The Garland Company, Inc.
Roof Asset Management Program
Madison #1 Middle School
Prepared BySean Flanagan
Prepared ForBen Barcon
Client Data
Client: Madison Elementary School District
Client Data
Name Madison Elementary School District
Address 1 5601 N 16th Street Address 2 -
City Phoenix State Arizona
ZIP 85016 Country United States
Contact Info
Contact Person Patrick Calvin Title -
Mobile Phone: 602-819-3944 Office Phone: 602-664-7900
Email: -
Facility Summary
Client: Madison Elementary School District
Facility: Madison #1 Middle School
Facility Data
Address 1 5525 N 16th Street
Address 2 -
City Phoenix
State Arizona
ZIP -
Type of Facility School
Square Footage 99,671
Contact Person Patrick Calvin
Asset Information
Name Date Installed Square Footage Roof Access
Buildings A, B & C 2005 - Internal Roof Hatch
Construction Details
Client: Madison Elementary School District
Facility: Madison #1 Middle School
Roof Section: Buildings A, B & C
Information
Year Installed 2005 Square Footage -
Slope Dimension 1/4:12 Eave Height One and Two Story
Roof Access Internal Roof Hatch System Type Modified BUR
Assembly
Roof # Layer Type Description Attachment R-Value Thickness
1 Deck Metal Deck Mechanically attached - -
1 Insulation Polyisocyanurate Mechanically attached 8.4 1.5
1 System Built Up Roof (BUR) Hot asphalt - -
Details
Perimeter Detail Parapet Wall, Wall Flashing
Flashing Material BUR
Drain System Internal Roof Drains
Parapet Wall Concrete Block
Coping Cap Metal
Inspection Report
Client: Madison Elementary School District
Facility: Madison #1 Middle School
Roof Section: Buildings A, B & C
Report Date: 04/01/2016
Inspection Information
Inspection Date 04/01/2016 Core Data No
Inspection Type Core Analysis Leakage No
Deck Conditions N/A
Flashing Conditions
Perimeter Fair Wall Fair
Projections Fair Counterflashing Fair
Miscellaneous Details
Reglets - Debris No
Control Expansion Joints - Ponding Water Minor
Parapet Wall Fair Coping Joints Fair
Perimeter
Rating Fair
Condition The perimeter walls and counterflashings are in fair condition overall. The caulking at theparapet wall joints is in poor condition and in need of replacement. The same conditionexists at the perimeter counterflashings. The caulking here serves as the only source ofprotection from water entry behind the base flashings and into the building. The surfacemounted counterflashings have been utilized on split faced block in several areas creatingan irregular, difficult surface to seal.Caulking Deterioration: As caulking is exposed to UV rays and temperature fluctuations itloses its flexibility and develops cracks. Once this occurs splits develop allowing water topenetrate walls and buildings causing damage as well as leaks.
Field
Rating Fair
Condition The field of the roof is in fair condition. The core of the system showed the asphalt andplies to be pliable and performing. The Protective mineral surfacing has deterioratedexposing the system to the intense, harmful effects of UV here in AZ.
Mineral Roof Granule Deterioration: It is very common for mineral finished roofs toexperience bare felts as early as five years after installation. Manufacturing quality controlissues as well as weather “washing off” the factory applied mineral coating causes theseareas. Typically this is indicated by accumulations of mineral where ponding is present.Bare felts cause exposure of the membrane to the sun/UV rays, which cause rapidmembrane deterioration. Therefore, it is extremely important to coat these areas as soonas they appear.
Penetrations
Rating Fair
Condition The mastic at penetrations is in fair to poor condition. The mastic is cracked and dried outdue to a lack of a reflective coating and age.
Drainage
Rating Good
Condition There seems to be adequate slope for the timely removal of water from the field of theroof.
Overall
Rating Fair
Condition The roof systems overall are in fair condition needing maintenance in several areas and aprotective field coating to protect and extend the service life of the system.
Photo 10
Another view of mineral loss
Photo 11
View of excess minerals from field membrane by scupper area and deterioratedmastic
Photo 12
Mastic without a reflective coating.
Photo 25
More excess minerals and repairs
Photo 26
Field area view
Photo 27
Large ridging and mineral loss at field area.
Solution Options
Client: Madison Elementary School District
Facility: Madison #1 Middle School
Roof Section: Buildings A, B & C
Restore Options
Solution Option: Restore Action Year: 2016
Square Footage: - Expected Life Years: 10
Budget: $300,000.00
The roof system is still performing but should have a protective coating and maintenance completed to ensure longterm performance.
The scope of work is as follows:
1. Clean all dirt, dust and debris from field of roof utilizing a Power Broom.2. Reseal all penetrations, corners, drains, scuppers and vertical laps with a three-course application of mastic
and mesh.3. Re-caulk all perimeter counterflashings, wall joints and termination areas.4. Apply a protective Urethane coating to all field, penetration and base flashing areas at 1.5 gallons per square.