maintainability and customer service operations improved organization for better product design...
TRANSCRIPT
![Page 1: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/1.jpg)
Maintainability and Customer Service Operations
Improved organization for better product design
ARW2011 Cape Town, South Africa - April 2011
C. SobletL. Meideros Romao
![Page 2: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/2.jpg)
© 2
00
6
2
Outline
IBA Short story of a fast growth
Customer Service Operationsorganization, processes and tools
Maintainability at IBApast/current situation
Personal questioning
« why does it seem so complicated? »
Questions and answers
![Page 3: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/3.jpg)
© 2
00
6
3
IBA
Short history…
![Page 4: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/4.jpg)
© 2
00
6
4
Ion Beam Applications
19
86
C30
90
’s
Medical imaging
Industrial irradiation
Particle Therapy
![Page 5: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/5.jpg)
© 2
00
6
The IBA Group in 2010
2,050 employees in 40 sites on 3 continents Turnover > 330 M€, growing 25% per year More than 300 systems (200 Cyclotrons) installed Not anymore a cyclotron company, but a company focused on
the fight against cancer: Diagnostic: molecular imaging Therapy: Particle therapy & dosimetry
2006
![Page 6: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/6.jpg)
© 2
00
6
Particle TherapyPharmaceuticalsRadiopharmaceuticals Molecular Imaging Nuclear Medicine
(diagnostics & therapy )
Bioassays In vitro medical
diagnostics Drug screening
Proton Therapy is increasingly considered as the ultimate radiotherapy for cancer due to its superior dose distribution
DosimetryDosimetry equipment to measure radiation dose for Radiotherapy Radiodiagnostics
Accelerators
Cyclotrons To produces Radioisotopes
E-beam / X-rays To irradiate / treat many
industrial products
IBA Today: Centering on the fight against cancer
6
![Page 7: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/7.jpg)
© 2
00
6
7
IBA
Medical imaging
![Page 8: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/8.jpg)
© 2
00
6
The Cyclone 30
The cyclotron used by all radiopharmaceutical producers8
![Page 9: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/9.jpg)
© 2
00
6
9
IBA
Particle Therapy
![Page 10: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/10.jpg)
© 2
00
6
NCC, Kashiwa, Japan
MGH, Boston
MPRI, Indiana
UFPTI, Jacksonville, FL
Beijing, China
KNCC, Ilsan, Korea
WPE, Essen, Germany
22 IBA PT customers in the world
Orsay, France
ProCure 2, Chicago
Hampton Univ., Virginia
Wanjie, China
U.Penn, PhiladelphiaProCure 1Oklahoma City
ProCure 4, Seattle
PTC Czech,Prague
ProVisionKnoxville, Tennessee
Trento,Italy
NCRH, Cracow,Poland
Skandion,Sweden
Procure 3,Somerset, NJ Dimitrovgrad,
Russia
Carl Gustav Carus,Dresden, Germany
10
![Page 11: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/11.jpg)
© 2
00
6
11
A complete PT center
![Page 12: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/12.jpg)
© 2
00
6
More ExpertiseIBA PT subsystems : the Cyclone 235
The 230MeV cyclotron. WPE, Essen, 2010.
12
![Page 13: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/13.jpg)
© 2
00
6
More ExpertiseIBA PT subsystems : the beam transport lines.The energy selection system. Wanjie, China, 2003.
13
![Page 14: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/14.jpg)
© 2
00
6
More ExpertiseIBA PT subsystems : the beam transport lines.The energy selection system. WPE, Essen, 2010.
14
![Page 15: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/15.jpg)
© 2
00
6
More ExpertiseIBA PT subsystems : the treatment rooms.
The isocentric gantry.
15
![Page 16: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/16.jpg)
© 2
00
6
An IBA proton therapy treatment room
16
![Page 17: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/17.jpg)
© 2
00
6
17
IBA
Industrial applications
![Page 18: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/18.jpg)
© 2
00
6
18
Rhodotron
TT1000
![Page 19: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/19.jpg)
© 2
00
6
19
Industrial - Applications
SterilizationMedical Devices
FoodPasteurization
Surface Decontamination
![Page 20: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/20.jpg)
© 2
00
6
20
Industrial - Applications
Property Enhancement
![Page 21: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/21.jpg)
© 2
00
6
Customer service operations
CS
PT
Molecular+Industrial Field service engineers organized in specialized
teams (by machine type) CS leads the spare parts management
IBA store Decentralized storage location (US, ASIA, EU)
CS started and is deploying CMMS
21
![Page 22: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/22.jpg)
© 2
00
6
CS in the new structure
22
R&D reliability and maintainability improvement
Current system release
CCB
Requirement update
Maintainability team
Customer service
New system release
![Page 23: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/23.jpg)
© 2
00
6
23
IBA
Maintainability at IBA
![Page 24: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/24.jpg)
© 2
00
6
24
Maintainability?
The ability for system to be easily maintained is a characteristic coming from the
DESIGN
the sooner the requirement is put in the design loop, the better
![Page 25: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/25.jpg)
© 2
00
6
25
IBA
Maintainability, why now?
![Page 26: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/26.jpg)
© 2
00
6
Quality improvement
In 2010, organization was made up of 3 main BU’s : Particle Therapy Molecular Industrial
In 2011, new organization: BU’s were merged.
Focus has been placed on improving product quality.
Maintainability department was created to set processes and build bridges between R&D, production and customer service.
