mahoning valley connector spillway bridge (11-05-10)

43
over the Deer Creek Reservoir Spillway Stark County, Ohio

Upload: dgonano

Post on 09-Jan-2017

178 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mahoning Valley Connector Spillway Bridge (11-05-10)

over the Deer Creek Reservoir Spillway Stark County, Ohio

Page 2: Mahoning Valley Connector Spillway Bridge (11-05-10)

Owner is the Stark County Park District

Subcontractor to Stevens-Painton, Corp.

Contract Documents by ms consultants

Design/Build/FabricatorUS Bridge’s Longest Single Span

Page 3: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 4: Mahoning Valley Connector Spillway Bridge (11-05-10)

Span = 248 ft. c/c of bearingsWidth = 14 ft. rail/railBow string arch truss (Pratt type,

with a curved or arching top chord)18 PanelsProfile grade vertical curvature

Page 5: Mahoning Valley Connector Spillway Bridge (11-05-10)

7” Concrete Deck Slab Pedestrian Live Load = 65 psfVehicular Live Load = H15 Truck Wind Pressure = 75 psf

Page 6: Mahoning Valley Connector Spillway Bridge (11-05-10)

AASHTO Standard Specifications for Highway Bridges 17th Edition, 2002

Load Factor Design (LFD) MethodAASHTO Guide Specifications for

Design of Pedestrian Bridges, 1997

Page 7: Mahoning Valley Connector Spillway Bridge (11-05-10)

H15 (15 T)(6k front axle, 24k rear axle)

Agency design vehicle

wped = the greater of:

85 psf ∙(0.25+(15/√A1))or

65 psf

Guide Specification Section 1.2.1.1

Page 8: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 9: Mahoning Valley Connector Spillway Bridge (11-05-10)

ASTM A709 Gr. 50W which means A588 Gr. 50 (weathering)

Painted Hand Railing & Bridge Ends Stay-in-Place (SIP) forms Future Wearing Surface of 20 psf Laminated Elastomeric Expansion Joints Strip Seal Expansion Joint Shippable Units – 8 field sections per truss

Page 10: Mahoning Valley Connector Spillway Bridge (11-05-10)

Hand computations Computer analysis of gravity loads using

Truss Analysis Rating Program (TRAP) by University of Maryland’s BEST Center

Top chord stability analysis using Excel Spreadsheet or by hand (for the sections without sway bracing)

Other Excel Spreadsheets for bolted or welded connections

Page 11: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 12: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 13: Mahoning Valley Connector Spillway Bridge (11-05-10)

Floor Beam Design

Page 14: Mahoning Valley Connector Spillway Bridge (11-05-10)

Floor Beam Design

Page 15: Mahoning Valley Connector Spillway Bridge (11-05-10)

Truss Analysis

Page 16: Mahoning Valley Connector Spillway Bridge (11-05-10)

Truss Analysis

Page 17: Mahoning Valley Connector Spillway Bridge (11-05-10)

Truss Analysis

Page 18: Mahoning Valley Connector Spillway Bridge (11-05-10)

Truss Analysis

Page 19: Mahoning Valley Connector Spillway Bridge (11-05-10)

Truss Analysis

Page 20: Mahoning Valley Connector Spillway Bridge (11-05-10)

Truss Analysis

Page 21: Mahoning Valley Connector Spillway Bridge (11-05-10)

Deflections affect fabricated geometry

DDL=7.25” Dead Load DeflectionMVC = 18.75” Vertical Curve Offset

Page 22: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 23: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 24: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 25: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 26: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 27: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 28: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 29: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 30: Mahoning Valley Connector Spillway Bridge (11-05-10)
Page 31: Mahoning Valley Connector Spillway Bridge (11-05-10)

U.S. Bridge in Cambridge, OH

Page 32: Mahoning Valley Connector Spillway Bridge (11-05-10)

U.S. Bridge in Cambridge, OH

Page 33: Mahoning Valley Connector Spillway Bridge (11-05-10)

Profile Processing

Page 34: Mahoning Valley Connector Spillway Bridge (11-05-10)

Plate Processing

Page 35: Mahoning Valley Connector Spillway Bridge (11-05-10)

Cleaning (Shot Blasting)

Page 36: Mahoning Valley Connector Spillway Bridge (11-05-10)

Layout & Cutting

Page 37: Mahoning Valley Connector Spillway Bridge (11-05-10)

Laydown

Page 38: Mahoning Valley Connector Spillway Bridge (11-05-10)

Shop Assembly

Page 39: Mahoning Valley Connector Spillway Bridge (11-05-10)

Shop Assembly

Page 40: Mahoning Valley Connector Spillway Bridge (11-05-10)

Finish (Sand Blasting)

Page 41: Mahoning Valley Connector Spillway Bridge (11-05-10)

Finish (Paint)

Page 42: Mahoning Valley Connector Spillway Bridge (11-05-10)

Delivery

Page 43: Mahoning Valley Connector Spillway Bridge (11-05-10)

Thank you!