CASE HISTORY BRIDGES INTRODUCTION If traffic pollution can cause corrosion on your car, image what a steady stream of cars driving in and out of the busiest city in America does to the Manhattan Bridge. The size and scope of this project covers everything from the main structure and towers to the main and suspender cables. They have to enclose the bridge to blast off old coatings making way for the proven technology of Wasser. Short downtimes, excellent corrosion resistance and long life are the reasons we are on the job, just ask George Campbell. OWNER New York City Department of Transportation PROJECT Manhattan Bridge Rehabilitation (North Span) CONTRACTORS Koch-Skanska George Campbell Painting Corp. SYSTEM Surface preparation SSPC-SP10 Near White Blast Cleaning Power Wash and Hand Tool Clean BRIDGE STRUCTURE AND TOWER Primer MC- Zinc 3-5mils DFT Intermediate MC- Prepbond 1.2-2.5 mils DFT MC-Ferrox B 3.0-5.0 mils DFT Top-coat MC-Luster 2-4 mils DFT MAIN CABLE AND SUSPENDER CABLES Primer MC-MioAluminum 1.5-2.0mils DFT Intermediate MC-Ferromastic 3.0-5.0 mils DFT Top-coat MC-Luster 2-4 mils DFT MANHATTAN BRIDGE NEW YORK, USA PROJECT DATE 2003 SUBSTRATE STEEL CATEGORY BRIDGES

Upload: others

Post on 04-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MANHATTAN BRIDGE - Wasser Polyflex

CASE HISTORY

BRIDGES

INTRODUCTIONIf traffic pollution can cause corrosion on your car,

image what a steady stream of cars driving in and out

of the busiest city in America does to the Manhattan

Bridge. The size and scope of this project covers

everything from the main structure and towers to

the main and suspender cables. They have to enclose

the bridge to blast off old coatings making way for

the proven technology of Wasser. Short downtimes,

excellent corrosion resistance and long life are the

reasons we are on the job, just ask George Campbell.

OWNERNew York City Department of Transportation

PROJECTManhattan Bridge Rehabilitation (North Span)

CONTRACTORSKoch-Skanska George Campbell Painting Corp.

SYSTEMSurface preparation SSPC-SP10 Near White Blast Cleaning

Power Wash and Hand Tool Clean

BRIDGE STRUCTURE AND TOWER

Primer MC- Zinc 3-5mils DFT

IntermediateMC- Prepbond1.2-2.5 mils DFTMC-Ferrox B3.0-5.0 mils DFT

Top-coat

MC-Luster 2-4 mils DFT

MAIN CABLE AND SUSPENDER CABLES

PrimerMC-MioAluminum 1.5-2.0mils DFT

IntermediateMC-Ferromastic 3.0-5.0 mils DFT

Top-coatMC-Luster 2-4 mils DFT

MANHATTAN BRIDGENEW YORK, USA

PROJECT DATE

2003 SUBSTRATE

STEELCATEGORY

BRIDGES