that

the Grid Recovery Procedure for Western Region is being updated and the users of WR Grid, STUs and CTU

may kindly convey the relevant details for facilitating timely updation of this document.

In view of the above it has been requested vide letter no 07-05/RPC-38/1951 dated 25.08.2017 to

kindly submit the relevant details as on 31.08.2017 pertaining to respective entity to SLDC as mentioned in

WRLDC letter under reference to this office by 10th September 2017, so that consolidated information could be

forwarded to WRLDC within specified time limit, but no information has been received till date. It is therefore

again requested to kindly convey the relevant details as given below :-

a. Contacts Details (Mobile/Land Line Numbers/Email-Id) of the Nodal officers identified for crisis

management.’

b. List of New transmission elements and generation units commissioned in 2017.

c. Shunt Reactive resources (Line Reactors/ Bus Reactors) in STU system.

d. Traction Supply Details( As per format enclosed at Annexure-6.4)

e. Synchronization facilities at 132 KV/220 KV/400 KV.

f. List of Stations having black start capabilities.

g. Any other relevant information.

The information regarding updation of Recovery Procedure has not been received from any of the

concerned entities. It is requested to submit the details in the meeting.

[MPPGCL/MPPTCL/NHDC]

6.5 MONITORING OF SCHEMES FUNDED FROM PSDF :- It was decided in the 6th meeting of NPC held on 19th December 2016 at Bengaluru, that all the RPCs in the monthly OCC meetings may follow up with the utilities to expedite the completion of schemes by giving due priority. The implementation of most of the schemes are based on the recommendation of the enquiry committee on grid disturbance of July 2012 headed by Chairperson, CEA. Therefore timely implementation of these schemes would enhance the grid security and reliability. Accordingly the details of grant sanctioned from PSDF for the schemes of MP is enclosed at

Agenda of 60th OCCM of MP 8

Page 11: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Annexure- 6.5A. The status of implementation of above schemes (physical as well as financial progress) may please be reviewed and the entities are requested to expedite implementation of the schemes. The utilities were advised to furnish the information in the format enclosed at Annexure – 6.5B by first week of every month on regular basis to Member Convener, PSDF project monitoring group (AGM, NLDC, POSOCO) with a copy to NPC, WRPC division and SLDC . The status of the same is being monitored by WRPC in OCC meeting of WRPC every month. It is observed that MPPTCL and MPPGCL are not submitting the requisite information to SLDC in first week of every month for onward transmission to WRPC. It is therefore requested that concerned official may please instructed to submit the same regularly to SLDC within time. [Action: MPPGCL/MPPTCL] 6.6 Tripping of 400 KV Sarni-Koradi line on over voltage on dated 17.10.2017:-

On dated 17.10.2017 at 23.05 Hrs, 400KV Satpura-Koradi line tripped on B-Ph. over voltage indication

from Satpura end only. In this context it is mentioned that at time of tripping, the voltage at Satpura end was

only 410 KV. It is evident that this line should not be tripped on over voltage indication. It appears mal-

operation.

Vide this office letter dated 18.10.2017, the aforesaid issue was raised and CE, STPS, Sarni has been

requested to ensure healthiness of relay, CVT and associated equipments at Sarni for remedial action to avoid

such mal-operation in future. The setting of over voltage relay at Sarni end are also required to be furnished to

SLDC along with detailed report of aforesaid tripping so that the tripping incidence may be analyzed. Status of

above tripping may please be updated. The Committee may please discuss the matter.

[Action:MPPGCL]

6.7 Grid incidence at SGTPS, Birsinghpur on 7th July, 2017:-

On 7th July 2017 at 18:39 Hrs,, the ICT at Birsinghpur S/s was charged from 220 KV side after shut

down which was availed for bus bar protection retro fitting work and while synchronizing at 400 KV side,

the ICT tripped on differential protection. Differential protection of generator also operated but generator

breaker opened after 310 mili sec. The delayed tripping of generator led to LBB operation. There was

generation loss of 144 MW. Based on detailed report submitted by MPPGCL, the tripping incidence was

analyzed by WRLDC and raised following observations-

(i) Why the lines were not uniformly distributed on 220 KV Bus No.1 and Bus No.2 at 400/220 KV Birsinghpur S/s? What is present status of bus bar arrangement? (ii) What was the reason for tripping of ICT on differential protection? (iii) The reason for differential protection for 220 KV GT 1 is also not clear. (iv) This is very serious that two of the feeders from 220 KV Bus No.2 have not tripped due to wrong bus isolator switch selection. This kind of issue during a bus fault would have led to delayed fault clearance and widespread system outage.

Agenda of 60th OCCM of MP 9

Page 12: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

2. MPPGCL may please give suitable justification regarding cause of aforesaid tripping incidence

and discrepancy observed in tripping report.

The Committee may discuss the matter.

[Action-MPPGCL]

6.8 REPORTING OF FLASH REPORT, DR and EL FOR 400KV, Interstate Transmission Elements & Detailed Tripping Report:-

As per the provisions of Regulation 5.2 (r) of CERC (Indian Electricity Grid Code) Regulations 2010 and Regulation of 5(9) of CERC (Indian Electricity Grid Code) (First Amendment) Regulations, 2012 all the Regional Entities of the Region shall furnish the tripping details including DR & SEL output to RLDC with in 24 hrs of the event for analysis and identify the real time measures required in future to ensure secured grid operation. The flash report is also required to be furnished to SLDC within an hour of tripping. It is observed that FLASH REPORT, DR & EL of station is not made available after tripping of transmission grid element by the State Grid Entities and the flash report is also not being sent after repeated pursuation. It has been intimated by WRLDC wide letter no.- WRLDC/SO-II/1737/2017/1996-2014 dated-21.07.2017 that in case of tripping of Inter State & inter Regional lines of voltage class 220 KV & above level, a tripping report along with the DR/EL files shall be submitted to WRLDC. In the matter it is to mention that the detailed report along with DR/EL shall be submitted to WRLDC/WRPC. Several incidences / trippings which occurred during the month of June-2017 for which the details has not been submitted are as below:-

S.no.

Element Date of tripping

Time of tripping

Remark

1. 220 KV Mehgaon - Auriya

01.08.17 02:13 Hrs. MPPTCL is requested to submit the detailed report along with DR/EL files, A/R details, etc. in the meeting.

2. 220 KV Mehgaon - Auriya

02.08.17 00:59 Hrs. MPPTCL is requested to submit the detailed report along with DR/EL files, A/R details, etc. in the meeting.

3. 220 KV Mehgaon - Auriya

02.08.17 02:50 Hrs. MPPTCL is requested to submit the detailed report along with DR/EL files, A/R details, etc. in the meeting.

In view of the above MPPTCL is requested to kindly take up the matter with the field offices and submit the detailed tripping report to SLDC at the earliest for onward submission to WRLDC/WRPC. [Action: MPPTCL/MPPGCL/IPPs/NHDC/ISP/OSP]

6.9 Review of important grid elements list of WRLDC in respect of MP:-

MP SLDC has requested WRPC /WRLDC that list of important grid elements (uploaded in WRPC

website in decided 497th OCCM) should be reviewed and only most important elements should be kept in the

list. The outage of such less important / critical element have been given by MP SLDC by taking into

Agenda of 60th OCCM of MP 10

Page 13: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

consideration intra-state grid condition. Accordingly, matter was raised in 499th meeting of WRPC in Mumbai.

Thereafter a meeting was conducted with WRLDC official and after discussion, elements to be excluded from

list of important grid elements of WR in respect of MP were decided with following conditions-

(i) For availing outages on aforesaid lines/ ICTs, N-1 contingency should be ensured.

(ii) The outage of element where different licensees are involved to be incorporated in Google sheet for

outage coordination on D-3 basis. No any planned outage shall be entertained if not requested in D-3.

(iii) The SLDC will permit shut down only after getting message from competent authority in D-3 basis. It is

therefore invariably required that all utilities shall ensure that such outage proposal should have forwarded to

SLDC at least 3 days before date of outage.

(iv) All outages more than 2 days shall be approved by OCCM as per practice in vogue.

(v) All such elements which are excluded from purview of OCCM are Annexure-6.9.a & Annexure-6.9.b.

The Committee may discuss the matter.

[Action: MPPTCL]

6.10 Inspection of Relays of Automatic Under Frequency Load Shedding & Certification thereof:- It is

desired that for safe & secure operation of integrated system, the under frequency relay should be connected

in the system in healthy condition. Accordingly, WRPC is pressing hard to provide the self-certified status of

healthiness of relays of Automatic Under Frequency Load Shedding (AUFLS) and periodic checking of the

same. Vide this office correspondence No. 1089 dated 08.06.2017 read with 1837 dated 17.08.2017 and

04.01.2017, CE (T&C) and also SE(T&Cs) were requested to provide status of healthiness of relays of

Automatic Under Frequency Load Shedding on priority basis to SLDC, so that same may be communicated to

WRPC. Inspite of repeated request vide various correspondence, moreover the matter had been raised in 59th

OCC meeting of MP, however the desired information are still awaited from utilities, only a few circle has

furnished the detail.

It is therefore desired that the above matter may be treated as urgent and status of healthiness of

Automatic Under Frequency Relays may be provided to SLDC and also the under frequency may be tested

periodically. In this context it is also mentioned that time to time WRPC official as well as SLDC official shall

visit the sub-stations to ascertain the healthiness of under frequency relay.

Committee may please discuss the matter. [Action- MPPTCL]

6.11 Formation of State Level Relay setting group- Review and Coordination of relay setting in state of

MP :- As decided in 128th Protection Committee meeting of WRPC held on 06th & 07th Dec. 2016 , relay

review group for state of MP has been constituted vide this officer letter No.07-05/RPC-14/596 Jabalpur dtd

22.05.2017. In the above context all entities are requested to provide relay settings of all important nodes & all

other nodes where relay settings are required to be examined considering protection issues. As desired by

Agenda of 60th OCCM of MP 11

Page 14: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

WRLDC important nodes like Indore PG, Bhopal etc. required to be examined first, which have huge effect on

reliability and security of Grid.

The first meeting of State Level Relay Setting Group convened on 18th August 2017 at SLDC for review the existing relay settings of critical state network and state network incidental to ISTS and to provide necessary interface between utilities/entities.

All the members were requested to make arrangement to furnish details of relay settings of all important nodes,

so that same may be communicated to all members and existing setting of critical nodes could be reviewed &

corrective measures may be taken. Attention was also invited to members that SLDC have made multiple

correspondences in this regard, however except MPPGCL, no any other utility has provided the desired data. It

is accordingly desired that the data may please be provided immediately to SLDC.

During discussions, it was envisaged that relay setting of ISP, OSP nodes required to be examined first, as in

recent past, frequent undesirable trippings were observed due to probable mismatch of relay coordination

issue. Accordingly, ISP, OSP representatives were requested to provide relay setting of ISP, OSP nodes so that

same could be validated by the committee in the next meeting. The issue of relay settings were discussed in

broader prospect.

The consolidated relay setting data has not been received by the entities. The desired data may kindly

be submitted in the meeting by all the entities. Further it is desired that one representative may be nominated

from the office of CE(T&C) for relay setting group so that the relay setting task may be coordinated properly as

far as T&C setup is concerned. [Action: MPPTCL,MPPGCL,NHDC,JP Bina]

6.12 Furnishing the Pending protection audit observation compliances :- As per Hon’ble CERC order

dated 21.02.2014 in petition No. 220/MP/2012 filed by Power Grid, SLDC has regularly submitted the quarterly

Protection Audit Report to the WRPC. WRPC vide letter under reference has intimated that the status of

Protection Audit Observations is being monitored in the PCM regularly. However, it is observed that the

compliances of many Protection Audit Observations is still pending.

The list of pending Protection Audit Observations as submitted by the Intrastate entities updated upto

June 2017 is enclosed as Annexure-6.12. It is therefore requested to take the pending Protection Audit

Observations with site officials and submit the timeline to resolve the pending Protection Audit Observation, to

SLDC so that same could be forwarded to WRPC/CERC.

The matter was discussed in the 59th OCCM and all the concerned entities were requested to submit

the required data at the earliest. The details has not been received by SLDC till date. All the entities are

requested to submit the details in the meeting. [Action- MPPTCL/MPPGCL/NHDC/ISP/OSP]

6.13 Frequent simultaneous tripping of all 220 KV feeders on overvoltage radiating from Omkareshwar

Hydel Power Station:- On dtd. 24.09.2017 at 5:42 hrs 220 KV OSP Khandwa line tripped on Zone –I

indication, thereafter all 220 KV feeders radiating from OSP were tripped on over voltage indication.

Agenda of 60th OCCM of MP 12

Page 15: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Similarly, on dated 07.07.2017 at 04:09 hrs Nimarni –Barwaha, 220 KV OSP – Chhagaon, 220KV OSP-

Khandwa and 220 KV OSP-Barwaha line tripped on over voltage alongwith 220 KV OSP- Julwaniya line.

Such incidents were also occurred at 09:59 hrs on dtd 31.08.2017 and 05:45hrs on dtd 26.07.2017. The

simultaneous tripping of all four 220 KV feeders do affect the stability of system and threatens the grid

security.

MD, MPPTCL has also shown concerned over these frequent trippings. The WRLDC is also perusing the

matter regarding such repeated mal-operation of relay on over voltage, whereas at time of tripping system

voltage was within normal range. Considering importance of Omkarshwar Hydel Power station such unwanted

trippings is not desirable for smooth operation integrated grid, moreover such incidence may lead to a major

grid disturbance.

The over voltage relay setting at Omkareshwar Hydel Power Station has been examined by the CE

(T&C) MPPTCL, Jabalpur and it is observed that the time delay on all feeders is almost the same, which may

be one of the reason of simultaneous tripping of all the feeders under over voltage condition. Therefore, in

order to avoid simultaneous tripping of all feeders, it is necessary to provide time grading in the settings of

different feeders according to the line length, so that over voltage condition may be normalized prior to tripping

of all feeders. Accordingly, the following settings are proposed to be adopted at Omkareshwar Power House

:-

. Sr. No.

Name of Feeder from Omkareshwar HPS

Present setting Proposed Setting

1. 220 KV Nimrani (Tap Barwaha)

108%- 6 Sec. 110%- 4 Sec.

2. 220 KV Julwaniya 108% - 5 Sec. 110% - 6 Sec.

3. 220 KV PGCIL Khandwa 110% - 5 Sec. 110% - 8 Sec.

4. 220 KV Chhegaon 110% - 5 Sec. 110% - 9 Sec.

5. 220 KV Barwaha 110% - 5 Sec. 110% - 10 Sec.

In view of above, SLDC has requested Omkareshwar HPS that proposed settings may be considered for implementation at Omkareshwar Power House. It is also requested all trippings due to over voltage may be thoroughly investigated and if any other reasons (mal operation of relay etc.) behind this trippings, may also be examined and suitable remedial action be taken accordingly and appraised to SLDC positively. The updated status on the matter be apprised to the Committee. [Action:NHDC-OSP] 6.14 Generation target / LGBR preparation for the year 2018-19

… A. Electricity Generation Target for the year 2018-19

The Chief Engineer OPM, CEA, New Delhi intimated vide letter dtd. 21.08.2017 that generation target for the year 2018-19 to be fixed up by MoP in consultation with CEA. The exercise is already started by CEA . All utilities of MP have already been requested to provide electricity generation target to CEA

Agenda of 60th OCCM of MP 13

Page 16: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

under intimation to SLDC. Therefore, all utilities are again requested that aforesaid information may be provided to CEA positively under intimation to MP SLDC. B. LGBR preparation for the year 2018-19

As per the regulation 5.7.4 of Central Electricity Regulatory Commission (Indian Electricity Grid Code) ) First Amendment) Regulations 2011, WRPC shall prepared Loan Generation Balance Report for the year 2018-19 in respect of Western Region. In this context all respective utilities were requested to provide desired information upto 10th Oct. 2017 so that same may be communicated to WRPC for necessary action. The desired data still awaited from all respective utilities. It is therefore again requested that following data may be provided to SLDC on priority basis:- 1. Generation Units proposed annual Maintenance programme in respect of your system ( also under your control area) for the year April 2018- March 2019. 2. Annual Maintenance programme in respect of transmission elements in your system for the year April 2018- March 2019. 3. Month-wise restricted an unrestricted requirement of power (MW) and energy (GWH) for the year April 2018 – March 2019. 4. Month-wise minimum requirement of power (MW) for the year April 2018- March 2019. 5. Projected month-wise , unit-wise generation of power (MW) corresponding energy (GWH) as furnished in Generation Target for the above period. 6. Commissioning dates of new generation units during the year April 2017- March 2018. 7. Expected dates of commissioning of new generating units likely to be commissioned during the April 2018-March 2019. 8. Month wise detail of proposed / tied-up bilateral agreements/ Short term open access sought for availing assistance from other agencies during the above period. 9. Expected RES energy (MUs) & corresponding demand (MW) for the year 2018-March 2019. A meeting of Generators SLDC ‘s, RLDC & WRPC is proposed to be held on 14.11.2017 at WRPC Mumbai to finalise Annual Maintenance Programme for the year 2018-19 therefore it is desired that the data may be made available to SLDC up to 30th October 2017 positively.

The Committee may like to discuss the matter.

[Action- MPPTCL/MPPMCL/MPPGCL/NHDC/DISCOMS]

6.15 THE DEMAND PATTERN OF MP DISCOMS AND STAGGERING THEREOF:- Discom wise MP

Demand of 23.10.2017 is enclosed as Annexure – 6.17. it may be seen that the demand pattern from 11:45

Hrs. to 12:00 Hrs., is changing abruptly and there is dip of about 900 MW. Similarly dip in the system observed

from 17:45 Hrs. to 18:15 Hrs. of about 700 MW. Further it is indicated that the afore-said fluctuation are

observed mainly due to variation in demand pattern of West Discom. It is therefore felt that west Discom may

re-staggered their load so that steep changes in the demand pattern in the vicinity of 12:00 Hrs. & 18:00 Hrs.

may be taken care off. It is to mention that abrupt changes in demand pattern are not desirable for safe grid

operation and causing difficulty in balancing of load & generation. The East & Central Discom are also

requested to address the issue.

[Action- DISCOM]

Agenda of 60th OCCM of MP 14

Page 17: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

6.16 OVERDRAWAL BY RAILWAY DURING CRITICAL SYSTEM CONDITIONS:- It is observed that the

railway is overdrawing number of times viz-a-viz their schedule. It is not desirable for smooth operation of

system. It is also indicated that due to straining the load-generation balance, the cost of short term power is

very high. It is evident that over drawl of railway not only threatening the system security but also impacting

commercial aspect of other entities. Considering above facts railway is advised to keep their drawl within their

schedule and enhance their power availability equal to their maximum requirement. Standby support may also

be arranged by railways to meet out any contingency requirement in case of tripping of generator.

[Action- Railway]

ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS :

Black Start mock drill of Hydel stations of MPPGCL:- During 2017-18 the black start mock drill successfully carried out at Bargi and Pench Hydel power station on dtd 23.05.2017 and 06.06.2017 respectively. The Black Start Mock drill exercise at Gandhi Sagar Power station was also carried out on dtd 30.05.2017 but synchronization of islanded system with national grid was not successfully done due to problem in bus coupler breaker at Gandhi sagar Power Station. Black Start Mock Drill at Birsinghpur HPS was successfully carried out on 17.10.2017. MPPGCL may apprise the same in the meeting. The black start mock drill exercise of other power stations is proposed to be held in November 2017 as scheduled below:-

S.No. Name of HPS Proposed Date of Mock Drill 1. ISP 15.11.17 2. OSP 16.11.17 3. Tons HPS 23.11.17

[Action : MPPGCL/NHDC]

ITEM NO. 8: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES:

8.1 Status of AMR system installed at SLDC:

In the month of September 2017, the complete data of 585 meters was received through AMR system and data of 39 Nos meters (Monthly- 23 & Partial – 16) was not received through AMR system. M/s Secure Meters Ltd. have been adviced to examine the reasons of 39 Nos. meters not read during the month. The status of data received through AMR system is invariably sent to all concerned offices including SE(T&C) offices through email for furnishing the missing data alongwith monthly JMR data latest by 4th of every month. The Committee may like to discuss the following as an action plan for receiving the complete data through AMR system in in a time bound manner.

1. CE(T&C) office is requested to take up the matter with M/s Secure Meters Ltd for resolving the

site related issues of the 23 Nos meters not read during the month of September 2017. Details are shown in enclosed Annexure-8.1.

2. Status of integration of 115 Nos. ABT meters installed at the interface points of newly

commissioned substation / Xmers / HT consumers / OACs.

Agenda of 60th OCCM of MP 15

Page 18: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

i. Modem & SIM details received from field Offices – 80 Nos.

ii. Modem & SIM details not received from field offices – 35 Nos.

iii. ABT meters integrated successfully with AMR system -36 nos

CE(T&C) office is requested to advice M/s Secure Meters Ltd. and field offices for integrating the balance ABT meters (44 Nos) whose modem and SIM details are received. Further, CE(T&C) office is requested to furnish the details of modem and SIM of 35 Nos ABT meters as per Annexure-II.

3. T&C Circle’s are not sending JMR data (ABC format) to SLDC except Jabalpur and Gwalior

Circle. CE(T&C) office is requested to issue instructions to concerned circle offices for furnishing the JMR data to SLDC on email id- [email protected].

