Tab 4 1 Index 2 May 12, 2017 3 MANITOBA HYDRO 4 2017/18 & 2018/19 GENERAL RATE APPLICATION 5 6 FINANCIAL TARGETS & UNCERTAINTY ANALYSIS 7 8 INDEX 9 10 4.0 Overview .............................................................................................................................. 1 11 4.1 Financial Ratios and Financial Targets ................................................................................. 1 12 4.2 KPMG’s 2015 Financial Target Review................................................................................. 3 13 4.3 Manitoba Hydro’S 2015 Financial Target Review ................................................................ 6 14 4.4 MHEB’s 2016 Review Since the KPMG Financial Target Review ......................................... 7 15 4.5 Uncertainty Analysis Methodology & Results ..................................................................... 7 16 4.6 Credit Rating Agency Perspectives .................................................................................... 27 17 18 Appendices 19 4.1 Financial Target Review Report Prepared by KPMG 20 4.2 Financial Target Review Report Prepared by Manitoba Hydro 21 4.3 Berkeley Research Group (BRG) Report 22 4.4 Credit Rating Agency Reports 23 Available in accessible formats upon request

Upload: others

Post on 29-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 1

Index 2

May 12, 2017 3

MANITOBA HYDRO 4

2017/18 & 2018/19 GENERAL RATE APPLICATION 5

6

FINANCIAL TARGETS & UNCERTAINTY ANALYSIS 7

8

INDEX 9

10

4.0 Overview .............................................................................................................................. 1 11

4.1 Financial Ratios and Financial Targets ................................................................................. 1 12

4.2 KPMG’s 2015 Financial Target Review ................................................................................. 3 13

4.3 Manitoba Hydro’S 2015 Financial Target Review ................................................................ 6 14

4.4 MHEB’s 2016 Review Since the KPMG Financial Target Review ......................................... 7 15

4.5 Uncertainty Analysis Methodology & Results ..................................................................... 7 16

4.6 Credit Rating Agency Perspectives .................................................................................... 27 17

18

Appendices 19

4.1 Financial Target Review Report Prepared by KPMG 20

4.2 Financial Target Review Report Prepared by Manitoba Hydro 21

4.3 Berkeley Research Group (BRG) Report 22

4.4 Credit Rating Agency Reports 23

Available in accessible formats upon request

Page 2: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 1 of 34

May 12, 2017

MANITOBA HYDRO 1

2017/18 & 2018/19 GENERAL RATE APPLICATION 2

3

FINANCIAL TARGETS & UNCERTAINTY ANALYSIS 4

5

4.0 OVERVIEW 6

7

Tab 4 provides an overview of Manitoba Hydro’s financial ratios and financial targets, its 8

examination of the impact of various financial planning assumptions by way of an 9

uncertainty analysis and a discussion on credit rating agency perspectives and reports. 10

11

4.1 FINANCIAL RATIOS AND FINANCIAL TARGETS 12

13

The financial and operational risks associated with the management of an integrated 14

electricity and natural gas distribution utility are significant. The most significant risks 15

facing Manitoba Hydro are catastrophic infrastructure failure, extreme drought, loss of 16

export market access and rising interest rates. Interest rate risk has become increasingly 17

critical as Manitoba Hydro’s electric segment debt is forecast to grow from 7 times 18

domestic revenue in 2012/13 to 15 times domestic revenue by 2021/22 at approved 19

rates. Manitoba Hydro manages these risks through the growth and the maintenance of 20

an adequate level of financial reserves in the form of retained earnings. An adequate 21

level of financial reserves is also required to maintain access to low-cost financing for 22

both the Corporation and its owner, the Province of Manitoba. 23

24

Improving the financial strength of the Corporation is essential to making the 25

investments in infrastructure needed to continue providing safe and reliable service to 26

customers; financially withstanding the risks and uncertainties that are inherent in 27

Manitoba Hydro’s operations; and to providing customers insurance against possible 28

future rate instability. 29

30

Manitoba Hydro has three primary financial targets which are used to assess the 31

financial strength of the Corporation. These targets have been revised since the last 32

GRA, having been recently reviewed both internally as well as by an external consultant 33

in 2015: 34

Page 3: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 2 of 34

May 12, 2017

1

MEASURE TARGET 2

Equity Ratio Maintain a minimum ratio of 25% 3

Interest Coverage Maintain a minimum ratio of greater than 1.80 4

Capital Coverage* Maintain a ratio of greater than 1.20 5

(*excluding major new generation and transmission projects) 6

7

The first is to maintain a minimum equity ratio of 25%, a measure of the portion of 8

assets that are financed by internally generated funds rather than debt. The second is an 9

earnings before interest, taxes, depreciation and amortization interest coverage ratio 10

with a minimum target of greater than 1.80, which measures the ability to meet interest 11

payment obligations with cash flow. The third is to maintain a capital coverage ratio of 12

greater than 1.20, which is a measure of the ability of cash flow from operations to fund 13

sustaining capital expenditures. It should be noted that as the Corporation continues 14

through a phase of unprecedented investment, the omittance of the capitalized interest 15

on major capital expenditures is recognized to overstate the capital coverage ratio. 16

17

The consolidated results for the last ten years are provided below in Figures 4.1, 4.2, 18

and 4.3. 19

20

Figure 4.1 Equity Ratio Actuals 21

22

23

20

2723

27 27 26 25 24

18 17

0

5

10

15

20

25

30

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Equity RatioFor the year ended March 31

Minimum Target

IFRS IFRSIFRS IFRS

Page 4: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 3 of 34

May 12, 2017

Figure 4.2 Interest Coverage Ratio Actuals 1

2 3

Figure 4.3 Capital Coverage Ratio Actuals 4

5 6

4.2 KPMG’S 2015 FINANCIAL TARGET REVIEW 7

8

Manitoba Hydro’s financial targets were originally set in 1995 after an internal study and 9

an external consultant review. Since that time, these targets have been internally 10

reviewed by the Corporation and periodically enhanced. Recognizing that the current 11

investments in Major New Generation and Transmission (MNG&T) and existing 12

infrastructure would place considerable pressure on Manitoba Hydro’s key financial 13

