mahzad 8-25-16

3
MAHZAD PAKZAD 9155 Judicial Dr. #5330, San Diego, CA 92122 (858) 261-4091 Email: [email protected] LI Profile: https://www.linkedin.com/in/mahzad-pakzad-profile SUMMARY: Seeking stability, in an engineering leadership role, utilizing strong technical & organizational management skills, that can align your marketing needs with product design specifications, deploy innovative application of technology, carefully chosen for reliable process designs and effective procedures delivering reliable production control. Keywords: Data Oriented, Scientific Evaluation of Materials, DFX (DFM, DFA, DFC, DFS,….), Six Sigma Black Belt, Practicing cGMP, Good Engineering, Utilizing Best Design Principles, High Tech, Analytical, Logical, Leader, Results Oriented, Innovative, Creative, Practical, EXPERIENCED. Proven abilities to solve complex design & development problems. Initiating & managing continuous improvement & cost reduction including automation/capital investment projects since 1984. Successful in product launches, setting up new, or modifying existing production/operations, delivering robust outputs. Cross functional team management, delivering specifications for DFX, including Standard Operating Procedures. Have managed plant wide programs, and projects for many industries, several times, and have successfully managed deliv- ering results such as increasing productivity, improving quality, assuring product reliability and meeting all customer demands, as well as reducing operational costs, or increasing profit. Experienced in working with simplifying use of regulatory standards as the product/process specifications, to develop reliable Designs, Processes, Risk Management, & Validation Protocols IQ/OQ/PQ, while complying with agencies’ regulations. EXPERIENCE (CONSULTANT PROJECT & PROGRAM MANAGEMENT SINCE 1989): Alere, Inc. , San Diego, CA, Biotechnology Company 02/2016 to 5/2016 Managed a Lab Consolidation program, transferring smaller Antibody Production, Reagent Chemistry, Particle Chemistry, Organ- ic Chemistry, and Device Chemistry Labs into a large lab. Trained Management how to Utilize standard Prince II project man- agement tools, as well as "Developing Custom Designed" tools to document and manage workstreams throughout different stages of a four phase program. Tools allow clear specification of tasks required, in sequence indicating resource requirement for each, as well as deadlines. The custom designed tools simplify communication activities included calibration, risk analysis, and validation, and construction, for all projects between labs operation, facilities, and lean organizations. Tenneco Inc. Ligonier, IN, 10/2015 to 11/2015 Identified the requirements to improve output of Automated Welding Assembly Processes. Planned and coordinated CAPA, solv- ing various aspects of issues with new product/process launches. CAPA activities included redesigning tooling, flagging mainte- nance issues and developing plans to perform DOE to redesign fixtures. Honeywell Aerospace, South Bend, IN, Aerospace & Defense (FAA, ITAR) 6/2015 to 9/2015 Projects/activities identifier, execution focal & escalation point for the F15 & F18 brakes (Carbon / Carbon production). Analyzed Chemical, Mechanical & Thermal Process treatments for Carbon Fibers to identify gaps between product design specifications & Process Design/Controls. Identified & related the root causes of scraps (up to $3MM/month) to equipment issues. Initiated a plan to make all problems visible, started automated equipment training, developed fixtures designs for equipment. ZIMMER, WARSAW, IN, MEDICAL DEVICES ORTHOPEDIC IMPLANTS (FDA, cGMP) 11/2014 to 4/2015 IQ/OQ/PQ/SOP; supporting remediation & CAPA activities for FDA, identified some Root Causes of variations in VE stabilized UHMWPE processing (including molding), identified required Std Oper. Proc. & Preventive Maintenance Modifications required, for containment as well as gaps in quality system protocols and process requirements and equipment. TRW, WESTMINTER, MA, AUTOMOTIVE (ISO) 3/2013 to 11/2013 Page of MAHZAD PAKZAD 1 3

Upload: mahzad-pakzad

Post on 11-Apr-2017

127 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MAHZAD 8-25-16

MAHZAD PAKZAD

9155 Judicial Dr. #5330, San Diego, CA 92122 (858) 261-4091 Email: [email protected] LI Profile: https://www.linkedin.com/in/mahzad-pakzad-profile

SUMMARY:

Seeking stability, in an engineering leadership role, utilizing strong technical & organizational management skills, that can align your marketing needs with product design specifications, deploy innovative application of technology, carefully chosen for reliable process designs and effective procedures delivering reliable production control. Keywords: Data Oriented, Scientific Evaluation of Materials, DFX (DFM, DFA, DFC, DFS,….), Six Sigma Black Belt, Practicing cGMP, Good Engineering, Utilizing Best Design Principles, High Tech, Analytical, Logical, Leader, Results Oriented, Innovative, Creative, Practical, EXPERIENCED.

• Proven abilities to solve complex design & development problems.

• Initiating & managing continuous improvement & cost reduction including automation/capital investment projects since 1984.

• Successful in product launches, setting up new, or modifying existing production/operations, delivering robust outputs.

• Cross functional team management, delivering specifications for DFX, including Standard Operating Procedures.

