Page 1 of 39 MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/30/2020. The projects listed below consist of the MaineDOT 2020 Construction Advertisement Plan and any projects that have been added to the schedule since the publication of the plan. Dates and cost estimates are subject to change as projects become more fully developed. This report will be updated each Monday. Questions about specific projects should be directed to the Program Manager listed below. Click here to view the current Construction Advertisement Plan Bridge Construction Change Status Location/Title Plan Advertise Date Current Forecast Advertise Date Actual Advertise Date Advertised On Time MONROE LORD BR#3348 01/08/20 01/08/20 01/08/20 Project Identification No: 022334.00 Description: Lord Bridge (#3348) over Marsh Stream. Located 0.03 of a mile west of Marsh Stream Road. Administered By: MaineDOT Total Project Estimate: $784,000 Program Manager: Wayne Frankhauser Phone: 624-3490 Advertised On Time CAMDEN, GREAT BROOK BR #2326 02/05/20 02/05/20 02/05/20 Project Identification No: 022610.00 Description: Great Brook Bridge (#2326) over Great Brook. Located 0.05 of a mile south of Dyer Drive. Administered By: MaineDOT Total Project Estimate: $890,000 Program Manager: Wayne Frankhauser Phone: 624-3490 Advertised On Time CAMDEN, SPRING BROOK BR #2794 02/05/20 02/05/20 02/05/20 Project Identification No: 022608.00 Description: Spring Brook Bridge (#2794) over Spring Brook. Located 0.94 of a mile southwest of the Lincolnville town line. Administered By: MaineDOT Total Project Estimate: $2,920,000 Program Manager: Wayne Frankhauser Phone: 624-3490 On Time DIXFIELD, DURRELLS MILL BR#0658 03/25/20 04/01/20 Project Identification No: 022234.00 Description: Durrells Mill Bridge (#0658) over Norton Road. Located 0.04 of a mile northwest of Main Street. Administered By: MaineDOT Total Project Estimate: $1,010,000 Program Manager: Wayne Frankhauser Phone: 624-3490 Advertised On Time FRENCHVILLE, GAGNON BR #2303 04/01/20 02/12/20 02/12/20 Project Identification No: 023565.00

Upload: others

Post on 27-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 1 of 39

MaineDOT Construction Advertisement Schedule Status ReportThis report was lasted refreshed on 03/30/2020.

The projects listed below consist of the MaineDOT 2020 Construction Advertisement Plan and any projects that have been added to the schedule since the publication of the plan.

Dates and cost estimates are subject to change as projects become more fully developed.

This report will be updated each Monday. Questions about specific projects should be directed to the Program Manager listed below.

Click here to view the current Construction Advertisement Plan

Bridge Construction

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Advertised On Time

MONROE LORD BR#3348 01/08/20 01/08/20 01/08/20Project Identification No: 022334.00Description: Lord Bridge (#3348) over Marsh Stream.Located 0.03 of a mile west of Marsh Stream Road.Administered By: MaineDOTTotal Project Estimate: $784,000Program Manager: Wayne FrankhauserPhone: 624-3490

Advertised On Time

CAMDEN, GREAT BROOK BR #2326 02/05/20 02/05/20 02/05/20Project Identification No: 022610.00Description: Great Brook Bridge (#2326) over Great Brook. Located 0.05 of a mile south of Dyer Drive.Administered By: MaineDOTTotal Project Estimate: $890,000Program Manager: Wayne FrankhauserPhone: 624-3490

Advertised On Time

CAMDEN, SPRING BROOK BR #2794 02/05/20 02/05/20 02/05/20Project Identification No: 022608.00Description: Spring Brook Bridge (#2794) over Spring Brook. Located 0.94 of a mile southwest of theLincolnville town line.Administered By: MaineDOTTotal Project Estimate: $2,920,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time DIXFIELD, DURRELLS MILL BR#0658 03/25/20 04/01/20Project Identification No: 022234.00Description: Durrells Mill Bridge (#0658) over Norton Road. Located 0.04 of a mile northwest of Main Street.Administered By: MaineDOTTotal Project Estimate: $1,010,000Program Manager: Wayne FrankhauserPhone: 624-3490

Advertised On Time

FRENCHVILLE, GAGNON BR #2303 04/01/20 02/12/20 02/12/20Project Identification No: 023565.00

Page 2: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 2 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Gagnon Brook Bridge (#2303) over Gagnon Brook. Located 0.47 of a mile south of Pelletier Avenue.Administered By: MaineDOTTotal Project Estimate: $2,568,000Program Manager: Nathaniel BenoitPhone: 624-3420

Advertised On Time

FRENCHVILLE, GAGNON BROOK RR 04/01/20 02/12/20 02/12/20Project Identification No: 021776.00Description: Gagnon Brook Rail Bridge (#7831) over Gagnon Brook. Located on the Madawaska Branch rail line.Administered By: MaineDOTTotal Project Estimate: $987,000Program Manager: Nathaniel BenoitPhone: 624-3420

On Time BELFAST, GOOSE RIVER BR #2319 04/08/20 04/08/20Project Identification No: 021874.00Description: Goose River Bridge (#2319) over GooseRiver. Located 0.15 of a mile east of Mitchell Street.Administered By: MaineDOTTotal Project Estimate: $2,331,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time BELFAST, SHELDON BR (#5557) 04/08/20 04/08/20Project Identification No: 021666.00Description: Sheldon Bridge (#5557) over Warren Brook. Located 0.89 of a mile east of Shepard Road.Administered By: MaineDOTTotal Project Estimate: $861,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time PORTLAND, 295 VERANDA BR #5933 04/08/20 03/24/20Project Identification No: 021745.00Description: Veranda Street Bridge (#5933) over Veranda Street. Located 0.15 of a mile south of Route 1.Administered By: MaineDOTTotal Project Estimate: $17,875,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time AMHERST, HALF MILE BROOK BR #6246 04/29/20 04/29/20Project Identification No: 021870.00Description: Half Mile Brook Bridge (#6246) over HalfMile Pond. Located 0.05 of a mile east of Haynes Brook Road.Administered By: MaineDOTTotal Project Estimate: $1,786,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time BREWER, WILSON STREET/I-395 BRIDGE #1564 05/06/20 05/06/20Project Identification No: 018915.20

Page 3: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 3 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Wilson Street/I-395 Bridge (#1564) over Interstate 395. Located 0.35 of a mile west of Dirigo Drive. FHWA INFRA Grant recipient. Administered By: MaineDOTTotal Project Estimate: $13,450,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time CHERRYFIELD SCHOODIC BR#3649 08/26/20 08/26/20Project Identification No: 022230.00Description: Schoodic Bridge (#3649) over Schoodic Brook. Located 0.32 of a mile south of the Deblois town line.Administered By: MaineDOTTotal Project Estimate: $2,106,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time MATTAWAMKEAG, MATTAWAMKEAG BR #2522 09/02/20 09/02/20Project Identification No: 023234.00Description: Mattawamkeag Bridge (#2522) over the Mattawamkeag River. Located 0.05 of a mile north of Boyd Street. FHWA TIGER Grant recipient.Administered By: MaineDOTTotal Project Estimate: $9,579,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time MILO, PLEASANT RIVER BR #3244 09/02/20 09/02/20Project Identification No: 022627.00Description: Pleasant River Bridge (#3244) over the Pleasant River. Located 0.09 of a mile west of Pleasant River Road. FHWA TIGER Grant recipient.Administered By: MaineDOTTotal Project Estimate: $8,698,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time T3 INDIAN PURCHASE BR #3666 09/02/20 09/02/20Project Identification No: 023236.00Description: Detective Benjamin Campbell (#3666) over the West Branch Penobscot River. Located 0.10of a mile north of North Twin Dam Road. FHWA TIGER Grant recipient.Administered By: MaineDOTTotal Project Estimate: $8,780,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time BRUNSWICK, FRANK WOOD BR #2016 09/30/20 09/30/20Project Identification No: 022603.00Description: Frank J. Wood Bridge (#2016) over Androscoggin River. Located at the Brunswick - Topsham town line.Administered By: MaineDOTTotal Project Estimate: $19,903,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time YARMOUTH, BAYVIEW STREET BR #5835 10/07/20 10/07/20