1.83

2.432.16 2.06 1.96

1.74 1.81 1.951.73 1.55

0.0

0.5

1.0

1.5

2.0

2.5

3.0

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Interest Coverage RatioFor the year ended March 31

Minimum Target

IFRS IFRSIFRS IFRS

1.10

1.62 1.77

1.34 1.25 1.13 1.25 1.35 1.20

1.37

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Capital Coverage Ratio For the year ended March 31 Minimum Target

IFRS IFRS IFRS

Page 5: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 4 of 34

May 12, 2017

ratios, it was important that Manitoba Hydro’s financial targets be once again reviewed 1

by an external consultant. 2

3

In November 2014, KPMG was retained to provide recommendations with respect to 4

appropriate financial targets which align with the mandate of Manitoba Hydro and the 5

interests of its stakeholders considering its operating and business outlook and 6

associated risks. KPMG’s observations and recommendations can be found in its report 7

to Manitoba Hydro which is dated May 2015 provided in Appendix 4.1 of this filing. 8

9

The financial target review considered: the objectives of maintaining rate stability for 10

customers while at the same time maintaining safe and reliable service; the period of 11

significant capital investment and infrastructure renewal that Manitoba Hydro is 12

entering into; and the maintenance of Manitoba Hydro’s self-supporting status for 13

credit rating purposes. 14

15

The scope of work did not extend to reviewing broader policy questions associated with 16

overall structure, governance framework, and business strategy and plans. 17

18

Key factors and observations that influenced KPMG’s recommendations as set out in the 19

Executive Summary of their report are as follows: 20

21

Relative to other Crown utilities with a significant base of hydro-electric 22

generation, Manitoba Hydro faces a number of heightened risks including a 23

larger capital investment program, greater hydrology risks, significant reliance on 24

export revenues, and relatively higher assets and debt on a per capita basis 25

compared to other jurisdictions. These risks suggest that Manitoba Hydro 26

should have financial targets that provide a significant amount of equity cushion. 27

Manitoba Hydro’s target equity ratio is at the low end of those maintained or 28

forecast by other power utilities and a number of those utilities plan to 29

strengthen their financial ratios in the longer term. 30

Loss of self-supporting status would have very detrimental effects on the 31

Province and the utility. Uncertainty with respect to when self-supporting status 32

would be lost suggests that financial targets should err on the side of caution. 33

Page 6: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 5 of 34

May 12, 2017

Additional rate increases in the early years of the forecast horizon can result in a 1

significant improvement in Manitoba Hydro’s financial metrics in later years 2

reducing the impact of interest compounding on the additional debt that is 3

required when rate increases are lower. 4

Manitoba Hydro has limited ability to restrain a drop in financial ratios during 5

adverse conditions such as drought which highlights the risk of having an equity 6

ratio that approaches 10%. 7

Manitoba Hydro’s capital investment program is characterized by periodic 8

“bumps” or “hills” of large magnitude which magnify the challenges associated 9

with Manitoba Hydro’s limited levers with which to adjust its equity cushion. 10

Manitoba Hydro will need to depart from its equity target during major build 11

programs: this reflects the utility’s limited financing tools and reliance on 12

retained earnings as its dominant source of equity. Accordingly, the equity 13

position should rise above 25% in advance of major build programs to mitigate 14

the deviations from target that are observed. 15

In the long-term, with respect to deviations from any target, it would be 16

desirable to limit decreases in the equity ratio to 5-10 percentage points. 17

Government guarantees enable government-owned utilities such as Manitoba 18

Hydro to have lower equity ratios in their capital structure and to have lower 19

financial metrics than averages observed for investor-owned utilities. 20

21

KPMG’s overall finding was that the current financial targets used by Manitoba Hydro 22

were appropriate. The following is a summary of KPMG’s key findings and 23

recommendations to Manitoba Hydro: 24

25

Debt/Equity: The current debt to equity ratio of 75:25 was a reasonable 26

long-term target but 70:30 would provide additional 27

financial strength and address unique financial challenges 28

and risks. KPMG recommended that the debt to equity 29

ratio in the long term should fall within the range of 75:25 30

to 70:30. KPMG also suggested that it would be desirable 31

to maintain a minimum equity ratio near 15% during major 32

capital expansions. 33

34

Page 7: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 6 of 34

May 12, 2017

Interest Coverage: If Manitoba Hydro continues with the current EBIT 1

(earnings before interest and taxes) interest coverage 2

ratio, a minimum target of 1.20 is reasonable. KPMG 3

recommended Manitoba Hydro adopt an EBITDA (earnings 4

before interest, taxes, depreciation and amortization) 5

interest coverage ratio with a target of 1.80 or greater. 6

7

Capital Coverage: The capital coverage ratio is a unique and important 8

financial target to Manitoba Hydro. KPMG found that the 9

current target of 1.20 or greater is reasonable. 10

11

4.3 MANITOBA HYDRO’S 2015 FINANCIAL TARGET REVIEW 12

13

In 2015, following the completion of the KPMG review, Manitoba Hydro developed its 14

financial target recommendations for the then members of Manitoba Hydro-Electric 15

Board (MHEB) taking into consideration the findings and recommendations of KPMG 16

and an expanded uncertainty analysis undertaken by the Corporation. Manitoba Hydro’s 17

2015 Financial Target Review is provided in Appendix 4.2 of this filing. 18

19

The previous MHEB endorsed the following conclusions in December 2015: 20

21

That the current debt/equity ratio target of 75:25 be retained as its long-term 22

financial target. 23

That it would be impractical to adopt a 70:30 target at this time due to further 24

incremental revenue increases that would be required from domestic customers 25

necessary to do so, and that it does not believe that maintenance of the 75:25 26

debt/equity ratio target places customers at undue risk of rate instability. 27

That the adoption of a minimum debt/equity ratio of 85:15 was not prudent at 28

this time. 29

That an EBITDA interest coverage ratio with a minimum target of 1.80 be 30

adopted to replace the current 1.20 EBIT interest coverage target. 31

That the current capital coverage ratio with a minimum target of 1.20 (excepting 32

