TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS REFURBISHMENT AND TILING OF AN EXISTING FIBREGLASS OUTDOOR POOL

Upload: david-green

Post on 18-Jul-2015

48 views

Category:

Engineering


2 download

TRANSCRIPT

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

REFURBISHMENT AND TILING OF AN EXISTING FIBREGLASS OUTDOOR POOL

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

REMOVAL OF EXISTING FIBRERGLASS LINER AND MOSIAC TILING OF POOL, PAINTING OF CONCRETE TILE SURROUND, ACID AND HOT WASH OF EXISTING FLAGS, FITTING NEW DOSING SYSTEM, REPAIR TO PIPEWORK, NEW POOL COVER, IMPROVEMENT TO CLEAN WATER DISTRIBUTION SYSTEM

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

THE FIBREGLASS LINED POOL

THE START OF THE PROJECT

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

ALL THE EXISTING FIBREGLASS LINING (510 SQUARE METRES) HAD TO BE REMOVED – THIS WAS A PAINSTAKING PROJECT

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

SHOWN IS ONE OF OUR OPERATIVES PAINSTAKINGLY REMOVING THE GLASS LINING AND SCABBLING THE NEWLY EXPOSED WALLS TO ENSURE CORRECT THOROUGH PREPARATION

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

COMMENCEMENT OF MOSAIC TILING TO SHALLOW END

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

PREPARED DEEP END FLOOR BEING THOROUGHLY CLEANED PRIOR TO BEING TILED

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

SHOWN IS THE POOL DEEP END IN THE PROCESS OF BEING MOSAIC TILED IN “POOL BLUE”

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

ONE OF OUR OPERATIVES QUALITY CHECKING AN AREA OF POOL WHICH HAS BEEN GROUTED

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

SHOWN IS ONE OF OUR FEMALE OPERATIVES GIVING THE FINISHED SHALLOW END THE “WOMANS TOUCH” PRIOR TO POOL FILLING

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

BEFORE AND AFTER PICTURES OF SURROUND TILES

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

ACID AND HOT JET WASHING OF SURROUNDING FLAGS BEFORE AND AFTER

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

THE POOL BEING SLOWLY FILLED

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

THE FINISHED POOL DURATION APPROX 5 WEEKS FROM START TO FINISH

BEFORE AND AFTER – WHAT A TRANSFORMATION

ON TIME AND IN BUDGET!!

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

Comments made by Mr Mark Hart “Operations Manager” of the School

“Thank you very much for all you have done for us to date an excellent job, I very much look forward to working with you all again”