40 Manual No. 4 NORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board, has formulated siting guidelines for the industries to stop haphazard growth of industry and to effectively implement the provisions of various pollution control laws. These siting guidelines are helpful in control of pollution and protection of the society from all the effects of pollution from the industries/development projects. The siting guidelines have been broadly categorized as under. The officers of the Board follow the following guidelines while discharge their duties: General guidelines Industry specific guidelines City/Area Specific guidelines 4.1.1. General Guidelines The Board has issued office order vide No.GPC/NIP/F-10/2010/4 dated 17/2/2010 for the Policy guidelines regardidng categorization of industries & procedure for Consent Management mechanism and validity period for various categories of industries. The Punjab Pollution Control Board vide its No. EE(Mega)/2013/19650-761 dated 30.4.2013 has further revised the Policy of Consent Management, which is placed as below:-

Upload: others

Post on 19-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

40

Manual No. 4

NORMS SET FOR THE DISCHARGE OF FUNCTIONS

TECHNICAL MATTERS

The Punjab Pollution Control Board, has formulated siting

guidelines for the industries to stop haphazard growth of industry and to

effectively implement the provisions of various pollution control laws. These siting

guidelines are helpful in control of pollution and protection of the society from all the

effects of pollution from the industries/development projects. The siting guidelines

have been broadly categorized as under. The officers of the Board follow the following

guidelines while discharge their duties:

General guidelines

Industry specific guidelines

City/Area Specific guidelines

4.1.1. General Guidelines

The Board has issued office order vide No.GPC/NIP/F-10/2010/4 dated

17/2/2010 for the Policy guidelines regardidng categorization of industries & procedure

for Consent Management mechanism and validity period for various categories of

industries. The Punjab Pollution Control Board vide its No. EE(Mega)/2013/19650-761

dated 30.4.2013 has further revised the Policy of Consent Management, which is

placed as below:-

Page 2: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

41

INDEX

Sr. No.

Description Annexure Number

Page Number

1. Policy of Punjab Pollution Control Board regarding Consent Management/ Authorization

-- 1-25

ANNEXURES

2. List of red category of industries Annexure - 1 26

3. List of orange category of industries Annexure - 2 29

4. List of green category of industries Annexure - 3 32

5. Requisite documents of NOC Annexure - 4 35

6. Fee criteria Annexure - 5 36

7. SAC requirement letter Annexure - 6 39

8. Requisite documents for CTO Annexure - 7 41

9. Requisite documents for renewal/varied

consent

Annexure - 8 42

10. Siting guidelines for rice shellers/par-boiling

plants

Annexure - 9 43

11. Clarification with regard to siting guidelines

for rice shellers/par-boiling plants

Annexure -

9(a)

48

12. Clarification with regard to siting guidelines

for rice shellers/par-boiling plants

Annexure -

9(b)

46

13. Amendment in siting guidelines for rice

shellers/par-boiling plants

Annexure -

9(C)

47

14. Siting guidelines for brick kilns/cement plants Annexure - 10 50

Page 3: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

42

15. Siting guidelines for hot mix plants Annexure - 11 53

16. Siting guidelines for Stone Crushers Annexure - 12 55

17. Amendment in siting guidelines for stone

crushers

Annexure -

12(a)

60

18. Amendment in siting guidelines for stone

crushers

Annexure -

12(b)

62

19. Department of Forest and Wildlife guidelines Annexure - 13 65

20. Guidelines for construction projects Annexure - 14 83

21. Amendment in guidelines for construction

projects

Annexure - 15 86

22. Office order No. 198 dated 21.11.1995 Annexure - 16 87

23. Office order No. 2 dated 17.02.2010 Annexure - 17 88

24. Fee criteria for the period 01.04.1992 to

09.10.1994

Annexure - 18 96

25. Fee criteria for the period 10.10.1994 to

30.09.2004

Annexure - 19 97

26. Fee criteria for the period 01.10.2004 to

21.10.2009

Annexure – 20 99

27. How to calculate the fee to be deposited by

the industry on a/c of increase in the value of

fixed capital investment

Annexure - 21 101

28. Criteria as to how the fee is to be charged for

adjusting the validity period of different

category industries upto the culminating

period

Annexure - 22 102

29. How to calculate the fee to be consumed out

of the fee deposited for 15 years

Annexure - 23 103

30. Procedure for processing the cases for

restoration of power supply/release of Bank

Guarantee/ withdrawal of directions

Annexure - 24 104

Page 4: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

43

31. -do- Annexure – 25 107

32. -do- Annexure - 26 108

33. -do- Annexure - 27 109

34. Frequency of visit/sampling Annexure - 28 110

35. New list of industries exempted from consent

management

Annexure - 29 112

36. Old list of industries exempted for consent management

Annexure - 30 117

37. -do- Annexure - 31 121

38. Exemption of hosiery units from consent

management

Annexure - 32 122

39. Exemption of IT/ITEs units from consent

management

Annexure - 33 130

40. Amendment in the circular for exemption of

IT/ITEs units from consent management

Annexure – 34 125

41. Release of 25% of total power load to the

industries

Annexure – 35 126

42. -do- Annexure – 36 128

43. NOC/clearance certificate for extension in the

power load for running of ETP/APCD

Annexure – 37 129

44. 100% extension in the power for the green

category unit existing in non-designated

areas

Annexure - 38 130

45. Regarding consent fee Annexure - 39 134

46. Policy regarding CTE/CTO in non-designated

area

Annexure - 40 135

47. -do- Annexure - 41 136

48. -do- Annexure - 42 138

49. Timelines for NOC Annexure - 43 140

Page 5: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

44

50. Definition of fixed capital investment Annexure - 44 142

51. Regarding exemption of industries Annexure - 45 143

52. Timelines for green category units in

Industrial Zone

Annexure - 46 144

53. Delegation of powers Annexure - 47 145

54. Policy to be adopted for installation of

Sewage Treatment Plants for colonies

proposed to be established

Annexure - 48 146

55. Delegation of powers for restoration of power

supply

Annexure - 49 148

56. Link of environmental clearance with SCA-

SAC cases

Annexure - 50 152

57. Delegation of powers for CETPs

Annexure - 51 150

58. Review of validity period of CTO granted by

the Board under the Water Act, 1974 and Air

Act, 1981

Annexure - 52 151

59. Regarding ensuring regular operation of

pollution control devices

Annexure - 53 154

60. Supply of a copy of notices to computer

section

Annexure - 54 155

61. Procedure for collection of samples by private

laboratories

Annexure - 55 158

62. Disconnection of power supply of closed units Annexure - 56 159

63. Powers for re-sampling of wastewater / stack Annexure - 57 161

Page 6: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

45

emissions

64. Regarding exercising of powers delegated to

SEEs/EEs

Annexure - 58 162

65. Sampling procedure of wastewater Annexure - 59 164

66. Submission of visit reports by special teams Annexure - 60 166

67. Vetting of show cause notices / Orders for

closure from LO

Annexure - 61 167

68. Regarding plantation Annexure - 62 168

69. Policy to be adopted for installation of STP

for hotels/ restaurants/ Marriage palace /

resorts in operation and proposed to be

established or being established

Annexure - 63 169

70. Procedure for consent management Annexure - 64 170

71. Applicability for HCs regarding consent

management

Annexure - 65 171

72. Timelines for ROs for restoration of power

supply

Annexure - 66 172

73. Guidelines permitting the use of petcoke in

boiler/furnaces

Annexure - 67 174

74. Consent management of units falling in

Master Plan / Outside Master Plan

Annexure - 68 176

75. Regarding permission of CGWA for

abstraction of groundwater

Annexure - 69 177

76. Fee for filing appeal before Appellate

Authority

Annexure - 70 179

77. Permission for building plan Annexure - 71 180

78. Siting guidelines for hotel/motel / restaurant

/ Lodge /Inn/Guest House/Banquet Hall /

Marriage Palace

Annexure - 72 181

79. Fee for CTO for local bodies Annexure - 73 183

Page 7: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

46

80. Regularization of consents for operation of

additional machinery/ modification /

increase in production capacity by

industries /project proponents under Water

Act, 1974 and Air Act, 1981

Annexure - 74 184

81. Permission for disposal of material

confiscated under NDPS Act by the Police

Authorities and other agencies

Annexure - 75 186

82. Regarding mining of minor minerals Annexure - 76 187

83. Eexemption of solar photovoltaic plants

having capacity less than 5MW from the

consent management system

Annexure - 77 189

********

Page 8: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

47

Policy of Punjab Pollution Control Board regarding Consent Management/Authorization