4. T&C office is requested to nominated a nodal officer for coordinating AMR related issues. [Action : CE(T&C) MPPTCL]

8.2 AMR facility for the ABT meters installed at MPPGCL :

In compliance to state commission directives for computation of weekly transmission losses and Deviation charges, SLDC has requested the MPPGCL for providing the AMR facility on the meters installed at the interface points for data downloading through AMR System installed at SLDC. Accordingly MPPGCL has provided AMR facility on 107 Nos ABT meters installed at the interface points as intimated by CE(Thermal), O/o ED(O&M:Gen), MPPGCL vide letter No. 426 dated 01.03.2016. The status of September 2017 of ABT meter data (34 Nos) not received through AMR system of SLDC has been emailed to GCC, MPPGCL on 18th Oct-2017. MPPGCL is requested to take up the matter with M/s Secure Meters Ltd. to resolve the problems related with non readability of meters integrated successfully. MPPGCL is also requested to instruct the Gandhi Sagar HPS & Silpara HPS officials for considering the ABT meters with AMR facility as main meters and shall furnish the JMR data accordingly. MPPGCL is requested to furnish the meter master of ABT meters installed at the interface points as main, check and standy meters alongwith modem and SIM details as per Annexure-8.2. In case of Bargi HPS, there was no generation in the month of Aug & Sep-17 whereas ABT meters installed at outgoing feeders were showing generation. Similarly, in the month of Aug-17, the meters installed at the outgoing feeders of SGTPS-II were showing generation in some blocks when there was no generation from the Unit No. 5. This may be due to the metering error. MPPGCL is requested to advise the site officials for monthly checking / verification of feeder wise data with Generator and Station Xmer wise data. In the month of Sept 2017, the JMR data sent by the Rajghat HPS officials was showing import during the month whereas there was generation from HPS. MPPGCL is requested to instruct the site officials to properly verify the energy balance calculation before sending to SLDC. [Action : MPPGCL ]

8.3 Non receipt of monthly injection data (JMR) of newly commissioned Wind & Solar Power Project for issuance of monthly State Energy Account :

The concerned SE(O&M)’s do not furnish the monthly injection data of following newly commissioned Wind & Solar Power Project connected at 33KV level. However, SLDC is

Agenda of 60th OCCM of MP 16

Page 19: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

incorporating the injection data recorded in ABT meter in SEA, but, verification of data could not be done.

i) 30MW Wind Power Project of M/s Sudheer Project Pvt. Ltd. connected at 132KV Maxi Substation. – SE(O&M) Ujjain.

ii) 30MW Wind Power Project of M/s Sudheer Project Pvt. Ltd. connected at 132KV Bercha Substation. – SE(O&M) Shajapur

iii) 30MW Wind Power Project of M/s Kshema Power & Infra connected at 132KV Ghosla substation. SE(O&M) Ujjain.

iv) 30MW Wind Power Project of M/s Kshema Power & Infra connected at 132KV Behrugarh. SE(O&M) Ujjain.

v) 15MW Solar Power Project of M/s Simcom Pvt. Ltd. (Simcom(1MW), Eastman(4MW) & Made Easy(10MW) connected at 220KV Ganjbasoda. –SE(O&M) Vidisha

vi) 29.4MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 132KV Khachrod substation. –SE(O&M) Ujjain.

vii) 28 MW Wind Power Project of M/s Inox Betul (Giriraj) connected at 132KV Gudgaon substation - SE(O&M) Betul.

viii) 6MW Biomass Power Project M/s Ramnik Power & Alloy connected at 33KV Wara Seoni substation - SE(O&M) Chhindwara.

DDC, Indore is requested to take up the matter with CE(Comml), MPPKVVCL for issauance of

directives to concerned SE(O&M)’s to furnish the wind & solar generation data by 3rd or 4th of every month.

Further, the JMR injection data of the following wind & solar generators connected at 132KV level and above is not furnished by the concerned EE(T), MPPTCL. SLDC consider the data received through AMR or through MRI by site official in monthy SEA, but verification of data could not be done.

i) 42MW Wind Power Project of M/s Suzlon Gujrat Wind Park Ltd. connected at 220KV Badnagar substation through 132KV Ckt. ii) 21MW Wind Power Project of M/s Sarjan Realities Ltd. connected at 220KV Badnagar substation through 132KV Ckt. iii) 200MW Wind Power Project of M/s Innox Wind Infra Structure Services (Lahori) conncetd at 220KV Shajapur through 220KV Ckt. iv) 11.5MW MSW Plant of M/s Essel Power Ltd., Marhotal, Jabalpur connected at 132KV Marhotal substation through 132KV Ckt. v) 50 MW Kukru Wind Power Project connected at 132KV Gudgaon substation through 132KV Ckt. vi) 49.5 MW Betul Wind Power Project connected at 132KV Gudgaon substation through 132KV Ckt. vii) 50MW Solar Power Project connected at 400KV Chhegaon substation through 132KV Ckt

CE(T&C) office is requested to issue necessary instructions to concerned offices for furnishing the JMR data to SLDC by 3rd or 4th of every month. [Action : MPPKVVCL & MPPTCL] 8.4 Change in billing / reading cycle of Renewable Energy Generators by the Discoms: For preparation of monthly State Energy Account, the monthly meter data of RE Generators is considered. These meter data is received through AMR system and JMR data

Agenda of 60th OCCM of MP 17

Page 20: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

furnished by the concerned (O&M) circles of Discoms. The cycle for meter data is from 1st day to last day of the month. SLDC, while commenting on the concept note of Director Comml, West Discom, has requested the Discoms that reading date of RE Generators may be kept on monthly basis i.e. from 1st day to last day of month so as to have uniformity of RE Generation data in monthly State Energy Account. However, Indore & Dewas Circles of West Discom has furnished the injection data upto 23rd of Sept 2017 i.e. for changed reading cycle for preparation of State energy Account. This has lead to partly monthly and partly reading cycle data in the SEA for Sept 2017. The Committee may like to discuss the issue and suggest remedial measures.

[Action : Discoms] ITEM NO. 9: SCADA and E&T RELATED ISSUES: 9.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS-

The telemetry of new 220KV S/s, important 132KV S/s having injection from renewable generating Stations, and Captive Power Plant, is to be provided through Dongfeng RTUS installed and commissioned under MPPTCL SCADA project. Total 50 Nos. Sub Stations has already been identified and forwarded to MPPTCL for arranging integration of telemetry. The integration of around FOURTEEN RTUs (132KV Biora,132KV Arniakala,132KV Kannod, 132KV Poliakala, 132KV Jeerapur, 132 KV Bankhedi S/s, 132 KV Chanera S/s, 132KV Banmore S/s, 132KV Morena S/s, 132KV Mungaoli S/s, 132KV Manjhgawa S/s, 132 KV Semri Harchan S/s & 132 KV Amla S/s,132KV Kothiya S/s) is required to be integrated with SLDC SCADA system. The telemetry of 132KV Kothiya Substation & 132 KV S/s Manjhgawa is also required to be extended by MPPTCL.

In addition to the above telemetry of Birsingpur HPS and Zinna HPS is also not available

and same needs to be provided by MPPGCL.

Further, most of the RTUs commissioned recently is not working properly and functioning intermittently. The telemetry of 132 KV Morwa, 400 KV Satpura Extension, 220 KV Morena, 220 KV Gwalior II, 220 KV Anuppur, 132KV Khilchipur, 132 KV Ayodhya Nagar, 132 KV Harda, 220 KV Betul, 132 KV Betul, 132 KV Khategaon, 132 KV Waidhan is commissioned but functioning intermittently.

MPERC vide Letter dated 09-08-2017 has directed to ensure proper functioning of RTUs.

The telemetry of these identified Sub Stations is urgently required for monitoring of grid. Hence the progress in the matter as well as further schedule of commissioning, including data channel, plan for arrangement of modems, and rectification of SOE issue may please be provided by T&C.

Action: - CE (T&C)/CE (T&P), MPPTCL, 9.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS &

Agenda of 60th OCCM of MP 18

Page 21: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

The present status of telemetry discrepancy including upgradation requirement is enclosed herewith as annexure-9.2. The list of important locations where RTU upgradation is required to accommodate renewable feeders/other feeders/transformers is detailed is also given hereunder:-

Sl No.

Name of Substation whose RTU is required to

be upgraded Name of feeders/transformers required to be

included in telemetry

01

220 KV Tons

Telemetered values of following feeders is wrong:- 1. 220 KV Tons-Sirmour 2. 220 KV Tons-Rewa 3. 220 KV Tons-Satna 4. 220 KV Tons-Kotar

Above discrepancy is pending since more then year. In Last OCCM it was ensured by MPPGCL that the same shall be rectified within a week but no action.

02 400 KV ISP 1.Telemetered values of 400 KV Indore-II MW & MVAR is 10 times of actual value. 2.Telemetry of all generators is non-current when the generators are taken out of service.

03 400 KV Chhegaon Breaker status of 400 KV Bus Reactor, 400 KV Julwania, 220 KV OSP. SOE to be verified

04 400 KV Birsingpur TPS

1.Wrong telemetry of 400/220 KV Xmer CB status (Both Sides), Bus Coupler CB status, Station Xmer 3 & 4 CB status,400 KV Bus II Voltage. 2.Non availability of telemetry of 220/33 KV Xmer. These discrepancies are persisting since long time.

05 400 KV Satpura TPS 1.Telemetered values of Generating Transformer 6 & 7 MW,MVAR 2.Wrong CB status of GT 6 ,GT 7 & 220 KV Transfer Bus Coupler.

06 220 KV ATPS Non availability of telemetry of Station Transformer 5A & 5B & 132/33 KV transformer.

07 220KV Birsingpur S/s

The telemetry of 220KV IC-1 & 4 feeder is not available since last ten months. The Value of 220/132KV TRF and 132KV Umariya feeder is wrong since long time and need to be rectified.

08 220 KV Rewa S/s Telemetry of 132 KV Rewa-Rewa Interconnector II, 132 KV Mangawan II, 132 KV JP Cement is not available.

09 Pench HPS Telemetry not available since one month. Voltage & Frequency of 132 KV Bus-II not available. It is not available since long time.

10 220 KV Itarsi Telemetered value of 220 KV Pipariya-II feeder & 220 KV Bus II Voltage, frequency is wrong.

11 220 KV Bhopal Telemetered values of 220 KV Bus II frequency,132 KV Bagroda, 132 KV Bhel, 132 KV STDS, 132 KV Amrawat Khurd is not available.

12

132 KV Jaora S/s

33 KV Choksi wind 1,2 is not available

Agenda of 60th OCCM of MP 19

Page 22: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

13 220KV Anuppur S/s 132KV Shahdol, 132KV Kotma 2, 132KV TRF 2 telemetry not available. Wrong CB status of 220 KV Amarkantak-II, 160 MVA Xmer II, 132 KV Kotma-I, 132 KV Kotma II, 132 KV Shahdol, 40 MVA Xmer.

14 132KV Kotma S/s 132KV Anuppur feeder II telemetry not available 15 220KV Pandurna S/s 220KV Pandurna-Sarni telemetry is not available &

the telemetered value of 132/33 KV 20 MVA Xmer II is wrong. Wrong CB status of 132 KV Railway Traction II.

16 220KV Ratlam Telemetry of 132/33KV 40 MVA Xmer-3 & 220 KV Bus voltage, frequency is not available. Wrong CB status of 132 KV Interconnector-II.

17

220Kv Indore SZ

Telemetry of 132 KV CAT II feeder is not available.

18 220 KV Seoni Non availability of telemetry of 132/33 Xmer II.

19 220 KV Dewas Non availability of telemetry of 132 KV Shankargarh II

20 220 KV Hoshangabad Non availability of telemetry of 132 KV SPM, 132 KV Shahganj & 132 KV Trident.

21 132 KV Seoni Bus Coupler CB status The commissioning of new SCADA/EMS system at SLDC is completed and for successful functioning of EMS system the availability of complete telemetry including CB status is a prerequisite. Hence the work regarding telemetry discrepancy mentioned in enclosed annexure is to be taken up on highest priority. MPERC vide Letter dated 09-08-2017 has directed to ensure proper functioning of RTUs. MPPGCL and MPPTCL may please provide completion schedule regarding rectification of telemetry discrepancy and upgradation of RTU’s.

[ACTION: T&C, MPPTCL & O&M: GEN, MPPGCL]

Action: - ED (O&M: GEN: MPPGCL)

9.3 Extension of RGMO/FGMO signal to SLDC/WRLDC :-

As per IEGC 5.2(f), RGMO/FGMO is mandatory for all thermal units above 200 MW and hydro units above 10 MW. Further considering the high penetration of renewable to grid and also the Government target to achieve 175 GW, it is essential to monitor operation of RGMO/FGMO at SLDC/RLDC for ensuring grid security and compliance of regulation. Subsequently SLDC vide letter no. 07-05/RPC-27/3739 dated 18-01-2017, letter No. SE/LD:E&T/693 dated 23-01-2017, letter No. SE/LD:E&T/34 dated 13-04-2017, letter No. SE/LD:E&T/143 dtd.26-05-17, , letter No. SE/LD:E&T/309 dtd.19-07-17 requested MPPGCL/NHDC for integration of telemetry of RGMO/FGMO in RTU installed at power station and forward the object address configured in RTU so that same may also be configured in SLDC SCADA and RGMO/FGMO status may be displayed

Agenda of 60th OCCM of MP 20

Page 23: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

in SCADA system. The matter was again taken up vide this office UO No.38 dated 21/08/2017. However, extension of RGMO/FGMO signal of following generating units is still to be extended to SLDC SCADA system:-

S.No. Name of Generating Station Unit.No. 1 Satpura TPS 6,7,8,9 2 SGTPS 1,2,3,4 3 SSTPS 1,2 4 BARGI HPS 1,2 5 PENCH HPS 1,2

Action: - ED (O&M: GEN: MPPGCL), GM (ISP:NHDC), GM(OSP:NHDC) 9.4 COMMISSIONING OF COMMUNICATION CHANNELS FOR DUAL REPORTING OF RTUS AS PER BACKUP SLDC REQUIREMENT:-

The commissioning of SCADA/EMS system at SLDC Jabalpur and backup SLDC Bhopal is already completed however the additional communication channel required for dual control centre reporting as per backup SLDC requirement is yet to be commissioned by MPPTCL & MPPGCL .The RTU wise progress may please be provided by MPPTCL & MPPGCL.

The Strengthening of existing wideband communication node is also required to be

arranged so as to ensure reliable backbone communication network. The immediate requirement in the matter has already been submitted by SLDC to MPPTCL and MPPGCL. The present status of the same may please be provided.

The wideband equipment installed and commissioned at SGTPS however,

remains unutilized. The RTU data need to be transferred using wideband link. The scheme for the same is already prepared and forwarded to SGTPS around six months back. The present status may be intimated by MPPGCL. 9.5 MAINTENANCE OF OPGW

The 8 No. fibers had been installed on EHV line section between 220 KV Jabalpur to 220 KV Katni S/s under ULDC project in 2003. Presently three number fibres out of eight number of fibers is not serviceable/ ready to use due to problem in joint box placed at 20 KM distance from 220 KV S/s Jabalpur towards Katni. The SLDC vide letter No.SE/LD:E&T/707/826 dt. 06/03/2017 already requested, SE (EHT:Maint), Jabalpur to arrange for replacement of the Joint box and ensure that all 8 fibers between 220 KV Jabalpur S/s to 220 KV Katni S/s being healthy and ready to use. However, replacement of joint box is still pending. This matter has been discussed in last 3 OCC meetings but the work progress is still to be intimated to SLDC.

9.6 NON AVAILABLITY OF SOE AT SLDC SCADA SYSTEM

WRLDC vide letters dtd. 03.05.17 & 15.05.17 intimated that SOE of grid disturbance at 220 KV

S/s Mahalgaon & 400 KV S/s Indore is not received in Back-up LDC SCADA/Sub-LDC SCADA system respectively. SLDC is carrying out data validation of various substations periodically & it is observed that SOE from various substations like 220 KV S/s Damoh, 220 KV S/s Anuppur, 220 KV S/s Malanpur, 220 KV S/s Tikamgarh, 220 KV S/s Mahalgaon, 220 KV S/s Hoshangabad, 220 KV S/s Bhopal, 220 KV Shujalpur, 220 KV S/s Ujjain, 220 KV S/s Badod was not received at SLDC

Agenda of 60th OCCM of MP 21

Page 24: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

SCADA system. Subsequently SLDC vide letter SE/LD:E&T/200 dtd. 14-06-17 requested MPPTCL to arrange simulation testing for SOE of all RTUs.

Receiving of SOE is very essential for analysis & investigation of major trippings in the grid.

MPPTCL is thus requested to arrange simulation testing for SOE of all RTU’s in coordination with SLDC SCADA/Back Up SLDC/Sub LDC SCADA system & also issue necessary instructions to sort out the issues for ensuring proper receipt of SOE in SLDC SCADA system.

9.7 INTERMITTENT TELEMETRY DUE TO NOISE IN COMMUNICATION CHANNEL :-

It has been observed that the telemetry of 400KV Pithampur, 132 KV Waidhan, Singaji Super Thermal Power Station, 220KV Sirmore, 220Kv Sidhi, 220KV Maiher, 220KV Tikamgarh, 220 KV Dewas, 220 KV Indore SZ, 220 KV Barwaha, 132 KV Jaora, 132 KV Chapda, 220 KV S/s Shajapur ,220 KV Rewa is intermittent due to heavy noise in the communication channel. Further these noisy channels interrupt the functioning of FEP at the SLDC/Back Up LDC/Sub LDC which leads to inconvenience in system operation & control.

MPPTCL is thus requested to arrange for alignment of PLCC Channel & identify/replace the outdoor equipments which injects the noise in the channel/system.

9.8 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS The long outage of telemetry of following S/s is discussed in detail:-

Sl No. Name of Sub Station Out from /Remark

01

132KV Morwa S/s

More then one and half Year.

02 132KV Beohari S/s Out from more than one year

03 132 KV Waidhan S/s Out from last 1 month

04 Pench HPS Out from more than six months

05 Bansagar III HPS Out from more than 8 months.

06 132 KV Madikheda HPS

Out since two months due to problem in data channel.

07 Bansagar II HPS Out from 1 week

MPERC vide Letter dated 09-08-2017 has directed to submit reason for long outage for RTU & also directed to ensure proper functioning of RTUs. MPPTCL, MPPGCL are requested to sort out rectification of above RTU/data channel on top most priority.

Agenda of 60th OCCM of MP 22

Page 25: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

9.9 Arrangement for Establishment of link routed through 132 KV S/s Pichhore Wide Band Node

It is to inform that 132 KV Pichhore wideband node is installed and commissioned by M/s Tejas recently and ready to use. It is thus requested to arrange to route the telemetry of 132 KV S/s Picchore, Madikheda HPS & Rajghat HPS.

It is already informed through this office letter No. 507 dtd. 30.09.17that telemetry of Madikheda HPS is intermittent and requested to shift the telemetry route through Pichhore Wideband node. [ACTION: T&C, MPPTCL] 9.10 Telemetry of railway TSS Sub Stations:- The telemetry of 36 Nos railway Traction Sub Stations is required to be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in MP. In last OCC, the railway representative informed that the tender for the telemetry arrangement is yet to be floated by railway and railway is planning to float tender for providing telemetry of 20 Railway TSS and not for all 38 existing TSS. Further, MPPTCL representative informed that in addition to existing 38 Nos Railway TSS in MP, planning for establishment of around 25 new TSS is also under progress. Accordingly, Railway is requested to plan for arranging telemetry of all 38 existing TSS as well as for 25 upcoming TSS and expedite the matter. Further Railway officials are requested to provide current progress in the matter along with the timeline. ITEM NO 10 : DATE AND VENUE OF NEXT OCC MEETING :

It is proposed to hold 61st Operation and Coordination Committee meeting of MP on 28-12-2017. The host and venue of the same shall be decided in the meeting.

***********

Agenda of 60th OCCM of MP 23

Page 26: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Annexure-2.1

S. No. Particulars

1

1.1 Maximum Frequency 50.1 HzBetween 06.00 hrs & 07.00 Hrs on 20.08.17

50.07 HzBetween 06.00 hrs & 07.00 Hrs on 18.09.17

1.2 Minimum Frequency 49.81 HzBetween 19.00 hrs & 20.00 Hrs on 08.08.17

49.8 HzBetween 14.00 hrs & 15.00 Hrs on 08.09.17

1.3 Average Frequency 49.99 Hz 49.97 Hz

2

2.1 Maximum Frequency 50.2 HzAT 06.03.03 HRS ON 20.08.17

50.2 Hz AT 06.04:20 HRS ON 17.09.17

2.2 Minimum Frequency 49.65 HzAT 20.56:40 HRS ON 08.08.17

49.62 Hz AT 18.26:50. HRS ON 23.09.17

3 Percentage of time when frequency was :-

%age of time when frequency was Aug-17 Sep-17

3.1 Below 48.5 Hz 0.00 0

3.2 Between 48.50 Hz and 48.8 Hz 0.00 0

3.3 Between 48.80 Hz and 49.2 Hz 0.00 0

3.4 Between 49.20 Hz and 49.5 Hz 0.00 0

3.5 Between 49.50 Hz and 49.7 Hz 0.00 0

3.6 Between 49.70 Hz and 49.9 Hz 7.20 11.77

3.7 Between 49.9 Hz and 50.05 Hz 76.82 78.5

3.8 Between 50.05 Hz AND 51.5 Hz 15.98 9.73

3.9 Above 51.5 Hz 0.00 0.00

4 No. of times frquency touched 48.80 Hz 0 0

4.1 No. of times frquency touched 48.60 Hz 0 0

4.2 No. of times frquency touched 51.0 Hz 0 0

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Aug-17 Sep-17

Agenda of 60th OCCM of MP 24

Page 27: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

I

S.

No. NAME OF THE TRANSMISSION LINE /

(FINANCED BY)

TYPE OF

CIR CUITS

ROUTE

LENGTH

CIRCUIT

KMS.