MNG&T) be retained as it is an effective measure of the ability of the 33

Corporation to generate sufficient cash to sustain its operations. 34

Page 8: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 7 of 34

May 12, 2017

1

4.4 MHEB’S 2016 REVIEW SINCE THE KPMG FINANCIAL TARGET REVIEW 2

3

Since the last (GRA) and the 2016/17 Supplemental Filing, a new Board of Directors 4

(MHEB) has been appointed along with a new President & CEO and a new Chief Finance 5

& Strategy Officer. Together, the MHEB and senior management team have charted a 6

new course for Manitoba Hydro inclusive of a strategic imperative to restore financial 7

sustainability. While overall minimum financial targets have not changed, Manitoba 8

Hydro is of the view that previous financial plans were inadequate in that the time 9

frame under which the Corporation reached financial health was unacceptable, leaving 10

the Corporation at too high of a risk for too long. A path back to 25% equity of longer 11

than ten years is, in the view of Manitoba Hydro, too risky. 12

13

4.5 UNCERTAINTY ANALYSIS METHODOLOGY & RESULTS 14

15

As part of the integrated planning process, Manitoba Hydro quantifies the financial 16

impacts of changes to key planning assumptions in the Integrated Financial Forecast 17

(IFF) report through sensitivity analysis. A sensitivity or scenario analysis is intended to 18

provide insight into directional changes and relative level of risk. 19

20

The cumulative impacts to the MH16 electric operations retained earnings and the 21

minimum equity ratio observed over the 10-year forecast period are shown in Figure 4.4 22

for each of the key changes in assumption. 23

24

Page 9: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 8 of 34

May 12, 2017

Figure 4.4 – Key Variable Sensitivity Impacts to MH16 Retained Earnings 1

2 3

Figure 4.4 reveals that a five-year drought beginning in 2018/19, interest rates one 4

percent higher or lower than forecast, and low and high export prices have the largest 5

potential impact on Manitoba Hydro’s retained earnings. 6

7

While the sensitivity analysis provides good insight into the financial impacts of changes 8

to key assumptions in isolation, further analysis is undertaken in the form of Manitoba 9

Hydro’s uncertainty analysis. The uncertainty analysis is a sophisticated analytical tool 10

which evaluates the impacts of the variation of multiple planning variables in order to 11

determine a range of possible financial outcomes for the utility. The uncertainty analysis 12

presented below combines multiple risk factors which reveals a more extensive picture 13

of the risks facing the Corporation. 14

15

Since its introduction at the 2013 Needs For and Alternatives To (NFAT) process, 16

Manitoba Hydro has expanded the capabilities of the uncertainty analysis to incorporate 17

and model the effects of water supply variability. Along with the other two significant 18

risk factors, namely interest rates and export prices, the uncertainty analysis combines 19

these three risk factors, some of which have offsetting impacts, to generate a number of 20

discrete financial projections. 21

22

It is assumed that the three risk factors are mutually independent, variation in one 23

parameter is independent of the variation in another. For each combination of risk 24

Lowest

Equity Ratio in

10 yr Risk

Scenario

2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27

Low Domestic Load Growth (6) (16) (31) (48) (69) (94) (121) (149) (179) 14% (2019)

High Domestic Load Growth 17 46 107 175 250 331 418 508 600 15% (2019)

+ 1% Interest (23) (64) (121) (207) (338) (480) (621) (766) (930) 14% (2019)

- 1% Interest 22 62 117 200 327 457 586 717 854 15% (2018)

C$/US$ Down 0.10 (C$ Strengthening) 13 16 20 16 (16) (68) (123) (169) (220) 15% (2019)

C$/US$ Up 0.10 (C$ Weakening) (13) (15) (18) (13) 17 63 111 150 194 14% (2018)

Low Export Price (31) (70) (106) (147) (236) (338) (446) (600) (777) 14% (2019)

High Export Price 31 75 138 218 332 448 562 705 848 15% (2018)

5 Year Drought (starting in 2018/19) (299) (761) (930) (1 151) (1 367) 12% (2020)

+ 1% Rate Increase in 2017/18 28 48 70 95 121 145 171 198 228 15% (2019)

- 1% Rate Increase in 2017/18 (27) (46) (68) (92) (119) (150) (182) (215) (253) 14% (2019)

$1B in Capital Overruns (11) (33) (54) (104) (178) (254) (331) (410) (498) 14% (2019)

Capital Down $100 million/year 12 30 57 93 139 193 254 323 404 15% (2019)

Capital Up $100 million/year (9) (26) (52) (87) (131) (185) (246) (316) (404) 14% (2019)

Page 10: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 9 of 34

May 12, 2017

factors (i.e. each scenario), a set of pro forma financial statements (projected income 1

statement, projected balance sheet and projected statement of cash flows) is 2

generated. The uncertainty analysis focuses on four financial metrics from the pro 3

forma financial statements: the equity ratio, net income/loss, net debt balance and 4

retained earnings, and displays the range of possible financial outcomes. 5

6

The results of the uncertainty analysis have been graphically depicted in a box plot. The 7

box plot is a convenient way of showing groups of numerical data through their 20th and 8

80th percentiles. In other words, the box represents 60% of possible outcomes in a fiscal 9

year. Box plots also have lines (whiskers) extending vertically from the boxes indicating 10

variability from the 80th up to the 95th percentile and from the 20th down to the 5th 11

percentile. Box plots display variation in samples of a statistical population without 12

making any assumptions about the underlying statistical distribution. The following 13

diagram in Figure 4.5 explains how to interpret the box plot figures. 14

15

Page 11: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 10 of 34 May 12, 2017

Figure 4.5 Box and Whisker Plot Interpretation 1

2 3

Instead of relying on an expected case (MH16) and a few sensitivities for a view of the 4

future, the uncertainty analysis incorporates hundreds of plausible views of the future 5

to assist the decision making process. Instead of focusing on a single forecast value 6

(such as one equity ratio in 2027), this analysis provides the decision maker with the 7

likelihood that the equity ratio in 2027 will be less than or greater than a particular 8

value, based on a large sample set of financial projections. 9

10

The next section describes the three key risk factors included in the uncertainty analysis. 11