Page 4: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 4 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Project Identification No: 022380.00Description: Bayview Street/ I-295 Bridge (#5835) over Interstate 295. Located 0.09 of a mile east of Spring Street.Administered By: MaineDOTTotal Project Estimate: $2,273,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time HODGDON, MADUSKEAK BR #2492 11/18/20 11/18/20Project Identification No: 023625.00Description: Maduskeag Bridge (#2492) over Maduskeag Stream. Located 1.04 miles south of the Hodgdon Mills Road.Administered By: MaineDOTTotal Project Estimate: $1,300,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time MADAWASKA, INT BR #2399 11/25/20 11/25/20Project Identification No: 021736.00Description: International Bridge (#2399) over St. John River. Located 0.27 of a mile north of Route 1 on the United States-Canada border. FHWA INFRA Grant recipient.Administered By: MaineDOTTotal Project Estimate: $84,600,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time GRAFTON TWP, CAMBRIDGE BR#3524 12/02/20 12/02/20Project Identification No: 022316.00Description: Cambridge Bridge (#3524) over the Swift Cambridge River. Located 0.12 of a mile north ofthe north intersection of the Cambridge River Road.Administered By: MaineDOTTotal Project Estimate: $810,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time HAMPDEN, TWIN BRIDGE #5315 12/09/20 11/25/20Project Identification No: 018959.00Description: Twin Bridge (#5315) over the West Branch Souadabscook Stream. Located 0.04 of a milenorth of Meadow Road.Administered By: MaineDOTTotal Project Estimate: $2,454,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time FARMINGTON HAMLIN BR#3286 12/16/20 12/28/20Project Identification No: 022236.00Description: Hamlin Bridge (#3286) over Wilson Stream. Located 0.16 of a mile south of Wilton Road.Administered By: MaineDOTTotal Project Estimate: $2,255,000Program Manager: Wayne FrankhauserPhone: 624-3490

Page 5: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 5 of 39

Bridges Other

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Advertised On Time

BRIDGE JOINTS I-95 NB, MEDWAY – HERSEYTOWN TWP.

01/22/20 01/22/20 02/05/20

Project Identification No: 023617.30Description: Various bridge joint improvements on Interstate 95 northbound from Medway to HerseytownTwp. Administered By: MaineDOTTotal Project Estimate: $150,000Program Manager: Wayne FrankhauserPhone: 624-3490

Advertised On Time

PORTLAND-SOUTH PORTLAND INTERSTATE 295 SB BRIDGE JOINTS

02/05/20 02/26/20 02/26/20

Project Identification No: 023615.01Description: Portland-South Portland Interstate 295 southbound bridge joints.Administered By: MaineDOTTotal Project Estimate: $11,400,000Program Manager: Wayne FrankhauserPhone: 624-3490

Advertised On Time

BRIDGE JOINTS I-95 NB ARGYLE-HOWLAND 02/12/20 02/12/20 02/19/20Project Identification No: 023617.10Description: Various bridge joint improvements on Interstate 95 northbound from Argyle to Howland. Administered By: MaineDOTTotal Project Estimate: $26,000Program Manager: Wayne FrankhauserPhone: 624-3490

Advertised On Time

BRIDGE JOINTS I-95 NB, HOWLAND – MATTAMISCONTIS TWP

02/12/20 02/12/20 02/19/20

Project Identification No: 023617.20Description: Various bridge joint improvements on Interstate 95 northbound from Howland to Mattamiscontis Twp. Administered By: MaineDOTTotal Project Estimate: $194,000Program Manager: Wayne FrankhauserPhone: 624-3490

Advertised On Time

BRIDGE JOINTS I-95 SB, MEDWAY – OLD TOWN 03/18/20 03/18/20 03/25/20Project Identification No: 023617.40Description: Various bridge joint improvements on Interstate 95 southbound from Medway to Orono.Administered By: MaineDOTTotal Project Estimate: $175,000Program Manager: Wayne FrankhauserPhone: 624-3490

Advertised On Time

CRYSTAL STATION ROAD/I95 BR#6171 03/25/20 03/26/20 03/25/20Project Identification No: 022298.00Description: Crystal Station Road Bridge (#6171) over Interstate 95. Located 0.24 of a mile north of the Sherman town line.Administered By: MaineDOT

Page 6: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 6 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Total Project Estimate: $466,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time ISLAND FALLS, RANDALL BR #2703 03/25/20 03/26/20Project Identification No: 022320.00Description: Randall Bridge (#2703) over the West Branch of the Mattawamkeag River. Located 0.17 of a mile northwest of Church Street.Administered By: MaineDOTTotal Project Estimate: $126,000Program Manager: Wayne FrankhauserPhone: 624-3490

Advertised On Time

LONG POND TWP PARLIN SREAM #2 BR#6025 03/25/20 03/25/20 03/25/20Project Identification No: 022330.00Description: Parlin Stream No. 2 Bridge (#6025) overParlin Pond Stream. Located 3.14 miles west of the Sandwich Academy Grant Twp. town line. Administered By: MaineDOTTotal Project Estimate: $150,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time MONSON, BARROWS FALLS BR #3413 03/25/20 03/25/20Project Identification No: 023523.00Description: Barrow Falls Bridge (#3413) over Piscataquis River. Located 0.05 of a mile south of Pine Lane.Administered By: MaineDOTTotal Project Estimate: $133,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time SMYRNA I95 NB/ ROUTE 2 BR#1391 03/25/20 03/26/20Project Identification No: 022352.00Description: I-95 NB/ Route 2 Bridge (#1391) over Route 2. Located 0.30 of a mile from Exit 291 on Interstate 95 northbound.Administered By: MaineDOTTotal Project Estimate: $551,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time SMYRNA, I95 SB / RTE 2 BR#6089 03/25/20 03/26/20Project Identification No: 022354.00Description: I-95 SB/ Route 2 Bridge (#6089) over Route 2. Located 0.08 of a mile east of the Smyrna Center Road.Administered By: MaineDOTTotal Project Estimate: $551,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time ARROWSIC - WOOLWICH, BR #2026 04/01/20 04/15/20Project Identification No: 023507.00Description: Max L. Wilder Memorial Bridge (#2026) over Sasonoa River. Located 0.21 of a mile south of Route 1.Administered By: MaineDOT

Page 7: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 7 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Total Project Estimate: $785,000Program Manager: Wayne FrankhauserPhone: 624-3490

Advertised On Time

ROCKLAND, RAIL BRIDGES #7655 AND #7667 04/01/20 04/01/20 01/29/20Project Identification No: 022920.00Description: Rockland Rail Bridge #53.04 (#7655) over Nichols River and Rockland Rail Bridge #79.17 (#7667) over Georges River. Located on the Rockland Branch rail line.Administered By: MaineDOTTotal Project Estimate: $1,457,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time BATH PAUL DAVIS MEM BR#3837 04/08/20 04/22/20Project Identification No: 022280.00Description: Paul Davis Memorial Bridge (#3837) over Route 1. Located 0.10 of a mile north of Union Street.Administered By: MaineDOTTotal Project Estimate: $651,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time MECHANIC FALLS, RED BRIDGE (#5009) 04/08/20 04/08/20Project Identification No: 023156.00Description: Red Bridge (#5009) over Little Androscoggin River. Located 0.09 of a mile north of Pine Street.Administered By: MaineDOTTotal Project Estimate: $114,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time PORTLAND, BR# 5616 CNRR 04/08/20 04/23/20Project Identification No: 023545.00Description: CNRR Crossing Bridge (#5616) under Interstate 295. Located 1.45 miles south of the Falmouth town line.Administered By: MaineDOTTotal Project Estimate: $1,174,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time PORTLAND, INTERSTATE 295 SB BRIDGE JOINTS 04/08/20 04/08/20Project Identification No: 023615.03Description: Portland Interstate 295 southbound bridge joints.Administered By: MaineDOTTotal Project Estimate: $387,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time AUBURN, VIET MEM W BR #6260 04/13/20 04/13/20Project Identification No: 022270.00Description: Vietnam Memorial West Bridge (#6260) over the west channel of the Androscoggin River. Located on the Auburn - Lewiston city line.Administered By: MaineDOT

Page 8: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 8 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Total Project Estimate: $339,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time LEWISTON, VIET MEM E BR #6331 04/13/20 04/13/20Project Identification No: 022324.00Description: Vietnam Memorial East Bridge (#6331) over Androscoggin River. Located 0.35 of a mile west of Route 202.Administered By: MaineDOTTotal Project Estimate: $339,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time SANFORD, WASHINGTON STREET BRIDGE (#1359)