After the enactment of the Water (Prevention and Control of Pollution) Act, 1974 and the Air

(Prevention and Control of Pollution) Act, 1981, the Punjab Pollution Control Board had

framed policies / guidelines for consent management from time to time as per the prevailing

situations. Lastly, the Punjab Pollution Control Board vide office order no. 4 dated 17/2/2010

has framed a comprehensive policy for consent management so as to streamline the

procedure for grant of various statutory clearances viz-a-viz hassle free clearance to the

entrepreneurs to encourage industrial growth in the State. In order to have a sustainable

industrial growth in the State of Punjab, it was felt to review the policy/ guidelines of the

State. Furthermore, the State of Punjab is in the process of implementing the administrative

reforms so as to achieve sustainable development of the State. Consent management Models

of various State Pollution Control Boards such as Tamilnadu, Gujarat and Haryana studied in

detail. The revised policy / consent management for grant of various statutory clearances

under the Pollution Control Laws, Environment (Protection) Act, 1986 and Rules framed

thereunder, is encapsulated below:

A. Categorization of industries

PPCB has categorized all existing as well as new industries into three

categories namely Red, Orange and Green keeping in view their pollution

potential. List of these categories is attached as Annexure-1, 2

However, if any additional category of industry is left out of the above scheme, then

a Committee comprising of Senior Environmental Engineer (HQ-2), Senior Scientific

Officer and Environmental Engineer (HO) will decide the said category of industry

as per its pollution potential.

B. Consent to Establish

No industrial plant, activity, operation, process, any construction project including

New Township, Industrial Township, Settlement Colonies, Commercial Complexes,

Hotel Complexes, Hospitals and Office Complexes, Industrial Estates/Industrial Area

can be established or expansion of any existing industry/project can be carried out

in the State of Punjab except the industries exempted from consent management of

the Board, without obtaining 'consent to establish' under the Water (Prevention &

Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981.

All the prospective entrepreneurs, who intend to establish such projects as above

Page 9: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

48

are required to obtain consent to establish of the Board u/s 25 of the Water act,

1974 and u/s 21 of the Air Act, 1981. The PPCB has evolved a common

application form for large, medium and small scale industries for consent

management and authorization, though the consent/ authorization would be

granted separately, which is available on the website of the Punjab Pollution

Control Board i.e. www.ppcb.gov.in The application to be filed by the entrepreneur

for „consent to establish' shall be accompanied with requisite documents, which are

given as per Annexure-4 alongwith fee prescribed by the Board, which is given

as per Annexure-5.

The Punjab Pollution Control Board (PPCB) is accepting application for

consent management/ authorization of all large, medium and small scale of

industries for obtaining consent to establish (NOC)/ operate in the State

through „Online Consent Management and Monitoring System.' However,

small scale industries will have the option to submit the hard copy as well.

Since the PPCB endeavours to become fully paperless, it does not encourage

the industries to submit offline consent application. However, for the purpose

of record, the Board accepts one hard copy of the application alongwith

required documents duly signed by the authorized signatory.

PPCB has adopted payment gateway system for all charges payable to it with

effect from 1.4.2013.

The Punjab Pollution Control Board will decide the applications for consent to

establish (NOC) of all industries to be set up in designated/ approved areas

such as Industrial Area/ Industrial Estate / Industrial Focal Point/ Approved

Industrial Park / Industrial Zone of the Master Plan. However, the Site

Clearance u/s 41 (A) of the Factories Act, 1948 will not be necessary for

grant of consent to establish/ operate/ authorization by the Board.

A copy of the NOC granted to the entrepreneur by the Board will be endorsed to the

Deptt. of Factories, Punjab. Also, a condition will be imposed in the said „consent to

establish' to the effect that the entrepreneur / industry shall obtain necessary

statutory permissions / clearances from all other concerned departments.

Accordingly, the letter no. CSA/04/P-48/7084-98 dated 22.06.2006 Annexure-6 of

Page 10: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

49

the Board stands omitted. However, Press Note 17 (1984 series) relating to Site

Clearance from environmental angle for the industries will remain operative.

For industries to be set up in areas other than the area such as designated /

approved areas such as Industrial Area / Industrial Estate/ Industrial Focal

Point /Approved Industrial Park / Industrial Zone of the Master Plan, site

clearance u/s 41 of the Factories Act, 1948 will be necessary before grant of

consent to establish/ authorization by the Board.

In cases, where an industrial plot is allotted by any of the agencies of the

Government/ statutory bodies or by a project developer whose project of

industrial park has been approved by the State Government, certificate of

allotment/ sale of plot by such an agency wil l be considered for grant of

consent to establish (NOC)/ authorization by the Board.

The PPCB will continue to grant consent to establish to any category of

industries, which are permissible in the mixed land use areas/zones as per

by-laws of the notified Master Plan / draft master plan. The Officers of the

Board shall check the permissibility of establishment of such industry in the

mixed land use from the bye-laws of the Master Plan.

In cases, where the site of the project is located in the area other than areas

such as designated/ approved areas such as Industrial Area/ Industrial

Estate/ Industrial Focal Point/ approved Industrial Park / Industrial Zone of

the Master Plan, certificate of its location/situation from the nearest village lal

lakir/ phirni/ MC limits from the Revenue Authorities such as Deputy

Commissioner/ Additional Deputy Commissioner or the Sub-Divisional

Magistrate would be required for grant of consent to establish (NOC)/

authorization by the Board.

PPCB will grant NOC to new industries of all categories, which are proposed

to be located in the designated Industrial zones / areas of the notified/draft

Master Plan on the basis of undertaking submitted by the entrepreneur to the

effect that the proposed site of the project / industry is located in the

designated Industrial zone / area of the notified Master Plan or draft Master

Plan in which the establishment of such industry/project is permissible. The

Page 11: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

50

undertaking to be submitted by the entrepreneur should clearly indicate the

revenue entries i.e Hadbast Number, khewat / khatauni number and Khasra

numbers. A copy of the said NOC alongwith undertaking and location plan

of the industry clearly indicating the category of industry (red/ orange/

green) would be sent by the concerned Senior Environmental Engineer /

Environmental Engineer to the concerned District Town Planner of the

Department of Town & Country Planning, Punjab / Local Body / Development

Authority (also an intimation in this regard will be sent through e-mail) with

the request to intimate the applicant (project proponent) under intimation

to the Punjab Pollution Control Board within 15 days, if the said authority

has any objection to the location of the project at proposed site. In the

said endorsement, it would be mentioned that in case no reply is

received from the aforesaid Authority within 15 days, then, it would be

presumed that the proposed site is suitable for the project from the

point of view of above referred Competent Authority. However, incase

of any objection to the location of the project by the above referred

Competent Authority or if any of the undertakings or documents are found

wrong, the NOC granted to the project would be deemed to have been

cancelled and the Board would not be responsible for the cost incurred by the

project proponent on the basis of the said NOC. In addition, a condition

would be imposed to the effect that in case any change/ amendment in the

draft Master Plan are required, then the continuance of the project would be

subject to such changes / amendments in the draft Master Plan by the

Competent Authority.

As per Office Memorandum dated 21.11.2006 of the Ministry of Environment

and Forests, there is no link of consent to establish (NOC) of the new

industries/ projects/ activities to be granted by the Board under the Water

Act,1974 and Air Act, 1981 with the environmental clearance under EIA

Notification No. 1533 (E) dated 14.9.2006.

The feasibility report to be submitted along-with the application for NOC shall be

prepared by a consultant having acquired at least Bachelor's Degree/AMIE in

Environmental Engineering/ Chemical Engineering/Civil Engineering from a

recognized Institution/University or from the institution having degree courses in

Page 12: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

51

Environment / Chemical/Civil Engineering field. Besides the above, Charted

Engineers to be approved by the Board will also be competent to prepare a

feasibility report. Such consultant/Charted Engineer/Institution will append an

undertaking to such an effect with the feasibility report relating to the above

mentioned qualification.

C. Revalidation of Consent to establish (NOC)

Every entrepreneur is expected to complete the construction of industrial unit /

project and the installation of the pollution control equipments within the validity

period of the N.O.C. But in case, the industry / project promoter fails to implement

the project within the validity period of the N.O.C, then, the

industry/project promoter will be required to get the NOC revalidated. For this

purpose, the industry is required to submit the progress made regarding the

installation of Pollution control devices viz-a-viz main project to the concerned

Regional Office of the Board. Such request shall be acceded to only if the progress

made by the industry regarding installation of pollution control devices is

commensurate with the main project both in physical as well as financial terms. For

extension in the validity of NOC for a further period of one year/part of year, the

industry/project promoter shall be required to pay 50% of the normal fee

applicable for one year. The fee will be charged on yearly basis and for a fraction

of the year, the consent fee will be charged for full year. For extension in the

validity of NOC, the industry/project promoter shall apply on the prescribed

proforma.