12

Water Supply Variability 13

The uncertainty of volume of water supply available for hydro generation is one of the 14

key risks that Manitoba Hydro faces. The IFF is produced from a forecast of interchange 15

revenues and generation costs based on the average of all historic stream flows. A 16

review of the chronology of the 102 historic stream flow record reveals the stream flow 17

variability from year to year, as well as trends over various periods of time. Much of this 18

water flow variability is dampened when only average revenues are assumed in the IFF. 19

Figure 4.6 shows the annual energy in terawatt-hours (TWh) from inflows over the 20

period from 1912 to 2013. 21

Page 12: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 11 of 34 May 12, 2017

Figure 4.6 Annual Energy from Inflows (TWh) 1

2

3 4

Figure 4.7 shows the year over year change of the annual energy (in TWh) over the 5

same 1912 – 2013 time period and demonstrates that the change in energy from one 6

year to the next can be extreme. 7

8

Page 13: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 12 of 34 May 12, 2017

Figure 4.7 Energy from Inflows – Year over Year Change 1

2

3

4

Figure 4.8 contains the same data points as Figure 4.6; however, in Figure 4.8 the years 5

that were below the historic median of 35.6 TWh are denoted in red and the years 6

above the historic median are denoted in blue. This colour coding highlights trends or 7

patterns of extended periods where the annual energy remained above or below the 8

historic median level. For example, the period in the 1920s to 1940s had predominantly 9

lower than median energy. The following period in the 1950s to 1970s had 10

predominantly higher than median energy. The 1980s to early 2000s was a period of 11

lower than median energy. Now, mid 2000s to present day, energy from inflows has 12

been well above median and for the longest sustained period in recorded history. 13

14

If historical water flow cycles are repeated, it is reasonable to expect, at a minimum, a 15

period of lower than median energy during the forecast period. For this reason, it is 16

important to understand the potential variability of financial results from average. 17

18

Page 14: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 13 of 34 May 12, 2017

Figure 4.8 Annual Energy from Inflows – Below and Above Median 1

2

3

To incorporate both the annual flow variability and the cycles, 102 ‘flow cases’ were 4

constructed each beginning with a different historical ‘flow year’ (i.e. 1912 to 2013), 5

followed by a repeat of the chronological flow history. The 102 ‘flow cases’ are run 6

through the Corporation’s production costing model to produce time series forecasts of 7

flow related revenues and costs which are then incorporated into the financial forecast 8

model to produce 102 financial projections. 9

10

Export Prices 11

The 2016 Electricity Export Price Forecast contains three price forecasts: 12

Reference the consultant’s best estimate of the future, adjusted in January 13

2017 to further reduce the forecast to reflect the current trend in 14

projected on-peak and off-peak prices and capacity values 15

Low contains 2016/17 on-peak and off-peak prices and capacity values 16

held constant in real terms throughout the forecast period 17

High the consensus reference export price forecast from the 2015 18

Electricity Export Price Forecast was selected to represent the 19

high price sensitivity for MH16 20

21

Page 15: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 14 of 34 May 12, 2017

Figure 4.9 shows the nominal dollar average unit export price for each of the three 1

export price forecasts. The average export price is the average of all firm and 2

opportunity export sales net of transmission charges. The reduction in average export 3

price in 2025/26 is a function of the expiry of a portion of Manitoba Hydro’s firm 4

dependable contracts. 5

6

Figure 4.9 Average Export Price 7

8

9

Figure 4.10 shows the annual variability of net extraprovincial revenues factoring in 10

both water flow variability and export price uncertainty for the period 2019 to 2027. 11

The three price forecasts were used in the Corporation’s production costing model to 12

generate 306 distinct net extraprovincial revenue forecasts (102 flow cases x 3 price 13

cases). Manitoba Hydro is no longer projecting that dependable energy prices and 14

capacity values will be obtained for available firm energy where Manitoba Hydro does 15

not presently have an export contract in place. This planning assumption change was 16

made to capture changing market dynamics, namely the reduced cost for U.S. 17

renewable supply options (aided in large part by subsidies) that would compete directly 18

with hydro generation, along with reductions to natural gas price fundamentals and 19

elements of the capacity market that are signaling a diminished need for new 20

generation. These developments have had a dampening effect on the net export 21

revenue variability once Keeyask is fully commissioned – 2023/24 and beyond. 22

Page 16: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 15 of 34 May 12, 2017

1

Figure 4.10 Net Export Revenue Variability 2

3

4

While the previous graph displays the possible range in any given forecast year, it does 5

not show how net extraprovincial revenue can vary year to year in any one of the 306 6

projections. 7

8

Figure 4.11 shows the net extraprovincial revenue from a sample of 5 flow cases taken 9

from the 306 different flow cases available. It compares these to the average of all flow 10

cases (at reference export prices) from which MH16 is derived. As shown by these 5 11

flow cases used, the annual net extraprovincial revenues can vary substantially from 12

what is projected in MH16. The timing of the occurrence of this variability from average 13

(earlier vs. later in the forecast) can have a significant impact on the financial forecast 14

not only in each year but also on a cumulative basis. For example, lower than average 15

net extraprovincial revenues early in the forecast while capital spending is high may 16

result in higher debt levels. The higher levels of debt will put downward pressure on the 17

equity ratio in all future years which can impact how quickly the equity ratio returns to 18

the minimum 25% target. It is thus critical that rates be set on the right trajectory such 19

that future rate increases are not unduly exposed to intervening events (i.e. drought) or 20

adverse forecast error. 21

(600)

(400)

(200)

0

200

400

600

800

1 000

1 200

(600)

(400)

(200)

0

200

400

600

800

1 000

1 200

2019 2020 2021 2022 2023 2024 2025 2026 2027

Mill

ion

s o

f C

urr

en

t D

olla

rs

Mill

ion

s o

f C

urr

en

t D

olla

rs

Fiscal Year Ending

Net Export Revenue (P05 P20 P80 P95 Values)MH16 - 102 Flow Records 1912 To 2013

3 Export Price Scenarios - Reference, High and Low102 x 3 = 306 Financial Runs

P50

Page 17: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 16 of 34 May 12, 2017