04/15/20 04/15/20

Project Identification No: 023222.00Description: Washington Street Bridge (#1359) over Mousam River. Located 0.48 of a mile northeast of Brown Corner Road.Administered By: MaineDOTTotal Project Estimate: $76,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time NEW SHARON, SANDY RIVER BRIDGE (#5724) 04/22/20 04/22/20Project Identification No: 023174.00Description: Sandy River Bridge (#5724) over Sandy River. Located 0.06 of a mile south of Water Street.Administered By: MaineDOTTotal Project Estimate: $706,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time AUGUSTA - WATERVILLE BR 6400 04/29/20 04/29/20Project Identification No: 023571.00Description: Augusta Memorial Bridge (#5196) over the Kennebec River on Route 201. Augusta Cushnoc Crossing Bridge (#6400) over the Kennebec River on Route 3. Waterville Donald V. Carter Bridge (#1141) over the Kennebec River on Route 137.Administered By: MaineDOTTotal Project Estimate: $1,002,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time WATERVILLE, NORTH ST BR #5235 05/06/20 05/06/20Project Identification No: 023635.00Description: North Street Overpass Bridge (#5235) over Maine Central Railroad. Located 0.02 of a mile north of West Street.Administered By: MaineDOTTotal Project Estimate: $286,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time LWR CUPSUPTIC TWP BR #3542 05/13/20 05/13/20Project Identification No: 023547.00

Page 9: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 9 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Cupsuptic Bridge (#3542) over Cupsuptic River. Located 0.59 of a mile northeast of the Adamstown Twp. town line.Administered By: MaineDOTTotal Project Estimate: $416,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time DEER ISLE-SEDGWICK, DEER ISLE SEDGWICK BR #3257

06/24/20 06/24/20

Project Identification No: 023152.00Description: Deer Isle-Sedgwick Bridge (#3257) over Eggemoggin Reach. Located 0.45 of a mile south of Silvermine Road.Administered By: MaineDOTTotal Project Estimate: $3,539,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time NORTH YARMOUTH, BR #0188 07/20/20 07/20/20Project Identification No: 022338.00Description: Walnut Hill Bridge (#0188) over MCRR. Located 0.14 of a mile north of Hazel Lane.Administered By: MaineDOTTotal Project Estimate: $540,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time CHERRYFIELD, COVERED BR #2192 08/26/20 08/26/20Project Identification No: 022294.00Description: Covered Bridge (#2192) over the Narraguagus River. Located 0.03 of a mile west of Main Street.Administered By: MaineDOTTotal Project Estimate: $536,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time JONESBORO, DRISCO BR #3956 09/09/20 09/09/20Project Identification No: 023557.00Description: Drisco Bridge (#3956) over Chandler River. Located 0.13 of a mile northeast of Geel Lane.Administered By: MaineDOTTotal Project Estimate: $385,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time PORTLAND, WASHINGTON AVE SB BR#0820 10/07/20 10/07/20Project Identification No: 023661.00Description: Washington Avenue SB Bridge (#0820) over Interstate 295. Located 0.15 of a mile south of Interstate 295 southbound Exit 8.Administered By: MaineDOTTotal Project Estimate: $936,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time BANGOR, VETERANS REM BR #1558 11/18/20 11/18/20Project Identification No: 022278.00

Page 10: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 10 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Veterans Remembrance Bridge (#1558) over the Penobscot River. Located at the Bangor-Brewer town line.Administered By: MaineDOTTotal Project Estimate: $2,750,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time BETHEL, SUNDAY RIVER BR #2822 12/02/20 12/02/20Project Identification No: 023651.00Description: Sunday River Bridge (#2822) over Sunday River. Located 0.18 of a mile north of Martin Lane.Administered By: MaineDOTTotal Project Estimate: $391,000Program Manager: Wayne FrankhauserPhone: 624-3490

On Time MAINE NORTHERN RAILWAY - 4 BRIDGES 12/02/20 12/02/20Project Identification No: 023488.00Description: Includes four (4) bridges (#7785, #7787,#7788, #7792) along the Maine Northern Railway.Administered By: MaineDOTTotal Project Estimate: $5,295,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time NEWRY, BEAR RIVER BR #2055 12/02/20 12/02/20Project Identification No: 023525.00Description: Bear River Bridge (#2055) over Bear River. Located 0.07 of a mile south of Bear River Road.Administered By: MaineDOTTotal Project Estimate: $475,000Program Manager: Wayne FrankhauserPhone: 624-3490

Page 11: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 11 of 39

Highway Construction

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Advertised On Time

CAMDEN, ROUTE 1 02/05/20 02/04/21Project Identification No: 018283.00Description: Beginning 0.56 of a mile north of Sagamore Farm Road and extending north 1.54 miles.Administered By: MaineDOTTotal Project Estimate: $7,802,000Program Manager: Brad FoleyPhone: 624-3480

On Time KINGFIELD, ROUTE 27 06/24/20 06/24/20Project Identification No: 018245.01Description: Beginning at the south intersection of High Street and extending north 2.33 miles. FHWA BUILD Grant recipient.Administered By: MaineDOTTotal Project Estimate: $11,131,000Program Manager: Brad FoleyPhone: 624-3480

On Time FRYEBURG, ROUTE 302 07/15/20 07/14/20Project Identification No: 017280.01Description: Beginning 0.09 of a mile east of Elm Street and extending east 1.24 miles to 0.01 of a mile east of the Recreational Complex Road. FHWA BUILD Grant recipient.Administered By: MaineDOTTotal Project Estimate: $7,400,000Program Manager: Brad FoleyPhone: 624-3480

On Time WOODSTOCK, ROUTE 26 08/19/20 08/19/20Project Identification No: 018767.01Description: Beginning 0.06 of a mile east of Rumford Avenue and extending west 2.51 miles. FHWA BUILD Grant recipient.Administered By: MaineDOTTotal Project Estimate: $10,523,000Program Manager: Brad FoleyPhone: 624-3480

On Time WATERVILLE, DOWNTOWN REVITALIZATION BUILD GRANT

09/30/20 09/29/20

Project Identification No: 024371.00Description: Downtown Waterville revitalization project. FHWA BUILD Grant recipient. Administered By: MaineDOTTotal Project Estimate: $9,214,000Program Manager: Brad FoleyPhone: 624-3480

On Time EAST MACHIAS, ROUTE 1 12/16/20 12/16/20Project Identification No: 019198.00

Page 12: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 12 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Beginning at Pope Memorial Bridge (#2682) over the East Machias River and extending north 1.80 miles.Administered By: MaineDOTTotal Project Estimate: $6,117,000Program Manager: Brad FoleyPhone: 624-3480

Page 13: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 13 of 39

Highway Light Capital Paving

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Advertised On Time

ANSON AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024539.00Description: Anson Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $2,260,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

BRUNSWICK AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024061.00Description: Brunswick Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $1,123,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

DOVER-FOXCROFT 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024559.00Description: Dover-Foxcroft Area 2020 LCP Administered By: MaineDOTTotal Project Estimate: $42,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

FARMINGTON AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024045.00Description: Rumford, Farmington, Livermore Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $1,064,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

GORHAM AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024055.00Description: Gorham Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $1,338,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

GREENVILLE AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024537.00Description: Greenville Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $428,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

HOULTON AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024073.00Description: Houlton Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $2,533,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On LIMERICK AREA 2020 LCP 03/04/20 03/04/20 03/04/20

Page 14: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 14 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Time Project Identification No: 024053.00Description: Limerick Area 2020 LCP Administered By: MaineDOTTotal Project Estimate: $1,196,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

MADISON AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024541.00Description: Madison Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $1,224,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

MEDWAY AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024069.00Description: Medway Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $1,088,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

MONMOUTH AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024051.00Description: Monmouth Area 2020 LCP Administered By: MaineDOTTotal Project Estimate: $2,100,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

NEWBURGH AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024049.00Description: Newburgh Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $1,239,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

ORONO AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024065.00Description: Orono Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $1,480,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

PRESQUE ISLE AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024071.00Description: Presque Isle Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $1,642,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

SOUTHWEST HARBOR AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024057.00Description: Southwest Harbor Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $2,757,000Program Manager: Brad Foley

Page 15: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 15 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Phone: 624-3480Advertised On Time

SWANVILLE AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024047.00Description: Swanville Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $1,394,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

WARREN AREA 2020 LCP 03/04/20 03/04/20 03/04/20Project Identification No: 024043.00Description: Warren Area 2020 LCPAdministered By: MaineDOTTotal Project Estimate: $2,847,000Program Manager: Brad FoleyPhone: 624-3480