DATE OF

COMPLETIO

N

DATE OF

COMMI-

SSIONING

A. 400 KV TRANSMISSION LINES

NIL 0 0

B. 220 KV TRANSMISSION LINES

1

(a).220Kv DCDS line for inter-connection of

400Kv S/s Betul with 220Kv S/s Betul (2x1.88)

(ADB-III Saving)

DCDS 1.88 3.76 July'2017charged on

21.07.2017

2

LILO of 2nd circuit of Damoh (MPPTCL) -

Sagar 220KV line at Damoh (PGCIL) 400 kV

Sub-station Damoh (2x0.592)

DCDS 0.59 1.184 Aug'2017

Charged

on

28.08.201

7

3

LILO of 2nd ckt. Of Itarsi(MPPTCL) -

Hoshangabad 220Kv line at Itarsi(PGCIL) 400

KV S/s. (2X0.060)

DCDS 0.06 0.12 Aug'2017

Charged

on

09.08.201

C. 132 KV TRANSMISSION LINES

1

132 kv DCDS Ujjain(220 kv) -Chandrawatiganj

line (2x33.191) (JICA) (Note: 18.40cktkm One

ckt charged by tapping arrangement on

DCDS 33.19 47.982 June'17comm.on

06.06.2017

22nd Ckt of 132 kv Badnagar - Gautampura

line (1x23.24)(JICA)2ND CKT 23.24 23.24 June'17

comm.on

30.06.2017

3132 kv DCSS line from220Kv S/s Chichli -

132Kv Karapgaon (1x31.058)(PFC-II)DCSS 31.06 31.058 June'17

charded on

18.06.207

4

132Kv DCSS line from proposed 132Kv s/s

Tamot to Sagar Yarn plant of M/s Sagar

Manufacturer (P) Ltd.(1x3.1) (contributory

DCSS 3.10 3.1 June'17comm.on

30.06.2017

5

132Kv DCSS line from 220kV s/s Pithampur

for supply of 5MVA to M/s SRF Ltd.(1x2.421)

(contribution work)

DCSS 2.42 2.421 June'17comm.on

29.06.2017

62nd Ckt of 132 kv Pithampur - Betama line

(1x14) (JICA)

2nd

ckt.km.14.00 14 July'2017

comm.on

02.07.2017

7132Kv DCSS line from 220Kv S/s Rajgarh to

132Kv S/s Jhabua (1x67.790) (PFC-III)DCSS 67.79 67.79 Aug'2017

Charged

on

09.08.201

8

132Kv DCDS line for extension of 132Kv line

from Manliya(132) - Mangliya (220) (2x0.736)

(PFC-III)

DCDS 0.74 1.472 Aug'2017

Charged

on

05.08.201

9

LILO of 132KV Gwalior- Dabra/Karera line at

Chinour (132KV DCSS Dabra- Chinour line)

(2X13.682) (ADB-III)

DCDS 13.68 27.364 Aug'2017

Charged

on

04.08.201

10132KV DCSS Sabalgarh - Kelaras line

(1x19.655) (ADB-III)DCSS 19.66 19.655 Aug'2017

Charged

on

14.08.201

11132 kv Sagar-Rahatgarh DCSS line

(1x54.790) (PFC-II)54.79 54.79 Sept'2017

comm. On

28.09.2017

12132 KV DCSS Kukshi - Jobat line

(1x33.74)(REC)33.74 33.74 Sept'2017

comm. On

21.09.2017

13

132Kv DCSS 2 phase 2wire line from 132Kv

s/s Umreth to RTS Parasiya (1x13.623)

(Contributory)

13.62 13.623 Sept'2017comm.on

05.09.2017

14

132kV DCSS line from 220kV S/s Kothiya to

51 MW Solar Power Project of M/s Re New

Clean Energy Pvt.Ltd. District

Ashoknagar.(Contributory)

18.90 18.9 Sept'2017comm.on

29.09.2017

ANNEXURE -2.2.5(i)

M.P POWER TRANSMISSION COMPANY LIMITED

TRANSMISSION WORKS COMPLETED DURING 2017-18 (UP TO 30.09.2017)

EHV TRANSMISSION LINES

Agenda of 60th OCCM of MP 25

Page 28: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

S.

No.NAME OF THE TRANSMISSION LINE

CKT.

KMS.

PROGRESS

IN %

A. 400 KV TRANSMISSION LINES

1400kV DCDS (Quad moose) line from Shri Singaji TPS (stage-II)

- Pithampur (2x69.968)140 11%

2400kV DCDS (Quad moose) line from Pithampur - Badnawar

(2x70)140 3%

3LILO of both ckt. Of 400kV Nagda to Rajgarh line at 400kV S/s

Badnawar (4x8.163)33 5%

B. 220 KV TRANSMISSION LINES

1 2nd Ckt of 220kv Satna - Chhatarpur line (152) 160 8%

2LILO of one circuit of Satna (MPPTCL) - Chhatarpur 220KV line

at Satna (PGCIL) 400 kV Sub-station (2x1.726)3.452 99%

3LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv

S/S Chapda (DCDS) (2x32.782)66 3%

4 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 37%

5220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam

D/C line at 400Kv S/s Badnawar (2x1+4x8)34 4%

6 220Kv DCDS Julwaniya- Kukshi (2X58) 116 16%

7 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 15%

8LILO of both ckt of Badod-Kota/Modak 220kV line at 220Kv

S/s Suwasara (4x4.382)17 15%

9LILO of 2nd ckt Nagda - Neemuch 220kV line at 220Kv S/s

Daloda (2x12.2)24.4 12%

10

(b).LILO of 220kV Sarni - Pandhurna at 220kV S/s Betul

(2x38.864) (Note: Betul220 & Betul400 I/C line 3.76 cktkm.

charged on 21.07.2017)

77.728 10%

11

220Kv DCDS Morena(400KV S/s CWRTL Adani Group) -

Sabalgarh DCDS line & lilo of Morena 400KV S/s (Adani) to

Sabalgarh at Morena 220Kv s/s (2X92 + 2x0.5)

185 31%

12LILO of one circuit of Malanpur - Mehgaon at 400Kv S/s

CWRTL (Adani) (2x6.031)12.062 54%

13LILO of 2nd ckt. Of Birsinghpur - Amarkantak 220kV line at

Shahdol 220 KV S/s. (2X5.6)11.2 23%

14LILO of 2nd ckt. Of Bansagar - Satna 220Kv line at Kotar 220

KV S/s. (2X5.693)11.386 56%

15220kV DCDS line for LILO of one ckt of 220kV DCDS Indore -

Indore-II(Jaitpura) line at Mangliya (2x0.3)1 60%

16

220Kv DCDS line from 220kV Pooling S/s RUMS at

Goojarkhedi, Suwasara (For interconnection of Solar PV Plant

of RUMS) (2X43.426)

86.852 40%

17220kV DCDS Barsitadesh (220kV Pooling S/s) - 400kV Grid S/s

PGCIL line (2X0.917)1.834 14%

18220kV DCDS Ramnagar (220kV Pooling S/s) - 400kV Grid S/s

PGCIL line (2X2.572)5.144 5%

19220kV DCDS Badwar (220kV Pooling S/s) - 400kV Grid S/s

PGCIL line) (2X0.917)4.33 2%

C. 132 KV TRANSMISSION LINES

1 132 kv DCSS Dewas-Barotha line (1x23) 23 60%

2 132 kv DCSS Ghatabillod-Betama line (1x18) 18 36%

3 132kv DCSS Gautampur -Depalpur line (1x19) 19 20%

4 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 18%

5 132kv Mugaliya Chaap - Sehore DCSS line (1x24) 24 30%

6132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV

Itarsi s/s(1x53.209)53.209 42%

7LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S

Seoni (2x20)40 17%

8 132 kv DCSS Guna-Eshagarh line (1x72) 72 32%

Annexure-2.2.5(ii)

EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 30.09.2017

Page 1 of 5Agenda of 60th OCCM of MP 26

Page 29: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

9LILO of one circuit of 132 kv Neemuch220 - Ratangarh DCDS

line at 132 KV S/s Morwan (2x1)2 0%

Page 2 of 5Agenda of 60th OCCM of MP 27

Page 30: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

10132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad

(1x32.859)32.859 43%

11132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh

(1x27.1)27.1 52%

12132 kv DCSS line from 132Kv S/s Kymore-132Kv S/s Barhi

(1x35)35 96%

13 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 18%

14LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) -

Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)55.09 36%

15 132 kv DCSS Dewas-Agrod line (1x20.76) 20.76 28%

16 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 20%

17

LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s

Mungaoli (4x7.8+2x0.7) Note: (4x7.8ckt.km line charged on

30.12.2015 by tapping )

32.6 96%

18LILO of 132Kv Vidisha- Bairasiya line at salamatpurr

(2x0.162)0.324 46%

19132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv

Tower)94 51%

20 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 7%

21 132 kv DCSS Badnagar - Chhayan Line (1x31) 31 34%

22 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 16%

23LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad

(2x7.4)14.8 5%

24 132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) 23.4 81%

25 132 kv DCSS Udaipura - Silvani line (1x25.8) 25.8 38%

26 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 18%

27 132 kv DCSS Karakbel - Belkheda (1x24.445) 24.445 11%

28 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 20%

29

LILO of 2ND CIRCUIT OF 132KV Gwalior- Pichhore at 132Kv

S/s Dabra (2X0.108) (ADB-III) (balance work) (Note: LILO at

Chinour 27.364 cktkm charged on 04.08.2017)

0.216 20%

30 132kv DCSS Chhegaon -Singot line (1x58) 58 17%

31 132kv DCSS Chhanera -Khirkiya line (1x30.42) 30.42 61%

32LILO of 132kv Nagda - Ratadiya line Unhel 132KV Sub-station

(2x2)4 53%

33LILO of one ckt of 132kv Neemuch - Mandsore line at Budha

132KV Sub-station (2x22.077)44.154 19%

34LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth

line at Bhanpura 220KV S/s (4x14)56 1%

35LILO of both ckt of 132kv Gandhisagar - Suwasara/Garoth

line at Suwasara 220KV S/s (2x3)6 16%

36 132kv DCSS Mugaliyachhap - Bilkishganj line (1x17.274) 17.274 14%

37132kv DCDS Rajgarh - Khujner/Sindaota line (2x26.499+

4x1.457)57 5%

38 132kv DCSS Betul-Bisnoor/Masod line (1x35.245) 35 6%

39 132kv DCDS line Guna-Bhonra (2x21.394) 21 4%

40 132kv DCSS line Bhonra - Kapasi (1x22.534) 23 30%

41 2nd ckt. Stringing of 132kV Shivpuri - Kolaras line (35) 35 94%

42 132kv DCSS line from Kolaras - Mada line (1x18.366) 18.366 83%

43 2nd ckt. of 132kV Malanpur - Morar line (28.708) 28.708 74%

44 132kv DCSS line Chhindwara-Saori line (1x31.60) 31.6 39%

45 132kv DCSS Damoh-Patera line (1x38) 38 5%

46132kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt.

Sanc.no.0187dtd.05.09.2016)45 44%

47 132kV MACT (Bhopal) - Mugaliachhap line (2x30.368) 60.736 28%

48132kV Julwaniya400 - Shahpura DCSS line (2nd ckt-28 +

1x46.866)74.866 4%

49132Kv DCSS line from GWSTPP to upcoming Make up Water

Pump House river Narmada (Line-I)(1x24.192)24.192 89%

50132Kv DCSS line from GWSTPP to upcoming Make up Water

Pump House river Narmada (Line-II)(1x24.152)24.152 17%

51132Kv DCSS 2 phase 2wire line from 132Kv s/s Bankhedi for

PS to RTS Bankhedi (1x7.9)7.9 96%

52132Kv DCSS 2 phase 2wire line from proposed 220Kv s/s

Narsinghpur 5MVA PS to RTS Narsinghpur (1x7.253)7.253 28%

Page 3 of 5Agenda of 60th OCCM of MP 28

Page 31: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

53132kV DCSS 2 phase 2wire line from 132kV s/s Mansakra for

PS to RTS Sihora road (1x2.087)2.087 19%

54132Kv DCSS line from 400Kv s/s Katni - RTS Patwara

(1x19.417)19.417 32%

55132Kv DCSS 2 phase 2wire line from 220Kv s/s Maihar for PS

to TSS Bhadanpur(1x13.1)13.1 74%

56132Kv DCSS 2 phase 2wire line from 220Kv s/s KOtar for PS

to RTS kaima1x26.938)26.938 37%

57132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan

for PS to TSS Majhgawan(1x0.19)0.19 89%

58132Kv DCSS 2 phase 2wire line from 132Kv s/s Rewa for PS to

TSS Rewa(1x0.4)0.4 74%

59132Kv DCDS 2 phase 4wire line from 220Kv s/s Ashoknagar

for PS to 132kV RTS Ashoknagar (2x4.474)8.948 31%

60 132kV DCSS Sirmore - RTS Dabhaura line (1x56.1) 56.1 16%

61

132Kv DCDS line from 132Kv s/s Morwa for Power supply of

21.6MVA in pfase manner on 132kV for RTS Singroli

(1x1.809)

1.809 48%

622nd ckt of 132Kv 2ph 2 wire line from 220Kv s/s Bina - RTSA

Mungaoli RVNL38 88%

63

132Kv DCSS line from 220kV s/s Rajgarh(Biora) - Birampura

Pumping station Distt- Rajgarh of water Resources

Department. (1x7.796)

7.796 35%

64

132Kv DCSS line from 132Kv s/s Chhegaon - 50MW Soalar

Power Project of M/s Sky Power Solar South-East Asia-One

Pvt'Ltd At vill. Chhirbel/Khajuri, Khandwa (1x11.226)

11.226 100%

65132kV DCSS line from 132kV Balwada - water pumping

station No.2 of NVDA at village Mukhtyara (1x2.6)2.6 30%

66

132kV DCSS line from 220kS/s Barwaha - water pumping

station 1 & 2 NVDA at village Sirley Tehsil Barwaha Dist.

Khargone (1x1.80)

1.8 56%

S.

No.NAME OF THE SUBSTATION

EFFECTIVE

CAPACITY

MVA

PROGRESS

IN %

A. 400 KV SUBSTATIONS

1400 KV sub-station Balaghat/Kirnapur with 2x100MVA

400/220 kv x-MER+ 1X40 MVA X-mer (Distt.Balaghat)200 61%

2400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-

mer (Distt. )630 69%

3Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA X-

mer (Distt.Bhopal)315 55%

4Chhegaon 400/220 kv s/s Addl. 315 MVA X-mer

(Distt.Khandwa)315 85%

B. a 220 KV SUBSTATIONS

1Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA

(Distt. )160 2%

2Upgradation of Depalpur 132Kv S/s to 220kv with

1x160MVA(Distt. )160 9%

3 Adampur 220/33kv S/s 2x50MVA 100 8%

4Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA

(Distt. )160 11%

5

Upgradation of Chhanera 132Kv S/s to 220kv with

2x160MVA +1x50MVA 132KV X-mer

(Distt. Khandwa )

320 22%

6 220/132kV S/s Suwasara (2x160MVA + 1x50)

(Distt. Mandsore)320 23%

7 Upgradation of Shahdol 132Kv S/s to 220kv with 1x160MVA

160 61%

Page 4 of 5Agenda of 60th OCCM of MP 29

Page 32: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

8220/132 KV S/s Mangliya with 1x160MVA+ 63MVA 132/33KV

X-mer 160 70%

9 33/220 Kv Pooling Sub-station at Barsitadesh 3x100MVA 300 51%

10 33/220kV Pooling Sub-station at Ramnagar 3x100 300 18%

11 220/33Kv Pooling Sub-station at Suwasara (Gujarkhedi)

3x100300 90%

C. 132 KV SUBSTATIONS

(a) NEW SUBSTATIONS

1 Barahi 132kv s/s (Distt. Katni) 40 32%

2 Karapgaon 132kv s/s (Distt- Narsinghpur) 40 45%

3 Biston 132kv s/s1x40 MVA 40 9%

4 Agrod 132kv s/s 1x40 MVA 40 59%

5 Chhayan 132kv s/s1x40 MVA 40 78%

6 Teesgaon 132kv s/s 1x40MVA 40 10%

7 Waraseoni 132kv s/s1x40 MVA (Dist- Balaghat) 40 3%

8 Devnagar 132kv s/s 1x40 MVA (Dist- Narsighpur) 40 35%

9 Belkheda 132kv s/s 1x40 MVA (Dist- Jabalpur) 40 4%

10 Khimlasa 132kv s/s 1x40 MVA 40 3%

11 Karakbel 132kv s/s1x40 MVA (Dist. Narsinghpur) 40 17%

12 Narsinghgarh 132kv s/s with 1x40 MVA 40 7%

13 Salamatpur 132kv s/s with 1x40 MVA 40 52%

14 Intkhedi 132kv s/s 1x63 MVA 63 71%

15 Silvani 132kv s/s with 1x40 MVA 40 12%

16 Udaipura 132kv s/s with 1x40 MVA 40 21%

17 Singot 132kv s/s with 1x50 MVA 50 25%

18 Unhel 132kv s/s with 1x50 MVA 50 64%

19 Bilkishganj 132kv s/s with 1x50 MVA 50 18%

20 Khajner/Sindaota 132kv s/s with 1x50 MVA 50 19%

21 Bisnoor/Masod 132kv s/s with 1x50 MVA 50 5%

22 Kapasi/Paranth 132kv s/s with 1x50 MVA 50 26%

23 Mada 132kv s/s with 1x50 MVA 50 41%

24 Rehli 132kv s/s with 1x50 MVA 50 18%

25 Patera 132kv s/s with 1x50 MVA 50 2%

26 Shahpura 132kv s/s with 1x40 MVA (Barwani) 40 12%

Page 5 of 5Agenda of 60th OCCM of MP 30

Page 33: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Annexure-2.3(i)

Aug-17 Sep-17 Aug-17 Sep-17

Commissinary HQ 23:52 23:51 23:40 23:37

District HQ 23:51 23:47 23:44 23:44

Tehsil HQ 23:45 23:46 23:35 23:34

Rural -Mixed 23:25 23:23 22:53 22:47

Rural -DLF 23:24 23:23 23:06 22:58

Rural -Irrigation 9:58 9:58 9:34 9:32

Aug-17 Sep-17 Aug-17 Sep-17

Commissinary HQ 23:45 23:43 23:45 23:44

District HQ 23:52 23:47 23:49 23:46

Tehsil HQ 23:44 23:36 23:42 23:39

Rural -3Phase 23:52 23:50 23:11 23:07

Rural -1Phase 23:33 23:23 23:21 23:15

Total Rural 9:45 9:39 9:46 9:43

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

West Zone MP

East Zone Central Zone

Agenda of 60th OCCM of MP 31

Page 34: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

132KV Rau 33KV Panther-I 14.03.2014 14.03.2016

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Ganjbasoda 33 KV Simcon Solar Power 18.11.2016 --

132 KV Bareli 33 KV Boras 19.02.2014 --132 KV Biora 33 KV Nagar Palika 09.03.2014 --132 KV Gopalpur 33 KV AE, PHE 27.02.2015 --132 KV Amrawad-Khurd 33 KV Katara Hills-II 01.06.2016 --

33 KV Goharganj 05.05.2016 31.01.201733 KV Obedullaganj 05.05.2016 02.02.2017

Name of EHV Substation Name of 33KV feeder Date of commission-ing of feeder bay

Date of commission-ing of feeder

220 KV Sabalgarh 33 KV Mangrol 30.05.2014 --

Annexure-2.3.(ii)

132 KV Tamot

BHOPAL REGION

220KV

UJJAIN REGION

NIL

GWALIOR REGION

132 KV

220 KV

132 KV

NIL

NIL

NIL

NIL

LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated)

220KV

JABALPUR REGION

INDORE REGION

132KV

SAGAR REGION

132KV

220KV

REWA REGION

NIL

220KV

132KVNIL

220KV

132KVNIL

Agenda of 60th OCCM of MP 32

Page 35: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Annexure-3.2

FROM TO

A

06.11.2017 08:00 -

18.11.2017 - 18:00

2 Nagda 400400KV Nagda- Rajghar-II Line

ReactorII 7.11.2017 09:00 18:00 09:00 For post monsoon maintenance work

7.11.2017 09:00 -

23.11.2017 - 18:00

4 Nagda 400 400KV Nagda - Indore Line I 14.11.2017 09:00 18:00 09:00 For post monsoon maintenance work

5 Nagda 400 400kV ISP-Nagda Line 01.12.2017 9:00 18:00 09:00 For post monsoon maintenance work

6 Nagda 400 400KV Nagda - Indore line 04.12.2017 9:00 18:00 09:00 For post monsoon maintenance work

7 Nagda 400315 MVA Ict-I & 50 MVAR Bus

Reactor -I Tie Bay Tie 06.12.2017 9:00 18:00 09:00 For post monsoon maintenance work

8 Nagda 400315 MVA Ict-II & 125 MVAR Bus

Reactor -II Tie Bay Tie 08.12.2017 9:00 18:00 09:00 For post monsoon maintenance work

9 Nagda 400315 MVA Ict-III & 400KV Nagda -

Indore Tie Bay Tie 20.12.2017 9:00 18:00 09:00 For post monsoon maintenance work

10 Katni 400 400KV 125MVAr Reactor - 05-12-2017 10:00 18:00 08:00 Recommissioning of Reactor Conservator by M/S BHEL

11 Katni 400 400KV Main Bus-II II 07-11-2017 09:00 17:00 08:00 For post monsoon maintenance work

06.11.17 10:00 -

07.11.17 - 18:00

09.11.17 10:00 -

10.11.17 - 18:00

14 Indore 400 400KV Indore- ISP-I I 01.11.17 10:00 18:00 08:00 For post monsoon maintenance work

15 Indore 400 400KV Indore- Nagda - 02.11.17 10:00 18:00 08:00 For post monsoon maintenance work

16 Indore 400 400/220KV 315MVA ICT-III - 04.12.17 10:00 18:00 08:00 For post monsoon maintenance work

17 Indore 400 400/220KV 315MVA ICT-III - 05.12.17 10:00 18:00 08:00 For relay testing work

11.12.17 10:00 -

16.12.17 - 18:00

I

Old CB Repalement work.3 Nagda 400400KV Nagda- Rajghar-I Line

reactor I 369

PROPOSED SHUT DOWN PROGRAMME OF TANSMISSION ELEMENTS OF 400 KV EQUIPMENTS/FEEDER FOR THE DURATION

01-11-2017 TO 31-12-2017

S-NO-NAME OF 400KV

SUB-STATION

NAME OF 400KV

EQUIPMENT/FEEDER/LINE

CIRCUIT

NO.DATE

PERIOD OF

SHUTDOWN DURATION

IN HRS-MAINTENANCE WORK PROPOSED

400KV Transformers / Reactors / Bays /Feeders

400KV S/S Indore 32.00400/220KV 315MVA ICT-II II For 220KV CTs replacement work

32.00 For 220KV CTs replacement work

Indore 400 400KV Indore- ISP-II 128:00:00 For maintenance work & attending oil leakage.

