managing power system
TRANSCRIPT
MANAGING POWER SYSTEM P.K.Agarwal Additional General Manager
Power System Operation Corporation Ltd.
Managing Power System 1
OUTLINE
• Evolution of Electricity Supply System • Overview of Indian Grid
• Tools for Grid Management.
• Electricity Market
• Way forward and Challanges
Managing Power System 2
EVOLUTION OF ELECTRICITY SUPPLY SYSTEM
Managing Power System 3
Managing Power System 4
Managing Power System 5
Supplying electricity to customers in the First District, a one-quarter square mile (0.65 square km) area
Edison’s direct current (dc) generating station at 257 Pearl Street, New York, US
Managing Power System 6
Direct Current power - suitable to supply to short distance - Nor Suitable for long distance
Managing Power System 7
Managing Power System 8
EARLY ELECTRICITY GENERATION
• In early days, power plants were localized. • Supplying power to local areas only. • In case of outage, no alternative supply. • Slowly started connecting through transmission system to increase reliability of supply.
• Needed a central control center for coordination and running of connected system in unison.
Managing Power System 9
VOLTAGE STEP-UP
VOLTAGE STEP-DOWN
CONSUMPTION
ELECTRICITY SUPPLY CHAIN
Managing Power System 10
Generation Transmission Consumption
Markets
Operations
Service Provider
Evolution of Central Control Center
Managing Power System 11
Power Grid to Smart Grid
Managing Power System 12
Managing Power System 13
Managing Power System 14
Managing Power System 15
Managing Power System 16
Managing Power System 17
Managing Power System 18
Managing Power System 19
OVERVIEW OF INDIAN POWER GRID
Managing Power System 20
Celestial View at Night
Photo Courtesy: NASA
Managing Power System 21
Indian Power Sector
15%
2%
13%
70%
Hydro Nuclear renewable Thermal
Thermal 191 GW
Hydro 42 GW
Nuclear 6 GW
Renewable 36 GW
Total 275
Power Installed Capacity = 275 GW
22
66%
11%
12%
11%
Wind Small Hydro Bio mass Solar
Wind 23.5 GW
Small Hydro 4 GW
Solar 3.8 GW
Biomass 4.5 GW
Total 35.8 GW
Managing Power System 22
Towards SAARC (South Asian Association for Regional Cooperation)Grid
Managing Power System 23
TOOLS FOR GRID MANAGEMENT
Managing Power System 24
Grid Control Centers Hierarchy Managing Power System 25
Data acquisition in Load Despatch Centers SCADA/EMS System
Acquired data put on displays in SCADA
Managing Power System 26
SCADA System Architecture
SCADA /EMS SERVERS
JUKE BOX
System Time Rack Swift
FROM GPS
VIDEO PROJECTION SYSTEM
ISR SERVERS
System Time &
Frequency
Local Frequency Input
Workstation Consoles
with Dual Monitors NMS
SERVERS
Development Server (PDS)
Archival Server
ICCP Communication
SERVERS
Frequency, Day & Date Display
Terminal Server
To Backup NLDC
Logger
Printer (B&W)
Printer (Colour)
To all RLDCs
ROUTERS
NID (N/W Intrusion
Detection System)
To DMZ Zones
CISCO PIX Firewall System
UPS Monitoring
System
Managing Power System 27
ALL INDIA POWER NETWORK Managing Power System 28
Synchrophasors Technology SCADA Vs WAMS (RTU vs PMU) X-Ray Vs MRI
Managing Power System 29
Indian Grid -‐ WAMS Pilot Project Architecture
NLDC
ERLDC PMU-12
WRLDC PMU-16
PDC/Console
NRLDC PMU-14
SRLDC PMU-12
PDC/Console PDC/Console
PDC/Console
NERLDC PMU-8
PDC/Console
PDC Console
Historian
Router
Managing Power System 30
Current Synchrophasors deployment in India
Managing Power System 31
ELECTRICITY MARKETS IN INDIA
Managing Power System 32
Structure of Indian Electricity Sector Managing Power System 33
Market Design
IMBALANCES CONGESTION MANAGEMENT
ANCILLARY SERVICES
SCHEDULING &
DISPATCH
ELECTRICITY MARKET
“Making Compe--on Work in Electricity”, Sally Hunt
Four Pillars of Market Design
Managing Power System 34
Evolution of Power Market in India
13/09/15 NLDC - POSOCO 35 2004: Open Access
2008: Power Exchange
2009: Imbalance (UI)
2011: Transmission Pricing (POC)
2010: Power Market, REC
April, 2012: Sub-Hourly Market (15 Min Bidding in PX)
2009: Grant of Connectivity, LTA and MTOA
2009: Trading License
2009: Congestion Management
2014: Deviation Settlement
2015: Ancillary Market
Managing Power System 35
25 – 12 Years 3 Years – 3 Months
< 3 Months
Medium Term
Short Term Long Term
Contracts in the Short Term Market
Bilateral - Advance
Bilateral - FCFS Power
Exchange
Day - Ahead
Contingency
Different Types of Contracts Managing Power System 36
MCV
MCP
PRICE
Sale Purchase
Accepted Purchase Bids (>= MCP)
(Consumers’ Discount)
Accepted Sale Bids (<= MCP)
(Generators’ Surplus)
Salient Features n Multiple Power
Exchanges q Competition amongst
Exchanges n Voluntary participation n Double sided bidding n Uniform pricing n Day-ahead exchange n 15 Minute bids n Congestion
management by market splitting
Social Welfare Maximization
Power Exchange Operations Managing Power System 37
DAILY POWER OPERATIO PLANNING PROCESS
Availability Declaration
Entitlements
S L D C
Requisition & Bilateral Agreements
Injection Schedule Drawal Schedule
Revision in DC Revision in Requisition
Final Injection Schedule
Final Drawal Schedule
09:00
10:00
15:00
18:00
22:00
23:00
R L D C
I S G S
Time
Revisions during Current day
Revisions during Current day
0 to 24 hours
Collective Transactions (PX)
38
Managing Power System
CHALLANGES
Managing Power System 39
Control Center – Challenges • High pace of growth
• Integration of new Control Centers & RTUs
• Technological obsolescence
• Security Issues
• Ever increasing appetite for information • Multiple stakeholders • Retrieval/presentation of archived data a Herculean task
• Expertise of man behind machine • Knowledge management systems • User friendly interfaces
Managing Power System 40
India’s Energy Challenge
Energy Security: India is dependent on oil imports for 80% of its demand Energy Access: Around 300 Million people still without access to electricity Growing Demand: In next 12 years India’s electricity requirement to grow 2.5 times Energy Shortage: Electricity shortage estimated at 25-35 GW Global Warming: Climate Change is also an important issue – 20-25% emission intensity reduction by 2020 to the 2005 level
Managing Power System 41
Managing Power System 42
[email protected]@posoco.in