(manual form) application solar up to 12kw

Upload: yeit-hau

Post on 02-Apr-2018

226 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    1/16

    Form version: 2.0/01-12-2012

    1 | P a g e

    MANUAL FEED-IN APPROVAL APPLICATION FORM (SOLAR PV 12 kWp)By Individual Only

    Please tick () in the applicable boxes.

    Information on Applicant

    Name of Applicant:

    MyKad No. / Passport No. / Registration

    No. (or if not available, Service Tax

    Registration No.1):

    e-PBT No.2:

    Information on New or Existing Project

    Renewable Resource: Solar PV

    Project Status:

    New project

    Existing project with net metering

    Total installed capacity (MW3):

    Net export capacity (MW)

    Voltage level at Connection

    Point:

    Low voltage

    Connection Type: Low voltage direct connection

    Low voltage in-direct connection

    Name of Distribution Licensee:(e.g. TNB, SESB, etc.

    1

    Not applicable to local authorities.2Only applicable to local authorities.

    31 MW = 1,000 kW

    For office use only:

    Reference No. : .

    Serial No. : .

    Date received : .../../

    Time received : .

    Receiving Officer : .

    Please submit your application form to:

    Sustainable Energy Development Authority Malaysia

    Galeria PjH

    Aras 9, Jalan P4W

    Persiaran Perdana

    Presint 4

    62100 Putrajaya, MALAYSIA

    Tel No.: 03 8870 5800

    Fax No.: 03 8870 5900

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    2/16

    Form version: 2.0/01-12-2012

    2 | P a g e

    Applicable criteria for bonus feed-in tariff rate in addition to basic feed-in tariff rate (ifany):

    Use as installations in buildings or building structures

    Use as building material

    Use of locally manufactured or assembled solar PV modules

    Use of locally manufactured or assembled solar inverters

    Location of RE Project Site

    UPI (Universal Parcel Identifier) location

    District:

    Sub-District / City / Town:

    Section:

    Lot / PT No.:

    Project site address

    Address:

    Postcode: District:

    State:

    Please enter the GPS location of project or attach site map. If entering GPS location, please

    enter the latitude and longitude coordinates in degrees, minutes and seconds format

    (DDMMSS) (e.g. Latitude: 5 18' 56.9802", Longitude: 103 7' 16.647").

    Latitude: Longitude:

    Site Ownership: Fully Owned Owned (Charged To Bank) Leased

    Owner of the site / Bank Name / Lessor Name (if leased):

    The Applicant is required to provide documents proving the Applicant's ownership of the

    site, or other conditional or unconditional rights (e.g. letter or agreement) that the Applicant

    has to utilise/lease the site for a minimum period equivalent to the effective period.

    Current site

    activities:

    Agriculture

    Others

    Commercial Industrial Residential

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    3/16

    Form version: 2.0/01-12-2012

    3 | P a g e

    ContractorThis section is only applicable to new projects

    Details of service provider4

    Company Registration No.:

    Company Name:

    Business Address:

    City: Postcode:

    State:Telephone No: Fax No:

    E-mail: Website:

    Project manager5(if any)

    Name of Project Manager:

    Nationality:

    MyKad No./Passport No.:

    Telephone No: Mobile No:

    Email:

    Qualified Persons6

    Qualified Person 1

    Name of Qualified Person:

    MyKad No./Passport No.:

    Organisation or Company

    Name:

    Company Registration No.(if any):

    Telephone No: Mobile No:

    Email:

    4 The service provider can be a main engineering procurement and construction contractor, system integrator or

    technology provider based in Malaysia. The Applicant may also be its own service provider provided that its employees

    possess the applicable qualifications. A service provider may also be one of the qualified persons.5Theproject manager can be an employee of either the Applicant or the service provider.

    6Persons tasked by the Applicant with the carrying out of any work, action, certification, obligation or responsibility to the

    compliance with any provisions of any subsidiary legislation made pursuant to the Renewable Energy Act 2011. TheApplicant is required to provide evidence of qualifications of qualified persons consistent with the requirements of the

    Renewable Energy (Technical and Operations) Rules 2011.

