BUDGET AND FINANCIAL MANAGEMENT PROJECT MANAGEMENT COURSE WRAP-UP DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment

Upload: others

Post on 20-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

BUDGET AND FINANCIAL MANAGEMENT

PROJECT MANAGEMENT COURSE WRAP-UP DECEMBER 1, 2016

Managing Effectively in Today’s Public Health Environment

Page 2: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Acknowledgements 2

TheAc'vistLabatBostonUniversitySchoolofPublicHealthistheCentralOfficeofTheNewEnglandPublicHealthTrainingCenter.ThisprojectissupportedbytheHealthResourcesandServicesAdministra'on(HRSA)oftheU.S.DepartmentofHealthandHumanServices(HHS)underUB6HP27877“RegionalPublicHealthTrainingCenterProgram”for$825,634.00with0%financedwithnongovernmentalsource.Thisinforma'onorcontentandconclusionsarethoseoftheauthorandshouldnotbeconstruedastheofficialposi'onorpolicyof,norshouldanyendorsementsbeinferredbyHRSA,HHSortheU.S.Government.

Page 3: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

T h i s c o u r s e w a s d e v e l o p e d a n d d e l i v e r e d o n D e c e m b e r 1 , 2 0 1 6

b y L u ’ A n n T h i b e a u a n d

G r a c e C l e a v e s

f o r a t r a i n i n g d e l i v e r e d b y

U n i v e r s i t y o f N e w E n g l a n d , a L o c a l P e r f o r m a n c e S i t e o f t h e N e w E n g l a n d P u b l i c

H e a l t h T r a i n i n g C e n t e r .

3333

3

Acknowledgement

Page 4: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Today’s Presenters

Lu’Ann Thibeau Manager of Finance and

Administration UNE Center for Excellence

in Health Innovation

Page 5: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Rules of engagement 5

ü  Limit use of competing technology

ü  Share the floor – be respectful ü  Ask questions at anytime ü  Protect confidentiality ü  Bring in context and reality ü  Participate actively

Page 6: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Learning outcomes � Understand the process of

building and managing proposal budgets by learning and practicing new tools

� Understand and practice the

principals and practical tools of project management

Page 7: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Agenda

Time Segment

9:oo Welcome, warm-up and setting the stage

9:15 Living on Grants – Part 1

10:30 Break

10:45 Living on Grants – Part 2

12:00 Lunch

Time Segment

12:30 Practical project management

1:15 Applying PM to planning

2:15

Closing activities Plus/Delta of course Ways to continue cohort alliance Appreciations

3:00 Adjourn

Page 8: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Warm-up Signature Strengths and Resilience

24 universal strengths found across cultures, nations, religions and politics. They are moral strengths – strengths that we value in and of themselves.

Martin Seligman, 2012

Page 9: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements
Page 10: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Signature Strengths

•  “Does this strength express who I am?” •  “Do I feel excited to display this quality?” •  “Do I feel that no one can stop me when I’m using

this strength?” •  “Do I express enthusiasm and joy when using this

strength?” •  “Do I feel invigorated by it?”

Page 11: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

P r e p a r i n g a p r o p o s a l b u d g e t c a n b e o v e r w h e l m i n g a n d i n t i m i d a t i n g w i t h o u t s o m e

b u d g e t t o o l s a n d g u i d a n c e .

T o d a y w e h o p e y o u d e v e l o p s o m e k n o w l e d g e a n d u n d e r s t a n d i n g t o c o n f i d e n t l y p r e p a r e a

b a s i c p r o p o s a l b u d g e t a n d c o m p l y w i t h g r a n t g u i d e l i n e s a f t e r i t i s a w a r d e d .

Living on Grants: Preparing and Monitoring Grant Budgets

Page 12: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Lifecycle of Budget Management

Proposal Awarded Post Award Compliance

Page 13: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Lifecycle of Budget Management

Proposal

Page 14: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Samples of FOA/RFP/RFA

�  HRSA

�  State of Maine

Page 15: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements
Page 16: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements
Page 17: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Register

Page 18: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Proposal Costs

q  Admin/Professional Salaries q  Fringe Benefits q  Project Related Supplies q  Capital Equipment (excluded from MTDC)

q  Photocopying/Printing q  Lab Supplies q  Software Licenses q  Consultants

q  Speakers/Honorariums q  Subawards (excess of $25,000 excluded from MTDC)

q  Dues and Subscriptions q  Travel & Conference/Meetings q  Functions q  Telephones q  Stipends/Fellowship q  Indirect Costs (facilities/admin/overhead)

Expenses to consider when preparing a budget:

Page 19: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Project Costs

When considering project costs, it’s best to keep in mind what costs are reasonable and what costs are necessary

Page 20: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Proposal Requirements