The validity of „consent to establish' (NOC) cannot be extended beyond five years

from the date of issuance of the same, in any case. In case, any industry/project

promoter applies for extension in the validity of NOC beyond the period of 5 years,

then, such industry/project promoter must be asked to apply afresh for NOC from

pollution angle and the same will be dealt/processed/decided as per the

policies/guidelines prevailing at that time.

D. Consent to operate to new units/projects/activities

Before putting into operation any industrial plant /project/ activity, the

entrepreneur is required to obtain consent of the Board to operate an outlet

u/s 25 of the Water (Prevention & Control of Pollution) Act, 1974 and to

operate an industrial plant u/s 21 of the Air (Prevention & Control of Pollution)

Page 13: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

52

Act, 1981. The Punjab Pollution Control Board has prescribed a composite

proforma for obtaining consent to operate of the Board for all category of

industries/projects, which is available on the website of the Punjab Pollution

Control Board i.e. www.ppcb.gov.in. The entrepreneurs shall file a Composite

Application Form for obtaining consent to operate u/s 25/26 of the Water Act,

1974 & u/s 21 of the Air Act, 1981 and authorization under rule 5 of the

Hazardous Wastes (Management, Handling & Transboundary Movement)

Rules, 2008. On the said application, separate consents and authorization will

be issued by the Competent Authority. The application to be filed by the

entrepreneur for consent to operate shall be accompanied with the requisite

documents, which are given in Annexure-7 and fee prescribed by the Board,

which is given in Annexure-5.

In case any existing industry/project promoter expands its industrial

activities / modernize its industrial plant / make any technological changes in

the manufacturing process resulting into increase in the air / water pollution

load, the industry/ project promoter is required to obtain varied consent

under the provisions of the Water Act, 1974 and Air Act, 1981. The

entrepreneur is also required to file an application for renewal of the

„consent to operate' after the expiry of the same. The requisite documents

required for renewal/varied consent and the prescribed consent fee are

given in Annexure-5, respectively.

The Board will grant consent to operate to all the industries/projects/

establishments in the areas/zones, where such industry/project/

establishment is allowed to establish.

The project proponents / industries are required to submit a building plan

prepared and duly authenticated by the Director of Factories/ Chartered

Architect/Chartered Engineer as may be authorized to do so under the

provisions of section 3-A of the Punjab Factory Rules, 1952. List of

Chartered Architects notified by the Department of Factories is available on

the website of Department of Factories.

e-governance system for authorization/consent management has been

implemented by the Board and all requisite details will need to be submitted

by the applicant online and he will be able to down-load the certificate of

Page 14: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

53

consent/ authorization of the Board soon after the approval of the

competent authority.

For the facilitation of industries, the Board will accept analysis

results of NABL accredited private laboratories for the purposes

of grant of consent/ authorization.

E. Clearance Certificate

Consent Certificate/ NOC/ Clearance Certificate to be granted by PPCB

will not be a pre-requisite for release of electric connection to the

industries by the Punjab State Power Corporation Ltd.

F. Delegation of powers :

Sr. No.

Description Competency

1. SSI units Green Category Orange and Red Category

Environmental Engineer Senior Environmental Engineer

2. Medium Scale units Green Category

Orange and Red Category

Senior Environmental Engineer Chief Environmental Engineer

3. Large Scale units Green and orange Category

Red category industries having

total project cost upto Rs.15 crores

Red category industries having total project cost more than Rs.15 crores

Chief Environmental Engineer Member Secretary of the Board Chairman of the Board

4. All Brick Kilns, Cupola Furnace and Rice Shellers without parboiling plant/ steamed rice manufacturing units in small scale category

Environmental Engineer

5. Common Environmental Treatment Facilities like CETP, Integrated

Chairman of the Board

Page 15: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

54

Municipal Solid Management Facility, Common TSDF, Common Bio-medical Waste, Treatment and Disposal Facility, STPs. Authorizations under the Municipal Solid Waste (Management & Handling) Rules, 2000 and consent to operate to the Municipal Corporation.

6. Municipal Councils/ Local Authorities etc.

Member Secretary of the Board

7. Building Construction and Area Development Projects

i) Projects having total project cost

upto Rs.10 crores

ii) Projects having total project cost

above Rs.10 crores, but upto Rs.

25 crores.

iii) Projects having total project cost

above Rs.25 crores, but upto Rs.

50 crores.

iv) Projects having total project cost

above Rs.50 crores.

Senior Environmental Engineer

Chief Environmental Engineer

Member Secretary of the Board

Chairman of the Board

8. Hotels i) 5 Star and above ii) 4 Star iii) Upto 3 Star iv) Without Star hotels, restaurant,

inns, motels, banquet halls, marriage palaces etc.

Chairman Member Secretary Chief Environmental Engineer Senior Environmental Engineer

9. Authorization under the Bio-Medical Rule, 1998. i) Upto 50 beds HCEs and lab and

Blood Banks, Pathological Lab, Veterinary Institutions/ Animal House etc.

ii) More than 50 beds but upto 200

Environmental Engineer Senior Environmental Engineer/

Page 16: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

55

beds i) More than 200 beds but upto

500 beds

iv) More than 500 beds

Additional Secretary Chief Environmental Engineer Member Secretary

10 (1) Authorization under the HWM Rules,2008

(2) Registration for importers under the HWM Rules,2008

(3) Registration as coprocessor for using hazardous waste as raw material

Delegation of powers will be same as for consent to operate under the Water Act, 1974 and Air Act,1981. However, in this case the Senior Scientific Officer will exercise powers at par with Senior Env. Engineer. Senior Environmental Engineer Chairman of the Board after the recommendations of Registration Committee constituted by the Board.

11. Registration under the Plastic Rules Environmental Engineer

12. e-Waste (Management & Handling) Rules, 2011 (A) Registration/ Consent to

establish/ operate for Integrated e-Waste Common facility

(B) Registration/ Consent to

establish/ operate for Re-cycler/ dismantler/ Re-furbishing/ Recovery unit

(C) Registration for Collection

centers

Chairman Chairman Chairman

13. Permission for Incineration for Narcotics/ drugs confiscated by the police/ any other authority

Concerned Environmental Engineer of the area in which incinerator installed after

Page 17: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

56

checking the surplus capacity.

14. Court cases (i) specific industrial units (ii) specific industrial units in which

senior authority (Chairman/ Member Secretary) has been impleaded as party

(iii) General cases/ policy decisions

To be filed by the competent authority as prescribed under consent management after vetting by Law officer. To be filed by the competent authority as prescribed under consent management after approval of the authority impleaded as party. To be filed by the concerned Environmental Engineer in whose area it falls, but with the approval of Chairman of the Board.

NOTE :

Comments relating to any industry/ project to be sent to any department/

committee of the State Government will be sent by the concerned Senior

Environmental Engineer / Additional Secretary/Senior Scientific Officer only

after the approval of the Chairman of the Board.

Notice/directions u/s 33-A of the Water (Prevention & Control of Pollution) Act,

1974 and u/s 31-A of Air (Prevention & Control of Pollution) Act, 1981 to large

and medium scale red category industries will be issued with the approval of

Chairman of the Board.

Notice / directions u/s 33-A of the Water (Prevention & Control of Pollution)

Act, 1974 and u/s 31-A of Air (Prevention & Control of Pollution) Act, 1981 to

all categories of small scale units and large/medium orange and green category

of industries, will be issued with the approval the Member Secretary of the

Board but personal hearing in these cases will be held at the level of Chief

Environmental Engineer.

Notice u/s 33-A of the Water (Prevention & Control of Pollution) Act, 1974 and

u/s 31-A of Air (Prevention & Control of Pollution) Act, 1981 shall be signed by

the concerned Environmental Engineer of the Zonal Office on behalf of the

approving authority.

Page 18: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

57

The directions for closure / restoration of the industrial units/projects u/s 33-A

of the Water (Prevention & Control of Pollution) Act, 1974 and u/s 31-A of the

Air (Prevention & Control of Pollution) Act, 1981 will be signed by the

concerned Senior Environmental Engineer, irrespective of its scale.