1

Figure 4.11 Net Export Revenue - 5 Flow Cases 2

3

4

Interest Rates 5

In 2015, Manitoba Hydro undertook significant additional work to develop and validate 6

the interest rate scenarios used in its uncertainty analysis. Manitoba Hydro set out to 7

test the impacts of different interest rate scenarios that encompass both rising and 8

declining paths, interest rate shocks as well as steady-state scenarios that are consistent 9

with history. A publically available stochastic1 interest rate generator developed by the 10

American Academy of Actuaries and the Society of Actuaries was used to produce the 11

interest rate forecasts used in this analysis. This model is based on historical U.S. 12

interest rates (Treasury Bills) and produces a time series going forward for bonds of 13

different durations (3-month, 1-year, 10-year, etc.) and captures both longer-term 14

multi-year trends and shorter-term intra-annual variation. Manitoba Hydro engaged the 15

Berkeley Research Group (BRG) to recommend an approach that made use of available 16

data on current futures and options prices to establish and calibrate an appropriate 17

range of interest rates emerging from the stochastic interest rate generator. BRG’s 18

scope of work, methodology and findings are discussed in Appendix 4.3 of this filing. 19

20

1 Randomly determined.

Page 18: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 17 of 34 May 12, 2017

MH16 reflects Manitoba Hydro’s revised debt management strategy that opts to 1

shorten the weighted average term to maturity of new debt issuance to 12 years from 2

20 years. On a forecast basis, new long-term debt generated by the financial forecasting 3

model is fixed at an interest rate that reflects this change and a 12-year average term to 4

maturity. In MH15, new long-term debt was fixed at an interest rate that reflected a 20-5

year average term to maturity. 6

7

Manitoba Hydro updated the stochastic interest rate generator with December 2016 8

futures and options prices. Notably, the results aligned with the timing of the consensus 9

projection of interest rates obtained from various external forecasters and used in 10

MH16. Figures 4.12 and 4.13 show the mean, upper and lower bounds for the Canadian 11

short term and long term interest rates resulting from the stochastic interest rate 12

generator and compare these to the consensus forecast assumed in MH16. Overall, the 13

mean interest rates for both short-term and long-term Canadian interest rates (the red 14

line) closely mirror the consensus forecast interest rates. As well, with the exception of 15

2017/18, the interest rate sensitivity one percent higher or lower than the consensus 16

forecast also falls within the upper and lower bounds produced by the stochastic 17

interest rate generator. 18

19

Page 19: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 18 of 34 May 12, 2017

Figure 4.12 Short Term Interest Rates 1

2 3

Figure 4.13 Long Term Interest Rates 4

5

6

Page 20: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 19 of 34 May 12, 2017

Interest is capitalized on Manitoba Hydro’s capital projects at the weighted average rate 1

of the Corporation’s entire debt portfolio. During the early years of the forecast, the 2

weighted average rate does not fluctuate as much as the incremental cost of borrowing 3

when forecast interest rates are varied through the uncertainty analysis. This is arising 4

from the fact the average rate is so highly weighted with Manitoba Hydro’s embedded 5

costs that it is not until new debt is either generated in the forecast and/or existing debt 6

that is maturing is refinanced that the incremental borrowing costs can impact the 7

weighted average rate. 8

9

The Keeyask project is an exception as the majority of the interest capitalized on the 10

project is calculated using the incremental cost of borrowing. The Project Financing 11

Agreement, a schedule to the Joint Keeyask Development Agreement, outlines how 12

interest is to be calculated during construction using incremental costs for the Keeyask 13

HydroPower Limited Partnership (KHLP) assets. Figure 4.14 shows the impacts to the 14

$8.7 billion in-service cost of the Keeyask project from the sample set of 50 interest rate 15

cases generated by the stochastic interest rate generator model as well as the +/-1% 16

sensitivity to the consensus projection of interest rates used in MH16. The blue line 17

represents the range of in-service amounts that result from the 50 interest rate cases. 18

The current budget and the +/- 1% sensitivities have also been included in the graph. 19

The impact of varying interest rates is +/- $170 million or 2% of the budget in-service 20

cost. 21

22

Page 21: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 20 of 34 May 12, 2017

Figure 4.14 Impact of Interest Rates on Keeyask In-Service Costs 1

2

3 4

Uncertainty Analysis Results 5

The uncertainty analysis was initially prepared using two different approaches to the 6

development of its interest rate assumptions. One approach uses the consensus 7

forecast of interest rates with two sensitivities, the first being one percent higher and 8

the second being one percent lower, and requires the generation of 918 discrete 9

financial projections. The other approach uses a representative sample set of 50 interest 10

rate cases from the stochastic interest rate generator described above and produces 11

15,300 discrete financial projections. Both approaches are summarized in Figure 4.15. 12

13

Figure 4.15 Uncertainty Analyses Approaches 14

3 Interest Rate Cases 50 Interest Rate Cases

Rate Increases 7.9% FY2018 to FY2022, 2% 7.9% FY2018 to FY2022, 2%

Water Flow Cases 102 102

Electricity Export Prices 3 3

Interest Rate Cases 3 50

Discrete Financial Projections 918 (102 x 3 x 3) 15,300 (102 x 3 x 50)

15

Page 22: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 21 of 34 May 12, 2017

A considerable amount of time and effort is required to prepare the uncertainty analysis 1

under the second approach. The processing time required to generate 15,300 scenarios 2

was considered a major obstacle and Manitoba Hydro sought out to test whether 3

generating a smaller set of discrete financial projections would render reasonably 4

indicative results compared to the generation of a full set of 15,300 financial runs. 5