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    4/16

    Form version: 2.0/01-12-2012

    4 | P a g e

    Scope of Work:

    Qualified Person 2

    Name of Qualified Person:

    MyKad No./Passport No.:

    Organisation or Company

    Name:

    Company Registration No.

    (if any):Telephone No: Mobile No:

    Email:

    Scope of Work:

    Qualified Person 3

    Name of Qualified Person:

    MyKad No./Passport No.:Organisation or Company

    Name:

    Company Registration No.

    (if any):

    Telephone No: Mobile No.:

    Email:

    Scope of Work:

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    5/16

    Form version: 2.0/01-12-2012

    5 | P a g e

    Technical Information on New or Existing Project

    Total Installed Capacity (MW):

    Net Export Capacity (MW)

    Interconnection Voltage (kV)7:

    (e.g.: 0.23kV, 0.4kV, 11kV, 22kV or 33kV)

    Distance from the plant to interconnection point (km):

    Module Type: Monocrystalline

    Polycrystalline

    Thin Film Amorphous Silicon

    Thin Film Compound

    Others

    Generation8

    Export9

    Capacity factor10

    (%):

    Energy Yield (MWh/year):

    Specific Yield (MWh/MW/year):

    Yield Projection

    Year / Yield

    Generation Based On Installed

    Capacity

    Export / Declared Annual

    Availability11

    (Based On Net Export Capacity)

    MWh Capacity Factor

    (%)

    MWh Percentage Export

    (%)

    1

    2

    3

    4

    5

    6

    7

    8

    7As determine by PSS or CCC (if any)

    8Total amount of renewable energy to be generated by the renewable energy installation in a year.

    9Total amount of renewable energy to be generated by the renewable energy installation and delivered up to the

    connection point in a year.10

    Capacity Factor Formula:

    Capacity Factor (%) = [Energy Generated (MWh)/(Installed Capacity (MW)* 8760)] * 100

    Percentage Export (%) = [Energy Export (MWh) / (Net Export Capacity (MW)* 8760)] * 10011The Declared Annual Availability will be automatically pro-rated for the first and last years by the e-FiT Online System

    based on export data input

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    6/16

    Form version: 2.0/01-12-2012

    6 | P a g e

    910

    11

    12

    13

    14

    15

    16

    17

    18

    1920

    21

    22

    These data entries will be automatically calculated by the e-FiT Online System using the

    information submitted by the Applicant above.

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    7/16

    Form version: 2.0/01-12-2012

    7 | P a g e

    FinancingThis section is only applicable to new projects.

    A. Projected Capital Expenditure1. Equipment Cost:

    Description Cost (RM)

    PV modules

    Inverter

    Balance of System

    2. Installation Cost (RM):3. Design & Consultancy (RM):4. Interconnection Cost (RM):5. Preliminary Cost (RM):6. Other Capital Cost (Please specify):

    Description Amount (RM)

    Total Capital Cost (RM):Summation of Section A (No. 1 6)

    B. Loan

    Do you require a loan? Yes No

    If yes, please fill in your loan information below.

    Financier:

    Loan Amount (RM):

    Loan Interest (%):

    Loan Tenure (years):

    Please attach the conditional letter(s) of approval from the entity(ies) who will be providing

    financing to the Applicant for the project. Such conditional letters of approval should state,

    among others, that the entity(ies) has considered the Applicants financing proposal and

    agrees to provide financing for the project subject to the grant of the feed-in approval to

    the Applicant.

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    8/16

    Form version: 2.0/01-12-2012

    8 | P a g e

    Total equity contribution by the Applicant

    12

    Equity (RM) : Percentage13

    (%):

    C. Projected Annual Operational Expenditure

    1. Insurance Premium (RM):2. Operation & Maintenance Cost (RM):3. Other Operating Cost (Please specify):

    Description Amount (RM)

    Total Operating Cost (RM):(Summation of Section C (No. 1- 3)

    Project IRR

    Project IRR (%):

    12Note for company only : As part of your Financial milestones, you will be required to upload a copy of your company's

    bank account latest 3 months statements showing a minimum credit balance of 5% of the capital cost of your project.13

    Applicants equity is limited to not less than 5% of the total project cost.