The MoEF vide notification No. S.O 23(E) dated 08.01.1997 has delegated the

powers vested in the Central Govt. u/s 5 of the Environment (Protection) Act,

1986 to the Chairman of the State Pollution Control Boards to issue directions

to any industry or any local or other authority for the violations of the

standards and rules relating to hazardous wastes notified under the

Environment (Protection) Act, 1986. Furthermore, the MoEF vide notification

No. S.O 327(E) dated 10.04.2001 has delegated the powers vested in the

Central Govt. u/s 5 of the Environment (Protection) Act, 1986 to the Chairman

of the State Pollution Control Boards to issue directions to any industry or any

local or other authority for the violations of the standards and rules relating to

Bio-Medical Waste, Hazardous Chemicals, Industrial Solid Waste and Municipal

Solid Waste including Plastic Wastes notified under the Environment

(Protection) Act, 1986.

Notice/Directions u/s 5 of the Environment (Protection) Act, 1986 to all

categories of industries will be issued with the approval of the Chairman of the

Board and the said directions will be signed by the concerned Senior

Environmental Engineer/ Additional Secretary. However, the notice to issue

directions u/s 5 of the Environment (Protection) Act, 1986 can be signed by the

concerned Senior Environmental Engineer/ Additional Secretary/ Environmental

Engineer/Asstt. Environmental Engineer.

G. Siting criteria

No new industry of any category shall be allowed in the approved

residential area of any town/city of the State of Punjab and no

red/orange category of industry shall be given consent to establish

within M.C. limits except in the designated industrial area/zone.

The PPCB will continue to grant consent to establish to any category of

industries, which are permissible in the mixed land use areas/zones as

per by-laws of the notified Master Plan / draft master plan.

Page 19: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

58

All Red/Orange/Green category of industries, which are to be established in the

areas / Zone other than designated/approved areas such as Industrial

Area/Industrial Estate/Industrial Focal Point/Approved Industrial Park/Industrial

Zone of the statutory/non-statutory Master Plans, will be allowed to set up at a

distance of 100m outside the Municipal Council limits/ phirni of village/

designated residential area /residential area comprising of 15 pucca houses by

the Competent Authority of the State. In such cases,certificate of its

location/situation from the nearest village lal lakir/ phirni/ MC limits from

the Revenue Authorities such as Deputy Commissioner/ Additional Deputy

Commissioner or the Sub-Divisional Magistrate will be required for grant

of consent to establish (NOC)/ authorization by the Board.

The siting guidelines issued for establishment of rice shelling units/parboiling

plants issued by the Government of Punjab, Department of Science, Technology

and Environment vide order No. 10/48/2004-STE(4)/4061-77 dated

13.09.2006 (Annexure-9); for cement plants/brick klins issued by the PPCB

vide it's Notification No. Admn/A2/FNo.178/98/3 dated 02.09.1998 (Annexure-

10); hot mix plant issued by the PPCB vide it's Notification No.

Admn/A2/FNo.178/99/3 dated 26.04.1999 (Annexure-11) and stone crushers

issued by the Government of Punjab, Department of Science, Technology and

Environment vide notification No. 3/7/96-STE(5)/562 dated

17.03.1998 (Annexure-12) as may be amended from time to time, will remain

operative.

The siting guidelines issued by the Department of Forests and Wildlife

Preservation vide its Notification No. 26/218/08-Ft-5/4097 dated

05.06.2012 (Annexure-13) relating to distance of the industrial units/projects

from wildlife sanctuary/zoo will remain operative.

The guidelines for setting up of Construction projects (residential colonies

& commercial establishments like shopping malls and multiplexes etc.) as

prescribed by the Govt. of Punjab, Deptt. of Science, Technology &

Environment vide notification No.

Page 20: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

59

3/6/07/STE(4)/2274 dated 25.7.2008 (Annexure-14) and as amended

vide notification no. 3/6/07/STE (4)/3768 dated 30.10.2009 (Annexure-

15), will remain operative.

Office order no. 198 dated 21/11/1995 (Annexure-16) of the Board

stands omitted.

Siting criteria as mentioned in Office Order No. GPC/NIP/F.10/2010/4

dated 17.02.2010 (Annexure-17) of the Board stands omitted.

All the distances shall be measured from the nearest source of air

pollution upto the boundary of the project/establishments and in case of

15 pucca houses, upto the nearest house towards the source of air

pollution.

H. Consent to operate to the existing industries

PPCB will continue to grant its consent to operate/ authorization to

all industries not having any hazardous process, existing and

operating in non-designated industrial areas prior to the date of

notification of Master Plan provided the industry complies with the

prescribed norms for the discharge of effluent/ emissions.

The project proponents/ industries will be required to submit a building

plan prepared and duly authenticated by the Director of Factories/

Chartered Architect/ Chartered Engineer as may be authorized to do so

under the provisions of section 3-A of the Punjab Factory Rules, 1952.

List of Chartered Architects notified by the Department of Factories is

available on the website of the Department of Factories.

e-governance system for its authorization/consent management has

been implemented by the Board and all requisite details will need to be

submitted by the applicant online and he would be able to down-load

the certificate of consent/ authorization of the Board soon after the

approval competent authority.

For the facilitation of industries, the Board will accept analysis

results of NABL accredited private laboratories for the purposes of

grant of consent/ authorization.

Page 21: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

60

I. Consent Fee:

Consent to establish/operate fee from large/medium/small scale Red/Orange/

Green category of industries shall be charged as specified by the Board vide

office order No. Admn./SA-2/F.No.563/2009/6 dated 22/10/2009 (Annexure-

5). The consent fee for the period 22/10/2009 upto the period for which the

consent is to be granted, shall be charged as per the said annexure.

The consent fee for the period 1/4/1992 to 9/10/1994 will be calculated as per

fee criteria given in (Annexure-18). The consent fee for the period

10/10/1994 to 30/9/2004 will be calculated as per fee criteria given

in Annexure-19 and consent fee for the period 1/10/2004 to 21/10/2009 will

be calculated as per fee criteria given in Annexure-20.

For clarification, illustrative examples as to how the consent to

establish/operate fee is to be calculated are given in Annexure-21, 22 &

23.

J. Procedure for processing the cases for restoration of power supply /

release of Bank Guarantee/withdrawal of directions.

Temporary restoration shall be granted for a period of six month in the first instance

and samples will be collected with a minimum gap of 45 days and maximum gap of 55

days during the temporary restoration of six months. Case for temporary restoration,

grant of consent for temporary period shall be approved by the competent authority on

a case to case basis as per competency. Thereafter, the case will be considered for

permanent restoration. Accordingly, Board's circular no. 14442 dated

26.01.1999 (Annexure-24) and no. 975-96 dated 9/3/2000 (Annexure-25) as

amended on 8/5/2001 (Annexure-26) relating to temporary restoration of electricity

shall remain in force with aforesaid amendment.

The industries to whom notice/directions for closure have been/are to be issued for

violation of environmental statutes will be visited and inspected by the Env. Engineer of

the concerned Regional Office. However, the Env. Engineer may get the assistance of

any officer/official posted in the Regional Office for conducting the visit. Therefore, the

Office Order No. 144 dated 24.06.2009 (Annexure-27)stands operative with

aforementioned amendments.

Page 22: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

61

K. Validity period of consent to establish / operate

(i) Consent to establish

The validity period of consent to establish under the provisions of the

Water (Prevention & Control of Pollution) Act, 1974, the Air (Prevention

& Control of Pollution) Act, 1981 will be for one year.

(ii) Consent to Operate

All the industries will be granted consent to operate/ authorization for a

period of 5 years except in the case of industries falling in green

category, where the consent would be for a period of 10 years.

However, the culminating period of consent to operate shall be as

under:

Sr. No.

Scale and category of the industry/project

Culminating period

1 Large & Medium-Red Category 31st March

2 SSI-Red category except brick kilns 30th June

3 All scale orange category of industries and brick kilns

30th September

4 All scale green category of industries 31st December

After obtaining the consent of the Board, the industry will intimate the

concerned Regional Office of the Board that its ETP/ APCD has stabilized

and shall make a request to the said Office within 3 months to carryout

performance study / sampling of pollution control devices. If, the

industry does not convey to the Board, then it will be the responsibility

of the Regional Office to visit the industry for carrying out monitoring

after 3 months but not later than 6 months. In case, the industry is

found violating the conditions of consent, the industry would be liable for

action under the provisions of the environmental laws including

revocation/cancellation of consent granted to it.