6

Figure 4.16 compares the results of the projected equity ratio from the two approaches 7

listed above. 8

9

Figure 4.16 Projected Equity Ratios from Uncertainty Analyses 10

11

Figure 4.16 shows that the first approach that produces 918 discrete financial 12

projections generates a reasonable and unbiased representation of the key financial 13

risks that Manitoba Hydro is facing when compared to the approach that uses 50 14

interest rate cases. A comparison of the two approaches also highlights the fact that 15

water flow variability is Manitoba Hydro’s largest risk factor. 16

17

Each of the 918 discrete financial projections is given an equal likelihood of occurring 18

(i.e. 1/918 = 0.11%) and the uncertainty analysis was run with two different domestic 19

rate increase scenarios: 20

1) The MH16 proposed rate increases of 7.90% annually from 2017/18 to 2021/22, 21

and then 2.00% rate increases thereafter, and 22

Page 23: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 22 of 34 May 12, 2017

2) The previously forecast 3.95% annually from 2017/18 to 2028/29, followed by 1

2.00% rate increases thereafter. 2

3

Projected Equity Ratios 4

Figure 4.17 shows the equity ratios under the financial projections incorporating water 5

flow, export price and interest rate risks. 6

7

Figure 4.17 Comparison of Equity Ratio Variability 8

9 From Figure 4.17, it can be observed that: 10

With 7.90% rate increases, the chance of the equity ratio being below 15% goes 11

from an 80% probability in 2018/19 to being only a 20% probability in 2020/21. 12

By 2023/24, there is less than a 5% chance that the equity ratio will be below 13

15%. By the end of the 10-year forecast period, there is a 50% chance that 14

Manitoba Hydro will achieve the minimum 25% equity ratio target. 15

With 3.95% rate increases, there is roughly only a 20% chance that the equity 16

ratio will be above 15% during the five year period 2018/19 to 2022/23. Over 17

the entire forecast period shown above, there remains a 50% chance that the 18

equity ratio will be either above or below 13% while the overall variability of the 19

equity ratio grows (as shown by the increase to the size of the boxes) once 20

Keeyask is commissioned. 3.95% annual rate increases does not provide a 21

sufficient financial cushion to absorb the key risks Manitoba Hydro is facing over 22

Page 24: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 23 of 34 May 12, 2017

the period 2018/19 to 2026/27. By the end of the 10-year forecast period, there 1

is very little chance the minimum 25% equity ratio target will be achieved. 2

3

Projected Net Income or Losses 4

Figure 4.18 shows the annual projected net income under the range of projections. 5

6

Figure 4.18 Comparison of Net Income Variability 7

8 From Figure 4.18, it can be observed that: 9

With 7.90% rate increases, there is only a very small chance of a net loss either 10

before or after Keeyask is commissioned, thus allowing Manitoba Hydro to build 11

its reserves and progress towards the minimum 25% equity ratio target. It must 12

be recognized that as the Corporation’s net plant in service doubles between 13

2016/17 and 2023/24, annual earnings will need to average approximately $400 14

million over the 10-year forecast period to achieve the minimum 25% equity 15

ratio target by the 10th year of the forecast. 16

With 3.95% rate increases, the domestic revenue projection does not build 17

sufficient reserves during the construction phase and cannot adequately support 18

the carrying costs of the Bipole III and Keeyask projects once they are both fully 19

commissioned. From 2023/24 to 2026/27, there is only roughly a 50% chance 20

that the Corporation will record a profit and considerable potential of significant 21

losses. 22

Page 25: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 24 of 34 May 12, 2017

1

Projected Net Debt Balances 2

Figure 4.19 shows the annual projected net debt balances under the range of 3

projections. 4

5

Figure 4.19 Comparison of Net Debt Variability 6

7 From Figure 4.19, it can be observed that: 8

With 7.90% rate increases, net debt rises to $23 billion and is able to recover to 9

less than $21 billion by 2026/27 in 50% of the financial projections; over $3 10

billion lower than with 3.95% rate increases by the end of the 10-year forecast 11

period. 12

With 3.95% rate increases, net debt rises to $24 billion by 2021/22 and remains 13

at that level in 50% of the cases for the remainder of the forecast period. 14

15

Projected Retained Earnings Balances 16

Figure 4.20 summarizes the retained earnings results for the range of projections. 17

18

Page 26: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 25 of 34 May 12, 2017

Figure 4.20 Comparison of Retained Earnings Variability 1

2 From Figure 4.20, it can be observed that: 3

With 7.90% rate increases, the retained earnings balance grows between 4

2018/19 and 2021/22 to keep pace with the net debt balance. From 2022/23 5

and on, the retained earning balance continues to grow as the equity ratio 6

progresses from 19% to 25% by 2026/27 in 50% of the financial projections. 7

With 3.95% rate increases, the retained earnings balance is expected to grow by 8

only $500 million over the 10-year forecast period in 50% of the financial 9

projections while at the same time the net debt balance is expected to grow by 10

$4 billion. As such, 3.95% rate increases do not enable any progress on the 11

Corporation’s equity ratio over the next decade. 12

Page 27: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 26 of 34 May 12, 2017

Conclusions 1

Overall, the approach to the uncertainty analysis that incorporates 3 interest rate 2

scenarios and generates 918 financial projections produces a reasonable and unbiased 3

representation of the financial risk facing the Corporation. This is based on the 4

similarity of outcomes achieved when results are compared to the uncertainty analysis 5

with 15,300 projections. 6

7

The uncertainty analysis demonstrates that with 7.90% rate increases, Manitoba Hydro 8

would make steady progress towards the minimum 25% equity ratio target and 9

achieve/exceed the target in the 10th year of the forecast in 50% of the cases. The 10

proposed 7.90% rate increases provide a level of domestic revenue that results in steady 11

earnings growth such that the net debt begins to decline following the commissioning of 12

the Bipole III and Keeyask projects. 13

14

The uncertainty analysis also demonstrates that 3.95% rate increases fail to provide 15

sufficient earnings both before and after the commissioning of Bipole III and the 16

Keeyask projects to make any improvement to the equity ratio or make any strides to 17

minimize the financial risks facing Manitoba Hydro over the next ten years. Given there 18

is only a 50% chance that the projected equity ratio will be either higher or lower than 19