• Have managed plant wide programs, and projects for many industries, several times, and have successfully managed deliv-ering results such as increasing productivity, improving quality, assuring product reliability and meeting all customer demands, as well as reducing operational costs, or increasing profit.

• Experienced in working with simplifying use of regulatory standards as the product/process specifications, to develop reliable Designs, Processes, Risk Management, & Validation Protocols IQ/OQ/PQ, while complying with agencies’ regulations.

EXPERIENCE (CONSULTANT PROJECT & PROGRAM MANAGEMENT SINCE 1989):

Alere, Inc. , San Diego, CA, Biotechnology Company 02/2016 to 5/2016 Managed a Lab Consolidation program, transferring smaller Antibody Production, Reagent Chemistry, Particle Chemistry, Organ-ic Chemistry, and Device Chemistry Labs into a large lab. Trained Management how to Utilize standard Prince II project man-agement tools, as well as "Developing Custom Designed" tools to document and manage workstreams throughout different stages of a four phase program. Tools allow clear specification of tasks required, in sequence indicating resource requirement for each, as well as deadlines. The custom designed tools simplify communication activities included calibration, risk analysis, and validation, and construction, for all projects between labs operation, facilities, and lean organizations.

Tenneco Inc. Ligonier, IN, 10/2015 to 11/2015 Identified the requirements to improve output of Automated Welding Assembly Processes. Planned and coordinated CAPA, solv-ing various aspects of issues with new product/process launches. CAPA activities included redesigning tooling, flagging mainte-nance issues and developing plans to perform DOE to redesign fixtures.

Honeywell Aerospace, South Bend, IN, Aerospace & Defense (FAA, ITAR) 6/2015 to 9/2015 Projects/activities identifier, execution focal & escalation point for the F15 & F18 brakes (Carbon / Carbon production). Analyzed Chemical, Mechanical & Thermal Process treatments for Carbon Fibers to identify gaps between product design specifications & Process Design/Controls. Identified & related the root causes of scraps (up to $3MM/month) to equipment issues. Initiated a plan to make all problems visible, started automated equipment training, developed fixtures designs for equipment.

ZIMMER, WARSAW, IN, MEDICAL DEVICES ORTHOPEDIC IMPLANTS (FDA, cGMP) 11/2014 to 4/2015 IQ/OQ/PQ/SOP; supporting remediation & CAPA activities for FDA, identified some Root Causes of variations in VE stabilized UHMWPE processing (including molding), identified required Std Oper. Proc. & Preventive Maintenance Modifications required, for containment as well as gaps in quality system protocols and process requirements and equipment.

TRW, WESTMINTER, MA, AUTOMOTIVE (ISO) 3/2013 to 11/2013

Page � of � MAHZAD PAKZAD1 3

Page 2: MAHZAD 8-25-16

Six Sigma Black Belt Champion, analyzed and identified errors in product design (including materials) specifications, root cause of process inconsistencies, and automated system integration issues; The processes included automated unloading of parts from complex TWO SHOTS Injection molding & Rubber Extrusion machines, and automated assembly of components. Improved process reliability, and reduced scrap, designed an automated inspection method to prevent missing defects and sending them to customers. Trained tool room with benefits of using state of the art Scanners & Portable Coordinate Measuring Systems for faster and more reliable mold repair, preventing extensive damages to tools during processes, due poor repair capabilities.

MARKEM-IMAJE, KEENE, NH, PHARMACEUTICAL FOOD (FDA, cGMP) 3/2012 to 11/2012 Mechatronics Project Management responsible for integration & testing of Laser Equipment, including Optical systems, in an R & D environment; Managed development of plans for launching international repair centers.

TIMKEN, KEENE, NH, AEROSPACE, & MEDICAL DEVICES (FAA & FDA, cGMP, ISO) 7/2011 to 2/2012 Launched TeamCenter & SAP for Process Specification Development (Included Chemical Treatment Processing of Parts), identi-fied metallurgy & equipment related issues as part of continuous improvement, improving OEE and reducing scrap rates.

HAMILTON SUNDSTRAND, SAN DIEGO, CA, AEROSPACE (FAA, ISO) 10/2009 to 12/2009 Managed a project, evaluating FAA & Customer (Boeing 787) requirements, resolving documentation and processing issues, releasing engineering drawings for after market engine tools.

BOEING, EVERETT, WA, AEROSPACE, (FAA, ISO) 4/2008 to 6/2009 Evaluated Airplane components designs & assembly methods, utilized CATIA/ENOVIA for DESIGN ANALYSIS; Managed project’s communication for concurrent engineering; Developed FAA compliant Standard Operations Procedures.

ADVANCED AUTOMATION, EXTON, PA, PHARMACEUTICAL & FOOD (FDA, ISO) 7/2007 to 3/2008 Developed automated equipment design; Evaluated the Automated Gatorade Recipe Mixing, & Bottling Process; PI&D evalua-tion; Automated Process Control (PLC) Validation & Testing; Wonderware HMI, Factory Automation Platform Design.