Page 23: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

62

L. Frequency of visit / sampling

Frequency of visit / sampling of the units shall be in accordance with the

guidelines issued by the CPCB, a copy of which is enclosed herewith

as Annexure-28. However, out the said criteria, officers of the Board shall

carry out atleast one visit to the units/projects as per scheme mentioned

below:

Sr. No Category of industry Level of the Officer

1. 17 category of highly polluting industries

Chief Environmental Engineer

2. Large Red category except 17 category of highly polluting industries

Senior Environmental Engineer

3. Medium & Small Scale Red category and all Orange category of Industries except for which CETP has been installed.

Environmental Engineer

4. All Green category of Industries Asstt. Environmental Engineer

5. All Health Care Establishments and common Bio-Medical Waste Treatment & Disposal Facilities.

EPA section.

NOTE : All the CETPs/common TSDF/STPs will be visited by EPS/any team constituted by the Chairman/Member Secretary of the Board.

M. Competence to visit to the industry/project for processing application for consent to establish/operate and authorization.

a. Small, Medium and Large scale green category of industries and

registration under the Plastic Rules may be visited by the Asstt. Env.

Engineer alone.

b. Small, medium and large scale orange category and small scale red

category of industries may be visited by a team to be constituted by the

Env. Engineer of the Regional Office.

c. Medium/large scale red category of industries and building, construction &

area development projects may be visited by the Env. Engineer of the

Page 24: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

63

Regional Office. He may get the assistance of any other officer/official

posted in the Regional Office for conducting the visit.

d. Authorization cases under the Bio-Medical Waste (Management and

Handling) Rules, 1998, which fall in the competency of Regional Office may

be visited by the Asstt. Env. Engineer. Other cases of authorization may be

visited by the Env. Engineer of the Regional Office. He may get the

assistance of any other officer/official posted in the Regional Office for

conducting the visit.

N. Procedure for industries exempted from consent management :

PPCB has prepared a list of 131 industries for exemption from its consent

management, which has been submitted to Central Pollution Control

Board for approval. Since the CPCB has not conveyed any objection to

the proposed list, PPCB will grant exemption to all these industries. A list

of the industries exempted from the consent management under the

Water Act, 1974 and Air Act, 1981 is appended as Annexure-29.

The Board's order no. EE-I/Gen-214/F-2 dated 31/8/2000 (Annexure-

30) and as partially amended vide office order no. 2 dated

16/9/2002 (Annexure-31) stands omitted.

The Board vide Office Order No. GPC/Hosiery/Inds/F.203/2010/2 dated

27.1.2010 (Annexure-32) raised the investment limit from Rs.25 Lacs

to Rs.1 Crore relating to hosiery manufacturing as mentioned at Serial

No. 63, 64, 65, 66 & 67 in the list of 95 types of industries. This Office

Order stands omitted.

The Board vide Office Order No. GPC/Inf.Tech/F.53/2010/3 dated

16.02.2010 (Annexure-33) has exempted 'Information Technology'

industry/Knowledge Industry from the Consent Management of the

Board under the provisions of the Water (Prevention & Control of

Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981

for five years subject to certain stipulations. Subsequently, the Board

vide Office Order No. GPC/Inf.Tech/F.53/2010/268 dated

04.10.2011 (Annexure-34) has made amendment in Office Order No.

Page 25: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

64

GPC/Inf.Tech/F.53/2010/3 dated 16.02.2010 in respect of condition No.

4. Both these Office Orders will remain operative.

The Board vide Office Order no. HQ-2/Solar PV/F-322/2010/08 dated

05.01.2011 (Annexure-77) has exempted the solar photovoltaic

plants having capacity less than 5MW from the consent management

system of the Board under the Water Act, 1974 and Air Act, 1981 for five

years subject to certain stipulations. This Office Order will remain

operative.

O. Procedure for power load to the existing industries:

Since the consent certificate/NOC/clearance certificate of the Punjab

Pollution Control Board will not be a pre-requisite for release of power

connection to the industries, as such, Circular no. Gen./F. No. GEN-

192/2001/3001-3100 dated 10/8/2001 (Annexure-35), no. 5558-68

dated 24/7/2002 (Annexure-36) and no. Tech/GPC/1999-2000/1 dated

27.04.1999 (Annexure-37)stand omitted.

The circular no. GPC/Gen/F. No. 434/2005/173 dated

7/3/2005 (Annexure-38) for power load to green category of industries

located in non-designated areas stands omitted.

P. Period prescribed for processing application for consent to establish/

operate

The Govt. of Punjab has prescribed the following time period for deciding the

application for consent to establish / operate under the Water (Prevention &

Control of Pollution) Act, 1974 & the Air (Prevention & Control of Pollution) Act,

1981 under the Punjab Industrial Facilitation Act, 2005:

Sr. No.

Approval/ clearances required Time limit

1. Consent to establish (NOC)

Green Category 15 days Red & Orange Category

Large & Medium 21 days

Page 26: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

65

Small Scale 15 days SAC-Cum-CSA 21 days

2. Clearance certificate and consent to operate

Green Category 15 days Red & Orange category 30 days

Any Office Order issued by the Board, inconsistent with the above said criteria, shall be amended accordingly.

Q. Outlet for discharge of wastewater

While granting „consent to operate', the concerned Regional Office shall mark

the authorized outlet on the site plan and said site plan should be signed by the

authorized signatory of the project proponent and the visiting officer of the

Board.

R. Miscellaneous

In order to encourage self-discipline amongst all industries, PPCB

will accept environment audit reports from the Chartered Engineers.

The Board would notify a panel of Chartered Engineers to facil itate

the industries to select any one of them for environment audit and

the same will be circulated to all concerned Officers of the Punjab

Pollution Control Board separately.

For monitoring the intensity of pollution and online surveillance of

highly polluting industries, PPCB will facilitate installation of CCTV

cameras.

PPCB will endeavour to take snap shots of industrial emissions at

any point of time and maintain a record of industries for one month

through digital video recorder (DVR). The said snaps would be used

as an evidence to take action against the defaulting industries.

Page 27: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

66

Annexure-1

Sr. No. Table A : List of Red Category of Industry

1. Airports, and Commercial Air Strips

2. Aluminium smelter

3. Asbestos and asbestos based Industries

4. Automobiles manufacturing (Integrated facilities)

5. Basic Chemicals and electro chemicals and its derivatives including manufacture of acids

6. Buildings, Construction Projects, Township & Area development Projects covered under EIA Notification dated 14.09.2006

7. Cement

8. Chloro Alkali

9. Chlorates, perchlorates and peroxides

10. Chlorine, fluorine, bromine, iodine, and their compounds

11. Coal Washeries

12. Coke making, liquefaction, coal tar distillation or fuel gas making

13. Common treatment and disposal facilities (Common Effluent Treatment Plant, TSDF, E-Waste recycling, CBMWTF, Effluent Conveyance Project, Incinerators, Solvent/Acid recovery plant, MSW

sanitary landfill sites, STP)

14. Copper Smelter

15. Creamic, Refractories

16. Distillery including Fermentation industry

17. Dry coal processing/mineral processing, industries involving ore sintering, pallestisation, grinding, pulverization

18. Dyes and Dye-Intermediates

19. Emulsion of oil & water

20. Fermentation industry including manufacture of yeast, beer, distillation of alcohal (ENA)

21. Ferrous and Non ferrous metal extraction involving different furnaces through melting, refining,

reprocessing, casting and alloy making

22. Fertilizer (basic) (excluding formulation)

23. Fibre glass production and processing (Excluding moulding)

24. Fire crackers manufacturing and bulk storage facilities

25. Flacks from rejected PET bottle

26. Fly ash export, transport and disposal facilities

27. Health care establishment (As defined in BMW Rules)

28. Heavy engineering including Ship Building (With investment on Plant & Machineries more than Rs.

10 Crores)

29. Hot mix plants

30. Hotels (3 Star and above) and Hotels having 100 rooms and above

Page 28: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

67

31. Hydrocyanic acid and its derivatives

32. Industrial carbon including electrodes and graphite block, activated carbon, carbon black

33. Industrial estates/parks/complexes/areas export processing zones/SEZs/Biotech Parks/Leather Complex

34. Industrial inorganic gases namely :

a) Chemical gases: Acetylene, hydrogen, chlorine, fluorine, ammonia, sulphur dioxide, ethylene, hydrogen sulphide, phosphine.

b) Hydrocarbon gases : Methane, ethane, propane

35. Industries engaged in recycling/reprocessing/recovery/reuse of Hazardous Waste under Schedule-IV of Hazardous Waste (M, H & TBM) Rules, 2008 and its amendments

