Making concrete cube, concrete prism and concrete cylinder
1) All the mix is placed back into the concrete mixer and mixing is started for another 1
minute
2) A cube no. 100mm is prepared, 1st layer out of 3 is filled with the concrete mix
3) Tamping rod is used and 25 times blow is applied to the 1st layer evenly
4) 2nd and 3rd layer has been filled and 25 blow is applied to each layer
5) The cube mould is then placed aside
6) After that, another 4 cube of no. 100mm, 2 no. 500 x 100 x 100 mm prism and 2 no.150
diameter x 300m height cylinder is filled with concrete mix for 1st layer out three layer
7) The cubes, prisms and cylinders mould is placed on the vibrating table as shown in
FIGURE P.6
8) The moulds containing the mix inside is vibrated and group members holds the mould to
ensure the concrete inside is vibrated uniformly
9) 2nd and 3rd layer is applied and the same process in procedure 23) is carried out
10) The excess part on top of the mould is removed using the hand float
11) The hand tempered concrete cube has been labelled as “WC” and “HT” which is Hand
tempered and is water cured
12) 3 of the cube which is vibrated using vibration table has been labelled as “WC” and
“VT” which is water cured and vibrated
13) The last cube that has been vibrated is labelled as “A” and “VT” which is air cured and
vibrated in vibrating table
14) One of the vibrated prism has been labelled as “A” and “VT” which is air cured and
vibrated and another prism is labelled as “WC” and “VT” which is water cured and
vibrated
15) Two vibrated cylinder has been labelled as “WC” and “VT”
16) All the mould has been left in open air for 24 hours before de-moulding on the next day
17) The equipment has been cleaned and placed back into proper place