298 Old CB Repalement work.Nagda 400Main CB OF 400KV 315MVA X-mer-I

(ICT -I)1

12

13 400KV S/S Indore 400/220KV 315MVA ICT-III III

18

Agenda of 60th OCCM of MP 33

Page 36: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

FROM TO

S-NO-NAME OF 400KV

SUB-STATION

NAME OF 400KV

EQUIPMENT/FEEDER/LINE

CIRCUIT

NO.DATE

PERIOD OF

SHUTDOWN DURATION

IN HRS-MAINTENANCE WORK PROPOSED

01.11.17 08:00 -

03.11.17 - 17:00

06.11.17 08:00 -

10.11.17 - 17:00

13.11.17 08:00 -

18.11.17 - 17:00

21.11.17 08:00 -

23.11.17 - 17:00

24.11.17 08:00 -

25.11.17 - 17:00

27.11.17 08:00 -

29.11.17 - 17:00

B

1 Pandhurna 220 220KV Kalmeshwar - 06.11.17 10:00 16:00 06:00 For line maintenance work

2 Chhindwara 220 220KV PGCIL -I I 12.12.17 9:00 18:00 09:00 For post monsoon maintenance work

3 Chhindwara 220 220KV PGCIL -II II 15.12.17 9:00 18:00 09:00 For post monsoon maintenance work

4 Pandhurna 220 220KV Kalmeshwar - 28.12.17 9:00 18:00 09:00 For post monsoon maintenance work at S/S

5 Sukha 220 220KV ICT-I bay I 16.11.17 9:00 17:00 08:00 For post monsoon maintenance work

6 Sukha 220 220KV ICT-II bay II 17.11.17 9:00 17:00 08:00 For post monsoon maintenance work

7 Mahalgaon 220 220KV PGCIL-I I 15.11.2017 9:00 17:00 08:00Shutdown for completing balance work of CVT & other maint.

Works

8 Mahalgaon 220 220KV PGCIL-II II 16.11.2017 9:00 17:00 08:00Shutdown for completing balance work of CVT & other maint.

Works

9 Malanpur 220 220KV PGCIL-I I 06.11.2017 9:00 17:00 08:00 Shutdown for Post monsoon mainetnance work

10 Malanpur 220 220KV PGCIL-II II 07.11.2017 9:00 17:00 08:00 Shutdown for Post monsoon mainetnance work

11 Malanpur 220 220KV Auraiya - 14.11.2017 9:00 17:00 08:00 Shutdown for Post monsoon mainetnance work

12 Mehgaon 220 220KV Auraiya - 18.11.2017 9:00 17:00 08:00 Shutdown for Post Monsoon Maintenance.Supply will be

managed from 220KV Mehgaon-Malanpur&132KVMalanpur-

13 Mehgaon 220 160MVA X-mer-I I 20.11.2017 9:00 17:00 08:00Supply will be managed by 160MVA X-mer-II At 220KV s/s

Mehgaon

14 Mehgaon 220 160MVA X-mer-II II 21.11.2017 9:00 17:00 08:00 Shutdown for Post Monsoon Maintenance.Supply will be

amnaged by 160MVA X-mer-I At 220KV s/s Mehgaon

15 Datia 220 220KV Bina - 27.11.2017 9:00 17:00 08:00 Shutdown for Post Monsoon Maintenance.Supply will be

managed from 220KV Datia- Gwalior

- 33:00:00 For replacement of main CTs

24 Bina 400 400KV Bus Reactor - 57:00:00 For replacement of Tie CTs

22 Bina 400 315MVA BHEL Transformer-II II 57:00:00 For replacement of main CTs

57:00:00 For attending Y phase OLTC of Transfomer

20 Bina 400 400KV Bhopal-I I 105:00:00 For Tie CB replacement work

129:00:00 For replacement of main CB and 2 no. main CTs 400KV Bhopal-I I

23 Bina 400 400KV Bus Reactor

220KV Transformers/Feeders / Bays

19 Bina 400 315MVA BHEL Transformer-I I

21 Bina 400

Agenda of 60th OCCM of MP 34

Page 37: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

FROM TO

S-NO-NAME OF 400KV

SUB-STATION

NAME OF 400KV

EQUIPMENT/FEEDER/LINE

CIRCUIT

NO.DATE

PERIOD OF

SHUTDOWN DURATION

IN HRS-MAINTENANCE WORK PROPOSED

16 Datia 220 220KV Gwalior - 28.11.2017 9:00 17:00 08:00 Shutdown for Post Monsoon Maintenance. Supply will be

managed from 220KV Datia- Bina &132KV Pichore-Datia -

17 Malanpur 220 220KV Mehgaon 17.11.2017 9:00 17:00 08:00 Shutdown for Post monsoon mainetnance work

18 Mahalgaon 220 220KV PGCIL-I I 12.12.2017 9:00 17:00 08:00 Maintenance Works & Isolator replacement under PSDF

19 Mahalgaon 220 220KV PGCIL-II II 13.12.2017 9:00 17:00 08:00 Maintenance Works & Isolator replacement under PSDF

20 Mahalgaon 220 220KV Bina - 19.12.2017 9:00 17:00 08:00 Maintenance Works & Isolator replacement under PSDF

21 Mehgaon 220 220KV Malanpur - 11.12.2017 9:00 17:00 08:00Maintenance work, Supply will be managed from Auraiya--

mehgaon &132KV Malanpur-Mehgaon Link

22 Mehgaon 220 220KV Auraiya - 12.12.2017 9:00 17:00 08:00Maintenance work, Supply will be managed from 220KV Mehgaon-

Malanpur & 132KV Malanpur-Mehgaon Link

23 Mehgaon 220 160MVA X-mer-I I 20.12.2017 9:00 17:00 08:00Maintenance work, Supply will be managed by 160MVA X-mer-II At

220KV s/s Mehgaon

24 Mehgaon 220 160MVA X-mer-II II 21.12.2017 9:00 17:00 08:00Maintenance work, Supply will be managed by 160MVA X-mer-I At

220KV s/s Mehgaon

25 Datia 220 220KV Bina - 27.12.2017 9:00 17:00 08:00Maintenance work, Supply will be managed from 220KV Datia-

Gwalior &132KV Pichore-Datia -Interconector.I&II Link

26 Datia 220 220KV Gwalior - 28.12.2017 9:00 17:00 08:00Maintenance work, Supply will be managed from 220KV Datia-

Bina &132KV Pichore-Datia -Interconector.I&II Link

Agenda of 60th OCCM of MP 35

Page 38: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

FROM TO

S-NO-NAME OF 400KV

SUB-STATION

NAME OF 400KV

EQUIPMENT/FEEDER/LINE

CIRCUIT

NO.DATE

PERIOD OF

SHUTDOWN DURATION

IN HRS-MAINTENANCE WORK PROPOSED

13.11.17 10:00 -

14.11.17 - 18:00

16.11.17 10:00 -

17.11.17 - 18:00

29 Indore 400 220KV South Zone Indore - I I 01.12.17 10:00 18:00 08:00 for Maintainance & Relay testing work

30 Indore 400 220KV South Zone Indore - II II 02.12.17 10:00 18:00 08:00 for Maintainance & Relay testing work

31 Indore 400 220KV Jetpura- I I 19.12.17 10:00 18:00 08:00 for Maintainance & Relay testing work

32 Indore 400 220KV Jetpura- II II 20.12.17 10:00 18:00 08:00 for Maintainance & Relay testing work

33 Indore 400 220KV Barwaha- I I 07.12.17 10:00 18:00 08:00 for Maintainance & Relay testing work

34 Indore 400 220KV Barwaha- II II 08.12.17 10:00 18:00 08:00 for Maintainance & Relay testing work

35 Indore 400 220KV Badnagar - 22.12.17 10:00 18:00 08:00 for Maintainance & Relay testing work

36 Indore 400 220KV Indore East - 23.12.17 10:00 18:00 08:00 for Maintainance & Relay testing work

37 Indore 400 220KV Dewas - 26.12.17 10:00 18:00 08:00 for Maintainance & Relay testing work

38 Indore 400 220KV pithampur - 27.12.17 10:00 18:00 08:00 for Maintainance & Relay testing work

11.12.17 08:00 -

13.12.17 - 17:00

18.12.17 08:00 -

20.12.17 - 17:00

41 Bina 400 220KV BORL-I I 22.12.17 08:00 17:00 09:00 for Maintainance & Relay testing work

42 Bina 400 220KV BORL-II II 23.12.17 08:00 17:00 09:00 for Maintainance & Relay testing work

43 Bina 400 220KV PGCIL - 27.12.17 08:00 17:00 09:00 for Maintainance & Relay testing work

44 Bina 400 220KV Shivpuri - 29.12.17 08:00 17:00 09:00 for Maintainance & Relay testing work

For line isolator replacement work

40 Bina 400 220KV Ashoknagar - 57:00:00 For line isolator replacement work

39 Bina 400 220KV Guna - 57:00:00

28

32.00 For 220KV PT replacement work at Sub-Station

Indore 400 220KV PT- II II 32.00 For 220KV PT replacement work at Sub-Station

27 Indore 400 220KV PT- I I

Agenda of 60th OCCM of MP 36

Page 39: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

A. ThermalStn. Name UNIT No. Capacity

MW Aug-17 Sep-173 120 0.00 0.004 120 0.00 0.00

PH II 240 0.00 0.005 210 152.35 146.20

PH III 210 152.35 146.20TOT 210 152.35 146.20

6 200 53.96 72.637 210 39.62 49.42

PH II 410 93.58 122.058 210 95.87 112.189 210 0.00 0.00

PH III 420 95.87 112.1810 250 157.49 157.0211 250 0.00 0.00

PH IV 500 157.49 157.02TOT 1330 346.93 391.25

1 210 81.94 47.132 210 62.71 97.37

PH I 420 144.65 144.493 210 52.58 64.554 210 103.08 102.47

PH II 420 155.66 167.035 500 278.86 240.98

PH III 500 278.86 240.98TOT 1340 579.17 552.50

1 600 309.81 325.892 600 0.00 0.00

PH1 1200 309.81 325.89

4080 1388.26 1415.84

B. HydelCapacity

MW Aug-17 Sep-17115.0 2.37 7.02172.0 2.67 8.2499.0 8.27 6.78

386.0 13.31 22.03193.0 6.65 11.02160.0 4.17 3.29107.0 2.78 2.1990.0 0.00 0.00

315.0 69.33 31.9320.0 9.93 6.6460.0 0.00 6.6130.0 1.55 2.2645.0 0.00 3.5522.5 0.00 1.7720.0 2.13 5.3460.0 0.00 4.96

1186.0 100.42 86.60915.0 89.48 71.59917.5 92.37 72.72

CapacityMW Aug-17 Sep-17

Indira Sagar Hydel Project 1000 20.690 105.825Omkareshwar Hydel Project 520 24.009 56.484

Unitwise / Stationwise Genration in MUAnn 4.1

AM

AR

KA

NTA

KSA

TPU

RA

SAN

JAY

GA

ND

HI

MPPGCL THERMAL

SSTP

S

TONSBIRSINGHPUR

Station NameGANDHISAGARR.P.SAGARJ.SAGARCHAMBAL

C. NHDC (Ex-Bus)Station Name

B.SGR(DEOLONDH)B.SGR(SILPARA)RAJGHATM.P.RAJGHATB.SGR(JINHA)MADIKHEDA

Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014. 2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.

TOTAL HYDELMPPGCL HydelMPSEB HYDEL Share

M.P.CHAMBALPENCHM.P.PENCHBARGI

Agenda of 60th OCCM of MP 37

Page 40: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

S No. Source Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Total30 31 30 31 31 30 0 0 0 0 0 0 183

A.1 Thermal 1034.52 1374.20 922.84 823.71 1282.62 1291.48 0.00 0.00 0.00 0.00 0.00 0.00 6729.382 Hydel 138.81 65.34 111.66 135.12 90.17 70.87 0.00 0.00 0.00 0.00 0.00 0.00 611.983 Total 1173.34 1439.54 1034.51 958.83 1372.80 1362.34 0.00 0.00 0.00 0.00 0.00 0.00 7341.36

B.1 Indira Sagar 129.51 156.20 150.63 68.70 18.97 101.94 0.00 0.00 0.00 0.00 0.00 0.00 625.962 Omkareshwar 65.48 77.85 77.46 41.31 24.01 56.48 0.00 0.00 0.00 0.00 0.00 0.00 342.583 MPPMCL Schedule from Central Sector of WR 1833.79 1792.95 1558.13 1599.06 1745.85 1752.78 0.00 0.00 0.00 0.00 0.00 0.00 10282.564 MPPMCL Schedule from Central Sector ER 19.03 18.18 12.01 9.83 35.49 29.17 0.00 0.00 0.00 0.00 0.00 0.00 123.725 Total MPPMCL Schedule from Central Sector (WR+ER) 1852.82 1811.13 1570.14 1608.89 1781.35 1781.95 0.00 0.00 0.00 0.00 0.00 0.00 10406.286 Deviation Energy of (WR+ER) -31.86 -26.91 -38.23 -6.99 11.43 62.73 0.00 0.00 0.00 0.00 0.00 0.00 -29.837 Schedule From DVC ER 156.34 208.88 112.45 128.21 175.36 160.34 0.00 0.00 0.00 0.00 0.00 0.00 941.588 Schedule From Sugen 0.00 0.00 0.00 0.00 0.19 12.94 0.00 0.00 0.00 0.00 0.00 0.00 13.139 LANCO Amk 196.56 178.13 122.84 113.23 77.35 87.18 0.00 0.00 0.00 0.00 0.00 0.00 775.3010 SASAN 1014.14 899.33 838.39 965.33 836.99 918.72 0.00 0.00 0.00 0.00 0.00 0.00 5472.8911 ESSAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0012 J P Nigri 327.32 332.81 304.49 146.14 322.43 248.89 0.00 0.00 0.00 0.00 0.00 0.00 1682.0813 MB Power 80.31 140.94 117.90 131.21 199.79 165.90 0.00 0.00 0.00 0.00 0.00 0.00 836.0514 JHABUA Power 9.94 23.88 6.85 0.00 28.08 33.72 0.00 0.00 0.00 0.00 0.00 0.00 102.4715 Other Open Access Schedule other than MPPMCL Incl. Seci -129.92 -138.00 -129.55 -81.03 -76.42 -38.08 0.00 0.00 0.00 0.00 0.00 0.00 -593.0016 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0017 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0018 Schedule from Sardar Sarovar 67.97 59.81 151.66 12.69 15.99 24.85 0.00 0.00 0.00 0.00 0.00 0.00 332.9619 SCH to Railway from RGPPL_ebid 154.54 149.12 157.11 163.53 159.41 155.50 0.00 0.00 0.00 0.00 0.00 0.00 939.2020 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0021 Schedule from Rihand+Matatila 6.47 9.44 10.06 12.01 13.47 15.47 0.00 0.00 0.00 0.00 0.00 0.00 66.91

22 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

23 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

24 Additional Power Purchase 0.22 7.22 7.97 10.28 22.18 63.75 0.00 0.00 0.00 0.00 0.00 0.00 111.6225 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0026 Banking of Energy -168.43 -7.60 -23.96 -235.96 -355.19 -334.61 0.00 0.00 0.00 0.00 0.00 0.00 -1125.7427 Sale of Power -321.90 -670.25 -592.09 -341.76 -205.62 -189.34 0.00 0.00 0.00 0.00 0.00 0.00 -2320.9528 Total MP Schedule (Including Railway) 3246.37 3004.82 2654.27 2632.78 2995.37 3107.17 0.00 0.00 0.00 0.00 0.00 0.00 17640.7829 Total MP Drawal (Including Railway) 3214.52 2977.92 2616.04 2625.79 3006.80 3169.90 0.00 0.00 0.00 0.00 0.00 0.00 17610.9630 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0431 Wheeled Energy of Wind Farm 8.61 7.99 6.45 10.15 6.11 2.14 0.00 0.00 0.00 0.00 0.00 0.00 41.4532 Wheeled Energy of Solar Plant 27.57 29.46 24.81 31.11 36.97 41.12 0.00 0.00 0.00 0.00 0.00 0.00 191.0533 Wheeled Energy of Bio-Mass 0.00 0.00 0.00 1.82 2.17 2.34 0.00 0.00 0.00 0.00 0.00 0.00 6.3434 Wheeled Energy of Ascent Hydro 1.35 1.32 1.12 1.07 1.19 1.24 0.00 0.00 0.00 0.00 0.00 0.00 7.2935 Export to MSEB (Nepa-Dharni) 0.00 0.00 0.00 -2.86 -3.19 -3.58 0.00 0.00 0.00 0.00 0.00 0.00 -9.6336 Deviation Energy of MPPGCL Thermal -11.71 -19.44 -25.21 -17.55 -15.53 -1.71 0.00 0.00 0.00 0.00 0.00 0.00 -91.1437 Energy Purchased by MP from Wind Farm 505.01 525.74 530.63 682.35 421.87 209.86 0.00 0.00 0.00 0.00 0.00 0.00 2875.4638 Energy Purchased by MP from Solar Plant 100.86 94.32 101.32 69.53 82.89 99.28 0.00 0.00 0.00 0.00 0.00 0.00 548.21

39 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP 171.01 173.70 169.69 121.87 95.94 55.03 0.00 0.00 0.00 0.00 0.00 0.00 787.23

40Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW

5.16 2.32 1.21 4.63 2.96 0.10 0.00 0.00 0.00 0.00 0.00 0.00 16.38

41 Deviation Energy of ISP 5.44 4.77 -6.02 3.43 1.72 3.89 0.00 0.00 0.00 0.00 0.00 0.00 13.2242 Schedule Energy of BLA Power against LTOA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0043 Schedule Energy of JP BINA Power against LTOA 55.54 73.35 45.22 19.30 59.63 91.73 0.00 0.00 0.00 0.00 0.00 0.00 344.7844 Import from bargi Left Bank Canal Power House + ISP NVDA 0.03 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0545 Chambal Complex Excess / less Overshare by MP -0.40 -1.77 3.92 4.86 -6.75 -6.98 0.00 0.00 0.00 0.00 0.00 0.00 -7.1246 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 -0.12 -0.03 -0.03 -0.02 1.13 0.00 0.00 0.00 0.00 0.00 0.00 0.9047 State Supply (Ex-Power st. Bus) 5451.30 5543.18 4731.74 4624.36 5108.53 5186.26 0.00 0.00 0.00 0.00 0.00 0.00 30645.3648 AVERAGE DAILY (Ex-Bus) 181.71 178.81 157.72 149.17 164.79 172.88 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 167.4649 MINIMUM DAILY (MP Periphery) 162.70 149.61 138.02 1301.53 142.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0050 MAXIMUM DAILY (MP Periphery) 182.74 179.81 170.82 160.33 180.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 182.7451 State Supply (Ex-Power st. Bus):- YEAR : 2016-17 5405.05 5099.95 4767.84 4213.94 4110.38 4736.12 5188.15 6416.59 6773.82 6418.79 5633.70 5519.39 28333.2852 Year ((17-18)-(16-17))*100/Year (16-17) 0.86 8.69 -0.76 9.74 24.28 9.50 -100.00 -100.00 -100.00 -100.00 -100.00 -100.00 8.1653 Unshedule L/S : Year-2017-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0054 Frequency Correction 2.97 3.19 2.06 2.26 2.40 4.42 0.00 0.00 0.00 0.00 0.00 0.00 17.3055 Restricted Requirement : Year-2017-18 5454.27 5546.37 4733.79 4626.62 5110.93 5190.68 0.00 0.00 0.00 0.00 0.00 0.00 30662.6656 Shedule L/S : Year-2017-18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0057 Un-Restricted Requirement : Year-2017-18 5454.27 5546.37 4733.79 4626.62 5110.93 5190.68 0.00 0.00 0.00 0.00 0.00 0.00 30662.66