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    9/16

    Form version: 2.0/01-12-2012

    9 | P a g e

    Proposed Work Plan14

    Please select proposed work plan:

    Work Plan A: If Renewable Energy Installation will be connected to a Low Voltage Supply

    Line.

    Work Plan B: If Renewable Energy Installation is an existing project with net metering.

    Work Plan A

    No. Milestones Estimated Due Date

    1. Feed-in approval application submission date

    Time frame: Month (s)15

    Week (s)

    2. Registration of Renewable Energy Power Purchase

    Agreement (REPPA) with the Sustainable Energy

    Development Authority (SEDA) Malaysia

    Time frame: Month (s) Week (s)

    3. 1st

    Payment to Contractor

    Time frame: Month (s) Week (s)

    4. Feed-in tariff Commencement Date

    14

    Total duration must not exceed 36 months.15Minimum time frame for registration of REPPA is 2 months

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    10/16

    Form version: 2.0/01-12-2012

    10 | P a g e

    Work Plan B

    No. Milestones Estimated Due Date

    1 Feed-in approval application submission date

    Time frame: Month (s)16

    Week (s)

    2 Registration of renewable energy power purchase

    agreement (REPPA) with the Sustainable Energy

    Development Authority (SEDA) Malaysia

    Time frame: Month (s) Week (s)

    3. Feed-in tariff Commencement Date

    These data entries will be automatically calculated by the e-FiT Online System using

    the information submitted by the Applicant above.

    16Minimum time frame for registration of REPPA is 2 months

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    11/16

    Form version: 2.0/01-12-2012

    11 | P a g e

    Supporting Documents Checklist

    The certified true copies of the following documents are to be submitted in support of this

    application, where applicable17

    .

    1. The detailed engineering design of the renewable energy installation,including all relevant calculations to justify the installed capacity and

    claimed efficiencies must be made available in CD and hardcopy to be

    delivered to SEDA Malaysia office within 7 working days of a successful

    submission of FiT application;

    2. The feed-in approval currently or previously held by the Applicant, if any; 3. Documents proving the Applicant's ownership of the site, or other

    conditional or unconditional rights (e.g. letter or agreement) that the

    Applicant has to utilise/lease the site for a minimum period equivalent to

    the effective period.

    4. Applicable documents as required in column 3 of the First Schedule of theRenewable Energy (Feed-in Approval and Feed-in Tariff Rate) Rules 2011,

    for bonus feed-in tariff rate in addition to basic feed-in tariff rate, where the

    renewable energy installation has any one or more of the following criteria:

    i) Use as installation in buildings or building structures.- Design drawings accompanied by the written confirmation by a

    qualified person that the criteria will be met based on such

    design drawings

    ii) Use as a building materials- Design drawings accompanied by the written confirmation by a

    qualified person that the criteria will be met based on such

    design drawings.

    17The maximum page size for supporting documents is A3.

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    12/16

    Form version: 2.0/01-12-2012

    12 | P a g e

    ii) Use of locally manufactured or assembled solar PV modules, either:

    - A certified copy of the manufacturers licence issued under theIndustrial Co-ordination Act 1975 [Act 156];

    - A certificate of factory acceptance test or its equivalent; or- A certificate from the manufacturer.

    iv) Use of locally manufactured or assembled solar inverters, either:

    - A certified copy of the manufacturers licence issued under theIndustrial Co-ordination Act 1975 [Act 156];

    - A certificate of factory acceptance test or its equivalent; or- A certificate from the manufacturer;

    5. A certificate in solar photovoltaic system design from any institutionrecognised by the Authority.

    6. A certificate(s) of Competency as a Wireman issued by the EnergyCommission to the Qualified Person(s);

    7. The site map (if GPS coordinates are not provided) 8. If the project requires loan from a bank(s) or financier(s), please provide the

    following documents:

    a) The letter(s) of intent/offer letter(s)/financing term sheet(s) fromthe entity(ies) that will be or has provided financing to the Applicant

    for the project; and

    b) Relevant documents to prove that the Applicant must raise capitalequivalent to at least 5 % of the total capital cost of the Renewable

    Energy Installation.

    If the project is self-financed, please provide the following documents as

    applicable:

    a) Company Relevant documents confirming that you have thefinancial capacity equivalent to or your bank account statement

    showing a credit balance of at least the total capital cost of the

    Renewable Energy installation.