Page 16: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 16 of 39

Highway Preservation Paving

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Advertised On Time

KATAHDIN SCENIC OVERLOOK 01/22/20 01/22/20 02/05/20Project Identification No: 024789.00Description: Overlook located off of I-95 Northbound.Administered By: MaineDOTTotal Project Estimate: $213,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

MEDWAY - HERSEYTOWN, INTERSTATE 95 NORTHBOUND

01/22/20 02/05/20 02/05/20

Project Identification No: 023679.00Description: Beginning 1.31 miles north of the T2 R9 NWP town line and extending north 12.93 miles to theHerseytown Twp. town line.Administered By: MaineDOTTotal Project Estimate: $6,708,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

MEDWAY, VISITOR INFORMATION CENTER, INTERSTATE 95 NB

01/22/20 01/22/20 02/05/20

Project Identification No: 024787.00Description: Visitor information center located off of I-95 Northbound.Administered By: MaineDOTTotal Project Estimate: $361,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

BIDDEFORD - ALFRED, ROUTE 111 01/29/20 02/05/20 02/05/20Project Identification No: 023511.00Description: Beginning 0.14 of a mile west of MarinerWay and extending west 0.65 of a mile. Beginning 0.04 of a mile east of Drews Mills Road and extendingwest 9.25 miles to 0.06 of a mile east of Route 202.Administered By: MaineDOTTotal Project Estimate: $4,518,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

JACKMAN, ROUTE 201 01/29/20 02/05/20 02/05/20Project Identification No: 024467.00Description: Beginning 2.34 miles north of Parlin Pond Twp. and extending northwest 4.69 miles.Administered By: MaineDOTTotal Project Estimate: $2,128,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

MARS HILL, ROUTE 1 01/29/20 01/29/20 01/29/20Project Identification No: 024145.00Description: Beginning at Route 1A and extending northwest 1.57 miles.Administered By: MaineDOTTotal Project Estimate: $689,000Program Manager: Brad Foley

Page 17: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 17 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Phone: 624-3480Advertised On Time

MOOSE R-SANDY BAY TWP, RTE 201 01/29/20 02/05/20 02/05/20Project Identification No: 023685.00Description: Beginning 0.24 of a mile south of the Moose River town line and extending north 14.30 miles.Administered By: MaineDOTTotal Project Estimate: $10,819,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

PORTLAND INDIA STREET 01/29/20 01/29/20 01/29/20Project Identification No: 024037.00Description: Beginning at Congress Street and extending south 0.29 of a mile to Commercial Street.Administered By: MaineDOTTotal Project Estimate: $225,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

2020 SEALING-REGION 5 02/05/20 02/05/20 02/05/20Project Identification No: 018995.53Description: Crack Seal, Chip Seal, and Fog Seal.Administered By: MaineDOTTotal Project Estimate: $139,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

MADAWASKA, ROUTE 161 02/05/20 02/05/20 02/05/20Project Identification No: 023677.00Description: Beginning 2.04 miles northwest of the Stockholm town line and extending northwest 7.32 miles.Administered By: MaineDOTTotal Project Estimate: $3,114,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

ARGYLE - HOWLAND, INTERSTATE 95 NORTHBOUND

02/12/20 02/12/20 02/19/20

Project Identification No: 022402.00Description: Beginning 0.05 of a mile north of the Alton town line and extending north 15.54 miles.Administered By: MaineDOTTotal Project Estimate: $9,562,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

HOWLAND- T2R8 NWP, INTERSTATE 95 NB 02/12/20 02/12/20 02/19/20Project Identification No: 020245.00Description: Beginning 0.30 of a mile north of Interstate 295 on-ramp and extending north 10.96 miles.Administered By: MaineDOTTotal Project Estimate: $7,654,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

MANCHESTER, ROUTE 202 02/12/20 02/12/20 02/12/20Project Identification No: 020408.00

Page 18: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 18 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Beginning 0.15 of a mile east of the Winthrop and Manchester Town line and extending east 1.07 miles.Administered By: MaineDOTTotal Project Estimate: $1,135,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

LISBON- LEWISTON, ROUTE 196 02/19/20 03/11/20 03/11/20Project Identification No: 024479.00Description: Beginning 0.17 of a mile west of Route 9and extending northwest 7.05 miles.Administered By: MaineDOTTotal Project Estimate: $2,473,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

MADRID TWP- SANDY RIVER PLT, ROUTE 4 02/19/20 02/19/20 02/19/20Project Identification No: 024465.00Description: Beginning 0.05 of a mile east of Township E town line and extending northwest 3.58 miles.Administered By: MaineDOTTotal Project Estimate: $1,150,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

T28 MD/T22 MD, ROUTE 9 02/19/20 02/19/20 02/19/20Project Identification No: 024463.00Description: Beginning 0.52 of a mile east of Back Road and extending southeast 2.49 miles.Administered By: MaineDOTTotal Project Estimate: $777,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

TOPSHAM- LISBON, ROUTE 196 02/19/20 03/11/20 03/11/20Project Identification No: 024477.00Description: Beginning 0.18 of a mile southeast of Birch Ridge Avenue and extending northwest 5.48 miles.Administered By: MaineDOTTotal Project Estimate: $1,488,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

CARIBOU, ROUTE 1 02/26/20 02/26/20 02/26/20Project Identification No: 024459.00Description: Beginning at Route 161B and extending north 2.13 miles. Project also includes 1.03 miles on the southbound lane and two ramps off Route 1.Administered By: MaineDOTTotal Project Estimate: $1,149,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

DEXTER - SANGERVILLE, ROUTE 23 02/26/20 03/11/20 03/11/20Project Identification No: 023553.00

Page 19: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 19 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Beginning 0.46 of a mile north of Crockett Road and extending north 4.74 miles.Administered By: MaineDOTTotal Project Estimate: $2,840,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

FAIRFIELD- NORRIDGEWOCK, ROUTE 139 02/26/20 02/26/20 02/26/20Project Identification No: 024469.00Description: Beginning 2.06 miles north of Route 104and extending northwest 5.74 miles.Administered By: MaineDOTTotal Project Estimate: $1,542,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

MONTICELLO-BLAINE, ROUTE 1 02/26/20 02/26/20 02/26/20Project Identification No: 024455.00Description: Beginning 0.12 of a mile south of the Bridgewater town line and extending north 8.80 miles.Administered By: MaineDOTTotal Project Estimate: $2,446,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

CARROLL PLT-KOSSUTH TWP, ROUTE 6 03/04/20 03/04/20 03/04/20Project Identification No: 024533.00Description: Beginning at the Carrol Plt. town line and extending east 6.55 milesAdministered By: MaineDOTTotal Project Estimate: $1,520,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

DEXTER- DOVER- FOXCROFT, ROUTE 7 03/04/20 03/04/20 03/04/20Project Identification No: 024529.00Description: Beginning 0.52 of a mile north of Route 23 and extending north 5.96 miles. Beginning 0.55 of a mile north of Kinney Corner Road and extending north 1.61 miles. Administered By: MaineDOTTotal Project Estimate: $1,563,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

FRYEBURG-LOVELL, ROUTE 5 03/04/20 03/04/20 03/04/20Project Identification No: 024513.00Description: Beginning at Bog Pond Road and extending north 2.57 miles. Beginning 0.22 of a mile north of Summit Drive and extending north 2.53 miles.Beginning at Eastman Hill Road and extending north 4.53 miles.Administered By: MaineDOTTotal Project Estimate: $1,588,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

KENNEBUNK, ROUTE 35 03/04/20 03/04/20 03/04/20Project Identification No: 024509.00

Page 20: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 20 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Beginning at Route 1 and extending north 0.50 of a mile, including the roundabout. Administered By: MaineDOTTotal Project Estimate: $236,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

KOSSUTH TWP- TOPSFIELD, ROUTE 6 03/04/20 03/04/20 03/04/20Project Identification No: 024535.00Description: Beginning 0.41 of a mile west of the Topsfield town line and extending east 0.95 of a mile.Administered By: MaineDOTTotal Project Estimate: $283,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

LIMERICK, ROUTE 11 03/04/20 03/04/20 03/04/20Project Identification No: 024511.00Description: Beginning at Route 5 and extending east 0.96 of a mile.Administered By: MaineDOTTotal Project Estimate: $245,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

LONG POND TWP-TAUNTON & RAYNHAM ACADEMY, ROUTE 6

03/04/20 03/04/20 03/04/20

Project Identification No: 024527.00Description: Beginning 4.00 miles east of the Jackman town line and extending east 10.54 miles.Administered By: MaineDOTTotal Project Estimate: $2,795,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

