mag rtp southwest area transportation study
DESCRIPTION
MAG RTP Southwest Area Transportation Study. MAG TRC January 30, 2003. 2000 Base Network (as modeled). - DRAFT -. Note: * New corridors are conceptual only and subject to revision based on input and study analysis. - PowerPoint PPT PresentationTRANSCRIPT
MAG RTP Southwest Area
Transportation StudyMAG TRC
January 30, 2003
2000 Base Network (as modeled)
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
2000 Base Networkwith Additions
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
2000 Base Network with Additions & Widenings
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
Combined changes make
up the Future Base
Network
3
4+1
3
3
4+1 4+1 4+1
4+1
3+1 4+1
4+1
4+1 5+1
4+1
4+1 4+1 4+1
4+1
5+1 (To 303)
(To Riggs Rd)
4+1
5+2
4+1 3
.-,10
.-,10
.-, 17
4+1
(/60
(/60
%g303
%g5 1
%g101
%g101
%g202
%g202%g202
%g85
%g88%g143
Dunlap
4+1
4+1
4+1
4+1
3+1
5+1 5+1
Baseline
Elliot5+1
See
Inset
3+16+1+CD or 5+2
MAG Regional Freeway Bottleneck StudyFreeway Lanes @ Buildout Within Existing ROW
2/3/2002 (Draft)
2/2/2002 c:\projects_local\mag\arcview3_projects\mag_f reeways.apr
7th
Av
5th
Av
7th
St
SR
-51
5+1(5th Av to7th Av)
I-17
I-10
5+2
4+1 (Tunnel)
6+1 or 6+2(7th St to Interchange)
5+2 or 6+1(To I-17 Interchange)
Inset
Enhanced Network (as modeled)
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
Loop 303
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
ADT:55,000 – 250,000
LOS:A - D
Cost:$1,248MM
East - West Reliever
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
ADT: East of SR-85
145,000 – 315,000
LOS:A - E
Cost:$3,480MM
Rio Salado Parkway
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
ADT:40,000 – 60,000
LOS:A - D
Cost:$172MM
Komatke/Riggs Road
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
ADT:12,000 – 60,000
LOS:A - C
Cost:$169MM
Loop 101 Extension
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
ADT:~ 215,000
LOS:B
Cost:$178MM
New Corridors Network (as modeled)
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
RPTA DRAFT Proposed Regional Connections
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
RPTA DRAFT Proposed Fixed-Route Network
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
MAG DRAFT High-Capacity Transit Study
Recommended Network
- DRAFT
-Note:
* New corridors are conceptual only and subject to revision based on input and study analysis.
* Concepts on this map were received as part of the public and agency consultation process and have not been assessed or endorsed by MAG.
Source:
MAG / IBI GroupHigh-Capacity Transit
Plan Milestone 5 Report
SWATS Highlights (Draft)
• Number of Arterial Lane Miles added (includes overlap with NWATS)– Current Base to Enhanced Model: 2,200 miles
• Total cost of all new proposed corridors:$5.2 Billion
• Cost of high capacity transit corridors in SW study area: approx. $816 Million
Final Report will address Study Focus Issues:
• Public modes of transportation– arterial and regional highway systems– transit (bus, LRT/BRT, rail)– non-motorized (bicycle and pedestrian)– freight mobility– recreational access
• Cost estimates include:– Intelligent Transportation Systems (ITS) on major
facilities– Bicycle lanes on arterial grid buildout
Southwest Area Transportation Study
Comments or
Questions
Contact Information: email / fax / phone
Linda Meronek Project ManagerWilbur Smith Associates [email protected]
Chris VoigtProject ManagerMaricopa Association of Governments [email protected]