13% while the overall variability of the equity ratio grows over the entire 10-year 20

forecast, 3.95% rate increases could place Manitoba Hydro at a higher risk that its debt 21

may not be viewed as self-supporting in the eyes of the credit rating agencies and 22

lenders. 23

Page 28: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 27 of 34 May 12, 2017

4.6 CREDIT RATING AGENCY PERSPECTIVES 1

2

The vast majority of Manitoba Hydro’s investment in new plant and assets is funded by 3

way of debt issuance advanced and guaranteed by the Province of Manitoba. While 4

Manitoba Hydro also uses internally generated cash flows to fund some level of 5

investment, due to the capital intensity of the Corporation’s business, debt financing is 6

both significant and essential. 7

8

Manitoba Hydro’s long and short term credit ratings are a flow-through of the Province 9

of Manitoba’s credit ratings (as highlighted in green in Figure 4.21 below): 10

11

Figure 4.21 Province of Manitoba Credit Ratings 12

13

14

Since the 2015/16 Electric GRA, the Province of Manitoba’s credit rating has been 15

downgraded by both Moody’s and S&P. The credit rating has come under increasing 16

pressure as the province’s debt burden grows. Figure 4.22 shows the comparative long 17

term credit ratings for each of the Canadian provinces. 18

19

Long

Term

Short

Term

Long

Term

Short

Term

Long

Term

Short

Term

AAA Aaa AAA

AA+ Aa1 AA high

AA Aa2 AA

AA- Aa3 AA low

A+ A1 A high

A A2 A

A- A-1/A-2 A3 P-1/P-2 A low

BBB+ A-2 Baa1 P-2 BBB high R-2 high

BBB A-2/A-3 Baa2 P-2/P-3 BBB R-2 middle

BBB- A-3 Baa3 P-3 BBB low R-2 low/R-3

R-1 high

R-1 middle

R-1 low

S&P Moody's DBRS

A-1+

A-1

P-1

Page 29: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 28 of 34 May 12, 2017

Figure 4.22 Provincial Long Term Credit Ratings Comparison 1

2 3

Figure 4.23 shows the downgrades of the western provinces that have occurred since 4

the last Electric GRA. 5

6

Figure 4.23 Downgrades of Western Provinces 7

8

9

The province’s credit rating should be of concern to Manitoba Hydro’s customers as it 10

impacts the cost of borrowing that the Corporation must recover in its rates. As 11

demonstrated in Figure 4.24, debt advances to Manitoba Hydro form a significant and 12

growing portion of the total provincial debt and the Corporation’s financial performance 13

is therefore a contributing factor toward the financial strength and assessment of the 14

Province’s credit rating. 15

Province Standard DBRS Moody's

& Poors Investors Service

British Columbia AAA AA (high) Aaa

Alberta AA # AA (high) Aa1 #

Saskatchewan AA+ # AA Aaa

Manitoba AA- # A (high) Aa2

Ontario A+ AA (low) Aa2

Québec A+ * A (high) Aa2

New Brunswick A+ A (high) Aa2

Nova Scotia A+ A (high) Aa2

Prince Edward Island A A (low) Aa2

Newfoundland & Labrador A# A (low) Aa3 #

* positive / # negative outlook

Province Standard DBRS Moody's

& Poors Investors Service

British Columbia 0 0 0

Alberta 2 1 1

Saskatchewan 1 0 0

Manitoba 1 0 1

Page 30: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 29 of 34 May 12, 2017

Figure 4.24 Composition of Province of Manitoba Debt 1

2

3

The credit rating agencies assign credit ratings based on their independent evaluations. 4

Each rating agency considers Manitoba Hydro’s financial risk profile including financial 5

performance, ratios and forecasts as well as the business risk profile in assessing 6

whether or not Manitoba Hydro is self-supporting. Providing that the rating agency 7

views Manitoba Hydro’s long term debt advances from the Province of Manitoba to be 8

self-supporting, the credit rating agencies have stated that they will not include 9

Manitoba Hydro’s debt levels (the blue portion in the bar chart) in the net tax-supported 10

provincial debt. This exclusion of Manitoba Hydro’s debt is significant when assessing 11

the Province of Manitoba’s ratio of net tax-supported provincial debt as a percent of 12

provincial GDP; a critical ratio for the provincial financial risk profile. Should Manitoba 13

Hydro lose its self-supporting status and the contingent liability represented by 14

Manitoba Hydro’s debt to the Province of Manitoba materialize, the implication to the 15

Province of Manitoba and its taxpayers is a higher risk of further downgrades. 16

17

On July 10, 2015 Moody’s downgraded the Province of Manitoba’s long term debt 18

credit rating, and revised the outlook on the Province of Manitoba's long term debt 19

-

5

10

15

20

25

30

35

40

45

2013 2017

Composition of Province of Manitoba Debt (in billions of $)As at March 31

Province of Manitoba (excluding Manitoba Hydro)

Manitoba Hydro

67%

33%

61%

39%

Page 31: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 30 of 34 May 12, 2017

rating from negative to stable. As indicated in the Moody’s report on the Province of 1

Manitoba: 2

3

“the downgrade reflects the deterioration of Manitoba’s financial metrics leading 4

to an increased debt burden and our expectation that the province will face 5

significant challenges in achieving fiscal balance by 2018-19”. 6

7

The credit rating and outlook from Moody’s has remained unchanged since July 10, 8

2015. Moody’s report on Manitoba Hydro from November 16, 2016 stated that: 9

10

“Moody’s continues to expect Manitoba Hydro to operate as a self-sufficient 11

corporation to service its debt and afford payments to the Province such as water 12

rentals and assessments”. 13

14

However in Moody’s report on the Province of Manitoba dated August 3, 2016, with 15

respect to Manitoba Hydro, Moody’s states: 16

17

“The anticipated increase in debt continues to pressure the province’s rating 18

since it raises the contingent liability of the province. Manitoba Hydro has 19

flexibility to increase utility rates to ensure that its own revenues will continue to 20

support its operations and debt payments. Political willingness to approve rate 21

increases when Manitoba Hydro's credit metrics will reach their low point will be 22

critical to recover expected capital expenditures and restore credit metrics.” 23