26
![Page 27: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/27.jpg)
© 2
00
6
Mr Eichhorn’s question…
« Is there a reliability management needed? »
I hope so…
27
![Page 28: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/28.jpg)
© 2
00
6
Mr Eichhorn’s question…
28
![Page 29: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/29.jpg)
© 2
00
6
Quality, new concept?
From the beginning, there were many initiatives for quality improvement.
Small autonomous teams Fast Reactive Creative Wheel re-invented too often (“Not invented here” syndrome) No parts standardization
The idea is to merge, organize them and build on experience by focusing on training and documentation.
29
![Page 30: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/30.jpg)
© 2
00
6
30
IBA
Improve maintainability,
how?
![Page 31: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/31.jpg)
© 2
00
6
R&D « tools »
Continuous improvement Change Control Board
Site bugs Development bugs Any other subject impacting the product
System Owner Accountable for his product Ensures coherent design Leverages on extensive field experience and broad
technical knowledge
31
![Page 32: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/32.jpg)
© 2
00
6
R&D tools: Design process?
Classical V Design phase is a good start but…
How to deal with long lead items?
How to deal with changing requirements?
Iterative process
Design reviews at various stage of product design and development
32
![Page 33: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/33.jpg)
© 2
00
6
33
R&D tools: Designing process
Customer
Offering Developement GroupHigh level requirements
Product Engineering(GRA)Medium level requirements
R&D component teams (system owners)FMECA
Component level requirements
Engineering (PS, Water cooling, mechanical design)
Design Iterations
Product release
Sub-contracted design
Maintainability
• Share info during the product design between people
• Share info between products
![Page 34: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/34.jpg)
© 2
00
6
R&D tools: Recommended Spare Parts List
Creation based on designers experienceRmk: 40.000 lines in a PT product Bill of Material
But
Not related to system uptime huge cost with no guarantee of covering all the need
34
![Page 35: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/35.jpg)
© 2
00
6
R&D tools: Rspl updates
35
Draft
![Page 36: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/36.jpg)
© 2
00
6
RSPL
FRU concept
36
![Page 37: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/37.jpg)
© 2
00
6
37
Low Level RF Rack & Components
YES: LLRF is a FRU
We replace the complete rack in case of problem on site in the way to reduce the downtime.
YES: Board is a FRU
We replace the electronic board on site in the way to reduce the downtime.
NO: This part is only used to repair.
Maintain the board in the Repair workshop only, in the way to reduce the Mean Time to Repair.
YES: Fuse is a consumable
We replace the fuse. This parts should be located on site in the way to reduce the downtime.
Time to Fix: 3hrs (validation)
Cost: 11k€
Time to Fix: 4hrs
Cost: 2k€
Board compatibility ?
Time to Fix: 5min.
Cost: 1€
RepairBusiness
Other criteria:
Cost of transport ?
![Page 38: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/38.jpg)
© 2
00
6
Criterion to be added to or removed from the list?
Many parameters MTBF Lead time Severity (all system, just a room) Cost (storage, transport) Previous part consumption MTTR Skill needed to replace the part
Set a simple computation formula is nearly impossible
the board goes through the parameters list and makes a ponderate decision
38
![Page 39: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/39.jpg)
© 2
00
6
39
Maintainability at IBA
Goals Summary Keep flexibility Selection of standard parts Selection of parts that do not need high skills to maintain Go to modular system (e.g. Modular PS, Modular WC manifolds) Ensure accessibility for maintenance (Standards are part of the
requirement) As few different bolt size as possible (FSE won’t go in the vault with a
complete toolbox) Spare part selection Test procedures Standard assembly procedures HW release upgrade
must be a design review output (Check list to help specialists)
![Page 40: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/40.jpg)
© 2
00
6
Future
Target for new projects Reduce footprint
less accessibility for maintenance
reliability must be higher to decrease failure probability
Go for operator less Remote service Data mining
How? By closing the loop between CS and R&D
40
![Page 41: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/41.jpg)
© 2
00
6
Why is it so complicated?
41
![Page 42: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/42.jpg)
© 2
00
6
Processes, processes…
42
Device
Measurements
Installation people
User
Device owner
Device
Device
System
Maintenance people
![Page 43: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/43.jpg)
© 2
00
6
Why is it so complicated?
Economists very often freeze all variables to observe only one…
We can’t
Our system architecture must be as simple as possible (Standard equipement exception for IBA added value only)
43
![Page 44: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/44.jpg)
© 2
00
6
Why is it so complicated?
Skills needed
to design,
to manufacture,
to assemble,
to test,
to install,
to maintain
are very rarely in the same brain…
For each interaction, a potential communication mistake
Our process must be as simple as possible and understood by anyone
44
![Page 45: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/45.jpg)
© 2
00
6
Why is it so complicated?
Sometimes we do not have the experience to make directly the right decision (prototype) but we have to learn from that error
Document the design phase is mandatory for future improvement (Training dep., Industrialization dep.)
45
![Page 46: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/46.jpg)
© 2
00
6
Is it so complicated?
« A problem without solution is a problem which is ill-posed»
A. Einstein
« In the middle of difficulty lies opportunity. »
A. Einstein
46
![Page 47: Maintainability and Customer Service Operations Improved organization for better product design ARW2011 Cape Town, South Africa - April 2011 C. Soblet](https://reader036.vdocument.in/reader036/viewer/2022062404/5516f065550346fe558b4aa3/html5/thumbnails/47.jpg)
© 2
00
6
47
Thank you… Baie dankie vir jou gasvryheid