36. Industry or process involving founday operations

37. Industry or process involving metal surface treatment or process such as pickling plating/ electroplating/paint stripping/heat treatment/phosphating or finishing and

anodizing/enamelling/galvanizing

38. Iron and steel (involving processing from ore/integrated steel plants and or Sponge Iron Units)

39. Isolated storage of Hazardous chemicals (as per schedule of manufacturing, Storage & Import of

Hazardous Chemicals, Rules, 1989 as amended

40. Lead acid battery manufacturing (excluding assembling & charging of acid lead battery in micro scale (<Rs. 25 lakhs)

41. Lime manufacturing (Using Lime Kiln)

42. Manufacturing of Glue and gelatin

43. Manufacturing of Explosives, detonators, fuses including management and handling activities,

44. Manufacturing of Glass

45. Manufacturing of Lubricating oils, greases or petroleum based products

46. Manufacturing of Paints, Varnishes, pigments and intermediate (excluding blending/mixing)

47. Manufacturing of Pesticides / Insecticide / Fungicides / Hebrides / Weedicides (Technical)

(excluding formulation)

48. Manufacturing of Starch/Saggo

49. Milk Processing and dairy products (Integrated project)

50. Mineral stack yards/Railway sidings

51. Mining and ore benification

52. New Highway construction projects

53. Non alcoholic beverage (soft drink) and bottling of alcoholic/non-alcoholic products (capital investment on plant & machinery > Rs. 1 Crore)

54. Nuclear Power Plants

55. Oil and Gas extraction including CBM (offshore & onshore extraction through drilling wells)

56. Oil and gas transportation pipeline

57. Oil Refinery (Mineral Oil or Petro Refineries)

58. Organic chemicals manufacturing

59. Petrochemicals (Manufacture of and not merely use of as raw material)

Page 29: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

68

60. Pharmaceuticals (excluding formulation)

61. Phosphate rock processing plant

62. Phosphorous and its compounds

63. Photographic films and its chemicals

64. Ports & Harbours, Jetties and dredging Operations

65. Power Generation Plants [Except Wind, Solar and Mini Hydel Power Plants of capacity (<25 MW) and D.G. set of capacity >5MVA]

66. Processes involving chlorinated hydrocarbons

67. Pulp and paper (paper manufacturing with or without pulping)

68. Pyrolysis Plants

69. Railway Locomotive workshops/Integrated Road transport workshop/Authorized service centers

70. Reprocessing of PVC

71. Reprocessing of use oils and waste oils

72. Rice Mills including parboiling having capacity more than 10 TPD

73. Ship breaking activities

74. Slaughter houses (As per the notification S.O. 270(E) dated 26.03.2001) and meat processing industries, bone mill, processing of animal horns, hoofs and other body parts

75. Steel and steel products using various furnaces like blast furnaces/open hearth furnace/induction

furnace/arc furnace/submerged arc furnace/basic oxygen furnace/hot rolling using reheating furnace

76. Stone crushers

77. Sugar (excluding Khandsari)

78. Surgical and medical products involving prophylactics and latex

79. Synthetic detergents and soaps (excluding formulation)

80. Synthetic fibres including rayon, tyre cord, polyester filament yarn

81. Synthetic resins

82. Synthetic rubber excluding molding

83. Tanneries

84. Thermal Power Plants

85. Tobacco products including cigarettes and tobacoo/opium processing

86. Vegetable oils including solvent extraction and refinery/hydrogenated oils

87. Yarn/textile processing involving any effluent/emission-generating process, bleaching, dyeing,

printing and scouring

88. Zinc Smelter

Note : 1. Any industries/industrial activity which is not covered in above list having coal fired boiler with steam generation capacity more than 5 T/hr will be covered under Red Category.

Page 30: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

69

2. The industry at Sr. No. 6 i.e. Buildings, Construction Projects, Township & Area development Projects covered under EIA Notification dated 14.09.2006, Sr. No. 68 i.e. Pyrolysis Plants have been added new industries in the list and industry at Sr. No. 47 and 72 have been amended as per the requirements of the Board.

Page 31: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

70

Annexure-2

Sr.

No.

Table C : List of Orange Category of Industry

1. Almirah, Grill manufacturing

2. Aluminum and copper extraction from scrap using oil fired furnace

3. Automobile servicing, repairing and painting (excluding only fuel dispensing)

4. Ayurvedic and Homeopathic medicine

5. Bakery and confectionery units with production capacity > 1 TPD

6. Biaxially oriented PP film alongwith metalizing operation

7. Bottling of Gases

8. Brickfields (excluding fly ash brick manufacturing using lime process)

9. Building & construction projects more than 20,000 Sq mtr built up area

10. Cashew nut processing

11. Chanachur and laddo from puffed and beaten rice (muri and chira) using husk fired oven

12. Chilling plant, cold storage and Ice making

13. Coffee seed processing

14. Coke briquetting (sun drying)

15. Cotton/cotton blended spinning and weaving (medium and large scale)

16. Cutting, sizing and polishing of marble stones

17. Dairy and dairy products (small scale) (capital investment on plant & machinery <Rs. 1 Crore)

18. Dal Mills

19. DG set of capacity > 1 MVA but < 5 MVA

20. Digital printing on PVC cloth

21. Dismantling of rolling stocks (wagons/coaches)

22. Dry cell battery (excluding manufacturing of electrodes) & assembling and charging of acid lead

battery in micro scale (<Rs. 25 lacs)

23. Emery powder (fine dust of sand) manufacturing

24. Engineering and fabrication units (with investment on plant & Machineries <Rs. 10 Crores)

25. Excavation of sand from the river bed (excluding manual excavation)

26. Facility of handling, storage and transportation of food grains in buk

27. Fertiliser (granulation and formulation only)

28. Fish feed, poultry feed and cattle feed

29. Fish processing and packing (excluding chilling of fish)

30. Foam manufacturing

31. Food & food processing including fruits and vegetable processing

Page 32: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

71

32. Forging of ferrous & non-ferrous metal (using oil or gas fired boiler)

33. Formulation/Palletization of camphor tablets, naphthalene balls from camphor/ naphthalene powder

34. Glass, ceramic, earthen potteries and tile manufacturing using oil or gas fired kiln, Coating on

glasses using cerium fluoride, magnesium fluoride etc.

35. Glue from starch (physical mixing)

36. Gravure printing, digital printing on flex, vinyl

37. Heat treatment using oil fired furnace (excluding cyaniding)

38. Hotels (Less than 3 star) or hotels having >20 rooms and less than 100 rooms

39. Hydro electric power plants < 25 MW capacity

40. Ice Cream

41. Infrastructure development project

42. Jute processing without dyeing

43. Liquid floor cleaner, black phenyl, liquid soap, glycerol monostearate manufacturing

44. Machanized laundry using oil fired boiler

45. Manufacture of mirror from sheet glass

46. Manufacturing of mosquito repellent coil

47. Manufacturing of iodized salt from crude/raw salt

48. Manufacturing of tooth powder, toothpaste, talcum powder and other cosmetic items

49. Marriage Palaces

50. Modular wooden furniture from particle board, MDF, swan timber etc., celling tiles/partition Board from saw dust, wood chips etc. & other agricultural waste using synthetic adhesive resin, wooden

box making

51. Paint blending & mixing (Ball Mill)

52. Pharmaceutical formulation and for R&D purpose (for sustained release/extended release of drugs

only and not for commercial purpose)

53. Plyboard Mfg. (including veneer & laminate) with oil fired boiler/thermic fluid heater (without resin plant)

54. Potable alcohol (IMFL) by blending, bottling of alcoholic products (capital investment on plant &

machinery < Rs. 1 Crore)

55. Power Press

56. Printing ink manufacturing

57. Printing or etching of glass sheet using hydrofluoric acid

58. Producer gas plant using conventional up-drift coal gasification (linked to rolling mills, glass and ceramic industry, refractories for dedicated fuel supply)

59. Pulverisation of bamboo and scrap wood

60. Reprocessing of waste plastic (excluding PVC)

61. Rice mill less than 10 TPD & rice hullers

62. Rolling Mills (oil or gas fired) and cold Rolling mill

Page 33: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

72

63. Saw mill

64. Seasoning of wood in steam heated chamber

65. Silk screen printing, Saree printing by wooden blocks

66. Spice grinding (> 20 HP motor)

67. Spray painting, paint baking, paint stripping

68. Surgical cotton including wet process

69. Tamarind power manufacturing

70. Tea processing

71. Thermocol manufacturing

72. Thermometer making

73. Transformer repairing/manufacturing

74. Tyres and tubes vulcanization/hot retreading

75. Wire drawing & Wire netting

Note : 1. The industry at Sr. No. 48 i.e. Packing materials manufacturing from

non asbestos fibre, vegetable fibre yarn and Sr. No. 58 i.e. Repairing of electric motor & generator from the original list of Orange

Category have been shifted to exempted category of industries due to their less water/air/noise pollution potential.