OWLS HEAD-SOUTH THOMASTON, ROUTE 73 03/04/20 03/04/20 03/04/20Project Identification No: 024523.00Description: Beginning 0.05 of a mile south of the Rockland town line and extending south 2.36 miles.Administered By: MaineDOTTotal Project Estimate: $477,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

ST. GEORGE-THOMASTON, ROUTE 131 03/04/20 03/04/20 03/04/20Project Identification No: 024525.00Description: Beginning at Port Clyde Road and extending northeast 9.84 miles. Including 0.03 of a mile on High Street from Route 131 north to Route 1.Administered By: MaineDOTTotal Project Estimate: $1,662,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

STETSON- LEVANT, ROUTE 222 03/04/20 03/04/20 03/04/20Project Identification No: 024531.00Description: Beginning 0.13 of a mile east of Cross Road and extending east 6.05 miles.Administered By: MaineDOTTotal Project Estimate: $1,065,000

Page 21: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 21 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

BIDDEFORD, PRECOURT STREET 03/11/20 03/11/20 03/11/20Project Identification No: 023977.00Description: Beginning at Route 1 and extending southeast 0.32 of a mile to Landry Street. PACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $209,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

BLUE HILL, ROUTE 15 03/11/20 03/25/20 03/25/20Project Identification No: 024127.00Description: Beginning at Main Street and extending north 4.38 miles.Administered By: MaineDOTTotal Project Estimate: $1,781,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

CHINA-WINSLOW, ROUTE 137 03/11/20 03/11/20 03/11/20Project Identification No: 023543.00Description: Beginning at Route 202 and extending west 6.14 miles to Route 137B. Then extending north 1.04 miles to Route 201.Administered By: MaineDOTTotal Project Estimate: $3,202,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

SACO, MAPLE STREET 03/11/20 03/11/20 03/11/20Project Identification No: 023985.00Description: Beginning at Lincoln Street and extending northeast 0.37 of a mile to Bradley Street. PACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $276,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

STANDISH- PARSONSFIELD, ROUTE 25 03/11/20 03/25/20 03/25/20Project Identification No: 024483.00Description: Beginning 0.07 of a mile west of Route 35 and extending west 2.05 miles. Beginning 0.03 of amile west of the Standish town line and extending west 9.12 miles. Beginning at Sokokis Trail and extending west 4.06 miles.Administered By: MaineDOTTotal Project Estimate: $3,404,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

BELFAST- SEARSPORT, ROUTE 1 03/18/20 03/25/20 03/25/20Project Identification No: 024453.00

Page 22: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 22 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Beginning 0.02 of a mile south of the Northport town line and extending north 3.76 miles, including the four ramps. Then beginning 0.13 of a mile west of Route 141 and extending east 4.57 miles,including Veterans Memorial Bridge (#5750).Administered By: MaineDOTTotal Project Estimate: $2,537,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

DENNYSVILLE-PERRY, ROUTE 1 03/18/20 03/25/20 03/25/20Project Identification No: 024481.00Description: Beginning 0.11 of a mile north of Shipyard Road and extending north 7.71 milesAdministered By: MaineDOTTotal Project Estimate: $2,504,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

PERRY- ROBBINSTON, ROUTE 1 03/18/20 03/25/20 03/25/20Project Identification No: 024457.00Description: Beginning 0.16 of a mile north of Shore Road and extending north 8.31 miles.Administered By: MaineDOTTotal Project Estimate: $2,171,000Program Manager: Brad FoleyPhone: 624-3480

On Time PORTLAND, RIVERSIDE STREET 03/18/20 04/01/20Project Identification No: 023711.00Description: Beginning 0.11 of a mile north of WarrenAvenue and extending north 0.97 of a mile.Administered By: MaineDOTTotal Project Estimate: $714,000Program Manager: Brad FoleyPhone: 624-3480

On Time PORTLAND, WASHINGTON AVE 03/18/20 04/08/20Project Identification No: 022452.00Description: Beginning at Reagan Lane and extending northwest 0.75 of a mile to Riverside Street.PACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $656,000Program Manager: Brad FoleyPhone: 624-3480

On Time PORTLAND-WESTBROOK, ROUTE 302 03/18/20 04/01/20Project Identification No: 023721.00Description: Beginning 0.02 of a mile west of Riverside Street and extending north 1.20 miles to 0.03 of a mile west of Chase Hill Drive.Administered By: MaineDOTTotal Project Estimate: $819,000Program Manager: Brad FoleyPhone: 624-3480

Removed from schedule

SCARBOROUGH, PAYNE ROAD 03/18/20Project Identification No: 023983.00

Page 23: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 23 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Beginning at Mussey Road and extending north 0.33 of a mile to Gorham Road. PACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $6,000Program Manager: Brad FoleyPhone: 624-3480

On Time SOUTH PORTLAND, BROADWAY 03/18/20 04/08/20Project Identification No: 023757.00Description: Beginning 0.04 of a mile east of the Scarborough town line and extending east 0.85 of a mile. Broadway West: Beginning 0.09 of a mile west of Sokokis Street and extending west 0.22 of a mile.Administered By: MaineDOTTotal Project Estimate: $583,000Program Manager: Brad FoleyPhone: 624-3480

On Time SOUTH PORTLAND, ROUTE 1 03/18/20 04/08/20Project Identification No: 024157.00Description: Beginning 0.18 of a mile north of Skillings Street and extending north 0.59 of a mile. Route 1S: Beginning 0.04 of a mile north of Billy Vachon Drive and extending north 0.34 of a mile, including the Veterans Bridge.Administered By: MaineDOTTotal Project Estimate: $533,000Program Manager: Brad FoleyPhone: 624-3480

On Time SOUTH PORTLAND, WATERMAN DRIVE 03/18/20 04/08/20Project Identification No: 023981.00Description: Beginning at Ocean Street and extending south 0.49 of a mile to Broadway. PACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $438,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

T2R9 NWP- OLD TOWN, INTERSTATE 95 SB 03/18/20 03/25/20 03/25/20Project Identification No: 023681.00Description: Beginning 0.03 of a mile north of the T2 R9 NWP town line and extending south 47.43 miles.Administered By: MaineDOTTotal Project Estimate: $12,192,000Program Manager: Brad FoleyPhone: 624-3480

On Time 2020 SEALING-REGION 1 03/25/20 04/01/20Project Identification No: 018995.13Description: Crack Seal, Chip Seal, and Fog Seal.Administered By: MaineDOTTotal Project Estimate: $125,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

2020 SEALING-REGION 2 03/25/20 03/11/20 03/11/20Project Identification No: 018995.23

Page 24: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 24 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Crack Seal, Chip Seal, and Fog Seal.Administered By: MaineDOTTotal Project Estimate: $184,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

CAPE ELIZABETH,SCOTT DYER RD 03/25/20 03/25/20 03/25/20Project Identification No: 022416.00Description: Beginning at Spurwink Avenue and extending east 0.89 of a mile to Ocean House Road. PACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $351,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

FARMINGDALE, ROUTE 201 03/25/20 03/25/20 03/25/20Project Identification No: 024471.00Description: Beginning 0.03 of a mile north of the Gardiner town line and extending north 1.55 miles.Administered By: MaineDOTTotal Project Estimate: $527,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

FARMINGTON, ROUTE 4 03/25/20 03/25/20 03/25/20Project Identification No: 024461.00Description: Beginning at Anson Street and extending northwest 2.18 miles.Administered By: MaineDOTTotal Project Estimate: $572,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

WAYNE, ROUTE 133 03/25/20 03/25/20 03/25/20Project Identification No: 023789.00Description: Beginning at Old Winthrop Road and extending north 3.18 miles to Livermore Falls town line. Administered By: MaineDOTTotal Project Estimate: $1,415,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

WEST GARDINER- GARDINER, ROUTE 9 03/25/20 03/25/20 03/25/20Project Identification No: 024473.00Description: Beginning 0.07 of a mile east of Service Plaza Drive and extending east 3.16 miles.Administered By: MaineDOTTotal Project Estimate: $1,049,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

WINTHROP, ROUTE 202 03/25/20 03/25/20 03/25/20Project Identification No: 023933.10Description: Beginning 0.03 of a mile south of Annabessacook Road and extending north 1.44 miles.Administered By: MaineDOTTotal Project Estimate: $553,000Program Manager: Brad Foley