ENERGY BALANCE SHEETYear : 2017 - 18

All figures in Million Unit

M.P. Availability

Exchange with other States / Systems

Agenda of 60th OCCM of MP 38

Page 41: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

S.NO. Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Yr 16-17C.1 DEMAND MET 8328 8181 7075 6977 7763 0 0 0 0 0 0 0 83282 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0D.1 DEMAND MET 8106 7936 7571 7372 8189 0 0 0 0 0 0 0 81892 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 03 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0F. REGISTERED MAXIMUM 8349 8181 7659 7372 8189 0 0 0 0 0 0 0 8349G. COMPUTED MAXIMUM DEMAND 8364 8181 7689 7412 8251 0 0 0 0 0 0 0 8364H. UNRESTRICTED MAXIMUM DEMAND 8364 8181 7689 7412 8251 0 0 0 0 0 0 0 8364I.1. Div. Head Quarters 23:49 23:41 23:42 23:40 23:45 0:00 0:00 0:00 0:00 0:00 0:00 0:00 19:502. District Head Quarters 23:51 23:45 23:43 23:44 23:49 0:00 0:00 0:00 0:00 0:00 0:00 0:00 19:523. Tahsil Head Quarters 23:44 23:38 23:33 23:37 23:42 0:00 0:00 0:00 0:00 0:00 0:00 0:00 19:464. Rural -Mixed 23:07 22:57 22:41 22:57 23:11 0:00 0:00 0:00 0:00 0:00 0:00 0:00 19:135. Rural -DLF 23:23 23:15 23:00 23:10 23:21 0:00 0:00 0:00 0:00 0:00 0:00 0:00 19:256. Rural -Irrigation 9:46 9:41 9:31 9:47 9:46 0:00 0:00 0:00 0:00 0:00 0:00 0:00 8:07J LOAD FACTOR % 90.68 91.07 85.81 84.31 83.85 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

S.N PARTICULARS Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17 Jan-18 Feb-18 Mar-18 Yr 16-17A. INTGRATED FREQUENCY

1 MAXIMUM 50.14 50.18 50.15 50.09 50.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.182 MINIMUM 49.83 49.78 49.85 49.82 49.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

B. INSTANTANEOUS FREQUENCY1 MAXIMUM 50.26 50.26 50.26 50.26 50.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.262 MINIMUM 49.66 49.64 49.72 49.82 49.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

C. AVG FREQUENCY 49.99 49.99 50.00 49.99 49.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.66D. % TIME WHEN FREQUENCY WAS

1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.002 50.05 TO 51.5 Hz 16.45 19.46 18.69 17.29 15.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.693 49.9 TO 50.05 Hz 74.49 71.45 75.50 76.15 76.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 62.614 49.7 TO 49.9 Hz 9.06 9.09 5.81 6.56 7.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.315 49.5 TO 49.7 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.006 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.007 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.008 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.009 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Year : 2017 - 18

MORNING PEAK (MAX)

EVENING PEAK (MAX)

Average Power Supply per day to

FREQUENCY ANALYSIS YEAR 2017-18

ENERGY BALANCE SHEET : Demand & Sypply Hours

Agenda of 60th OCCM of MP 39

Page 42: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs Injecti

on

Total CPPs Injecti

on

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat MP

STOA

Rihand+Matatila-Rajghat

Total SCH UN SCH TOTAL

1:00 50.00 1941 1766 151 11 50 203 633 2814 2436 289 0 96 1063 5 417 320 48 14 210 0 -756 -324 79 0 29 18 3944 6758 4049 105 -5 6858 0 0 0 6860 6860

2:00 50.02 1906 1735 105 7 26 202 656 2732 2415 279 0 96 1083 5 417 315 42 14 215 0 -750 -294 80 0 23 18 3958 6690 3981 23 -5 6708 0 0 0 6708 6708

3:00 50.01 1866 1698 93 7 22 205 653 2678 2393 274 0 96 1092 5 418 302 42 14 212 0 -698 -288 63 0 -18 18 3926 6603 3971 46 -5 6644 0 0 0 6646 6646

4:00 50.02 1850 1684 81 4 15 207 645 2634 2380 269 0 96 1100 1 418 290 44 14 202 0 -710 -217 50 0 -54 18 3901 6535 3967 66 -5 6597 0 0 0 6598 6598

5:00 49.98 1844 1678 83 4 7 206 637 2614 2352 244 0 96 1104 0 416 259 43 14 208 0 -723 -5 16 0 -68 18 3974 6589 3952 -22 -5 6562 0 0 0 6566 6566

6:00 49.99 1841 1676 85 18 15 201 621 2616 2286 236 0 96 1126 0 416 242 43 14 211 0 -420 -11 13 0 -123 18 4147 6762 4097 -50 -3 6709 0 0 0 6713 6713

7:00 50.00 1876 1707 118 18 19 204 618 2683 2292 255 0 96 1129 3 411 276 43 17 213 0 -412 -140 25 0 -127 18 4099 6783 4156 57 -4 6835 0 0 0 6839 6839

8:00 50.04 1855 1688 101 25 21 204 694 2733 2332 248 0 96 1116 3 410 274 42 18 215 0 -413 -123 13 0 -139 18 4109 6843 4026 -84 -4 6755 0 0 0 6755 6755

9:00 50.02 1846 1680 92 25 17 203 823 2839 2296 242 0 96 1103 3 413 254 39 19 217 0 -413 -99 0 0 -158 18 4029 6869 3935 -95 -4 6770 0 0 0 6771 6771

10:00 50.02 1827 1663 78 25 17 198 916 2897 2277 230 0 96 1089 3 416 250 35 18 216 0 -413 -169 0 0 -174 18 3893 6791 3708 -186 -4 6601 0 0 0 6603 6603

11:00 50.01 1813 1650 79 26 21 196 926 2897 2239 201 0 96 1105 3 415 237 32 20 204 0 -431 -300 0 0 -189 18 3649 6546 3595 -53 -3 6489 0 0 0 6491 6491

12:00 50.00 1778 1618 86 26 21 194 919 2863 2239 160 0 96 1087 3 415 212 32 21 210 0 -431 -395 0 0 -198 18 3470 6333 3347 -122 -3 6207 0 0 0 6209 6209

13:00 50.00 1773 1613 91 25 21 193 934 2877 2242 171 0 96 1093 3 419 200 33 21 201 0 -437 -479 0 0 -195 18 3386 6263 3332 -53 -4 6206 0 0 0 6210 6210

14:00 50.01 1764 1605 81 25 21 192 933 2857 2204 163 0 96 1087 3 422 189 27 21 202 0 -440 -435 0 0 -192 18 3366 6223 3296 -70 -4 6149 0 0 0 6151 6151

15:00 49.99 1781 1621 78 25 21 191 885 2821 2202 163 0 96 1091 2 421 200 29 21 213 0 -499 -533 0 0 -182 18 3244 6065 3335 91 -3 6153 0 0 0 6156 6156

16:00 49.99 1812 1649 77 25 24 188 797 2761 2233 160 0 96 1092 2 421 210 24 22 209 0 -498 -442 0 0 -172 18 3376 6136 3378 2 -4 6135 0 0 0 6138 6138

17:00 49.98 1815 1651 74 26 21 186 645 2603 2201 146 0 96 1080 2 421 197 13 25 211 0 -504 -257 0 0 -156 18 3490 6094 3532 41 -3 6132 0 0 0 6136 6136

18:00 50.00 1813 1650 91 26 28 187 460 2441 2156 118 0 96 1083 1 422 160 8 26 213 0 -442 -111 0 0 -135 18 3612 6053 3716 103 -3 6154 0 0 0 6156 6156

19:00 49.96 1922 1749 224 83 75 216 404 2751 2264 234 0 96 1084 4 422 208 28 27 215 0 0 -519 0 0 -46 18 4035 6785 4067 32 -4 6814 0 0 0 6824 6824

20:00 49.98 2009 1828 273 112 119 266 444 3042 2406 321 2 169 1061 4 422 310 44 27 209 0 -350 -391 19 0 -30 18 4242 7284 4245 4 -6 7281 0 0 0 7288 7288

21:00 49.98 1991 1812 190 36 65 268 479 2849 2392 313 2 96 1064 4 423 320 38 28 207 0 -337 -348 21 0 -29 18 4212 7061 4311 99 -6 7154 0 0 0 7162 7162

22:00 50.02 1957 1781 162 11 41 259 552 2805 2381 297 0 96 1065 4 423 315 43 27 201 0 -337 -323 40 0 -31 18 4217 7022 4270 53 -6 7069 0 0 0 7072 7072

23:00 50.00 1950 1775 199 25 55 255 585 2894 2393 298 0 96 1062 4 424 306 43 26 191 0 -331 -277 82 0 -31 18 4305 7199 4319 14 -6 7207 0 0 0 7211 7211

24:00 50.00 1951 1775 176 29 67 215 627 2889 2471 310 2 93 1067 4 425 318 47 23 202 0 -804 -278 150 0 11 18 4060 6948 4116 56 -5 6999 0 0 0 7003 7003

Avg. 50.00 1866 1698 120 27 34 210 687 2775 2312 234 0 99 1089 3 419 257 36 20 209 0 -481 -281 27 0 -99 18 3860 6635 3862 2 -4 6633 0 0 0 6636 6636

00 TO 06 HRS.

50.00 1875 1706 100 8 23 204 641 2681 2377 265 0 96 1094 3 417 288 43 14 210 0 -676 -190 50 0 -35 18 3975 6656 4003 28 -5 6680 0 0 0 6682 6682

06 TO 12 HRS.

50.01 1832 1668 92 24 19 200 816 2819 2279 223 0 96 1105 3 413 251 37 19 213 0 -419 -204 6 0 -164 18 3875 6694 3794 -81 -4 6610 0 0 0 6611 6611

12 TO 18 HRS.

49.99 1793 1631 82 25 22 190 776 2727 2206 154 0 96 1087 2 421 193 22 23 208 0 -470 -376 0 0 -172 18 3412 6139 3431 19 -3 6155 0 0 0 6158 6158

06TO 18 HRS.

50.00 1813 1649 87 25 21 195 796 2773 2243 188 0 96 1096 2 417 222 30 21 210 0 -444 -290 3 0 -168 18 3644 6416 3613 -31 -4 6382 0 0 0 6385 6385

18 TO 24 HRS.

49.99 1963 1787 204 49 70 246 515 2872 2384 296 1 108 1067 4 423 296 40 26 204 0 -360 -356 52 0 -26 18 4178 7050 4221 43 -5 7088 0 0 0 7093 7093

Deviation

Intra State STO

A

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- August 2017

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

Agenda of 60th OCCM of MP 40

Page 43: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSP

Total IPPs

Injection

Total CPPs Injecti

on

Total CSS DVC ER Sugen Lanco Sasan Essar JP

NigriMB

Power

Jhabua

PowerSSP

SCH to

Railway

SEZ Banking Sale Pur

Total MTO

Aat

MP

STOA

Rihand+Matatila-Rajghat

Total SCHUN

SCH TOTAL

1:00 49.98 1966 1789 103 125 75 202 400 2693 2439 248 15 111 1218 15 326 243 51 27 209 0 -415 -222 156 0 -7 20 4434 7127 4543 109 -5 7232 0 0 0 7237 7237

2:00 50.00 1956 1780 61 129 71 198 420 2658 2451 239 15 111 1223 14 327 240 50 27 212 0 -414 -222 127 0 -6 20 4414 7072 4386 -28 -5 7039 0 0 0 7041 7041

3:00 49.98 1926 1753 55 125 64 193 405 2594 2370 203 7 111 1229 14 333 229 50 27 213 0 -349 -253 126 0 -13 20 4316 6910 4378 62 -5 6968 0 0 0 6974 6974

4:00 50.01 1919 1746 53 125 62 191 395 2571 2348 182 10 111 1234 14 333 233 48 25 211 0 -328 -137 95 0 -59 20 4340 6911 4339 -1 -5 6905 0 0 0 6907 6907

5:00 49.94 1934 1760 50 125 60 191 375 2562 2368 200 15 111 1243 14 331 238 47 25 211 0 -493 -113 103 0 -73 20 4248 6810 4347 98 -5 6904 0 0 0 6917 6917

6:00 49.96 1932 1758 59 152 72 194 355 2589 2411 222 24 111 1286 14 325 238 46 25 211 0 -488 -99 144 0 -69 20 4421 7010 4458 37 -5 7042 0 0 0 7052 7052

7:00 49.99 1951 1775 63 152 71 201 385 2647 2423 231 17 111 1281 14 324 237 46 25 213 0 -530 -106 142 0 -71 20 4377 7024 4444 67 -5 7086 0 0 0 7092 7092

8:00 50.02 1958 1781 54 147 73 205 469 2731 2411 230 10 111 1259 15 330 242 44 26 214 0 -528 -107 134 0 -90 20 4321 7051 4250 -70 -5 6977 0 0 0 6978 6978

9:00 49.99 1955 1779 52 148 74 205 603 2861 2436 221 17 111 1234 14 332 234 39 28 214 0 -509 -189 15 0 -108 20 4110 6971 4080 -30 -4 6937 0 0 0 6942 6942

10:00 49.98 1946 1771 46 144 79 202 726 2968 2394 220 10 111 1224 14 333 214 39 31 213 0 -508 -286 13 0 -127 20 3914 6882 3857 -57 -4 6821 0 0 0 6826 6826

11:00 49.98 1925 1752 44 141 77 194 751 2959 2370 194 7 111 1214 14 328 207 43 32 209 0 -474 -345 13 0 -139 20 3804 6763 3814 9 -4 6769 0 0 0 6774 6774

12:00 49.97 1934 1759 46 137 79 187 754 2962 2365 179 5 106 1207 13 333 207 43 34 209 0 -620 -319 13 0 -143 20 3652 6614 3550 -101 -4 6509 0 0 0 6517 6517

13:00 49.97 1935 1761 48 121 79 187 762 2958 2328 188 5 115 1207 14 334 225 43 34 202 0 -646 -386 16 0 -139 20 3560 6518 3580 20 -4 6534 0 0 0 6541 6541

14:00 49.98 1924 1750 52 125 81 187 695 2892 2321 174 7 115 1211 13 335 192 43 34 197 0 -681 -374 16 0 -136 20 3488 6380 3593 106 -4 6482 0 0 0 6487 6487

15:00 49.96 1920 1747 57 136 75 189 634 2838 2321 170 10 115 1215 13 335 178 43 35 210 0 -599 -435 13 0 -125 20 3520 6358 3608 88 -4 6443 0 0 0 6453 6453

16:00 49.97 1921 1748 51 125 75 191 507 2697 2330 184 5 115 1221 13 322 175 43 37 209 0 -507 -506 13 0 -112 20 3563 6261 3658 94 -4 6351 0 0 0 6358 6358

17:00 49.96 1923 1750 53 129 79 192 350 2553 2369 194 7 112 1225 14 326 178 42 37 208 0 -489 -513 13 0 -91 20 3653 6206 3803 150 -4 6353 0 0 0 6361 6361

18:00 49.96 1966 1789 80 129 81 195 265 2539 2382 200 10 116 1228 14 334 196 38 39 211 0 -534 -264 20 0 -76 20 3933 6472 4005 72 -4 6540 0 0 0 6550 6550

19:00 49.97 2065 1879 317 261 104 224 279 3065 2393 266 42 116 1219 14 336 234 47 38 209 0 -303 -210 30 0 -34 20 4416 7481 4422 6 -5 7482 0 0 0 7490 7490

20:00 50.00 2084 1896 278 207 106 238 313 3038 2440 280 59 184 1222 14 343 245 43 37 208 0 -303 -261 63 0 -39 20 4556 7594 4518 -38 -6 7551 0 0 0 7554 7554

21:00 49.98 2070 1884 222 179 92 238 312 2927 2415 262 37 116 1226 14 343 232 43 37 205 0 -325 -264 66 0 -39 20 4389 7316 4462 73 -6 7384 0 0 0 7390 7390

22:00 49.99 2015 1834 198 149 87 238 329 2835 2386 257 17 116 1226 14 344 231 43 37 203 0 -344 -249 149 0 -39 20 4412 7247 4486 74 -6 7315 0 0 0 7320 7320

23:00 49.99 1999 1819 197 164 102 233 338 2852 2440 262 37 116 1232 14 344 237 49 35 190 0 -337 -244 171 0 -36 20 4529 7381 4696 167 -5 7543 0 0 0 7548 7548

24:00 50.00 1977 1799 165 133 89 216 366 2768 2468 265 34 116 1230 14 345 230 46 33 197 0 -422 -222 182 0 -20 20 4515 7282 4601 86 -5 7364 0 0 0 7368 7368

Avg. 49.98 1962 1786 100 146 79 204 466 2782 2391 220 18 116 1230 14 333 222 44 32 208 0 -464 -264 76 0 -75 20 4120 6902 4162 41 -4 6939 0 0 0 6945 6945

00 TO 06 HRS.

49.98 1939 1764 63 130 67 195 391 2611 2398 216 14 111 1239 14 329 237 49 26 211 0 -415 -174 125 0 -38 20 4362 6973 4409 46 -5 7015 0 0 0 7021 7021

06 TO 12 HRS.

49.99 1945 1770 51 145 76 199 615 2855 2400 212 11 110 1236 14 330 224 42 29 212 0 -528 -225 55 0 -113 20 4030 6884 3999 -30 -4 6850 0 0 0 6855 6855

12 TO 18 HRS.

49.97 1931 1758 57 128 78 190 536 2746 2342 185 7 114 1218 14 331 191 42 36 206 0 -576 -413 15 0 -113 20 3619 6366 3708 88 -4 6450 0 0 0 6458 6458

06TO 18 HRS.

49.98 1938 1764 54 136 77 195 575 2800 2371 199 9 112 1227 14 331 207 42 33 209 0 -552 -319 35 0 -113 20 3825 6625 3854 29 -4 6650 0 0 0 6657 6657

18 TO 24 HRS.

49.99 2035 1852 230 182 97 231 323 2914 2424 265 37 127 1226 14 342 235 45 36 202 0 -339 -242 110 0 -35 20 4469 7384 4531 61 -5 7440 0 0 0 7445 7445

Deviation

Intra State STO

A

DEMAND MET

Load Shedding

REST. DEMAN

D

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- September 2017

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule from

TotAvl.

Act.Drl

Agenda of 60th OCCM of MP 41

Page 44: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 50.00 2302 2413 111 0 0 2414 2414 2412 2546 134 0 0 2547 2547 1905 1695 -210 0 0 1695 1695 210 204

2:00 50.02 2248 2350 102 0 0 2350 2350 2360 2493 133 0 0 2493 2493 1883 1650 -233 0 0 1651 1651 215 215

3:00 50.01 2185 2314 129 0 0 2315 2315 2301 2442 141 0 0 2443 2443 1856 1680 -176 0 0 1681 1681 212 208

4:00 50.02 2180 2302 123 0 0 2303 2303 2285 2418 133 0 0 2418 2418 1853 1681 -172 0 0 1682 1682 202 195

5:00 49.98 2172 2271 99 0 0 2273 2273 2287 2392 105 0 0 2394 2394 1891 1698 -193 0 0 1700 1700 208 200

6:00 49.99 2169 2194 25 0 0 2195 2195 2295 2407 112 0 0 2408 2408 2068 1898 -170 0 0 1899 1899 211 210

7:00 50.00 2104 2159 56 0 0 2160 2160 2284 2407 122 0 0 2408 2408 2133 2055 -77 0 0 2056 2056 213 214

8:00 50.04 2084 2099 15 0 0 2099 2099 2329 2410 81 0 0 2410 2410 2175 2030 -145 0 0 2030 2030 215 216

9:00 50.02 2044 2047 3 0 0 2047 2047 2333 2423 91 0 0 2424 2424 2209 2080 -130 0 0 2080 2080 217 220

10:00 50.02 2054 2034 -20 0 0 2035 2035 2310 2361 51 0 0 2361 2361 2179 1988 -191 0 0 1988 1988 216 219

11:00 50.01 2019 2064 46 0 0 2065 2065 2235 2330 95 0 0 2331 2331 2046 1895 -151 0 0 1896 1896 204 200

12:00 50.00 1993 1992 -1 0 0 1993 1993 2171 2204 33 0 0 2205 2205 1967 1806 -161 0 0 1807 1807 210 204

13:00 50.00 1976 2011 35 0 0 2012 2012 2099 2179 80 0 0 2181 2181 1969 1820 -149 0 0 1821 1821 201 196

14:00 50.01 1935 1953 19 0 0 1954 1954 2098 2184 85 0 0 2185 2185 1966 1814 -152 0 0 1815 1815 202 197

15:00 49.99 1856 1947 90 0 0 1948 1948 2055 2166 111 0 0 2167 2167 1917 1828 -89 0 0 1829 1829 213 212

16:00 49.99 1887 1923 36 0 0 1924 1924 2064 2160 96 0 0 2161 2161 1971 1848 -123 0 0 1849 1849 209 204

17:00 49.98 1854 1891 37 0 0 1893 1893 2044 2146 102 0 0 2148 2148 2008 1886 -122 0 0 1888 1888 211 209

18:00 50.00 1822 1899 78 0 0 1900 1900 2037 2177 140 0 0 2178 2178 1989 1868 -121 0 0 1869 1869 213 209

19:00 49.96 2099 2219 120 0 0 2222 2222 2119 2217 98 0 0 2220 2220 2191 2158 -33 0 0 2161 2161 215 221

20:00 49.98 2419 2515 96 0 0 2517 2517 2391 2507 116 0 0 2509 2509 2240 2056 -184 0 0 2058 2058 209 204

21:00 49.98 2420 2519 98 0 0 2521 2521 2389 2511 123 0 0 2514 2514 2111 1926 -185 0 0 1928 1928 207 199

22:00 50.02 2386 2488 103 0 0 2489 2489 2374 2513 139 0 0 2514 2514 2092 1875 -217 0 0 1876 1876 201 192

23:00 50.00 2436 2524 88 0 0 2525 2525 2517 2684 167 0 0 2685 2685 2094 1814 -280 0 0 1815 1815 191 186

24:00 50.00 2358 2462 104 0 0 2463 2463 2458 2604 146 0 0 2606 2606 1987 1737 -250 0 0 1738 1738 202 196

Avg. 50.00 2125 2191 66 0 0 2192 2192 2260 2370 110 0 0 2371 2371 2029 1866 -163 0 0 1867 1867 209 205

