malawi 2014 building progress administration block and staff toilets internally painted with pva and...
TRANSCRIPT
Malawi 2014
Building Progress
• Administration block and staff toilets internally painted with PVA and 2 topcoats
•Window frames repainted with 2 coats now glazed
Classrooms 1&2
• Re-painting all the glazed window frames with two coats of gloss and cleaning the glass
• Painted murals
Classroom 4
Cleared rubbish, swept and re-organised all the building materials (including 10 tonnes of roof timber), making room for next consignment of roof timber
Teachers Houses 1&2
• Cleared rubbish• Scraped concrete debris from
floors & walls• Swept & prepared for painting• PVA & 2 topcoats completed
in house 1• PVA completed in house 2
Builder & labourers work• Five sections of floors poured
for second school block
• Walkway between block 1 and toilet block poured
• Bricks made and 2 brick kilns built and fired
Fundraising Matters• £9125 was taken out for the
project this year.• Parachute purchased &donated to
the school• 200 book bags purchased • Personal donations given to mission
partners
Good Job done!
Time Out
Sunrise Devotions
Bible Translation Project
R&R at Lake Malawi
What Next?• Please continue to pray:• Head-teacher still needed.• Toilet block needs completing
before school can be inspected & opened
• Second block of 4 classrooms + library to be built
• 6 more teachers houses to build
Staff Team Plans
David & Pauline are still committed to lead the Malawi project forward.