Manual: Distribution Substation Manual (DSM) Section 2: Medium Voltage Network Arrangements Standard Number: HPC-5DA-07-0002-2012

Upload: others

Post on 18-Jun-2020

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

Manual: Distribution Substation Manual (DSM) Section 2: Medium Voltage Network Arrangements

Standard Number: HPC-5DA-07-0002-2012

Page 2: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 2 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Document Control

Original Author Name: Viswa Easwaran

Position: Standards Engineer

Rev. 1 Author Name: Adrian Barnes

Position: Senior Standards Engineer

Document Owner

(May also be the Process Owner)

Name: Adrian Barnes

Position: Senior Standards Engineer

Endorsed By Name: Dieter Mendoza

Position: Engineering Services Manager / Principal Engineer

Approved By * Name: Marc Beckx

Position: Manager Engineering and Project Services

Date Created/Last Updated July 2017

Review Frequency ** 3 years

Next Review Date ** July 2020

* Shall be the Process Owner and is the person assigned authority and responsibility for managing the whole process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business results.

** Frequency period is dependent upon circumstances– maximum is 5 years from last issue, review, or revision whichever is the latest. If left blank, the default shall be 1 year unless otherwise specified.

Revision Control

Revision Date Description

0 12/07/2013 Initial Document Creation

1 03/07/2017 1st revision, removing design philosophy and design notes

STAKEHOLDERS

The following positions shall be consulted if an update or review is required:

Asset Managers Manager Capacity Management Services

Manager Health and Safety

Page 3: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 3 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

TABLE OF CONTENTS

1 CONTENTS .................................................................................................. 4

1.1 Index of Drawings ................................................................................................... 4

2 Drawings ...................................................................................................... 6 Appendix A Revision Information .......................................................................................................................... 47

Page 4: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 4 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

1 CONTENTS

1.1 Index of Drawings

Drawing Number Drawing Title

DSM-2-00 Legend

6.6 kV Overhead Supply

DSM-2-01 District And Sole Use Substations – Typical Urban

DSM-2-02 Customer Owned Substations - Typical Urban

6.6 kV Underground Supply

DSM-2-03 District And Sole Use Substations - Typical Urban

DSM-2-04 Customer Owned Substations - Typical Urban

11 kV Overhead Supply

DSM-2-05 District And Sole Use Substations – Typical Urban

DSM-2-06 Customer Owned Substations - Typical Urban

11 kV Underground Supply

DSM-2-07 District And Sole Use Substations - Typical Urban

DSM-2-08 Customer Owned Substations - Typical Urban

22 kV Overhead Supply

DSM-2-09 District And Sole Use Substations - Typical Urban

DSM-2-10 District And Sole Use Substations - Typical Rural

DSM-2-11 Customer Owned Substations - Typical Urban

DSM-2-12 Customer Owned Substations - Typical Rural

22 kV Underground Supply

DSM-2-13 District And Sole Use Substations - Typical Urban and Rural

DSM-2-14 Customer Owned Substations - Typical Urban and Rural

33 kV Overhead Supply

DSM-2-15 District And Sole Use Substations - Typical Rural

DSM-2-16 Customer Owned Substations - Typical Rural

Page 5: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 5 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Drawing Number Drawing Title

33 kV Underground Supply

DSM-2-17 District And Sole Use Substations - Typical Urban and Rural

DSM-2-18 Customer Owned Substations - Typical Urban and Rural

Page 6: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 6 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

2 DRAWINGS

Page 7: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 7 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 8: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 8 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 9: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 9 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 10: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 10 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 11: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 11 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 12: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 12 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 13: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 13 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 14: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 14 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 15: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 15 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 16: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 16 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 17: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 17 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 18: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 18 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 19: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 19 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 20: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 20 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 21: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 21 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 22: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 22 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 23: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 23 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 24: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 24 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 25: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 25 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 26: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 26 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 27: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 27 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 28: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 28 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 29: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 29 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 30: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 30 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 31: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 31 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 32: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 32 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 33: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 33 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 34: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 34 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 35: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 35 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 36: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 36 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 37: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 37 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 38: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 38 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 39: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 39 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 40: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 40 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 41: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 41 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 42: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 42 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 43: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 43 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 44: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 44 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 45: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 45 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 46: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 46 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

Page 47: Manual: Distribution Substation Manual (DSM) Section 2 ... · process, end-to-end, which may extend across more than one division and/or functions, in order to deliver agreed business

CS10# 3666719 HPC-5DA-07-0002-2012 Page 47 of 47 Print Date 3/07/2017

© Horizon Power Corporation Uncontrolled document when downloaded. Refer to CS10 for current version.

APPENDIX A REVISION INFORMATION (Informative) Horizon Power has endeavoured to provide standards of the highest quality and would appreciate notification of errors or queries.

Each Standard makes use of its own comment sheet which is maintained throughout the life of the standard, which lists all comments made by stakeholders regarding the standard.

A comment sheet found in CS10# 3486430 can be used to record any errors or queries found in or pertaining to this standard. This comment sheet will be referred to each time the standard is updated.

Date Rev No. Notes

12/07/2013 0 Original Issue

03/07/2017 1 1st revision, removing design philosophy and design notes. This content may now be found in the Distribution Design Rules HPC-9DJ-01-0002-2015