Making healthcare remarkable

Managing Joint Commission Life Safety Deficiencies

PFI’s No Longer Work

Objectives

Joint Commission Preparation

Your Risk Assessment Process

Mitigating Deficiencies

Interim Life Safety Measures (ILSM)

Time Frames

Responding to Identified Deficiencies

Repairing Identified Deficiencies

Survey-Related Plan for Improvement (SPFI) Waivers

2/5/2018

2

Novant Health

PFI History

Prior to 2017, TJC would allow a Plan for Improvement (PFI)

If you could show proof of a workorder, you may not be cited.

Many PFIs could be fixed

You could set your timeline for corrective action

There was not a formal risk assessment process

A few months before a survey, rush to fix

2/5/2018

3

Novant Health

Beginning to 2017

TJC new process: “See it! cite it!”

Workorders will not save you

Cannot create a PFI or timeline to repair

Proactively need to manage and repair deficiencies quicker

A defined process as to how Life Safety deficiencies are identified through inspections

Three months before a survey will not work

Post survey – 60 days to repair or request a waiver

2/5/2018

Novant Health

4

Leadership Involvement

Is this how you ask for funding?

2/5/2018

Novant Health

5

Life Safety Deficiencies Policy

Do you have a Risk Assessment Policy?

Define the frequency for conducting a life safety risk assessment

Ensure ILSM is included, if needed

Both construction and routine

Important to define the term “Immediate”

What is your process to manage deficiencies?

2/5/2018

Novant Health

7

Risk Assessment

2/5/2018

Novant Health

8

• Conduct Life Safety Assessment• Identify LS Deficiencies• Create Workorder• Repair Within 24-hours• Implement ILSM • Complete Repair within 60-

Days

Risk Assessment Tool

2/5/2018

Novant Health

9

Risk Assessment Tool

2/5/2018

Novant Health

10

Risk Assessment Tool

2/5/2018

Novant Health

11

Risk Assessment Tool - ASHE

2/5/2018

Novant Health

12

Risk Assessment Tool - ASHE

2/5/2018

Novant Health

13

Life Safety Drawings

LS.01.01.01 EP 3

The hospital maintains current and accurate drawings denoting features of fire safety and related square footage.

2/5/2018

Novant Health

14

Life Safety Drawings

LS.01.01.01 EP 3

Fire safety features include the following: - Areas that are fully sprinklered/partially sprinklered

- Locations of all hazardous storage areas

- Locations of all fire-rated barriers

- Locations of all smoke-rated barriers

- Sleeping and non-sleeping suite boundaries, including the size of the identified suites (sq. ft.)

- Locations of designated smoke compartments (sq. ft.)

- Locations of chutes and shafts

- Any approved equivalencies or waivers

2/5/2018

Novant Health

15

Tracking LS Deficiencies

How are you tracking Life Safety Deficiencies

Workorder System

JC PFI section – JC does not have access.

Excel Spreadsheet

Other Format

2/5/2018

Novant Health

16

Tracking LS Deficiencies

2/5/2018

Novant Health

17

Tracking LS Deficiencies - ATG

ILSM Document

2/5/2018

Novant Health

19

ILSM Document

2/5/2018

Novant Health

20

Managing the Survey Process

Survey Management – Document Review Organization Have all documentation available at time of survey Walk surveyor through the documentation

Control the review Do not have the surveyor review documentation on their

own Be Confident Repeat surveyor’s question for clarification Answer only what is asked Do Not volunteer information Have support team help with any discrepancies

2/5/2018

Novant Health

21

Managing the Survey Process

Never volunteer LS deficiencies

Be prepared to address how you will identify and manage LS deficiencies

Ensure that ILSM’s are in place and you can explain, both past and present

Repair as much as possible before the surveyor leaves

If repairs cannot be completed before the surveyor leaves, be able to address the ILSM that will be in place until the repair can be made

Keep your leadership informed of both findings and ILSM’s.

2/5/2018

Novant Health

22

The Survey is Over

Deficiencies need to be completed within 60 days

If repairs cannot be completed within 60 days, request a SPFI and a time limited waiver request

Found on the JC website

Request needs to be approved by JC and CMS

Repair deficiency within limited waiver time frame

2/5/2018

Novant Health

23

2/5/2018

Novant Health

24

Gary MilewskiCorporate ComplianceNovant Health(919) 817-6823