Page 25: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 25 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Phone: 624-3480On Time 2020 SEALING-REGION 4 04/01/20 04/01/20

Project Identification No: 018995.43Description: Crack Seal, Chip Seal, and Fog Seal.Administered By: MaineDOTTotal Project Estimate: $120,000Program Manager: Brad FoleyPhone: 624-3480

On Time BANGOR, MAIN STREET 04/01/20 04/01/20Project Identification No: 023519.00Description: Beginning at the Hampden town line and extending north 0.66 of a mile to Dutton Street. BACTS Sponsored.Administered By: Other AgencyTotal Project Estimate: $774,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time CRACK SEALING PROJECTS 2020 04/01/20 04/01/20Project Identification No: 024829.00Description: Crack Seal Program. PACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $50,000Program Manager: Scott BickfordPhone: 624-3480

On Time 2020 SEALING-REGION 3 04/08/20 04/08/20Project Identification No: 018995.33Description: Crack Seal, Chip Seal,Administered By: MaineDOTTotal Project Estimate: $115,000Program Manager: Brad FoleyPhone: 624-3480

Page 26: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 26 of 39

Highway Rehabilitation

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Advertised On Time

N YARMOUTH - DURHAM, ROUTE 9 03/11/20 03/11/20 03/11/20Project Identification No: 023695.10Description: Beginning at the intersection of Parsonage Road and extending north 11.89 miles to Route 136.Administered By: MaineDOTTotal Project Estimate: $2,702,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

WATERVILLE, TRAFTON ROAD 03/11/20 03/11/20 03/11/20Project Identification No: 023246.00Description: Beginning at Eight Rod Road and extending east 0.95 of a mile to Route 104.Administered By: MaineDOTTotal Project Estimate: $4,830,000Program Manager: Brad FoleyPhone: 624-3480

On Time CROSS LAKE TWP. - ST. AGATHA RT 162 04/01/20 04/01/20Project Identification No: 022496.10Description: Beginning 2.47 miles northwest of the T17 R4 WELS town line and extending southeast1 0.46 miles to 0.03 of a mile north of Route 161.Administered By: MaineDOTTotal Project Estimate: $2,621,000Program Manager: Brad FoleyPhone: 624-3480

On Time LEWISTON, RIVER RD 10/28/20 10/28/20Project Identification No: 011599.30Description: Beginning at Mount Hope Avenue and extending south 0.65 of a mile to Razel Way. ATRC sponsored.Administered By: Other AgencyTotal Project Estimate: $1,234,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time LEWISTON, STETSON ROAD 11/25/20 11/25/20Project Identification No: 022490.00Description: Beginning at Main Street and extending southeast 0.66 of a mile to College Street. ATRC Sponsored.Administered By: Other AgencyTotal Project Estimate: $918,000Program Manager: Jeffrey TweediePhone: 624-3420

Page 27: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 27 of 39

Highway Safety and Spot Improvements

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Advertised On Time

SHERMAN, INTERSTATE 95 01/22/20 01/22/20 02/05/20Project Identification No: 024221.00Description: Large Animal/Vehicle crash mitigation measures. Beginning at the T2 R9 NWP town line andextending north 28.59 miles to the Crystal town line.Administered By: MaineDOTTotal Project Estimate: $131,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

ST. FRANCIS - ALLAGASH, ROUTE 161 01/29/20 01/29/20 01/29/20Project Identification No: 017236.00Description: Beginning 0.22 of a mile west of GC Hartt Road and extending southwest 0.16 of a mile. Continuing 0.02 of a mile west of Carney Road and extending northeast 0.11 of a mile.Administered By: MaineDOTTotal Project Estimate: $8,549,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

WESTBROOK, ROUTE 25B 01/29/20 02/26/20 02/26/20Project Identification No: 018637.00Description: "Rotary" area intersections of Harnois Street/Main Street/Cumberland Street; Main Street/Warren Avenue; and Main Street/Forest Street.PACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $3,367,000Program Manager: Jeffrey TweediePhone: 624-3420

Advertised On Time

MADAWASKA LAKE,RT 161 [RAMP] 02/05/20 02/05/20 02/05/20Project Identification No: 022897.00Description: Beginning 2.06 miles north of the Stockholm town line and extending north 1.50 miles.Administered By: MaineDOTTotal Project Estimate: $247,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

INTERSTATE 295 IMPROVEMENTS 02/12/20 02/12/20 02/12/20Project Identification No: 023663.01Description: Implement Transportation System Management (TSM) actions to improve safety, reliability and level of service along the Interstate 295 Corridor between Falmouth and Topsham, with various Emergency Refuge Areas (ERA). Administered By: MaineDOTTotal Project Estimate: $2,575,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

PATTEN, ROUTE 11 02/12/20 02/13/20 02/12/20Project Identification No: 021810.00

Page 28: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 28 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Large culvert (#282919) located 0.01 of a mile south of Church Street.Administered By: MaineDOTTotal Project Estimate: $638,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

PORTLAND, CONGRESS ST 02/12/20 02/26/20 02/26/20Project Identification No: 022132.00Description: Beginning at State Street and extending northeast 0.62 of a mile to Myrtle Street. PACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $1,610,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

SEARSPORT, MT EPHRAIM RD 02/26/20 02/26/20 02/26/20Project Identification No: 023751.00Description: Large culvert (#46842) located 0.15 of amile north of Route 1.Administered By: MaineDOTTotal Project Estimate: $348,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

LEWISTON, VARIOUS INTERSECTION 03/11/20 03/11/20 03/09/20Project Identification No: 018656.00Description: Fiber optic interconnect, vehicle detection, signal upgrades, and ADA improvements atselected intersections. ATRC Sponsored.Administered By: Other AgencyTotal Project Estimate: $445,000Program Manager: Jeffrey TweediePhone: 624-3420

Advertised On Time

VASSALBORO, ROUTE 201 03/11/20 03/11/20 03/11/20Project Identification No: 023775.00Description: Large truck weigh stations.Administered By: MaineDOTTotal Project Estimate: $75,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

SANFORD, ROUTE 109-4A 03/18/20 03/18/20 03/11/20Project Identification No: 022974.00Description: Located at the intersection of Route 109and 4A.Administered By: MaineDOTTotal Project Estimate: $272,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time SANFORD, ALFRED & SCHOOL ST 04/04/20 04/04/20Project Identification No: 019001.00Description: Located at the intersection of Route 4 and School Street.Administered By: MaineDOTTotal Project Estimate: $220,000Program Manager: Brad Foley

Page 29: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 29 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Phone: 624-3480On Time BREWER, WILSON STREET 04/08/20 04/08/20

Project Identification No: 023575.00Description: Located at the intersection of Wilson Street and Dirigo Drive. BACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $186,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time HERMON, COLDBROOK ROAD 04/08/20 04/08/20Project Identification No: 022877.00Description: Located at the intersection of Coldbrook Road, Odlin Road and Emerson Mill Road. BACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $323,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time WATERFORD, RTE 118, LC940780 04/15/20 04/15/20Project Identification No: 021838.00Description: Large culvert (#940780) located 0.20 of a mile west of Hunts Corner Road.Administered By: MaineDOTTotal Project Estimate: $356,000Program Manager: Brad FoleyPhone: 624-3480

On Time SANFRD-ALFD, LARGE CULV 910881 04/22/20 04/22/20Project Identification No: 021823.00Description: Large culvert (#910881) located on the Alfred-Sanford town line.Administered By: MaineDOTTotal Project Estimate: $776,000Program Manager: Brad FoleyPhone: 624-3480

On Time COLUMBIA, LARGE CULV XC-269581 04/29/20 04/29/20Project Identification No: 021772.00Description: Large culvert (#269581) located 0.35 of a mile southwest of the Columbia Falls town line.Administered By: MaineDOTTotal Project Estimate: $833,000Program Manager: Brad FoleyPhone: 624-3480

On Time STOCKTON SPRINGS ROUTE 1 94441 04/29/20 04/29/20Project Identification No: 021831.00Description: Large culvert (#94441) located 0.09 of amile north of Muskrat Farm Road.Administered By: MaineDOTTotal Project Estimate: $1,433,000Program Manager: Brad FoleyPhone: 624-3480

On Time HOULTON, SMYRNA STREET SIGNAL 05/13/20 05/13/20Project Identification No: 022885.00