00 TO 06 HRS. 50.00 2209 2307 98 0 0 2308 2308 2323 2450 126 0 0 2451 2451 1909 1717 -192 0 0 1718 1718 210 205

06 TO 12 HRS. 50.01 2049 2066 16 0 0 2066 2066 2277 2356 79 0 0 2356 2356 2118 1976 -142 0 0 1976 1976 213 212

12 TO 18 HRS. 49.99 1888 1937 49 0 0 1938 1938 2066 2169 102 0 0 2170 2170 1970 1844 -126 0 0 1845 1845 208 204

06TO 18 HRS. 50.00 1969 2002 33 0 0 2002 2002 2172 2262 91 0 0 2263 2263 2044 1910 -134 0 0 1911 1911 210 208

18 TO 24 HRS. 49.99 2353 2454 101 0 0 2456 2456 2375 2506 131 0 0 2508 2508 2119 1928 -192 0 0 1929 1929 204 199

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- August 2017

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 60th OCCM of MP 42

Page 45: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

SCH Demand Met

O/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandSCH Demand

MetO/U DRL

SCH LS

Unsch LS

Restricted

Demand

Unrestricted

DemandTotal Sch Total

Drawal

1:00 49.98 2406 2537 131 0 0 2539 2539 2502 2707 205 0 0 2709 2709 2022 1779 -243 0 0 1780 1780 209 209

2:00 50.00 2370 2464 93 0 0 2465 2465 2471 2648 177 0 0 2648 2648 1992 1710 -283 0 0 1710 1710 212 218

3:00 49.98 2320 2440 120 0 0 2442 2442 2421 2594 173 0 0 2597 2597 1968 1722 -247 0 0 1723 1723 213 212

4:00 50.01 2324 2425 100 0 0 2425 2425 2415 2544 130 0 0 2545 2545 1990 1725 -264 0 0 1726 1726 211 211

5:00 49.94 2269 2399 129 0 0 2403 2403 2354 2512 158 0 0 2517 2517 1975 1784 -190 0 0 1787 1787 211 208

6:00 49.96 2260 2341 81 0 0 2344 2344 2352 2533 180 0 0 2536 2536 2112 1957 -156 0 0 1959 1959 211 212

7:00 49.99 2205 2276 71 0 0 2278 2278 2328 2494 165 0 0 2496 2496 2246 2101 -145 0 0 2102 2102 213 216

8:00 50.02 2160 2203 43 0 0 2203 2203 2348 2447 99 0 0 2447 2447 2273 2111 -162 0 0 2112 2112 214 216

9:00 49.99 2104 2146 41 0 0 2147 2147 2332 2467 135 0 0 2469 2469 2269 2106 -162 0 0 2108 2108 214 217

10:00 49.98 2105 2126 21 0 0 2128 2128 2311 2438 127 0 0 2440 2440 2234 2038 -197 0 0 2039 2039 213 219

11:00 49.98 2100 2152 52 0 0 2154 2154 2295 2420 125 0 0 2422 2422 2175 1989 -185 0 0 1991 1991 209 207

12:00 49.97 2081 2100 19 0 0 2102 2102 2226 2362 136 0 0 2365 2365 2077 1840 -237 0 0 1842 1842 209 208

13:00 49.97 2070 2116 46 0 0 2119 2119 2210 2331 121 0 0 2334 2334 2089 1889 -200 0 0 1891 1891 202 197

14:00 49.98 2011 2069 58 0 0 2071 2071 2174 2323 149 0 0 2325 2325 2047 1898 -149 0 0 1899 1899 197 192

15:00 49.96 1972 2037 65 0 0 2040 2040 2163 2308 145 0 0 2311 2311 2042 1891 -151 0 0 1894 1894 210 207

16:00 49.97 1956 2011 55 0 0 2014 2014 2126 2246 120 0 0 2248 2248 2030 1890 -140 0 0 1892 1892 209 204

17:00 49.96 1890 1956 67 0 0 1959 1959 2070 2227 157 0 0 2230 2230 2033 1962 -71 0 0 1965 1965 208 207

18:00 49.96 1945 2024 79 0 0 2027 2027 2132 2278 146 0 0 2281 2281 2111 2027 -84 0 0 2030 2030 211 211

19:00 49.97 2347 2484 137 0 0 2486 2486 2374 2534 160 0 0 2537 2537 2406 2255 -151 0 0 2257 2257 209 209

20:00 50.00 2504 2590 86 0 0 2591 2591 2571 2667 96 0 0 2668 2668 2334 2088 -246 0 0 2089 2089 208 206

21:00 49.98 2475 2593 118 0 0 2595 2595 2496 2623 127 0 0 2625 2625 2174 1966 -207 0 0 1968 1968 205 201

22:00 49.99 2442 2554 112 0 0 2555 2555 2465 2630 165 0 0 2632 2632 2135 1933 -202 0 0 1934 1934 203 199

23:00 49.99 2470 2622 152 0 0 2624 2624 2572 2806 234 0 0 2807 2807 2138 1933 -204 0 0 1934 1934 190 182

24:00 50.00 2444 2591 147 0 0 2593 2593 2555 2748 193 0 0 2749 2749 2068 1834 -234 0 0 1835 1835 197 191

Avg. 49.98 2218 2302 84 0 0 2304 2304 2344 2495 151 0 0 2497 2497 2122 1935 -188 0 0 1936 1936 208 207

00 TO 06 HRS. 49.98 2325 2434 109 0 0 2436 2436 2419 2590 171 0 0 2592 2592 2010 1779 -230 0 0 1781 1781 211 212

06 TO 12 HRS. 49.99 2126 2167 41 0 0 2169 2169 2307 2438 131 0 0 2440 2440 2212 2031 -182 0 0 2032 2032 212 214

12 TO 18 HRS. 49.97 1974 2036 62 0 0 2038 2038 2146 2286 140 0 0 2288 2288 2059 1926 -132 0 0 1929 1929 206 203

06TO 18 HRS. 49.98 2050 2101 51 0 0 2103 2103 2226 2362 135 0 0 2364 2364 2136 1979 -157 0 0 1981 1981 209 208

18 TO 24 HRS. 49.99 2447 2572 125 0 0 2574 2574 2505 2668 163 0 0 2670 2670 2209 2002 -207 0 0 2003 2003 202 198

Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- September 2017

FIGURES IN MW

Hrs. FREQ.

EZONE CZONE WZONE Railway

Agenda of 60th OCCM of MP 43

Page 46: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Annexure-5 System Disturbance / System Incidence

1. System Disturbance on 08.08.2017 at 400 KV S/s Pithampur : On dated 08.08.2017 at

around 03:30 Hrs. M.P system was normal and frequency of National Grid was 49.99 Hz. At around 03:33 Hrs. ‘R’-Phase PT of 220 KV Main Bus – II burst at 400 KV S/s Pithampur resulting in bus fault on 220 KV Main Bus – II and Bus Bar Protection for 220 KV Main Bus – I & II operated at 400 KV S/s Pithampur. Consequently all feeders and transformers connected to 220 KV Main Bus – I & II at 400 KV S/s Pithampur tripped as follows:- 400/220 KV 315 MVA ICT – I. 400/220 KV 315 MVA ICT – II 220 KV Pithampur – Pithampur (Sector- I) Ckt 220 KV Pithampur – Badnagar Ckt 220 KV Pithampur Interconnector – I 220 KV Pithampur Interconnector – II Due to above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.

2. System Disturbance on 24.08.2017 at STPS: On dated 24.08.2017 at around 21:00 Hrs. M.P system was normal and frequency of National Grid was 49.96 Hz. At around 21:05 Hrs. while synchronizing STPS Unit#9, LBB of 400 KV side breaker of GT operated (due to fire). Consequently Bus Bar Protection of 400 KV Main Bus Operated and resulted in tripping of feeders and transformers as follows:- STPS Unit # 9 STPS Unit # 8 400 KV STPS – ISP Ckt. 400 KV Bus Coupler at STPS. 63 MVAR Bus reactor. 400/220 KV, 500 MVA ICT. Due to above tripping there was no load loss. There was generation loss of about 176 MW and System was normalized in due course of time.

3. System Disturbance on 14.09.2017 in Satna area: On dated 14.09.2017 at around 19:04 Hrs. M.P system was normal and frequency of National Grid was 49.98 Hz. At around 19:05 220 KV Bus – I at 400 KV S/s Satna (PGCIL) got tripped due to bus fault. Simultaneously 400/220 KV, 315 MVA ICT – II & III tripped on inter trip from 220 KV side as 220 KV Tie CB open status was wrong.

During the above tripping Satna, Kotar & Tons was being fed radially. Hence interruption occurred at 220 KV S/s Satna, Kotar, Tons HPS, 132 KV S/s Satna, Rampur Baghlan, Panna, Pawa, Nagod and Majhgawan.

Due to above tripping there load loss of about 200 MW. There was no generation loss and System was normalized in due course of time.

Agenda of 60th OCCM of MP 44

Page 47: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Agenda of 60th OCCM of MP 45

Page 48: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Annexure-6.5A

Schemes of Western Region funded under PSDF

State I UT Sr. No.

Details of the Scheme Nos. of Schemes

Grant Sanctioned (in Rs Crores)

Date of Sanction

Funds released (in Rs Crores) as on 30.11.2016

%age of fund Disbursed against Grant sanctioned

Madhya Pradesh

1. Implementation of Integrated system for availability based tariff.

2 3.6 17/03/2016 0 0%

2. Renovation and Upgradation of protection system of substations of MPPTCL

92.7 17/03/2016 0 0%

Madhya Pradesh

3. Renovation and Upgradation of protection system of substations MPPGCL

2 47.11 5/9/2016 0 0%

4. Installation of 125MVARBus Reactor at SSTPP Khandwaand 50MVARLine Reactor at SGSTPS Birsinghpur substation of MPPGCL.

5.59 0 0%

Chhattisgarh 5. Renovation and Upgradation of protection system of substations

1 61.67 5/9/2016 0 0%

Gujarat 6. Automatic Demand Management Scheme

3 1.50 11105/2015 17/03/2015

1.35 89.82%

7. Load Forecasting Scheme

3.70 04/08/2015 0 0%

8. Wind generation forecasting project for State of Gujarat.

1.62 17/03/2015 0 0%

TOTAL 8 217.49

Agenda of 60th OCCM of MP 46

Page 49: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Annexure-6.8B

1. Name of the Scheme

1.1 Name of the substation and its Location

1.2 Executing Agency

1.3 State/Region

2. Date of Sanction Order

2.1 Date of Agreement of Entity with State Govt. / NLDC

2.2 Total Approved Cost of Scheme

2.3 Approved Grant by Monitoring Committee (Rs. In Lakhs)

2.4 Date of Requisition by the Entity

2.4 a) Date and Reference of LOA

2.4 b) Amount of LOA

2.5 Date of Disbursement and amount

2.5.1 Ist Installment

2.5.2 IInd Installment

2.5.3 IIIrd Installment

2.6 Date of Scheduled completion of work

2.7 Date of Handling over of Site to entity ( In case of Turn key project)

Sch. Act.1 Item Details (As per Annexure-II)

1.1

1.2

Erection Discriptionworks as per

LOAProgress During Month

Balance

2 Work Details

2.1

2.2

3 Others

Signature With Seal of The Nodal Officer

CUMMULATIVE PROGRESS till date

RemarkBalance

Quantity Received during

MonthQty. AS PER

LOASupply DiscriptionNo.

Report for the Month of JANUARY 2017

CUMMULATIVE PROGRESS till date

Reporting Format to the PSDF Project Monitoring Group

Agenda of 60th OCCM of MP 47

Page 50: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Minutes of Meeting of 2nd VC on Review of List of Important Grid Elements of WR on Dtd 25.09.2017

Minutes of Meeting of 2nd VC on Review of List of Important Grid Elements of WR on Dtd.

25.09.2017 with SLDC MP

With reference to Western Region OCCM 498 decision it was decided to review the list of important

grid elements of Western Region in coordination with SLDC’s and WRLDC. For this WRLDC had

reviewed the list of important grid element of Western Region and accordingly reviewed list had been

sent through email to Maharashtra, Chhattisgarh, Madhya Pradesh and Gujarat on dated 11th

September 2017 seeking comments from states. Accordingly first meeting through VC were organized

on 19th Sep 2017 with SLDC Gujarat and SLDC Chhattisgarh, Details of elements which are to be

removed from list of important grid element of WR were finalized and same were sent through email

on 19th Sep 2017. Second meeting was organized with SLDC Madhya Pradesh on 25th Sep 2017 from

12:00-13:00Hrs. through VC. After discussion elements to be excluded from list of important grid

element of Western Region is attached for Madhya Pradesh. Also list of participants are given in

Annexure I.

Following were considered while reviewing the list of important grid elements.

1. All radial feeders within states which having less impact on the system.

2. Lines with both end of state and which are less sensitive / does not affect any important lines

in the system.

3. ICTs in s/s (states) that does not affect adjacent ISTS s/s loading.

4. Bus reactors with in state having less impact on adjacent ISTS/ISGS stations.

For the outages on ICTs/Lines which are excluded from the list, the concerned SLDC shall prepare ‘N-

1’ contingency plan and review reliability and submit that the system is safe under n-1 contingency

prior to availing the shutdown.

The elements excluded from important grid elements list would not appear in OCC approved list for

outages, but SLDCs to take responsibility of reviewing the reliability and ensure grid security and shall

inform WRLDC before taking outage.

The outage of the element where different licensee is involved, to be incorporated in Google sheet

for outage co-ordination on D-3 basis.

All long outages more than two days shall be taken up as per outage procedure agreed in OCCM or

shall be approved in OCCM forum.

All OCCM approved outages will be given first priority and if required unplanned outages to be

deferred in real time to facilitate the OCCM approved outages.

Elements to be removed from List of important grid elements for SLDC MP is given below-

Sr. No

End-1 End-2 Id Line

Owner

End-1 Owner

End-2 Owner

Km Conductor

Type WRLDC Remark

400kV Lines

73 Bina-MP JP-Bina 1 MPPTCL MPPTCL Jaypee 20 Twin ACSR

Moose

83 Birsingpur Katni 1 MPPTCL MPPGCL MPPTCL 118 Twin ACSR

Moose

Agenda of 60th OCCM of MP 48

Page 51: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Minutes of Meeting of 2nd VC on Review of List of Important Grid Elements of WR on Dtd 25.09.2017

84 Birsingpur Katni 2 MPPTCL MPPGCL MPPTCL 118 Twin ACSR

Moose

SLDC will ensure

reliability and security

of system under N-1

contingency

106 Chhegaon Julwania 1 MPPTCL MPPTCL MPPTCL 114 Twin ACSR

Moose

150 Indore-MP Nagda 1 MPPTCL MPPTCL MPPTCL 108 Twin ACSR

Moose

250 Malwa Chhegaon 1 MPPTCL MPPTCL MPPTCL 53 Twin ACSR

Moose

251 Malwa Pithampur 1 MPPTCL MPPTCL MPPTCL 136 Twin ACSR

Moose

252 Malwa Pithampur 2 MPPTCL MPPTCL MPPTCL 136 Twin ACSR

Moose

253 Malwa Julwania 1 MPPTCL MPPTCL MPPTCL 170 Twin ACSR

Moose

327 Satpura Indira sagar

1 MPPTCL MPPTCL MPPTCL 189 Twin ACSR

Moose

329 Satpura Astha 1 MPPTCL MPPTCL MPPTCL 240 Twin ACSR

Moose

330 Satpura Astha 2 MPPTCL MPPTCL MPPTCL 240 Twin ACSR

Moose

220kV Lines

21 Bina-MP Bina-PG 1 MPPTCL 3 Single Zebra

SLDC will ensure reliability and security of system under

N-1 contingency

22 Bina-PG Shivpuri 1 MPPTCL 169 Single Zebra

29 Damoh-MP Damoh-PG 1 MPPTCL 8 Single Zebra

30 Damoh-MP Damoh-PG 2 MPPTCL 9 Single Zebra

31 Damoh-PG Sagar 2 MPPTCL 62 Single Zebra

32 Damoh-PG Tikamgad 1 MPPTCL 151 Single Zebra

43 Gwalior Gwalior-II 1 MPPTCL 3 Single Zebra

44 Gwalior Gwalior-II 2 MPPTCL 3 Single Zebra

48 Hoshangabad Itarsi-PG 1 MPPTCL 21 Single Zebra

49 Itarsi Itarsi-PG 1 MPPTCL 3 Single Zebra

62 Katni Satna-PG 1 MPPTCL 102 Single Zebra

71 Khandwa Omkareswar 1 MPPTCL 98 Single Zebra

103 Pithampura Rajgarh-PG 1 MPPTCL 79 Single Zebra

104 Pithampura Rajgarh-PG 2 MPPTCL 78 Single Zebra

Agenda of 60th OCCM of MP 49

Page 52: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Minutes of Meeting of 2nd VC on Review of List of Important Grid Elements of WR on Dtd 25.09.2017

110 Rajgarh-PG Rajgarh-MP 1 MPPTCL 13 Single Zebra

SLDC will ensure reliability and security of system under

N-1 contingency

111 Rajgarh-PG Dhar 1 MPPTCL 12 Single Zebra

112 Satna-MP Satna-PG 1 MPPTCL 1 Single Zebra

113 Satna-MP Satna-PG 2 MPPTCL 1 Single Zebra

114 Satna-PG Maihar 2 MPPTCL 42 Single Zebra

116 Seoni-PG Seoni-MP 1 MPPTCL 4 Single Zebra

117 Seoni-PG Seoni-MP 2 MPPTCL 4 Single Zebra

118 Seoni-PG Chindwara 1 MPPTCL 67 Single Zebra

119 Seoni-PG Chindwara 2 MPPTCL 67 Single Zebra

123 Shujalpur Shujalpur-

MP 1 MPPTCL 4 Single Zebra

124 Shujalpur Shujalpur-

MP 2 MPPTCL 4 Single Zebra

400/220kV ICT’s

Sr. No

Sub-Station

ID MVA Voltage

Ratio Owner WRLDC Remark

14 Astha 1 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

15 Astha 2 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

38 Bhopal-

MP 1 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

39 Bhopal-

MP 2 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

40 Bhopal-

MP 3 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

42 Bina-MP 1 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

Agenda of 60th OCCM of MP 50

Page 53: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Minutes of Meeting of 2nd VC on Review of List of Important Grid Elements of WR on Dtd 25.09.2017

43 Bina-MP 2 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

44 Bina-MP 3 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

46 Birsingpur 1 500 400/220 MPPGCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

57 Chhegaon 1 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

83 Indore-MP 1 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

84 Indore-MP 2 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

85 Indore-MP 3 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

86 Indore-MP 4 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

98 Julwania 1 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

99 Julwania 2 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

111 Katni 1 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

112 Katni 2 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

139 Malwa 1 315 400/220 MPPTCL After availing outage on this element, N-1 contingency tripping of other element to

Agenda of 60th OCCM of MP 51

Page 54: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Minutes of Meeting of 2nd VC on Review of List of Important Grid Elements of WR on Dtd 25.09.2017

submitted and ensure that during N-1 system is safe and secure.

140 Malwa 2 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

149 Nagda 1 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

150 Nagda 2 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

151 Nagda 3 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

152 Nagda 4 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

178 Pithampur 1 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

179 Pithampur 2 315 400/220 MPPTCL

After availing outage on this element, N-1 contingency tripping of other element to submitted and ensure that during N-1 system is safe and secure.

400kV Bus Reactors Proposed by SLDC Madhya Pradesh are to be excluded from the list of

important grid element-

S. No.

Substation Owner Reactors Total

MVAR Rated

Voltage WRLDC Remark

4 Astha MPPTCL 1x50 50 420

SLDC would review over voltages issue/Also at a time only one reactor at one station would be allowed

13 Bhopal-MP MPPTCL 1X125 +

1x80 205 420

SLDC would review over voltages issue/Also at a time only one reactor at one station would be allowed

15 Bina-MP MPPTCL 1X50 50 420

SLDC would review over voltages issue/Also at a time only one reactor at one station would be allowed

20 Chhegaon MPPTCL 1x50 50 420

SLDC would review over voltages issue/Also at a time only one reactor at one station would be allowed

Agenda of 60th OCCM of MP 52

Page 55: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Minutes of Meeting of 2nd VC on Review of List of Important Grid Elements of WR on Dtd 25.09.2017

42 Julwania MPPTCL 1x50 50 420

SLDC would review over voltages issue/Also at a time only one reactor at one station would be allowed

66 Pithampur MPPTCL 1x50 50 420

SLDC would review over voltages issue/Also at a time only one reactor at one station would be allowed

76 Satpura MPPTCL 2X63 126 420

SLDC would review over voltages issue/Also at a time only one reactor at one station would be allowed

* Here Sr. No means the actual serial number of the element in List of Important Grid Element of

Western Region May 2017.

