maintenance task railmlextension for the automain project · vossloh group employees > 4800...
TRANSCRIPT
Maintenance task railML extension for the AUTOMAIN project
Stéphane Huguet
Vossloh Cogifer – Siema applications
22nd railML conference
Zürich, 14th november 2012
• Vossloh group and Vossloh Cogifer
• The AUTOMAIN project
• Maintenance task extension for railML
Maintenance task railML extension for the AUTOMAIN project
Vossloh Group Employees > 4800Sales = 1,35 b€ (2010)
Motive Power & Components474 M€
1648 employees
Rail Infrastructure874 M€
3188 employees
104,0 M€440,0 M€ 353,0 M€ 163,0 M€
Vossloh Locomotives
Vossloh Cogifer
Vossloh Fastening Systems
Vossloh Electrical Systems
Vossloh Rail
Services81,0 M€
Vossloh Rail vehicles
207,0 M€
4
In Vossloh group since 2002
Ø Located in Villeurbanne (Lyon – France)
Ø CA 2011: 7,3 M€Ø Export > 10%
Ø 38 people
012345678
2007 2008 2009 2010 2011
SIEMA applications 100% subsidiary of Vossloh CogiferThe company
5
Outdoor Telephone Set (Postes Téléphoniques Extérieurs)
Available in wired version (high and
low impedance) and in GSM-R version. Power supply by solar panel, battery or external power supply.
Fixe version and portative version.
Digital Micro-Switch (Commutateur) or safety railway telephony
For small installation, allow GSM-R dispatcher function
Conformed to European
specifications (EIRENE)
NUMCOM product lineProducts of NUMCOM product line
► NUMCOM-3000
NUMerical switch (COMmutateur) for safty railway telephony
It’s a fully digital switch using Voice
over IP technology (VoIP) to install new generation system with nalog
railway telephone system.
► PTE ► MicroCom-3000
6
Condition monitoring system for turnout. The system use a large
range of sensor (force, displacement,
electrical, distance, vibration, temperature…) to predict statues of
the turnout.
Condition monitoring system for
track circuit. The system can detect
insulation of the track default, default of the joint, destabilize in
traction return…
PRIME product lineProducts of PRIME product line
► SIAM
Event Monitoring System (Système
Informatisé d’Aide à la
Maintenance), Based on centralization of information received
from sensors (logic, battery voltage,
voltage, …), system generate alerts and alarms.
► SURVAIG NG ► SURTRACK
SILER product lineProduct of SILER product line
► SNTI-NG
Système Normalisé de Transmission Informatique Nouvelle Génération
Data acquisition and transmission
system between a control command and a relay interlocking ( TC/TK)
.(level of safety SIL2 -CENELEC)
► MAPA
Module acquisition de position d’aiguille pour autorisation Entrée ou Sortie en gare.
acquisition of turnout position and setting of signals, allowing entrance and exit in safety from a station (level of safety SIL2 - CENELEC)
Poste de
Contrôle
Commande
Poste
d’enclenchement
à relais
Poste
d’enclenchement
à relais
Poste
d’enclenchement
à relais
SNTI-NG
(PS)
PS
SNTI-NG
(PS)
PS
SNTI-NG (PC)
PC
Terminal
technique
Autres
systèmesCSI
• Vossloh group and Vossloh Cogifer
• The AUTOMAIN project
• Maintenance task extension for railML
Maintenance task railML extension for the AUTOMAIN project
AUTOMAIN
Augmented Usage of Track by Optimisation of Maintenance, Allocation and Inspection of railway Networks
Challenge of the project :- do more effective inspection and maintenance in less time
Project goal :- reduce the possession time around 40 %
www.automain.euA Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission
AUTOMAIN
Work packages description
DemonstrationWP6Dissemination, Training and Exploitation of KnowledgeWP7Project CoordinationWP8
Automated planning and schedulingWP5
High-speed maintenanceWP4
High speed inspectionWP3
Analysis and lean maintenance optimisationWP2
Functional requirements, objective functionWP1
DescriptionWork package
AUTOMAIN
Work on WP3/WP6
MMIVossloh
SchedulingTool (WP5)
Internet
Emails, SMSTrack data
Track data
Switch data
RailML + HTTPS
RailML + HTTPS
Maintenance workers
RailML + HTTPS
RailML + HTTPS
Switch data
RailM
L +HT
TPS
InternetImport RailML files
Infrastructure managers
• Vossloh group and Vossloh Cogifer
• The AUTOMAIN project
• Maintenance task extension for railML
Maintenance task railML extension for the AUTOMAIN project
Objectives of the data schema
• AutomainML data schema :à XML format using the rules of railml.org (railML 2.1)à coded in a XSD file
• Objectives :à standard for manufacturersà covers the complete process
• Data schemaà information on the life cycle of the taskà links to the Infrastructure dataà « statuses » to understand how was managed the task
Architecture The automainml.xsd file is a copy of the railml.xsd file adding the section “maintenance”.
Details of the automainML schema
• For a sub schema, two files are used
à Maintenance.xsd which includes the element
à MaintenanceTypes.xsd which includes the types, group of attributes, list of restricted values (enums)
• The namespace used is prefixed, and the prefix used for the maintenance task is “automain”.
• The current namespace used is “http://www.automain.eu/schemas” and the three files (automain.xsd, maintenance.xsd and maintenanceTypes.xsd) are available on the web at this URL.
• To link the data from the other sub schema, use a reference (tGenericRef) and the global reference of the sub schema.
Example: in the element <maintenance> we use the attribute “infrastructureRef” to link to the infrastructure railML file.Then, in the maintenance railML file, the element <asset ref=”OSW12”> links a reference “OSW12”which is unique in the infrastructure railML file.
Maintenance task structure
Maintenance tasksTasks
List of regions of the maintenance taskRegions
List of users of the MMI for the maintenance taskUsers
List of statuses of the maintenance taskStatuses
List of risks to take into account related to the global maintenance task
Risks
Time details for the maintenance taskTime
Description of the global maintenance taskDescription
Maintenance task