CNH, DUBLIN, GA, AGRICULTURE, (ISO) 9/2006 to 7/2007 Project Manager, lead engineering efforts between Dublin, India & Chicago, launched new product lines successfully, utilized: PLM, DFX, Lean, KANBAN, 3D design tool “Inventor”, designed tooling & fixtures, prepared justification packages for equipment, worked with vendors for developing best designs & quotes, oversaw assembly line modifications.

FLUOR, RICHLAND, WA, DEPARTMENT OF ENERGY, PLUTONIUM FINISHING (OSHA, EPA) 3/2004 to 7/2006 Plutonium Processing PI&D assessment, developed work instructions for decontamination & equip. modifications; Managed HVAC system development for confined, contaminated area; Transportation skid 3D D & D; Utilized metallurgy, & EHS.

BIOGENEX, SAN RAMON, CA, MEDICAL DEVICES (FDA, cGMP, ISO) 12/2002 to 7/2003 Medical device design for blood analysis; 3D AutoCAD, Metal & Plastic parts deign, Industrial Design, DFX, Validation, Supplier relations, software validation.

VOLEX, FREMONT, CA, AEROSPACE, MEDICAL DEVICES (FDA, FAA, ISO) 7/2000 to 2/2002 Managed New Product Introduction Projects, reviewed/modified customers’ designs & oversaw process development for new products, and supervised documentation of design and process procedures that were regulatory agency compliant; Initiated & Implemented CAPA projects, eliminated 30% rework & 40% customer returns for existing products.

FORD MOTOR, LOUISVILLE, KY, AUTOMOTIVE (ISO) 4/2000 to 7/2000 Modified several sections of a mile long assembly line (detailed drawings for customized materials handling systems). JIT materials management, KANBAN, assembly, testing, AutoCAD 3D design.

GE, LOUISVILLE, KY, APPLIANCES (ISO) 10/1999 to 4/2000 Capital investment project manager/owner for developing automated equipment, molds/tooling for new parts; Vendor quote eval-uation, oversaw PFMEA. Supported New plant Start up in Mexico; Supported Six Sigma based designs.

TIGHitco, MARIETTA, GA, AEROSPACE, AUTOMOTIVE (FAA, ISO) 1/1998 to 10/1999 Applied innovative problem solving skills to develop customized solutions enabling lean manufacturing; Designed KANBAN, & JIT materials handling/management solutions for customer (Boeing). Initiated & Implemented CAPA projects, Applied DFM, DFA, redesigned tooling, developed a Preventive Maintenance Program & solved several quality problems from roots for several cus-tomers/products (CESSNA, SAAB, FORD, BOEING,.) …

Page � of � MAHZAD PAKZAD2 3

Page 3: MAHZAD 8-25-16

AVERY DENNISON, FLOWERY BRANCH, GA, CONSUMER GOODS (ISO) 1/1995 to 12/1997 Analyzed a new product through out its lifecycle; Managed a team that initiated & implemented CAPA projects, DOE, SPC, test-ing, applied PFMEA, worked with quality & suppliers and successfully eliminated 50% scarp for New Product.

STAR EXPANSION, MOUNTAINVILLE, NY, SPECIALTY FASTENERS 1/1992 to 12/1992 Business Process Analysis, Developed Plant wide production and materials management systems, developed automated equipment design, as well as SOP for manual packaging; Initiated & Implemented CAPA projects, and increased manufacturing throughput by 96% within 9 months.

KNOLL, EAST GREENVILLE, PA, DESIGNER FURNITURE 2/1991 to 12/1991 Evaluated, selected & qualified suppliers; Mapped Product Lines, Developed Process Flow Charts, Oversaw Suppliers’ Design & Development of Standard Operating Procedures for our products.

BREEZE EASTERN, UNION, NJ, AEROSPACE (MIL STD, FAA) 9/1990 to 12/1990 Worked with managers to build & manage continuous improvement team. Solved Quality Issues with a Product Line transferred from another division. Lead evaluation of all factors contributing to product performance, from A to Z, and identified the root causes of quality issues that had stopped production and solved them.

WCI, EDISON, NJ, APPLIANCES (OSHA, EPA) ADVANCED MANUFACTURING ENGINEER 2/1984 to 4/1989 Initiated & managed multiple cost reduction & automation projects; worked with marketing, & designers for strategic planning & identifying production equipment requirements (Electro-deposition paint system, molding operations, metal stamping, & assem-bly machines,..). Other responsibilities included problem solving, concept design, troubleshooting, & preventive maintenance programs. Managed 5 year CI plan, oversaw a 40 MM Capital Investment Program for automated materials handling. Developed several innovative process equipment for assembly lines as well as fabrication (molding, piping,..), this included de-signing tooling for robotics; Managed product/process standardization; Managed DFX projects.

EDUCATION:

B.S. in Mechanical Engineering from the University of the District of Columbia 1983

Courses in Marketing & Industrial Design 1997

Owner linked in group “Advanced Manufacturing Engineering Society” since 2011 https://www.linkedin.com/groups/3891960

Page � of � MAHZAD PAKZAD3 3