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    13/16

    Form version: 2.0/01-12-2012

    13 | P a g e

    b)

    Individual Relevant documents confirming that you have thefinancial capacity equivalent to or your bank account statement

    showing a credit balance of at least the total capital cost of the

    Renewable Energy installation.

    c) Other entities Relevant documents confirming that you have thefinancial capacity equivalent to or your bank account statement

    showing a credit balance of at least the total capital cost of the

    Renewable Energy installation.

    9. Land title 10. Others (Please specify):

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    14/16

    Form version: 2.0/01-12-2012

    14 | P a g e

    Declaration

    Declaration Form for Solar PV Feed-in Approval Application (12kWp) by Individual Only*

    Applicants Name :

    Total Installed Capacity (MWp) :

    Method of Connection :

    Feed-in Tariff Rate (RM/kWh) :

    Bonus :

    SCOD :

    Installation Address :

    I, [Name: .., MyKad/ Passport No.: ],

    the Applicant, hereby declare that:

    1. All information and accompanying documents submitted herein are true, accurate and

    complete. I am not aware of any other information or document which would make thedocuments submitted herein untrue or misleading. I understand and acknowledge that the

    omission of any relevant information or document, or the submission of any information or

    document that is false or misleading may result in the rejection of this application, the

    revocation of any feed-in approval granted pursuant to this application and/or would constitute

    an offence committed by me under the Renewable Energy Act 2011 and/or its applicable

    subsidiary legislation.

    2. The certified true copies of the documents identified in the Supporting Documents Checklist of

    this application form have been submitted by the Applicant to the Sustainable Energy

    Development Authority Malaysia in support of this application.

    3. I agree that any additional information that may henceforth be required will be submitted by me

    by electronic medium or by way of electronic transmission in accordance with the requirements

    of the Sustainable Energy Development Authority Malaysia. Such information shall include but is

    not limited to information relating to the milestones for the proposed renewable energy

    installation and the dates by which such milestones are to be achieved. The declaration I have

    made in paragraph 1 above shall be repeated for any additional information I may submit in

    accordance with this paragraph 3.

    4. I will immediately notify the Sustainable Energy Development Authority Malaysia if I become

    bankrupt.

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    15/16

    Form version: 2.0/01-12-2012

    15 | P a g e

    5. A service provider may be appointed by me to make this application on my behalf but I shall befully responsible for the contents thereof.

    6. I hereby agree to the Terms and Conditions of Use of the Sustainable Energy Development

    Authority Malaysia website. These terms include but are not limited to the restriction on

    divulging the e-FiT Online System username and password assigned to the Applicant to any third

    party and permitting or encouraging any unauthorised user to access the restricted section in

    the e-FiT Online System by using the username and password assigned to me.

    7. I hereby agree and consent to the full disclosure of the information submitted with this

    application and any additional information I may submit in accordance with paragraph 3 above

    to the Energy Commission and any service provider and/or financier identified by me. I alsoagree and consent to the disclosure of such information to the distribution licensee whose

    electricity distribution network the proposed renewable energy installation is to be connected

    to, to the extent deemed appropriate by the Sustainable Energy Development Authority

    Malaysia. Such disclosure shall not be a breach of any confidentiality obligations owed to me by

    the Sustainable Energy Development Authority Malaysia.

    8. I have read and understood all the rules and regulations as stipulated in the Renewable Energy

    Act 2011, its subsidiary legislations and SEDAs Guidelines and Determinations. This Registration

    complies with the provisions of the Renewable Energy Act 2011 and subsidiary legislations made

    thereunder.

    Name: MyKad No./Passport No:

    Date:

  • 7/27/2019 (Manual Form) Application Solar Up to 12kw

    16/16

    Declaration by Service Provider18

    I,[Name: .., MyKad No.: ..],

    the service provider, hereby agree that paragraphs 1, 2, 3, 6, 7 and 8 of the above declaration by the

    Applicant shall apply to me in making this application on behalf of the Applicant.

    Name:

    MyKad No./Passport No:

    Designation:

    Date:

    18If application is submitted on behalf of the Applicant by a service provider.