2. The industry at Sr. No. 7, 39, 49 and 68 have been added in the list of Orange Category of the industries as per the requirements of the

Board.

Page 34: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

73

Annexure-3

Sr.

No.

Table B : List of Green Category of Industry

1) Assembling of Acid lead battery (upto 10 batteries per day excluding lead plate casting)

2) Automobile fuel outlet (only dispensing)

3) Bakery/Confectionery/Sweets production (with production capacity < 1 TPD with oil, gas or electrical oven)

4) Bio fertilizer & bio-pesticide without using inorganic chemicals

5) Biomass Briquettes (sun drying) without using toxic or hazardous wastes

6) Blending or melamine resins & different powder, additives by physical mixing

7) CO2 recovery

8) Candy

9) Cardboard or corrugated box and paper products (excluding paper or pulp manufacturing and

without using boiler)

10) Chalk making from plaster of paris

11) Chilling plant and Ice making without use of ammonia

12) Compact disc, computer floppy & cassette manufacturing

13) Compressed oxygen gas from crude liquid oxygen

14) Cotton/Cotton blended spinning & weaving (small scale)

15) Cotton and woolen hosiery making (SSI & Cottage industries)

16) Distilled water

17) Electric lamp (bulb) manufacturing (small scale)

18) Flour Mills (dry process)

19) Fly ash bricks/blocks manufacturing

20) Glass putty and sealant

21) Glass, ceramic, earthen potteries and tile manufacturing using electrical kiln or not involving fossil fuel kilns

22) Gold and Silver smithy (purification with acid, smelting operation and sulfuric acid polishing

operation) (using less than or equal to 1 litre of Sulphuric Acid/Nitric Acid per month)

23) Handloom/Carpet weaving (without dyeing and bleaching operation)

24) Hotels (upto 20 rooms)

25) Lubricating oils, greases or petroleum based products (only blending at normal temperature)

26) Manufacturing of coir items from coconut husk

27) Manufacturing of metal caps containers etc.

28) Manufacturing of pasted veneers without using boiler or Thermic Fluid Heater or by sundering

29) Manufacturing of silica gel (without furnace)

30) Medical oxygen

Page 35: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

74

31) Mineralized water

32) Organic and inorganic nutrients (by physical mixing)

33) Paper pins and U-clips

34) Phenyl/Toilet cleaner formulation & bottling

35) Polythene & plastic processed products manufacturing (virgin plastics)

36) Poultry, hatchery, Piggery

37) Power looms (without dyeing and bleaching)

38) Printing Press

39) Ready mix cement concrete

40) Reel manufacturing

41) Reprocessing of waste cotton

42) Rope (cotton & Plastic)

43) Rubber goods industry (with baby boiler only)

44) Scientific and mathematical instruments manufacturing

45) Soap manufacturing (Handmade without steam boiling)

46) Solar module (Non conventional energy apparatus) manufacturing unit

47) Solar power generation through solar photovoltic cell, wind power & mini hydal power (< 25 MW)

48) Spice grinding : (20 HP motor)

49) Steeping and processing of grains

50) Synthetic detergent formulation

51) Teflon based products

52) Tyres and tubes retreading (without boiler)

Note : The following industries from the list of green category of industry have

been shifted to the list of exempted category of the industry due to their

pollution potential as these type of industries does not involves in the process creating water/air/noise pollution.

Sr.

No.

List of Green Category of Industries shifted to exempted category

1. Aluminiun utensils from aluminium circles

2. Assembly of air collers/conditioners repairing and servicing

3. Assembly of bicycles baby carriage and other small non-motorized vehicles

4. Ayurvedic and Homeopathic medicine (without boiler)

5. Bailing (hydraulic press) of waste papers

6. Biscuit trays etc. from rolled PVC sheet (using automatic vaccum forming machine)

7. Blending and packaging of Tea

8. Block making for printing without foundry (excluding wooden block making)

9. Brass & Bell metal utensils manufacturing from circle (without re-rolling factory)

Page 36: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

75

10. Carpentry and wooden furniture manufacturing (excluding saw mill) with the help of electrical (motorized) machines such as electric wood planner, steel saw cutting

circular blade etc.

11. Cement products (without using Asbestos) like pipe, pillar, jafri, well ring,

blocks/tiles etc. should be done under closed covered shed to control fugitive

emissions)

12. Ceramic colour manufacturing (not using boiler and wastewater recycling process)

13. Coated electrode manufacturing

14. Decoration of ceramic cups & plates by electric furnace

15. Diesel Generator sets (15 KVA to 1 MVA)

16. Diesel pump repairing & servicing

17. Electrical & electronic items assembling

18. Flavoured bettle nut production/grinding.

19. Fountain pen manufacturing

20. Glass ampoules & vials making from glass tubes

21. Groundnut decorticating (dry)

22. Insulation and other coated papers (excluding paper or pulp manufacturing) manufacturing

23. Jobbing and machining

24. Leather cutting and stitching (more than 10 machines and using motor)

25. Leather footwear and leather products (excluding tanning and hide processing) (except cottage scale)

26. Manufacturing of optical lenses (using electrical furnace)

27. Manufacturing of shoe brush & wire brush

28. Oil mill ghani & extraction (no hydrogenation/refining)

29. Organic manure (manual mixing)

30. Paints and varnishes (mixing and blending) (without ball mill)

31. Packing of powdered milk

32. Puffed rice (muri) (using oil gas or electrical heating system)

33. Steel furniture without spray painting

34. Surgical and medical products not involving effluent/emission generating processes

Page 37: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

76

Annexure-4

Documents required for obtaining Consent to Establish (NOC)

1. Site Plan.

2. Location Plan.

3. Partnership Deed/Memorandum of Article of Association/Proprietorship certificate.

4. S.S.I. Registration Certificate (Provisional)/copy of letter of intent/license/

acknowledgement/DGTD registration certificate.

5. Copy of Project Report.

6. Manufacturing Process.

7. Feasibility report of the Pollution Control Systems for control of Water/Air Pollution/ Air Pollution

Control Devices/Effluent Treatment Plant.

8. Complete Application Form.

9. NOC Fee as per total project cost.

10. Irrigation scheme for use of its trade effluent onto land for irrigation in case the disposal is onto

land for irrigation.

11. Land documents such as Registration deed/Rent deed/Lease deed mentioning details of the

property.

12. Undertaking to the effect that the proposed site of the project/industry is located in the designated Industrial zone/area of the notified/draft Master Plan in which the establishment of

such industry/project is permissible. The undertaking shall clearly indicate the revenue entries i.e. Hadbast Number, Khewat/Khatauni number and Khasra numbers.

13. Certificate of Revenue Authorities (DC/ADC/SDM) indicating the distance of proposed site of

industry from the MC limits/Phirni/Lal lakir of the nearest village, in case, the industry is to be established at a site other than the site in the industrial area/industrial estate/industrial zone of

the draft master plan/industrial zone of the notified master plan.

14. Allotment letter of the Allotting Authority, if the site of the project is located in the designated

Industrial Area/Industrial Estate/Focal Point.

15. For industry specific guidelines, certificates/documents as mentioned in the said guidelines.

Note : Each & every document should be duly authenticated by the industry.

Page 38: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

77

Annexure-5

Punjab Pollution Control Board Vatavaran Bhawan, Nabha Road, Patiala

No. Admn./SA-2/F.No. 563/2010/06

Dated : 22.10.2009

OFFICE ORDER

The sub section 2 of section 25 of the Water (Prevention & Control of Pollution) Act,

1974 states that every industry covered under the said Act, is required to file an application for

'Consent to Establish/Operate' as required under sub section 1 of section 25 of the said Act alongwith

such fee prescribed by the Board. There is similar provision for obtaining 'Consent to Establish/Operate'

under sub section 2 section 21 of the Air (Prevention & Control of Pollution) Act, 1981, also Punjab

Pollution Control Board is charging the application fee for processing the consent applications filed by

the industries and other establishments for 'Consent to Establish' and 'Consent to Operate' which was

prescribed by the Board since its inception in 1975.

