mainstreaming drrm and cca in comprehensive land use ......mainstreaming drrm and cca in...
TRANSCRIPT
Mainstreaming DRRM and CCA in Comprehensive Land Use Plan:
THE SANTA ROSA EXPERIENCE
Erlinda Carrasco-Creencia, EnP.City-ENRO
6th Asia Pacific Climate Change Adaptation Forum17-19 October 2018
Asian Development Bank
1989 2004 2005 2008 2012 2015 2016 2017
11 Million
625 Million838 Million
1.06 Billion
2 Billion 2.1 Billion2.3 Billion
3 Billion
DEVELOPMENTAL CHALLENGESFLOODING
AIR POLLUTION AND GHG EMISSIONS SOLID WASTE
WATER POLLUTION
AND SANITATION ISSUES
GROUNDWATERSCARCITY
CLUP 2018-2026 Section 2: Vision and CCA/DRR Mainstreaming
Exposure to Hazards
Vulnerability Assessment to Disaster Risks
Adaptive Capacity to Disaster Risk Vulnerability
Collaboration of Local Government Units within the Sta. Rosa Watershed
Creation of the Sta. Rosa Watershed Management Council
Santa Rosa Central Command and Evacuation Center
Formulation of an Integrated Water Resources Management Action Plan for the Santa Rosa Sub-watershed.
• Formulation of a Policy For Regulating Groundwater Extraction
• Small Water Impounding System (SWIS) for flood control (includes construction of detention ponds in strategic locations, in Brgy. Sto. Domingo (upstream), MacablingMidstream and Tagapo (downstream) to improve waterways
Formulation of the City Green Building Code
• Clean Air Certification Program with technical assistance from Clean Air Asia
• Clean Energy Investment Accelerator Program (CEIA) led by World Resources Institute (WRI), Allotrope Partners, US National Renewable Energy Laboratory (NREL), supported by the German Government, in partnership with ICLEI Southeast Asia
Other Pipeline/Proposed Projects for CCA/CCM
THANK YOU!