Agenda of 60th OCCM of MP 53

Page 56: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

ANNEXURE-6.9.b

1Bhopal-MP Itarsi 2 MPPTCL MPPTCL WRST-2 98 Twin ACSR

Moose

2Bhopal-MP Damoh 1 WRTS-2 MPPTCL WRST-2 214 Twin ACSR

Moose

3Bhopal-MP Damoh 2 WRTS-2 MPPTCL WRST-2 214 Twin ACSR

Moose

4Bina-MP Bina-PG 1 WRTS-2 MPPTCL WRST-2 3 Twin ACSR

Moose

5Bina-MP Bina-PG 2 WRTS-2 MPPTCL WRST-2 3 Twin ACSR

Moose

6Bina-MP Bina-PG 3 WRTS-2 MPPTCL WRST-2 3 Twin ACSR

Moose

7Bina-MP Bina-PG 4 WRTS-2 MPPTCL WRST-2 3 Twin ACSR

Moose

8Indore-MP Indore-PG 1 WRTS-2 MPPTCL WRTS-2 50 Twin ACSR

Moose

9Indore-MP Indore-PG 2 WRTS-2 MPPTCL WRTS-2 50 Twin ACSR

Moose

10Indore-MP Asoj 1 GETCO MPPTCL GETCO 287 Twin ACSR

Moose

11Indore-MP Asoj 2 GETCO MPPTCL GETCO 293 Twin ACSR

Moose

12Indore-PG

Pithampur 1 MPPTCL MPPTCL MPPTCL 150Twin ACSR Moose

13Indore-PG

Pithampur 2 MPPTCL MPPTCL MPPTCL 150Twin ACSR Moose

14Nagda Dehgam 1 WRTS-2 MPPTCL WRTS-2 331 Twin ACSR

Moose

15Nagda Dehgam 2 WRTS-2 MPPTCL WRTS-2 331 Twin ACSR

Moose

16Nagda Shujalpur 1 WRTS-2 MPPTCL WRTS-2 151 Twin ACSR

Moose

17Nagda Shujalpur 2 WRTS-2 MPPTCL WRTS-2 151 Twin ACSR

Moose

18Satpura Itarsi 1 WRTS-2 MPPTCL WRTS-2 79 Twin ACSR

Moose

400KV LINES INCORPORATED IN THE LIST OF IMPORTANT GRID ELEMENTS( outage shall be

approved by WR OCCM)

Sl No End-1 End-2 IdLine Owner End-1

OwnerEnd-2 Owner

KmConductor Type

Agenda of 60th OCCM of MP 54

Page 57: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

1 Anuppur 2 MPPTCL 61 Single Zebra

2 Auraiya 1 MPPTCL 146 Single Zebra

3 Auraiya 1 MPPTCL 113 Single Zebra

4 Badod 1 MPPTCL 199 Single Zebra

5 Badod 1 MPPTCL 62 Single Zebra

6 Bhanpura 1 MPPTCL 63 Single Zebra

7 Bina-MP 1 MPPTCL 246 Single Zebra

8 Bina-MP 2 MPPTCL 246 Single Zebra

9 Gwalior 1 MPPTCL 38 Single Zebra

10 Gwalior 2 MPPTCL 38 Single Zebra

11 Gwalior 1 MPPTCL 11 Single Zebra

12 Gwalior 2 MPPTCL 11 Single Zebra

13 Jabalpur 1 MPPTCL 11 Single Zebra

14 Jabalpur 2 MPPTCL 11 Single Zebra

15 Mehgaon 1 MPPTCL 37 Single Zebra

16 Nepniya 1 MPPTCL 51 Single Zebra

Modak

220KV LINES INCORPORATED IN THE LIST OF IMPORTANT GRID ELEMENTS ( outage shall be approved by WR OCCM)

Sl No End-1 End-2 Id Line Owner

KmConductor Type

Kotmikala

Malanpur

Mehgaon

Sakatpur

Nepniya

Jabalpur-PG

Jabalpur-PG

Malanpur

Bhanpura

Mahalgaon

Mahalgaon

Malanpur

Malanpur

Mahalgaon

Mahalgaon

Agenda of 60th OCCM of MP 55

Page 58: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Yes NoPA

conducted on date

If not done Taget

Yes No TotalCatergory

ACatergory

BTotal

Catergory A

Catergory B

TotalCatergory

ACatergory

B

1 400KV S/s Bhopal 400KV Yes 17.01.13 5 5 0 5 4 0 4 1 0 12 220KV S/s Bhopal 220KV Yes 22.04.13 4 4 0 4 3 0 3 1 0 13 400KV S/s Katni 400KV Yes 17.01.13 8 8 6 2 7 6 1 1 0 14 220KV S/s Gwalior 220KV Yes 27.04.13 5 5 2 3 3 2 1 2 0 25 220KV S/s Malanpur 220KV Yes 01.05.13 8 8 6 2 6 6 0 2 0 26 220KV S/s Mehgaon 220KV Yes 30.04.13 6 6 5 1 5 5 0 1 0 1

7220KV S/s South Zone Indore

220KV Yes 23.04.13 5 5 3 2 4 3 1 1 0 1

8 220KV S/s Jabalpur 220KV Yes 24.04.13 4 4 3 1 3 3 0 1 0 19 220KV S/s Rewa 220KV Yes 29.04.13 8 8 6 2 6 6 0 2 0 2

10 220KV S/s Satna 220KV Yes 01.05.13 6 6 3 3 3 3 0 3 0 311 220KV S/s Sagar 220KV Yes 09.05.13 4 4 2 2 2 2 0 2 0 212 220KV S/s Chichli 220KV Yes 13.03.15 3 3 1 2 2 1 1 1 0 113 220KV S/s Narsinghpur 220KV Yes 13.03.15 3 3 2 1 2 2 0 1 0 114 220KV S/s Pipariya 220KV Yes 16.03.15 8 8 7 1 7 6 1 1 1 015 220KV S/s Guna 220KV Yes 13.03.15 10 10 4 6 8 4 4 2 0 216 220KV S/s Shivpur 220KV Yes 15.03.15 7 7 2 5 5 2 3 2 0 217 220KV S/s Sabalgarh 220KV Yes 17.03.15 7 7 5 2 6 5 1 1 0 118 220KV S/s Nagda 220KV Yes 16.04.15 6 6 5 1 5 5 0 1 0 119 220KV S/s Tikamgarh 220KV Yes 13.03.15 11 11 8 3 10 8 2 1 0 120 220KV S/s Seoni 220KV Yes 11.03.15 5 5 3 2 4 3 1 1 0 121 220KV S/s Chhatarpur 220KV Yes 13.03.15 8 8 5 3 7 5 2 1 0 122 220KV S/s Sarni 220KV Yes 14.03.15 3 3 2 1 2 2 0 1 0 1

Annexure-6.12

No. of Defeciencies No. of Defeciency attendedNo. of Defeciencies not yet

attended

Protection Audit Report Of MPPTCL

Name of Entity - MPPTCL Name of State - Madhya Pradesh FY : 2017-18

Sr. No.

Name of the S/s KV

Weather identified

of PAIf identified for PA

Deficiency observed

for the period April-17 to June- 17

Agenda of 60th OCCM of MP 56

Page 59: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Yes NoPA

conducted on date

If not done Taget

Yes No TotalCatergory

ACatergory

BTotal

Catergory A

Catergory B

TotalCatergory

ACatergory

B

No. of Defeciencies No. of Defeciency attendedNo. of Defeciencies not yet

attended

Protection Audit Report Of MPPTCL

Name of Entity - MPPTCL Name of State - Madhya Pradesh FY : 2017-18

Sr. No.

Name of the S/s KV

Weather identified

of PAIf identified for PA

Deficiency observed

for the period April-17 to June- 17

23 220KV S/s Pandurna 220KV Yes 13.03.15 4 4 0 4 2 0 2 2 0 224 220KV S/s Chhindwara 220KV Yes 12.03.15 3 3 0 3 0 0 0 3 0 325 220KV S/s Betul 220KV Yes 15.03.15 3 3 1 2 1 1 0 2 0 226 220KV S/s Daloda 220KV Yes 15.04.15 6 6 5 1 5 5 0 1 0 127 220KV S/s Anuppur 220KV Yes 17.03.15 25 25 19 6 18 17 1 7 2 528 220KV S/s Indore Eas 220KV Yes 12.03.15 10 10 7 3 8 6 2 2 1 129 220KV S/s Dhar 220KV Yes 07.04.15 11 11 9 2 10 9 1 1 0 130 220KV S/s Neemuch 220KV Yes 16.04.15 8 8 6 2 7 6 1 1 0 131 220KV S/s Vidisha 220KV Yes 07.04.15 6 6 4 2 5 4 1 1 0 1

32 220KV S/s Rajgarh Baiora 220KV Yes 08.04.15 8 8 6 2 6 6 0 2 0 2

33 220KV S/s katni 220KV Yes 08.04.15 8 8 6 2 7 6 1 1 0 134 220KV S/s Nepanagar 220KV Yes 08.04.15 11 11 5 6 6 5 1 5 0 535 220KV S/s Sidhi 220KV Yes 09.04.15 6 6 3 3 2 2 0 4 1 336 220KV S/s Maihar 220KV Yes 07.04.15 5 5 3 2 2 2 0 3 1 237 220KV S/s Bairagarh 220KV Yes 06.04.15 6 6 5 1 5 5 0 1 0 138 220KV S/s Dewas 220KV Yes 08.04.15 5 5 4 1 4 4 0 1 0 139 220KV S/s Handiya 220KV Yes 09.04.15 7 7 3 4 5 3 2 2 0 240 220KV S/s Kotar 220KV Yes 08.04.15 8 8 5 3 5 5 0 3 0 341 220KV S/s Rajgarh 220KV Yes 13.03.15 12 12 10 2 11 10 1 1 0 1

42220KV S/s Birsinghpur Pali

220KV Yes 16.03.15 23 23 15 8 12 11 1 11 4 7

Agenda of 60th OCCM of MP 57

Page 60: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Annexure-6.12

Name of the entity :- MPPGCL State- Madhya Pradesh

1 220 YES11.02.13 &

12.02.13 YES 11 3 8 7 3 4 4 0 4

2 220 YES13.02.13 &

14.02.13 YES 17 11 6 12 11 1 5 0 5

3 400 YES13.02.13 &

14.02.13 YES 15 10 5 10 10 0 5 0 5

4 220 YES12.03.13 &

13.03.13 YES 18 6 12 6 6 0 12 0 12

5 400 YES12.03.13 &

13.03.13 YES 16 9 7 6 6 0 10 3 7

6 220 YES11.02.13 &

12.02.13 YES 31 7 24 11 6 5 20 1 19

7 400 YES06.04.15 &

07.04.15 YES 4 4 0 3 3 0 1 1 0

8 132 YES22.04.13 &

23.04.13YES 12 4 8 5 4 1 7 0 7

9 132 YES22.04.13 &

23.04.13YES 13 5 8 6 5 1 7 0 7GANDHISAGAR

Category BCategory B Total Category A Category B Total Category A

STPS

TONS

SSTPS

BARGI

Total Category A

ATPS

SGTPS

Quarterly Report for the period of APRIL 2017 to JUNE 2017MPPGCL

FY: 2017-18

S.No. Name of the S/s KV

Whether identified for PA If identified for PA Deficiencies

Observed No.of Deficiencies No.of Deficiencies attended No.of Deficiencies not yet attended

Yes No

SGTPS

STPS

NoPA conducted on date

if not done, Target

Yes

Agenda of 60th OCCM of MP 58

Page 61: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Agenda of 60th OCCM of MP 59

Page 62: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

23-Oct-17DISCOM WISE DEMAND PATTERN FOR DT.

0300600900

120015001800210024002700300033003600390042004500480051005400570060006300660069007200750078008100840087009000930096009900

102000:

301:

001:

302:

002:

303:

003:

304:

004:

305:

005:

306:

006:

307:

007:

308:

008:

309:

009:

3010

:00

10:3

011

:00

11:3

012

:00

12:3

013

:00

13:3

014

:00

14:3

015

:00

15:3

016

:00

16:3

017

:00

17:3

018

:00

18:3

019

:00

19:3

020

:00

20:3

021

:00

21:3

022

:00

22:3

023

:00

23:3

024

:00

MP DMD CZ DMD

EZ DMD WZ DMD

Agenda of 60th OCCM of MP 60

Page 63: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Annexure-8.1

SNO Meter No Location Feeder Name T & C Circle T & C Division Data Not Available Dates

1 MPE53482 132KV S/S ARON 40MVA,EMCO 400KV BINA Testing Division Guna 01/09/2017 to 30/09/2017

2 MPE51924 132KV S/S ASHOKNAGAR 40MVA,BBL-II 400KV BINA Testing Division Guna 01/09/2017 to 30/09/2017

3 MPC56322 132KV S/S PITHAMPUR 132KV SPENTEX(INDORAMA) 400KV Indore Testing Division - II Indore 02/09/2017 to 30/09/2017

4 MPE51793 132KV S/S PITHAMPUR MVA 132/33KV X'MER-I BHEL S.NO. 20097 400KV Indore Testing Division - II Indore 01/09/2017 to 30/09/2017

5 XC530820 132KV S/S BAGRODA 40MVA BHOPAL Testing Division -II Bhopal 01/09/2017 to 30/09/2017

6 MPP28723 220KV S/S BINA ISCOM_33KV VIDISHA FEEDER ( EZ TO C EZ-CZ 400 KV Testing Division Bina 01/09/2017 to 30/09/2017

7 Y0221297 132KV S/S MORENA 40 MVA MAKE BBL SN 4910/7 GWALIOR Testing Division -I Gwalior, S/S DN Morena 01/09/2017 to 30/09/2017

8 MPE53513 132KV S/S DATIA 40 MVA MAKE EMCO SN HT-12510 GWALIOR Testing Division -II Gwalior 01/09/2017 to 30/09/2017

9 MPE51941 132KV S/S LAHAR 40 MVA MAKE BBL SN 4910/2 GWALIOR Testing Division -II Gwalior 01/09/2017 to 30/09/2017

10 MPE51936 132KV S/S SEONDHA 12.5 MVA MAKE BHEL SN 6002787 GWALIOR Testing Division -II Gwalior 01/09/2017 to 30/09/2017

11 MPE51937 132KV S/S SEONDHA 20MVA MAKE HEL SN 6000197 GWALIOR Testing Division -II Gwalior 01/09/2017 to 30/09/2017

12 MPP28667 132KV S/S SANWER 20 MVA NGEF 280004-6059 INDORE Testing Division - I Indore 01/09/2017 to 30/09/2017

13 MPP28690 220KV S/S NIMARANI 16 MVA BBL 1992/1 INDORE Testing Division - I Indore 01/09/2017 to 30/09/2017

14 MPP28587 132KV S/S NARSINGPUR 40MVA BHEL SN6004697 JABALPUR Testing Division -II Jabalpur 01/09/2017 to 30/09/2017

15 MPC53456 220KV S/S SIDHI ALUMINIUM PROJECT PLANT OF M/S HIN SATNA Testing Division - Rewa 03/09/2017 to 30/09/2017

16 MPP28336 132KV S/S NAGOD 40 MVA X-mer EMCO SNO.1864/13201/04 SATNA Testing Division - Satna 03/09/2017 to 30/09/2017

17 Y0221549 132KV S/S SHAJAPUR 40MVA MAKE BHEL SN 2012385 UJJAIN Testing Division - Dewas 01/09/2017 to 30/09/2017

18 MPE51826 132KV S/S MOMIN BADODIA 20MVA MAKE NGEF SN 2800050844 UJJAIN Testing Division - Dewas - S/S Dn Shujalpur 01/09/2017 to 30/09/2017

19 MPE51861 132KV S/S GAROTH 20MVA MAKE TELK SN 120255-1(R) UJJAIN Testing Division - Ratlam 02/09/2017 to 30/09/2017

20 MPP28623 220KV S/S RATLAM 40MVA MAKE BHEL SN 2014006 UJJAIN Testing Division - Ratlam 01/09/2017 to 30/09/2017

21 Y0221427 220KV S/S UJJAIN 40MVA MAKE CROMPTON SN T-8362/3 UJJAIN Testing Division - Ujjain 01/09/2017 to 30/09/2017

22 Y0221446 220KV S/S UJJAIN 63MVA MAKE BHEL SN 2014010 UJJAIN Testing Division - Ujjain 01/09/2017 to 30/09/2017

23 Y0221526 220KV S/S UJJAIN 63MVA MAKE BBL SN 5442/9 UJJAIN Testing Division - Ujjain 01/09/2017 to 30/09/2017

Agenda of 60th OCCM of MP 61

Page 64: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Annexure-8.2

Sr. No Make SIM No.SIM Data No.

IMSI No.Service Activated GPRS/ GSM

1 MPC57145 132KV S/S DHAR 40MVA BHEL 400KV Indore Testing Division - II Indore2 NA 132KV S/S ICHHAWAR 40MVA BBL SN 1448/3 BHOPAL Testing Division - I Bhopal

3 MPC74042 132KV TAMOT 40MVA MAKE CGL SN 24788 BHOPAL Testing Division -II Bhopal

4 XB577758 132KV S/S ESAGARH_NEW 40MVA MAKE BHEL 400KV BINA Testing Division Guna5 XB583343 132KV PRATAPURA 40MVA GWALIOR Testing Division -II Gwalior6 XC559777 220KV MORENA 63MVA GWALIOR Testing Division Morena7 MPC59861 132KV S/S ALIRAJPUR 20MVA BBL 1991/3 INDORE Testing Division - Rajgarh

8 MPC58407 220KV S/S JULWANIYA 40MVA BHEL SN 2037620 INDORE Testing Division - II Barwaha

9 NA 132KV JHABUA 40 MVA MAKE NGEF INDORE Testing Division - II Indore10 NA 132KV S/S KASRAWAD 20MVA INDORE Testing Division - I Indore11 NA 132KV S/S TALAKPURA 40 MVA INDORE Testing Division - Barwaha12 MPC73877 132KV S/S SINGHANA 40 MVA IMP INDORE Testing Division - II Indore13 XB552537 132KV S/S Kishangarh 40 MVA IMP INDORE Testing Division - Dewas14 MPC58410 132KV S/S BICHHUA 40MVA BHEL XMER JABALPUR Testing Division -II Chindwara15 MPP28518 220KV S/S CHHINDWARA 50MVA XMER JABALPUR Testing Division -II Chindwara16 NA 132KV BENEGAON 12.5MVA JABALPUR Testing Division -II Chindwara17 XB577474 132KV AMARWARA 50MVA BHEL JABALPUR Testing Division -Chhindwara18 XB577435 132KV S/S KATNI 50MVA MAKE BHEL JABALPUR Testing Division - Katni19 XB577453 220KV S/S SEONI 50MVA BHEL JABALPUR Testing Division - Seoni

20 XB577412 132KV S/S NARSINGPUR 50MVA BHEL SN2042481 JABALPUR Testing Division -II Jabalpur

21 Y0221147 220KV S/S CHICHLI 50MVA XMER MAKE BHEL SR. 2042480 JABALPUR Testing Division -II Jabalpur

22 Y0062910 132KV S/S GADARWARA 132KV TC_NTPC JABALPUR Testing Division -II Jabalpur

23 XB577425 132KV S/S SLEEMANABAD 12.5MVA NGEF SN2800022226

JABALPUR Testing Division -Katni

24 XC530817 132KV S/S LALBARRA 40MVA IMP JABALPUR Testing Division -II Chindwara25 XC548595 132KV S/S UMRETH 40MVA BBL XMER JABALPUR Testing Division -II Chindwara

26 XB577374 132KV S/S BOREGAON 50MVA BHEL SN.2042482 JABALPUR Testing Division -II Chindwara

27 MP924832 132KV S/S RAMPUR NAIKIN 40 MVA X-mer (33 kv side) SATNA Testing Division - Satna

28 KA907077 220KV S/S ANUPUR 132KV MOSERBEAR SATNA Testing Division - Satna- S/S DN Shahdol29 MPC58838 220KV S/S SIDHI 220KV S/S SIDHI SATNA Testing Division - Rewa30 KA904800 220KV S/S ANUPUR 132KV OPM SATNA Testing Division - Satna- S/S DN Shahdol

31 MPP28396 132KV S/S KATRA 50MVA BHEL MAKE XMER SATNA Testing Division - Rewa

32 MPP28606 132KV S/S RATLAM 50MVA X-mer BBL SN 5406/10

UJJAIN Testing Division - Ratlam

33 XC573290 132KV S/S TAL 40MVA MAKE IMP UJJAIN Testing Division - Ratlam

34 NA 132KV S/S SATWAS 20MVA NGEF SN 280002-2214 UJJAIN Testing Division - Dewas

35 NA 132KV BAGRODA 40MVA BHOPAL Testing Division -I Bhopal

SIM

Modem & SIM details required of the newly commissioned transformers / HT Consumers

SNO Meter No Location Feeder Name T & C Circle T & C Division

Modem & SIM detailModem

Agenda of 60th OCCM of MP 62

Page 65: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Annexure-9.1DATA OUT FROM LONG TIME

1 MORWA 132 KV S/S2 BEOHARI 132 KV S/S3 REWA132 KV S/S

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 ALL T.M. DATA CB ,MW,MVAR N/A2 132/33 KV(50MVA) XMER CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED

1 132 KV MANGAWAN 2 CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED2 132 KV REWA 2(INTERCONNECTOR) CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED3 132 KV RAMPUR NIKEN CB FAULTY CLOSE4 220/132 XMER 2 SEC CB FAULTY CLOSE

1 220 KV INTERCONNECTOR 1 & 4 MW/MVAR N/C 115/152 132 KV UMRIYA MW/MVAR 21/2 26/51 220/132 KV XMER MW/MVAR 22/7 36/10

1 132 KV KOTMA CB N/A2 220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE3 220 KV BUS VOLTAGE & FREQUENCY N/A3 132 KV SHAHDOL CB ,MW,MVAR N/A4 132 KV KOTMA 2 CB ,MW,MVAR N/A5 132 /33 KV TR 2 CB ,MW,MVAR N/A

1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED

1 132/33 KV XMER 1 MW/MVAR 10/5 20/102 132/33 KV XMER 1 MW/MVAR 5/2 10/5

1 132/33 KV XMER 20MVA CB /MW/MVAR N/A PROCESSES CONNECTION REQUIREDUMARIYA 132 KV S/S

MAIHAR 132 KV S/S

KOTMA 132 KV S/S

BEOHARI 132KV S/S

REWA 220 KV S/S

SATNA CIRCLE

BIRSINGHPUR 220 KV S/S

ANUPPUR 220 KV S/S

PROCESSES CONNECTION REQUIRED

Agenda of 60th OCCM of MP 63

Page 66: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site

1 132/33 KV XMER 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED

1 220 KV SARNI CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED2 132 KV RLY TRACTION 2 CB FAULTY CLOSE

1 132 KV BUS COUPLER CB FAULTY OPEN

1 132KV B/C CB FAULTY OPEN

2 132 KV BUS FREQUENCY N/A

1 400 KV BUS TIE CB /MW/MVAR N/A PROCESSES CONNECTION REQUIRED

1 132 KV BUS COUPLER CB FAULTY OPENSEONI 132 KV S/S

KATNI 400 KV S/S

JABALPUR CIRCLE

SEONI 220 KV S/S

PANDURNA 220 KV S/S

KYMORE 132 KV S/S

BHANEGAON 132 KV S/S

CHINDWARA 132 KV S/S

Agenda of 60th OCCM of MP 64

Page 67: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

1 220 KV BUS TIE CB FAULTY CLOSE2 220/132 KV 160 MVA XMER-1 HV CB FAULTY CLOSE3 220/132 KV 160 MVA XMER-2 LV CB NON CURRENT CLOSE4 132 KV BUS COUPLER CB FAULTY OPEN5 132/33 KV 40 MVA-1 TR CB FAULTY

1 220 KV BINA BINA PG MW/MVAR2 220 KV GWALIOR MW/MVAR3 220 KV GUNA MW/MVAR4 220 KV DATIA MW/MVAR5 220 KV SHIVPURI MW/MVAR6 400/220 KV XMER 2 &3 MW/MVAR

BINA 400 KV S/S

FREQUNTLY DATA NON CURRENT

GUNA 220 KV S/S

BINA CIRCLE

Agenda of 60th OCCM of MP 65

Page 68: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

1 220 KV BUS TIE CB FAULTY CLOSE2 400 KV BUS TIE CB FAULTY CLOSE3 400 KV ISP-1 CB FAULTY CLOSE4 400/220 TRF-1 OLTC NOT COMING5 400/220 TRF-3 OLTC NOT COMING

1 220/132 TRF-2(Sec) Side MW,MVAR Direction need to be reversed from field.