24

On July 14, 2016 S&P downgraded the Province of Manitoba’s long term debt credit 25

rating and placed the outlook as negative. The negative outlook reflects the view that 26

there is at least a one-in-three chance that S&P could lower the province’s ratings by 27

one notch in the subsequent 12 to 24 month period should the Province of Manitoba 28

fail to meet its fiscal targets. As indicated in this S&P report on the Province of 29

Manitoba: 30

31

“the downgrade reflects our assessment of the significant rise in Manitoba’s debt 32

burden. This stems from the province’s ongoing fiscal shortfalls and significant 33

Page 32: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 31 of 34 May 12, 2017

debt on-lent to the MHEB which we no longer consider to be self-supporting 1

mainly due to its high and rising leverage.” 2

3

S&P has clarified its rating methodology such that it now defines “self-supporting” as 4

maintaining stand-alone investment grade credit metrics. Since Manitoba Hydro does 5

not meet this standard, Manitoba Hydro’s debt is now included in the tax supported 6

debt of the Province. S&P considers Manitoba Hydro to have a “highly leveraged” 7

financial risk profile. 8

9

The S&P report on the Province of Manitoba from July 29, 2016 stated that: 10

11

“The province has run fiscal deficits since fiscal 2010 and MHEB is currently 12

undertaking a large capital program to renew and expand its generating assets. 13

The result has been a steady increase in the province's tax-supported debt burden 14

to a level that we view as very high and that is significantly higher than that of its 15

domestic and international peers. In addition, although we had previously 16

expected that Manitoba's debt burden would continue to grow, the pace of 17

borrowing in fiscal years 2016 and 2017 was greater than we had previously 18

expected.” 19

20

The credit rating and outlook from DBRS has remained unchanged since Manitoba 21

Hydro’s last GRA in 2015. 22

23

The November 25, 2016 DBRS rating report on Manitoba Hydro stated that: 24

25

“DBRS considers Manitoba Hydro to be self-supporting, as it is able to fund its 26

own operations and service debt obligations. However, DBRS could consider 27

reclassifying a portion of the Utility’s debt to be tax-supported should the 28

financial health of the Utility deteriorate to the point where its expenses cannot 29

be recovered through rates. If this were to occur, it could potentially put 30

downward pressure on the Province’s credit rating.” 31

32

“DBRS had noted that rate increases of 3.95% were expected to be insufficient for 33

Manitoba Hydro to recover costs related to major projects for the medium term.” 34

Page 33: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 32 of 34 May 12, 2017

1

Attached as Appendix 4.4 are the following credit reports that have recently been issued 2

by DBRS for Manitoba Hydro and the Province of Manitoba: 3

4

DBRS Manitoba Hydro November 25, 2016 5

DBRS Province of Manitoba September 12, 2016 6

DBRS Manitoba Hydro November 26, 2015 7

DBRS Province of Manitoba August 17, 2015 8

9

The following credit reports and ratings actions from Moody’s and S&P for Manitoba 10

Hydro and the Province of Manitoba have been filed in confidence with the PUB. These 11

reports are proprietary and Manitoba Hydro has not received permission to file these on 12

the public record. 13

14

Moody’s Manitoba Hydro November 16, 2016 15

Moody’s Province of Manitoba August 3, 2016 16

S & P Province of Manitoba July 29, 2016 17

S & P Province of Manitoba December 21, 2015 18

Moody’s Manitoba Hydro November 6, 2015 19

Moody’s Province of Manitoba July 16, 2015 20

21

In addition, the following ratings actions (downgrades) have recently been issued by 22

Moody’s and S&P with respect to long term credit ratings, and have been filed in 23

confidence with the PUB: 24

25

S & P Province of Manitoba July 14, 2016 26

Moody’s Province of Manitoba July 10, 2015 27

28

Credit rating agencies, in their review of provincial sovereign debt, take into 29

consideration the ratio of debt to GDP as one indicator of the financial health of the 30

bond issuer. Credit rating agencies are willing to exclude Manitoba Hydro’s debt from 31

the calculation of total provincial debt so long as Manitoba Hydro is deemed to be self-32

supporting in its ability to adequately support the cost of its borrowing. In the event 33

Page 34: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 33 of 34 May 12, 2017

that Manitoba Hydro’s financial situation deteriorates to a level whereby the credit 1

rating agency no longer views it as self-supporting, the level of total provincial debt 2

must then include that attributed to Manitoba Hydro. 3

4

Figure 4.25 below illustrates that the level of borrowing required for Manitoba Hydro's 5

capital expansion will dramatically increase the total level of debt taken on by the 6

Province. If Manitoba Hydro is no longer considered to be self-supporting (as S&P has 7

now concluded), Manitoba Hydro’s debt would need to be included in the tax supported 8

debt of the Province for purposes of ratio calculation for assessing the financial strength 9

of the Province. In combination with the Province’s estimated borrowings over the 10

course of the next few years, BCG projected that the debt-to-GDP ratio would increase 11

to 65% by the fiscal year 2023. 12

13

Figure 4.25 Manitoba Debt to GDP Ratio 14

15 16

Page 35: MANITOBA HYDRO 2017/18 & 2018/19 GENERAL RATE … · Tab 4 Page 1 of 34 May 12, 2017 1 MANITOBA HYDRO 2 2017/18 & 2018/19 GENERAL RATE APPLICATION 3 4 FINANCIAL TARGETS & UNCERTAINTY

Tab 4 Page 34 of 34 May 12, 2017

As shown in the Figure above, the circumstances facing the Province of Manitoba and 1

Manitoba Hydro at this time are far different from those experienced in the past, in 2

terms of the level of debt compared to GDP. 3

4

Therefore, it is critical that credit rating agencies view Manitoba Hydro’s debt as self-5

supporting and that weakened financial ratios as a result of major capital investments 6

and reinvestments do not negatively impact the credit rating of the Province. An 7

implication of the recent and potential future downgrades is an increased cost of 8

borrowing. 9

10

The proposed rate increases are necessary to demonstrate to the credit rating agencies 11

that Manitoba Hydro is on a path to maintain its self-supporting financial status. 12