„making energy efficiency investible“
TRANSCRIPT
„Making Energy Efficiency Investible“
ACE – Asset Class Energy Efficiency
Kai Schinck (DENEFF)Martin Reisinger, Diana Wang (EEP)Rüdiger Lohse (KEA)
Frankfurt, 05.12.2018
Financing EfficiencyWhat we can learn from Renewables
ACE - Asset Class Energy Efficiency | Rüdiger Lohse, KEA 2
Financing Renewables hasbecome a strong and competetive market!
Standardized due diligence process
Risks widely known Performance Data Available
Que
lle: U
mw
eltb
unde
sam
t/AG
EE S
tat
High Overhead Costs financing EE: EE measures: complex, not tangible High degree of uncertainity Unknown due diligence processes
Small- Medium Investment Small volume projects (appr. 150 k€/case) High Transaction costs for financing small
projects
Lack of Data Few performance data available for EE projects No reference data available
Competing assets more attractive
Financing Energy Efficiency Projects: Major Hurdles
ACE - Asset Class Energy Efficiency | Rüdiger Lohse, KEA 3
4
ACE: Asset Class Energy Efficiency
Mission: Provide Structures / Tools to overcome major
hurdles in financing Energy Efficiency in Germany based on the ICP methodology
Guided by Funded by
ACE Initiative – Joint Effort of more than 50 active StakeholdersDevelopping practical approaches to EE financing hurdles
ACE - Asset Class Energy Efficiency | Rüdiger Lohse, KEA 5
ACE Initiative: Three Products Developping practical approaches to EE financing hurdles
ACE - Asset Class Energy Efficiency | Rüdiger Lohse, KEA 6
Standardized Due Dilligence Tackles: Quick due diligence for EE projects Quick- analysis of EE financing project cases Simplyfied time saving approach of project finance
Best Practice Data Base Tackles: Data Issue Reference data available on project level Including Performance Data
Pooling-Plattform Tackles: Small projects / high costs issue Plattform matching financiers, project
facilitators, ESCos on the project level efficient pooling mechanisms
Standardized Due Diligence
7
Simplified Economic and Technical Assessment
Time saving (< 1 h) 6 cross cutting technologies Status: Evaluation Mockup Routine available
1. Quick evaluation of small and medium sized EE projects (< 0,5 M€/p)
2. Standardization of Input and Output Data for the business and technical KPIs
3. Dynamic business KPIs serving both loan and equity capital
4. Technical KPIsquick plausibility evaluation of potential impacts on the cash flow (baseline, savings, investment costs, availability over time, technical elegibility)
5. Keep it Simple Any kind of major divergence pulling out of EE project due diligence deep analysis (de risking clinic)
6. Self- learning systemimprovement with number of projects
EE project Due Diligence- 5 step project finance checkRequirements
ACE - Asset Class Energy Efficiency | Rüdiger Lohse, KEA 8
5 step project finance checkEE project Due Diligence
ACE - Asset Class Energy Efficiency | Rüdiger Lohse, KEA 9
Step 1: Project Framework Data
Step 2: Financial & Technical Statement Analysis (KPIs)
Step 3: Deep Risk Analysis
Step 4: Risk Management
Step 5: Risk Pricing
Minimal Requirements fullfilled?
no
KPI Analysis positive?
OPTIONAL: EE Project DE RISKING CLINIC
Bundeling Plattform
2 step Quick Analysis
5 step project finance check Result EE project Due Diligence
ACE - Asset Class Energy Efficiency | Rüdiger Lohse, KEA 10
Result: Due Diligence Check for Project Basics, Economic and Technical Parameters
11
Project Data Base Provides EE- Project Performance Data Provides first indicative information on
comparable projects Receives project performance data from
projects and bundling platform Status: Mock- Up Version available
Project Data Base: Providing data for improving KPIs in the future, credit and insurance conditions
ACE - Asset Class Energy Efficiency | Rüdiger Lohse, KEA 12
Insurer
ESCo/User
Financier
Comparative figures KPIs, credit and insurance conditions
KPIs2
3 3
4 4
51
calculates KPIs
Project data (incl. technical data*)
Credit costs and contract conditions*
Insurance costs and contract conditions*
Data base*
Model**
provides comparative
figures
KPIs
Legend:
1 ... n Steps
* Host: must be trustful (e.g. DEEP-extension)
** Model to improve better comparison of efficiency
13
Pooling Platform
Pooling PlattformMatching Projects and Finance
ACE - Asset Class Energy Efficiency | Rüdiger Lohse, KEA 14
Finance
Commercial Banks
Funds
Asset Manager
Financial Service Providers
Project Faciliation
SMEs (end costumer)
Project Facilitators
ESCos
EE Manufacturers 4.0
„Financiers will find pre- checkedEE- projects ready for bundling“.
Pooling PlatformMatching Projects and Finance
ACE - Asset Class Energy Efficiency | Rüdiger Lohse, KEA 15
Project Facilitation Financiers
Looking for Finance
Due Diligence Processaccomplished
Finance- and Riskprofile
Individual Funding
SMEs (end costumer) Project Facilitators ESCos EE Manufacturers 4.0
Commercial Banks Funds Asset Manager Financial Service
Providers
Due Dilligence, Bundling Platform and Project Database 3 ACE tools interaction
ACE - Asset Class Energy Efficiency | Rüdiger Lohse, KEA 16
Project data base
EconKPIs
Due Diligence
TecKPIs
Optional: De- Risiking Clinic
Project evaluationComparative figures
for KPIs
Performance data
Input of Performance Data improves overall data
quality.
Bundling Platform
Project Bundling and Matching
KPIs
Request/ transmission of data to forecast financing/
insurance conditions
First indication%- rate
ACE
Data base
17
ACE- Next Steps
Save the Date: 12. February 2019 Final Workshop
Deliverable: Tool Box / Website Further Funding available? ß- Version and
Roll out in 2019 (II- IV)
Get in touch with ACE: [email protected], [email protected]; [email protected]; [email protected]