1 220 KV BUSCOUPLER CB FAULTY CLOSE

1 132/33 TRF-2 P MW,MVAR NOT COMING2 132/33 TRF-2 S MW,MVAR NOT COMING3 33KV DHAR CB FAULTY OPEN

1 220 KV MAHESHWAR 2 CB FAULTY OPEN2 220/132 TR3 SEC SIDE MW,MVAR, OLTC N/C3 132/33 TR3 CB FAULTY CLOSE4 220/132 TR2 PRI SIDE MW 19.6 64

1 220/132kV 160MVA TRF-1(SEC SIDE) CB FAULTY CLOSE

1 220/132 TR1, TR2,TR3 & TR4 OLTC N/C2 220/132 TR4(SECONDARY SIDE) CB FAULTY3 132KV BUS COUPLER CB FAULTY CLOSE4 220 KV MAIN BUS HZ NOT COMING

3 132KV BUS COUPLER CB FAULTY CLOSE

2 220/132 TR2(SECONDARY SIDE) MW,MVAR 141,13 0,0

1 132KV RAILWAY TRAC 1&2 MW NOT COMING2 132KV RAILWAY TRAC 1&2 MVAR NOT COMING3 132KV RAILWAY TRAC 1 CB FAULTY CLOSE4 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

1 220/132 TR2 160MVA OLTC N/A2 220/132 TR 1 4*40 MVA OLTC N/A3 132 KV CHOTI KHARGONE MVAR N/A4 220/132 TR1(SECONDARY SIDE) CB FAULTY

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

1 400 KV REACTOR CB FAULTY CLOSE2 400 KV BUS COUPLER CB FAULTY OPEN3 400 KVJULWANIYA CB FAULTY OPEN4 220 kV BUS I & II FREQ NOT SHOWING IN DECIMAL POINT5 220 KV BUS COUPLER CB FAULTY OPEN6 220 KV OMKARESHWER CB FAULTY OPEN7 400 kV BUS II VOLTAGE,FREQ NOT COMING8 132 KV INTCC-1 CB FAULTY CLOSE9 220/132 TRF-2 Sec Side CB FAULTY CLOSE

10 33KV CHIRAGPUR CB FAULTY CLOSE11 33KV DONGGAON CB FAULTY CLOSE12 33KV BHOJAKHEDI CB FAULTY CLOSE

1 132KV BHIKANGAON CB FAULTY CLOSE2 132/33 TRF 2 SEC MW,MVAR NOT COMING3 132/33 TRF 2 SEC CB FAULTY CLOSE4 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING5 33KV MALWA 1&2 MW,MVAR,CB,SOE NOT COMING6 33/11 KV TRF 1 & 2 MW,MVAR,CB,SOE NOT COMING

INDORE 400 KV S/S

INDORE NZ (JETPURA) 220KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDINDORE EAST 220 KV S/S

INDORE CHAMBAL 132 KV S/S

PITAMPUR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

PITAMPUR 220 KV S/S-II

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDINDORE SZ 220KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

NEPANAGAR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S BAHADURPUR

BARWAHA 220 KV S/S

CHHEGAON 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S CHHEGAON

Agenda of 60th OCCM of MP 66

Page 69: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

1 220 KV BUS -1 KV,HZ N/A2 132/33 KV TR 2 SEC CB FAULTY CLOSE4 33KV CAP BANK CB FAULTY CLOSE

1 132KV BUS KV2 132KV BUS HZ3 33KV BUS KV4 33KV BUS HZ

1 132 KV BUSCOUPLER CB FAULTY2 400KV BUS 2 KV N/C3 400KV BUS 2 HZ N/C4 132/33 KV 40 MVA TR CB FAULTY5 400/220KV TRF-2PRI CB OPEN CLOSE

2 132/33 KV TR 2 CB/OLTC FAULTY3 132/33 KV TR II OLTC N/A4 132 KV NIMRANI I CB FAULTY CLOSE5 132/33 KV 20 MVA TR CB/MW/MVAR NOT COMING

2 220/132 TR 1 & 2 OLTC N/A3 132/33 63MVA TR-2 CB/OLTC N/A

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

JULWANIA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

JULWANIA 220 KV S/S

NIMRANI 220 KV S/S

CB's of 33 SIDE feeders are coming faulty from field.33 SIDE Telemetry not available

RAJGRAH (DHAR) 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED220 KV S/S DHAR

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

NOT COMINGNOT COMINGNOT COMINGNOT COMING

Agenda of 60th OCCM of MP 67

Page 70: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

1 132KV ALIRAJPUR CB FAULTY CLOSE2 132KV BUS COUPLER CB FAULTY CLOSE

3 33KV CAP BANK MW,MVARNOT

COMING

1 132KV BUS KVNOT

COMING

2 132KV JICA 1 MW,MVARNOT

COMING

3 132KV JICA 2 MW,MVARNOT

COMING4 132KV NAGDA CB OPEN CLOSE5 132/33 KV TRF 2 PRI CB FAULTY CLOSE5 132/33 KV TRF 2 SEC CB FAULTY CLOSE5 33 KV GRASIM CB FAULTY CLOSE

1 220KV SOUMIL POWERMW,MVAR,CB

,SOENOT

COMING

1 220/132KV TRF2 CB FAULTY CLOSE

1 132KV DALODA CB FAULTY CLOSE

2 132/33KV TRF1 MW,MVARNOT

COMING3 132/33 TRF2(sec side) CB OPEN CLOSE

4 33KV CHOUKSEY ENERGY 1 CB,MW,MVARNOT

COMING5 33KV CHOUKSEY ENERGY 2 CB,MW,MVAR

6 33/11KV TRF1 MW,MVAR,CB

,SOENOT

COMING7 33/11KV TRF2 CB FAULTY

1 132KV BUS COUPLER CB FAULTY CLOSE2 132KV BUS -2 FREQ3 33KV SUZLON 4 CB OPEN CLOSE4 33KV SUZLON 5 CB OPEN CLOSE5 33KV CAP BANK-II CB FAULTY OPEN6 33KV BUS COUPLER CB FAULTY CLOSE7 132/33 TRF2(sec side) CB FAULTY OPEN

1 132/33 XMER CB FAULTY CLOSE2 132KV SARJAN CB FAULTY CLOSE

3 132KV KSHEMA POWERMW,MVAR,CB

,SOE

1 33KV CAP BANK CB FAULTY CLOSE132 KV S/S RATANGARH

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED220 KV S/S BADNAGAR

NOT COMINGSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S JAORA

NOT COMING

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S SAILANA

N/C

132 KV S/S KACHROD

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED220 KV S/S DALODA

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED220 KV S/S RATLAM

132 KV S/S KUKSHI

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda of 60th OCCM of MP 68

Page 71: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

2 33KV DELIGENTIA-1 CB FAULTY CLOSE3 132KV BUS COUPLER CB OPEN CLOSE4 132/33 KV TRF-2 CB FAULTY OPEN

1 33KV DEEPAKHEDA CB OPEN CLOSE2 132/33KV TRF CB OPEN CLOSE

1 220 KV NAGDA I CB OPEN CLOSE2 220/132 TR1 OLTC N/C3 220/132 TR2 OLTC N/C4 220/132 TR3 OLTC N/C

1 220/132 KV TR (160 MVA) 1 PRIMARY CB FAULTY OPEN2 220/132 KV TR (160 MVA) 1 SECONDARY CB FAULTY OPEN3 220/132 KV TR (160 MVA) 2 SECONDARY CB FAULTY CLOSE4 132 KV BUS COUPLER CB FAULTY CLOSE5 33kV BAPCHA CB FAULTY CLOSE6 33kV SUZLON-2 CB FAULTY CLOSE7 33KV TODAY ENERGY-1 MW,MVAR N/C8 33KV TODAY ENERGY-2 MW,MVAR N/C9 33KV TODAY ENERGY-1 CB FAULTY CLOSE

10 33kV BUS CP CB FAULTY CLOSE11 33kV SUZLON-2 MW,MVAR N/C12 33kV MB-1 MW,MVAR N/C13 33kV MB-1 MW,MVAR N/C

1 132KV BUS COUPLER CB FAULTY CLOSE2 33KV BUS COUPLER CB FAULTY CLOSE3 33 KV CAP BANK CB FAULTY CLOSE4 33KV DISCOM CB FAULTY CLOSE

1 132KV UJJAIN CB FAULTY CLOSE2 CAP BANK MVAR N/C 10.663 132KV BUS COUPLER CB FAULTY CLOSE

1 132 KV CHAPDA 1 CB FAULTY CLOSE2 132 KV CHAPDA 2 CB FAULTY CLOSE3 132 KV SHANKARGARH 2 CB/MW/MVAR N/A PROCESSES CONNECTION REQUIRED3 220/132 KV 160MVA TR3 CB FAULTY CLOSE4 132 KV GAMESHA FATANPUR 2 CB FAULTY CLOSE5 33KV CAP BANK CB FAULTY CLOSE6 33KV JOHNDEER 2 CB FAULTY CLOSE7 33KV TONK KALAN CB FAULTY CLOSE8 33KV DEWAS PRADHIKARAN CB FAULTY CLOSE9 33KV NEW BAY CB FAULTY CLOSE

10 33KVGAMESHA JAMBODARANI-1 CB FAULTY CLOSE11 33KVGAMESHA JAMBODARANI-2 CB FAULTY CLOSE

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S AGAR

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGHOSLA 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDDEWAS 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S SITAMAU

UJJAIN 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDBADOD 220 KV S/S

Agenda of 60th OCCM of MP 69

Page 72: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

1 33KV IND NO-4 CB FAULTY CLOSE2 33KV DRP CB FAULTY CLOSE3 33KV DEWAS BNP-2 CB FAULTY CLOSE4 33KV SIYA CB FAULTY CLOSE

1 132/33 20MVA TRF-1 CB FAULTY OPEN2 33KV BUSCOUPLER CB FAULTY CLOSE3 33KV DEWAS BNP-2 CB FAULTY CLOSE4 33KV SIYA CB FAULTY CLOSE

1 132/33 KV 12.5MVA TR CB,MW,MVAR N/C

2 132/33 KV 20MVA TR CB,MW,MVAR N/C3 33KV DEVGARH CB FAULTY CLOSE3 33KV BAGLI CB FAULTY CLOSE3 33KV KARNAWAD CB FAULTY CLOSE2 132/33 KV 20MVA TR-4 CB FAULTY CLOSE

1 220KV ILFS-1 CB FAULTY CLOSE2 132 KV SIDTUBE CB /MW/MVAR N/A

1 33KV BADONI-1 CB FAULTY CLOSE2 33KV BADONI-2 CB FAULTY CLOSE

1 33KV BUS FREQ N/C3 33KV CAP BANK CB FAULTY CLOSE4 132/33KV TRF1 CB OPEN CLOSE5 33KV RAWTI CB FAULTY CLOSE

1 132KV BUS COUPLER CB FAULTY CLOSE2 132KV GAUTAM CB FAULTY CLOSE

2 132KV GAUTAM MW,MVARNOT

COMING3 33KV CAP BANK CB FAULTY CLOSE4 132/33 TRF-2 SEC SIDE CB,MW,MVAR NOT COMING5 33/11 KV TR2 CB FAULTY CLOSE6 33KV BUS COUPLER CB FAULTY CLOSE

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

SHAJAPUR 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDMAKSI 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/SUWASRA

DEPALPUR 132 KV S/S

DEWAS BNP 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDSONKATCH 132 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED132 KV S/S CHAPDA

Agenda of 60th OCCM of MP 70

Page 73: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

1 400KV TIE BREAKER SHUJALPUR-1 & DEHGAM-1 CB FAULTY CLOSE2 220KV BUS COUPLER CB FAULTY CLOSE3 220KV BUS TIE CB FAULTY CLOSE4 400/220 TRF-4 CB FAULTY CLOSE5 400/220 TRF-3 TIE BREAKER CB FAULTY CLOSE

1 132 KV BUS COUPLER CB FAULTY CLOSE2 33KV CAP BANK CB FAULTY CLOSE3 33KV BUS COUPLER CB FAULTY CLOSE4 33KV BUS TIE CB FAULTY CLOSE5 220/132 100MVA CB FAULTY CLOSE6 220KV BUS COUPLER CB FAULTY CLOSE7 132KV INTCC CB FAULTY CLOSE

1 132KV BUS COUPLER CB FAULTY CLOSE2 220/132 TR-2 CB OPEN CLOSE3 132 KV CAP BANK-1 CB FAULTY OPEN4 33KV DHNERAKALAN CB FAULTY CLOSE5 132/33 TRF-2 CB OPEN CLOSE6 132/33 TRF-3 50 MVA MW 7 MW 22 MW

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

NAGDA 400 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNAGDA 220 KV S/S

NEEMUCH 220 KV S/S

SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED

Agenda of 60th OCCM of MP 71

Page 74: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 220/132 KV 160 MVA XMER CB FAULTY CLOSE

1 132 KV KHIRKIYA PROCESSES CONNECTION REQUIRED2 132 KV KHIRKIYA TRACTION-2 MW/MVAR NON CURRENT3 132 KV KHIRKIYA TRACTION-2 CB FAULTY4 132 KV KHIRKIYA TRACTION-1 CB FAULTY5 132 KV HANDIA-2 MW/MVAR NON CURRENT

1 220 KV BUS-2 VOLTAGE WRONG VALUES2 220 KV PIPARIYA-2 MW/MVAR WRONG VALUES

1 132 KV GUDGAON-1 MW/MVAR WRONG VALUES

1 132 KV ASTHA-2 MW/MVAR WRONG VALUES2 132 KV ASHTA-2 CB FAULTY CLOSE3 132/33 KV 40 MVA CB OPEN CLOSE4 132 KV BUS FREQUENCY NON CURRENT

1 400 KV & 220 KV BUS FREQUENCY WRONG VALUES2 400 KV BUS COUPLER CB FAULTY

1 220 KV BHOPAL-1 CB OPEN CLOSE2 132 KV SHYAMPUR-2 CB NON CURRENT CLOSE

1 220 KV BUS VOLTAGE WRONG VALUES2 132 KV S.P.M PROCESSES CONNECTION REQUIRED3 132 KV SHAHGANJ PROCESSES CONNECTION REQUIRED4 132 KV TRIDENT PROCESSES CONNECTION REQUIRED

.

1 132 KV SEHORE CB FAULTY2 132/33KV 20 MVA XMER CB NON CURRENT

1 132/33KV 20 MVA XMER CB NA CLOSE

1 SOE DATA PROCESSES CONNECTION REQUIRED

KHILCHIPUR 132 KV S/S

SARANGPUR 132 KV S/S

ASHTA 132 KV S/S

ASHTA 400 KV S/S

SOE DATA NOT RECEIVED

BAIRAGRAH 220 KV S/S

HOSHANGABAD 220 KV S/S

ICHAWAR 132 KV S/S

14-08-2017SARNI 220 KV S/S

HARDA 132 KV S/S

ITARSI 220 KV S/S

BETUL 220 KV S/S

ALL CB STATUS ARE NON-CURRENT

Agenda of 60th OCCM of MP 72

Page 75: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 400 KV ITARSI-2 MVAR WRONG VALUES2 400 KV DAMOH-1&2 (LINE REACTOR) MVAR WRONG VALUES

1 220KV BUS COUPLER MW/MVAR NON CURRENT2 132 KV TRACTION-2 MW NON CURRENT3 132KV BUS COUPLER MW/MVAR NON CURRENT4 132 KV BINA CB FAULTY

1 220 KV BHOPAL MW/MVAR NON CURRENT2 220KV BUS VOLTAGE WRONG VALUES3 220KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED4 132 KV SANCHI R.-TRACT.-1 CB NON CURRENT5 132KV BUS COUPLER MW/MVAR PROCESSES CONNECTION REQUIRED6 220/132 KV 160 MVA XMER-2(LV) CB FAULTY CLOSE

1 132KV BUS COUPLER CB FAULTY

100 mva MW/MVAR wrong values1 220 KV HOSHANGABAD MVAR NON CURRENT2 220 KV BUS COUPLER CB FAULTY3 132 KV AMRAWAT KHURD MW/MVAR NON CURRENT4 132 KV BAGRODA MW/MVAR NON CURRENT5 132 KV BHEL MW/MVAR NON CURRENT6 132 KV STDS MW/MVAR NON CURRENT7 132 KV BUS COUPLER MW/MVAR NON CURRENT

1 220 KB BUS COUPLER CB FAULTY CLOSE2 220 KV TRANSFER BREAKER CB FAULTY OPEN3 220/132 KV 160 MVA XMR-2 CB FAULTY CLOSE

BERASIA 132 KV S/S

BHOPAL 220 KV S/S

MANDIDEEP 220 KV S/S

14-08-2017BHOPAL 400 KV S/S

GANJBASODA 220 KV S/S

VIDISHA 220 KV S/S

MANDIDEEP 132 KV S/SALL CB STATUS ARE NON CURRENT

Agenda of 60th OCCM of MP 73

Page 76: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER

1 220 KV BUS COUPLER-2 CB FAULTY

2 220 KV BUS COUPLER-1MW/MVA

R NON CURRENT3 220 KV MORENA-1 CB FAULTY4 132 KV BUS COUPLER-1 CB FAULTY

1 220 KV BUS COUPLER CB FAULTY

2 132 KV BUS COUPLERMW/MVA

R NON CURRENT3 132 KV KOLARAS CB FAULTY CLOSE4 132 KV INTERCONNECTOR-1 CB FAULTY CLOSE

1 132 KV SABALGARH-1MW/MVA

R SIGN REVERSAL

2 132 KV BARODAMW/MVA

R WRONG VALUES

3 132/33 KV 63 MVA XMER-1MW/MVA

R WRONG VALUES

1 132 KV BUS COUPLER CB FAULTY OPEN2 132/33 KV 63 MVA XMER-2 CB FAULTY CLOSE

1 220 KV BUS COUPLER CB FAULTY CLOSE2 220 KV BUS TIE CB FAULTY

3 132 KV DABRAMW/MVA

R/CBPROCESSES CONNECTION

REQUIRED

1 132/33 KV 40 MVA TR CB NON CURRENT CLOSE

SOE DATA NOT RECEIVED

GWALIOR-2_220 KV S/S SOE DATA NOT RECEIVED

VIJAYPUR 132 KV S/S

16-08-2017

MALANPUR 220 KV S/S

SHIVPURI 220 KV S/S

SHOEPURKALAN 132 KV S/S

MEHGAON 220 KV S/S

DATIA 220 KV S/S

Agenda of 60th OCCM of MP 74

Page 77: MADHYA PRADESH POWER TRANSMISSION …sldcmpindia.com/uploads/meeting/Agenda of 60th OCCM of...MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON,

Name at SLDC end at site end

1 GEN 6 GT MW/MVAR 0 155 /102 GEN 7 GT MW/MVAR 0 160/103 GEN 6 GT CB FAULTY OPEN4 GEN 7 GT CB FAULTY OPEN5 220 KV TRB CB FAULTY CLOSE

1 UNIT 5 GT MW N/A 1902 STATION XMER 5A & 5B CB N/A3 132/33 AUTO XMER CB N/A

1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C

1 400/220 KV ICT CB FAULTY CLOSE2 400 KV BUS TIE CB NA CLOSE3 400 KV STN TRANSFORMER A & B CB NA CLOSE5 STN TR 1 ,2 (220 KV ) CB NA CLOSE

6 220 KV BUS TIE CB NA CLOSE

7 220 /33 KV TR CB/MW/MVAR NA8 400 KV BUS 1 FREQ 49.79 49.989 220 KV BUS 2 VOLTAGE 197 230

1 220 KV SIRMORE MVAR 494 52 220 KV SIRMORE MVAR 685 53 220 KV SATNA MW 23 274 220 KV KOTAR MW 49 54

PENCH H P S RTU OUT

SATPURA T P S

AMARKANTAK TPS

SINGHA JI S T P S

S G T P S

TONS H P S

DEOLOAN H P S Telemetry N/C

Agenda of 60th OCCM of MP 75