Page 30: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 30 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Located at the intersection of Smyrna Road and North Street.Administered By: MaineDOTTotal Project Estimate: $396,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time GORHAM, LARGE CULV 47422 05/27/20 05/27/20Project Identification No: 018821.00Description: Large culvert (#47422) located 0.41 of amile north of State Street.Administered By: MaineDOTTotal Project Estimate: $2,026,000Program Manager: Brad FoleyPhone: 624-3480

On Time MACHIASPORT, LARGE CULV 146244 06/03/20 06/03/20Project Identification No: 018834.00Description: Large culvert (#146244) located 0.42 of a mile north of Base Road.Administered By: MaineDOTTotal Project Estimate: $479,000Program Manager: Brad FoleyPhone: 624-3480

On Time SOUTH PORTLAND, BROADWAY 06/03/20 06/03/20Project Identification No: 022136.00Description: Located at the intersection of Broadway and Evans Street, and the intersection of Broadway and Lincoln Street. PACTS Sponsored.Administered By: Other AgencyTotal Project Estimate: $381,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time YORK, ROUTE 1 06/03/20 06/03/20Project Identification No: 020899.00Description: Located at the intersection of Route 1 and New Connector Road. KACTS Sponsored.Administered By: Other AgencyTotal Project Estimate: $838,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time CAMDEN, ROUTE 1 [RAMP] 06/10/20 06/10/20Project Identification No: 021771.00Description: Beginning at Union Street and extendingnorth 0.25 of a mile.Administered By: MaineDOTTotal Project Estimate: $686,000Program Manager: Brad FoleyPhone: 624-3480

On Time WINDHAM, ROUTE 202 06/17/20 06/17/20Project Identification No: 023801.00Description: Installation of traffic signal at the intersection of Route 202 and Falmouth Road. Administered By: MaineDOTTotal Project Estimate: $401,000Program Manager: Jeffrey Tweedie

Page 31: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 31 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Phone: 624-3420On Time 2020 STATEWIDE RUMBLE STRIPS 06/24/20 06/24/20

Project Identification No: 023761.00Description: New and replacement rumble strip program.Administered By: MaineDOTTotal Project Estimate: $700,000Program Manager: Brad FoleyPhone: 624-3480

On Time HERMON, ROUTE 2 06/24/20 06/24/20Project Identification No: 022879.00Description: Located at the intersection of Route 2 and Annis Road.Administered By: MaineDOTTotal Project Estimate: $1,126,000Program Manager: Brad FoleyPhone: 624-3480

On Time STATEWIDE, RUMBLE STRIPS 06/24/20 06/24/20Project Identification No: 024255.00Description: Rumble strips and other safety improvements on curves.Administered By: MaineDOTTotal Project Estimate: $330,000Program Manager: Brad FoleyPhone: 624-3480

On Time EAGLE LAKE SLY BROOK ROAD 07/15/20 07/15/20Project Identification No: 022853.00Description: Cross culvert (#180749) located 1.65 miles south of the Wallagrass town line.Administered By: MaineDOTTotal Project Estimate: $506,000Program Manager: Brad FoleyPhone: 624-3480

On Time AUBURN, MAIN ST 07/22/20 07/29/20Project Identification No: 020894.00Description: Located at the intersections of AcademyStreet and Main Street; Elm Street and Main Street; Minot Avenue and Elm Street; and Minot Avenue and High Street. ATRC Sponsored.Administered By: MaineDOTTotal Project Estimate: $941,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time SOUTH PORTLAND, ROUTE 77 08/12/20 08/12/20Project Identification No: 018665.00Description: Multifaceted approach to corridor improvements to address traffic, safety, and bicycle/pedestrian needs and deficiencies on/off Route 77. PACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $533,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time CANTON, ROUTE 140 08/19/20 08/05/20

Page 32: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 32 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Project Identification No: 024083.00Description: Beginning 0.45 of a mile east of Canton Point Road and extending west 0.25 of a mile.Administered By: MaineDOTTotal Project Estimate: $2,318,000Program Manager: Brad FoleyPhone: 624-3480

On Time EDGECOMB, EDDY ROAD [RAMP] 09/16/20 09/16/20Project Identification No: 023587.00Description: Located 0.49 of a mile north of Clifford Road and extending west 0.05 of a mile.

Administered By: MaineDOTTotal Project Estimate: $166,000Program Manager: Brad FoleyPhone: 624-3480

On Time EDGECOMB, EDDY ROAD [RAMP] 09/16/20 09/16/20Project Identification No: 023585.00Description: Located 0.16 of a mile north of Clifford Road and extending north 0.02 of a mile.

Administered By: MaineDOTTotal Project Estimate: $143,000Program Manager: Brad FoleyPhone: 624-3480

On Time EDGECOMB, ROUTE 1 09/16/20 09/16/20Project Identification No: 021783.00Description: Located at the intersection of Route 1 and Route 27.Administered By: MaineDOTTotal Project Estimate: $2,685,000Program Manager: Brad FoleyPhone: 624-3480

On Time LEWISTON, RIVER ROAD 10/28/20 10/28/20Project Identification No: 022390.00Description: Beginning at Alfred A. Plourde Parkway and extending north 0.66 of a mile to Razel Way. ATRC Sponsored.Administered By: Other AgencyTotal Project Estimate: $1,526,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time WELLS, FURBISH ROAD (FLAP) 11/11/20 11/11/20Project Identification No: 023913.10Description: Improvements to Furbish Road within the Rachel Carson National Wildlife Refuge. Federal Lands Access Program.Administered By: Other AgencyTotal Project Estimate: $464,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time PORTLAND, ROUTE 9/22 11/18/20 11/18/20Project Identification No: 018664.00

Page 33: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 33 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Connection between Congress Street signals via overhead hardwire to existing signals on Brighton Avenue at Stevens Avenue intersection and the city's streetwise Advanced Traffic Management System (ATMS). PACTS Sponsored.Administered By: Other AgencyTotal Project Estimate: $696,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time YORK, ROUTE 1A 11/18/20 11/18/20Project Identification No: 021651.00Description: Beginning 0.07 of a mile north of Lindsay Road and extending south 0.23 of a mile. Beginning at Route 1A and extending northeast 0.17 of a mile.Administered By: Other AgencyTotal Project Estimate: $3,235,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time STATEWIDE, ADVANCED TRAFFIC SIGNAL UPGRADES (BUILD GRANT)

12/02/20 12/02/20

Project Identification No: 024301.00Description: Design and replacement of signals with Advanced Transportation Controller (ATC) capabilitiesat various intersections located around the state to address pedestrian, ADA, vehicle operational and mobility deficiencies. FHWA BUILD Grant recipient.Administered By: MaineDOTTotal Project Estimate: $23,490,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time STOCKTON SPRINGS, ROUTE 1A 12/09/20 12/09/20Project Identification No: 024285.00Description: Large culvert (#94454) located 0.27 of amile south of Blueberry Lane.Administered By: MaineDOTTotal Project Estimate: $896,000Program Manager: Brad FoleyPhone: 624-3480

On Time STATEWIDE, ANIMAL WARNING SIGNS 12/23/20 12/23/20Project Identification No: 024223.00Description: Large Animal Warning sign updates/additions.Administered By: MaineDOTTotal Project Estimate: $57,000Program Manager: Brad FoleyPhone: 624-3480

On Time REGION 3,4, AND 5, LARGE ANIMAL HIGH CRASHFREQUENCY LOCATIONS

12/30/20 12/30/20

Project Identification No: 024219.00Description: Mitigate Large Animal-Vehicle crashes at select high crash frequency locations.Administered By: MaineDOTTotal Project Estimate: $12,000Program Manager: Brad Foley

Page 34: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 34 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Phone: 624-3480

Page 35: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 35 of 39

Multimodal

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Advertised On Time

TREMONT, SHIP 01/08/20 01/08/20 01/03/20Project Identification No: 023018.00Description: Replace stingers, pilings, decking, installbracing and shore up municipal pier. Located at the end of Rice Road.Administered By: Other AgencyTotal Project Estimate: $237,000Program Manager: Jeffrey TweediePhone: 624-3420

Advertised On Time

BANGOR, SYLVAN TO STILLWATER 01/22/20 01/22/20 01/15/20Project Identification No: 022208.00Description: Beginning at the end of Sylvan Road and extending west 0.39 of a mile to Stillwater Avenue. Administered By: Other AgencyTotal Project Estimate: $525,000Program Manager: Jeffrey TweediePhone: 624-3420

Advertised On Time

WATERVILLE, ROUTE 104 03/11/20 03/11/20 03/11/20Project Identification No: 024099.10Description: Beginning at Dunbar Court and extending north 0.42 of a mile.Administered By: MaineDOTTotal Project Estimate: $140,000Program Manager: Brad FoleyPhone: 624-3480