It is common for a request for a proposal (RFP) to have specific requirements that need to be followed such as: q  Salary/Consultant Rate Limitations q  Required FTE’s (min/max) q  Exclusion of Capital Equipment q  Details of Consultants q  Meetings q  Conferences q  Lodging/Meals/Mileage Limits

q  Limit or exclusion of Honorariums q  Food q  Stipends – Definition

Amounts % of Budget q  Limitation of Indirect Costs

Page 21: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Approved Indirect Rate

Page 22: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Remember to review the RFP a final time after the proposal budget is prepared to ensure you have followed all the

requirements and restrictions

Once the budget is final, you can prepare the detailed budget justification explaining the necessary costs

Page 23: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

The Proposal Budget

Page 24: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements
Page 25: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Travel Breakdown

Page 26: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Samples of Proposal Forms

� HRSA

� State of Maine

Page 27: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

IC Flavours, LLC

Request for a Proposal

IC Flavours, LLC is offering $75K to each state to conduct a statewide taste testing of our new 12 trial ice cream flavors. The awarded bidder’s project director and manager will present their results to our board members at our annual meeting in our corporate office located in San Diego, CA. The 12-month project will begin February 1, 2017. No incentives allowed and samples for testing will be provided at $.50/sample, per flavor. Indirect costs up to 8% MTDC is allowed.

Page 28: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

TBOTRIBE Foundation

Request for a Proposal

TBOTribe Foundation is offering $300K for a 18 month period to conduct a study of the mental state of stay at home moms with three or more children living in the State of Maine. The number of participants must be the same in each district. The program specialist needs to commit .80FTE annually to the project and is expected to meet each participant. Incentives up to $20 per participant is allowed. Biweekly meetings at our Scarborough, Maine office is required. Indirect costs are limited to 12% of MTDC.

Page 29: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Lifecycle of Budget Management

Awarded

Page 30: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Award Notification

Notice of Award (NoA) provides details of your award

q Project Officer q Budget Management Officer q Award Amount q Reporting Requirements q Guidelines

Page 31: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Lifecycle of Budget Management

Post Award Compliance

Page 32: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Post Award

Prepare Agreements

Review Internal Policies

Review Funder’s Policies

Purchases Time Allocation Reporting

Page 33: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Prepare Agreements

Consulting and Subaward Agreements should be prepared and fully executed immediately after your award is executed in case changes are necessary before the project begins Included in agreements:

Subaward q  Funder’s Terms q  Reporting Requirements q  Budget and Justification q  Workplan/Scope of Work

Consultant q  Scope of Work q  Project Period q  Total Cost and Rate q  Exclusions/Inclusions

Page 34: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Subaward or Consultant?

Consider a subaward agreement if any of the following conditions are met: q Is the entity working in collaboration with the PI to perform a significant portion of the programmatic efforts on an award? q Represents a significant portion of the programmatic decision-making? q Does he/she have the authority to make administrative and programmatic decisions and to control the method and results of work made? q The work results involve intellectual property or lead to publications? Normally a consultant will have one or more of the following characteristics: q Is an individual or business where his/her expertise is required to perform on the project, q The services are typically temporary and may be specialized or highly technical, q The independent contractor was excluded with the development of the project objectives and is not responsible for the overall outcome of the project, q The scope of work was defined by the PI, q Independent contractor will have discretion in how they accomplish the work.

Page 35: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Internal and Funder’s Policies

It is important to follow your organization’s policies as well as the funder’s policies and requirements/

restrictions q Purchases q Time Reporting q Travel q Approval Documentation

Page 36: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Purchases: Supplies

Although necessary, supplies may be restricted based on the funder’s guidelines. Generally, allowable supplies are as

follows:

q  Office equipment, supplies, postage and duplication costs that are necessary to carry out the project’s objectives and were approved in the proposal are allowable to charge to the project

q  Office supplies that are common and have a joint purpose

are generally not allowable on the project

Page 37: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Purchases—continued

All costs must satisfy the RAN test:

q  Reasonable—a cost that a prudent person would opt to incur under the circumstances. Is the cost comparable to similar products?

q  Allocable—the cost of an item is chargeable or

assignable to the program. q  Necessary—the cost of an item’s relationship to the

mission and objectives of the program. Can the program continue if the product was not purchased?

Page 38: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Travel

Allowable on the grant if it was included in your proposal q  Mileage

§  Organization’s or funder’s reimbursement rate-whichever is less §  Federal, State, Private

q  Detailed meal receipts §  Alcohol and associated tax may not be allowable

q  Reasonable meals, lodging and tips §  Per diem rates: http://www.gsa.gov/portal/content/104877 §  Refer to your organization’s or funder’s restrictions

q  Conferences excluded from awarded proposal §  Require approval from the funder

Follow your organization’s internal travel policy as well as the funder’s restrictions

Page 39: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Time Reporting

It is important to certify personnel time charged to the project is fair and an accurate representation of one’s effort.