Advertised On Time

RAYMOND, FERRY SERVICE ENTRANCE ROAD 03/18/20 03/18/20 03/18/20Project Identification No: 024413.00Description: Repaving the entrance to the Frye Island Ferry.Administered By: MaineDOTTotal Project Estimate: $100,000Program Manager: Jeffrey TweediePhone: 624-3420

Advertised On Time

BELFAST, SHIP 03/25/20 03/25/20 01/23/20Project Identification No: 024505.00Description: Construction of float system, located on Main Street.Administered By: Other AgencyTotal Project Estimate: $43,000Program Manager: Jeffrey TweediePhone: 624-3420

Advertised On Time

SORRENTO, SHIP 03/25/20 02/26/20 02/26/20Project Identification No: 023088.00Description: Installing seven new floats and seven new pilings. Located 0.06 of a mile southeast of Main Street.Administered By: Other AgencyTotal Project Estimate: $64,000Program Manager: Jeffrey TweediePhone: 624-3420

Page 36: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 36 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

On Time RANGELEY, SIDEWALK 04/29/20 04/29/20Project Identification No: 022220.00Description: Beginning on the west side of Main Street at the Scenic Overlook, and extending north 0.30 of a mile to the existing sidewalk that ends just north of Grandview Avenue.Administered By: Other AgencyTotal Project Estimate: $791,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time WINTHROP, SIDEWALKS 05/13/20 05/13/20Project Identification No: 022222.00Description: Beginning 0.17 of a mile west of the southbound exit of Route 202 and extending west 0.10 of a mile to Metcalf Road. Continuing at Depot Street and extending west 0.03 of a mile to Route 41.Administered By: MaineDOTTotal Project Estimate: $416,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time WINDHAM, ROUTE 35 SIDEWALK 05/20/20 05/20/20Project Identification No: 022166.00Description: Beginning at Basin Road and extending east 0.36 of a mile to Route 302. PACTS Sponsored.Administered By: Other AgencyTotal Project Estimate: $460,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time BANGOR, HOGAN ROAD SIDEWALK 05/27/20 05/27/20Project Identification No: 024313.00Description: Beginning 0.02 of a mile north of HaskellRoad and extending south 0.51 of a mile. Then beginning 0.01 of a mile east of Hogan Road and extending 0.20 of a mile southwest on Mt. Hope Avenue.Administered By: Other AgencyTotal Project Estimate: $353,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time BRUNSWICK, INTERMODAL CENTER 05/27/20 05/27/20Project Identification No: 023921.00Description: Located 0.07 of a mile east of Spring Street.Administered By: Other AgencyTotal Project Estimate: $807,000Program Manager: Nathaniel BenoitPhone: 624-3420

Advertised On Time

CASCO BAY ISLAND CAPITAL IMPROVEMENTS 06/03/20 03/11/20 03/11/20Project Identification No: 022014.00Description: Chebeague Island, Little Diamond, Great Diamond, Long Island and Peaks Island Ferry Facilities.Administered By: MaineDOTTotal Project Estimate: $794,000

Page 37: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 37 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Program Manager: Jeffrey TweediePhone: 624-3420

On Time BUCKSPORT, SHIP 06/10/20 06/10/20Project Identification No: 023086.00Description: Replacement of the fuel system at the Town Marina.Administered By: Other AgencyTotal Project Estimate: $60,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time CAMDEN, MULTIPLE SIDEWALK IMPS 06/10/20 06/10/20Project Identification No: 023539.00Description: Pedestrian facility improvements along Route 1, Route 52, Chestnut Street, Bayview Street, and Mechanic Street.Administered By: MaineDOTTotal Project Estimate: $614,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time S. PORTLAND-SCARBOROUGH, EASTERN TRAIL 06/17/20 06/17/20Project Identification No: 019426.00Description: Beginning at Wainright Field in South Portland and extending south 0.80 of a mile to Pleasant Hill Road in Scarborough. Administered By: Other AgencyTotal Project Estimate: $1,186,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time SCARBOROUGH, EASTERN TRAIL 06/17/20 06/17/20Project Identification No: 019426.10Description: Eastern Trail bicycle and pedestrian connection. Beginning at Nonesuch River and extending 0.60 of a mile to Pleasant Hill Road.Administered By: Other AgencyTotal Project Estimate: $4,751,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time BASS HBR, DOLPHIN, WALKWAY,WAV 08/05/20 08/05/20Project Identification No: 023476.00Description: Install south side dolphin, walkway, and wave fence.Administered By: MaineDOTTotal Project Estimate: $1,895,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time FRENCHBORO, NEW DOLPHIN 08/05/20 08/05/20Project Identification No: 022202.00Description: Construction of new Frenchboro dolphin.Administered By: MaineDOTTotal Project Estimate: $1,510,000Program Manager: Nathaniel BenoitPhone: 624-3420

Advertised On Time

STONINGTON, SHIP 08/05/20 04/08/20 03/13/20Project Identification No: 024507.00

Page 38: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 38 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Description: Expansion of the west side of the Stonington Fish Pier to allow for additional parking and a wider area for trucks to turn. Small extension of the Fish Pier and construction of a retaining wall.Administered By: Other AgencyTotal Project Estimate: $130,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time SWANS ISL DOLPHINS,WALKWAY,FEN 08/05/20 08/05/20Project Identification No: 023480.00Description: Build two dolphins, walkways and wave fence.Administered By: MaineDOTTotal Project Estimate: $3,010,000Program Manager: Nathaniel BenoitPhone: 624-3420

On Time CAMDEN, WASHINGTON STREET SIDE 08/12/20 08/12/20Project Identification No: 019400.00Description: Beginning at Matthew John Avenue and extending north 0.30 of a mile.

Administered By: Other AgencyTotal Project Estimate: $442,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time CAMDEN-ROCKPORT, SIDEWALK 08/12/20 08/12/20Project Identification No: 018880.00Description: Beginning at Quarry Hill Road in Camden and extending south 0.36 of a mile.Administered By: MaineDOTTotal Project Estimate: $1,013,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time BATH, SIDEWALKS 08/19/20 08/19/20Project Identification No: 021665.00Description: Beginning at Crawford Drive and extending south 0.41 of a mile, plus 0.02 of a mile for divided highway. Then beginning at Oak Grove Avenue and extending west 0.15 of a mile to Old Brunswick Road.Administered By: Other AgencyTotal Project Estimate: $855,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time ROCKLAND, SHIP 09/23/20 09/23/20Project Identification No: 023000.00Description: Located at the intersection of Weeks Street and Commercial Street.Administered By: Other AgencyTotal Project Estimate: $500,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time WELLS, HARBOR ROAD (FLAP) 11/11/20 11/11/20

Page 39: MaineDOT Construction Advertisement Schedule Status Report · MaineDOT Construction Advertisement Schedule Status Report This report was lasted refreshed on 03/16/2020. The projects

Page 39 of 39

Change StatusLocation/Title

Plan Advertise

Date

Current Forecast Advertise

Date

Actual Advertise

Date

Project Identification No: 023913.00Description: Improvements to Harbor Road within theRachel Carson National Wildlife Refuge. Improvements to include sidewalks, bicycle lanes, andstreetscape improvements. Federal Lands Access Program.Administered By: Other AgencyTotal Project Estimate: $976,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time SOUTHWEST HARBOR, SIDEWALK 11/18/20 11/18/20Project Identification No: 022204.00Description: Located on the west side of Main Street . Beginning at Apple Lane and extending 0.20 of a mile.Administered By: Other AgencyTotal Project Estimate: $1,326,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time SWAN'S ISLAND FERRY 11/18/20 11/18/20Project Identification No: 022194.00Description: New ferry for the Maine State Ferry Service serving Swan's Island. Propulsion system yetto be determined.Administered By: MaineDOTTotal Project Estimate: $12,100,000Program Manager: Jeffrey TweediePhone: 624-3420

On Time SOUTH PORTLAND, MULTI USE PATH 12/02/20 12/02/20Project Identification No: 022138.00Description: Multiuse path extension. Beginning 350 feet north of the Broadway intersection, including a 200-foot path connection to Cash Street. Signal upgrades on Route 1 at Broadway and Rumery Streetto facilitate pedestrian movements. PACTS Sponsored.Administered By: MaineDOTTotal Project Estimate: $633,000Program Manager: Jeffrey TweediePhone: 624-3420