Page 40: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Project Expenditures

Depending on the size of your organization, it might be wise to track the expenses at the department/program level

Page 41: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Budget Summary

Page 42: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Reporting

Funder’s have their own guidelines for financial reports

q  Format q  How often q  Process for submitting

Page 43: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements
Page 44: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements
Page 45: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements
Page 46: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Other Project Reminders

q  Focus group payments should be properly documented q  Cost matching funds need to follow the same project guidelines as the

awarded funds q  Detailed documents are required to support all costs charged to the

project q  Only project-related costs are allowed to be posted to the award q  Sales tax exempt status

Always contact your grant accountant with any project-related questions or

concerns

Page 47: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Budget Revisions

If your approved estimated budget is not realistic to your project needs, it may be necessary to revise the approved budget.

q Refer to the funder’s guidelines for formal budget revisions requirements/deadline for submissions q Contact your Office of Sponsored Programs, if applicable, to formally submit the revision

Page 48: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

References

Federal: q  Uniform Administrative Requirements, Cost Principles, and Audit

Requirements for Federal Awards (Federal Register) https://www.gpo.gov/fdsys/pkg/FR-2013-12-26/pdf/2013-30465.pdf

q  eCFR – Electronic Code of Federal Regulations

http://www.ecfr.gov/cgi-bin/text-idx?SID=90d83f573e096f4ff09af6a7d3e571d4&mc=true&tpl=/ecfrbrowse/

Title02/2cfr200_main_02.tpl State of Maine: q  Division of Contract Management: Policy & Procedures Manual

http://www.maine.gov/dhhs/contracts/policy-procedure-manual.html

q  Maine Uniform Accounting and Auditing Practices (MAAP) http://www.maine.gov/sos/cec/rules/10/144/144c030.doc

Page 49: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Tempered Radicals

“People who want to succeed in their organizations yet want to live by their values or identities, even if they are somehow at odds with the dominant culture of their organizations.”

Debra Meyerson

Page 50: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Traits of Tempered Radicals

•  Speak their truths, even when afraid •  Have strong support networks •  Take bias toward action, especially “small “deviant”

actions” •  Have clarity about and focus on their most

important goals •  Promote experimentation and deep conversations,

by example and with their advocacy

Page 51: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Duke’s WISER program

Rely on signature strengths

“How can we be

clever?”

Monique Valcour Harvard Business Review

November, 2106 “On Beating Burnout”

Acknowledge Reality Ritualize ingenuity

Page 52: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Resilience at Work

Tools and Practices to Enhance Resilience at Work

Page 53: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Project Management

� What is your project at work right now? � Have you just started something?

� Are you about to take on something new?

Page 54: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

How to get started with a new project

Create the Project Charter, addressing: – Project team members – Project objectives and scope – Timeline, including interim milestone

due dates – Funding constraints – Kick-Off meeting

Page 55: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

How to build team trust

� New situations, like joining a project team, means that team members are vulnerable and often lack trust

�  As PM, lead by example: ÷ Share your strengths as well as your

weaknesses ÷ Don’t be afraid to be wrong and “own it” ÷ Don’t do everything in the group setting

Page 56: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Effective Decision Making in a Team Setting

Decision-Making Method How It Works

Consensus Every member must agree to adopt a decision. If consensus is impossible, new alternatives are developed and presented for evaluation.

Majority rule Members provide input, discuss the decision, then vote. The choice receiving more than 50% of the votes is adopted.

Small group/committee A subset of individuals with relevant experience and skills makes specific decisions.

Leader with input The team leader gathers input from members and uses it to make decisions.

Leader announcement The leader decides and announces

Page 57: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

How to form your project plan

�  Brainstorm with your team members to develop detailed scope

�  Identify key milestones needed to complete project and sequence

�  Assign resources and deadlines

�  Determine plan for communication and status updates

�  Schedule routine team meetings to discuss progress and resolve issues

Handout

How to make an

action plan

Handout

Gantt Chart

Page 58: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

How to get buy-in for the plan

� Communicate, communicate, communicate � Present your plan to ALL stakeholders, over and

over, to ensure that everyone understands what is to be done, when its to be done, why its to be, and who will be involved

� Circle back to the project team on ANY adjustment in the plan communicated by sponsor or stakeholders to ensure understanding and impact of change

Handout

Project Communication

Plan

Page 59: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Completing the project

� Monitorthe3S’scarefully¡ Schedule¡ Scope¡ Spending

Page 60: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Present to your colleagues

Page 61: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Celebrate!

Page 62: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

� What is your project at work right now? � Have you just started something?

� Are you about to take on something new?

Building your own project plan

Page 63: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Project Viability

What did your group discover? How much support already exists for your stated outcomes? How good are the chances of you beginning your project? Finishing it?

Page 64: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

What is your attitude?

Page 65: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Closing thoughts

Continuing alliance?

Appreciations

Session evaluation

Page 66: Managing Effectively in Today’s Public Health Environment 3 Budget Manageme… · DECEMBER 1, 2016 Managing Effectively in Today’s Public Health Environment . Acknowledgements

Thanks for attending!

[email protected] 207-899-7079