Keeping in view the changing financial scenario, increase in the expenditure of the

Board and the Board is in the process of introducing a new category namely orange category, it has

been felt necessary to go in for a revision of the 'Consent to Establish' and 'Consent to Operate' fees for

the processing of the application etc. Accordingly, the matter for 'Consent to Establish/Operate' fee was

placed before the Board in its 144th meeting held on 20.08.2009 and accorded its sanction.

In pursuance of the decision taken by the Board in its 144th meeting held on

20.08.2009, the 'Consent to Establish' and 'Consent to Operate' fees for the processing of application

under the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of

Pollution) Act, 1981 etc. will now be charged as under :

Sr.

No.

Capital Investment Application fee to

be charged for obtaining 'Consent

to Establish (NOC)/ 'Consent

to Operate' for per year (Red

category) (Rs.)

Application fee to

be charged for obtaining 'Consent

to Establish (NOC)/ 'Consent

to Operate' for per year (Orange

category) (Rs.)

Application fee to

be charged for obtaining 'Consent

to Establish (NOC)/ 'Consent

to Operate' for per year (Green

category) (Rs.)

1. Upto 5 Lacs 750 500 500

2. 5 to 10 Lacs 1,000 750 625

3. 10 to 25 Lacs 1,500 1,250 1,000

4. 25 to 50 Lacs 2,500 2,000 1,500

5. 50 to 75 Lacs 3,750 2,500 2,000

6. 75 to less than 1 Crore

5,000 4,000 3,000

Page 39: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

78

7. 1 to 2 Crores 7,500 6,000 4,500

8. 2 to 5 Crores 10,000 7,500 6,000

9. 5 to 10 Crores 15,000 12,500 7,500

10. 10 to 15 Crores 25,000 15,000 10,000

11. 15 to 20 Crores 30,000 17,500 12,500

12. 20 to 25 Crores 35,000 20,000 15,000

13. 25 to 30 Crores 40,000 25,000 17,500

14. 30 to 40 Crores 45,000 30,000 20,000

15. 40 to 50 Crores 50,000 40,000 30,000

16. 50 to 75 Crores 60,000 50,000 40,000

17. 75 to 100 Crores 75,000 60,000 50,000

18. 100 to 150 Crores 1,00,000 75,000 60,000

19. 150 to 200 Crores 1,50,000 1,00,000 75,000

20. 200 to 300 Crores 2,00,000 1,50,000 1,00,000

21. 300 to 400 Crores 2,50,000 2,00,000 1,50,000

22. 400 to 500 Crores 3,00,000 2,50,000 2,00,000

23. 500 to 1000 Crores 4,00,000 3,00,000 2,50,000

24. 1000 to 2000 Crores 5,00,000 4,00,000 3,00,000

25. 2000 to 5000 Crores 10,00,000 7,50,000 5,00,000

26. 5000 Crores and above 20,00,000 15,00,000 10,00,000

Note :

1. Separate consent fee shall be charged for obtaining 'Consent to Operate' as required under the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981.

2. For grant of 'Consent to Operate' as required under the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981 more than one year under any category i.e. Red/Orange/Green, the consent fee will be charged on yearly basis and for a fraction of the year, the consent fee will be charged for full year.

3. For extension in the validity of 'Consent to Establish', only 50% of the normal fee applicable for one year will be charged for extension fee for a period of one year or for a fraction of the year.

4. This order supercedes the earlier orders issued by the Board in this regard from time to time.

5. This order will be applicable with immediate effect.

Sd/-

Chairman

Endst. No. Admn./SA-2/F.No. 563/2010/6261-305 Dated : 22.10.2009

A copy of the above is forwarded to the following for information and necessary action: 1. The Senior Environmental Engineer (HQ), Punjab Pollution Control Board, Patiala. 2. The Senior Environmental Engineer (EPA/Computers), Punjab Pollution Control Board, Patiala.

3. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office-I/II,

Patiala/Ludhiana/Jalandhar (HQ at Patiala). 4. The Deputy Secretary (G&P), Punjab Pollution Control Board, Camp Office, Mohali.

Page 40: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

79

5. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/Ludhiana-

I/II/III/Jalandhar/Amritsar/Hoshiarpur/Batala/Sangrur / Bathinda / Faridkot and Nodal Office, Mohali.

6. The Environmental Engineer (P-I/J/L)/CSA/Const./HWM, Punjab Pollution Control Board, Patiala.

7. The Deputy Controller (F&A), Punjab Pollution Control Board, Patiala.

8. The Law Officer/All Assistant Environmental Engineers of the Board/ Asstt. Administrative Officer/Public Relations Officer/PS to Chairman/PA to Member Secretary, Punjab Pollution

Sd/-

Member Secretary

Page 41: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

80

Annexure-6

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN, PATIALA Tel. : 0175- 2215802, 2215793

No. CSA/04/P-48/7084-98 Dated :22.06.2006 To

1. The Senior Environmental Engineer,

Punjab Pollution Control Board, Zonal Office, Patiala/Jalandhar/Ludhiana.

2. The Environmental Engineer, Punjab Pollution Control Board,

Regional Office, Patiala/Ludhiana-I/II/III/Jalandhar/ Amritsar/Hoshiarpur/Batala/Sangrur/Bathinda/Faridkot/

Nodal Office, Mohali.

Sub: Grant of NOC/Consent to Operate from pollution angle to industries, which

are covered under Factories Act and require site clearance by Site Appraisal Committee.

Ref : This office letter No. CSA/03/21st Meet/10149-63 dated 8/3/2005.

The Board in its 121st meeting held on 15/12/2003 had decided that the industry,

which requires site clearance by Site Appraisal Committee and has been granted NOC by the Board,

may be issued clearance certificate for release of power load, only, after the industry obtains Site

Appraisal Committee approval in order to stop unregulated growth of the industry. The decision of the

Board was conveyed to all the Zonal Offices and the Regional Offices of the Board vide letter No. 43-57

dated 2/1/2004.

Thereafter, certain queries were received from the field offices and the issue was again

considered by the Board in its 125th meeting held on 25/2/2005 and the Board decided as under:-

"That the consent to operate to such industries, which have been established before or

after 2/1/2004, without obtaining site clearance from Site Appraisal Committee (SAC) and /or NOC from

pollution angle from the Board, shall not be granted NOC/consent till such time the industry obtains site

clearance from the SAC so as to check haphazard growth of such industries".

This decision of the Board was conveyed to all the officers vide letter No. CSA/03/21st

Meet/10149-74 dated 8/3/2005.

Page 42: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

81

Now, certain representations in this regard were received from various Industrial

Associations. Accordingly, the matter was again put up before the Board in its 132nd meeting held on

24/5/2006 vide item no. 132.12 and the Board decided not to apply its decision dated 8/3/2005 to

industries existing prior to 2/1/2004 and further decided that the Board shall continue to grant consents

to these industries, in consonance to its policy of shifting of existing industries from the non-designated

areas to designated areas, but, without asking them to obtain prior site clearance from the Site

Appraisal Committee.

You are, therefore, requested to take necessary action to ensure compliance of the

above decision of the Board in future and bring it into notice of all concerned.

Sd/-

( Gulshan Rai ) Environmental Engineer (CSA)

Endst. No. CSA/04/P-48/______________ Dated : ____________

A copy of the above is forwarded to the following for information & necessary action :-

1. The Senior Environmental Engineer (EPA), Punjab Pollution Control Board, Head Office, Patiala. 2. The Senior Scientific Officer, Punjab Pollution Control Board, Head Office, Patiala.

3. The Environmental Engineer (P)/(L)/(J)/HWM/EPA/EPS, Punjab Pollution Control Board, Patiala.

4. The Administrative Officer, Punjab Pollution Control Board, Head Office, Patiala.

Sd/-

Environmental Engineer (CSA)

Endst. No. CSA/04/P-48/______________ Dated : ____________

A copy of the above is forwarded to the following for information & necessary action :-

1. The PS to Chairman, Punjab Pollution Control Board, Head Office, Patiala for the information of

Chairman of the Board.

2. The PA to Member Secretary, Punjab Pollution Control Board, Head Office, Patiala for the information of Member Secretary of the Board.

Sd/- Environmental Engineer (CSA)

Page 43: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

82

Annexure-7

Documents required for getting consent to operate for new industries/first time CTO cases

1. Compliance report of NOC conditions in annotated form.

2. Bills/vouchers of Air Pollution Control Devices/Effluent Treatment Plant/ photographs.

3. Demand Notice issued by Punjab State Electricity Board.

4. Plan showing the location of APCD/ETP and all outlets and various channels/ pipes/sewers with

requisite colours as detailed below :

a) Fresh Water - Blue Colour

b) Effluent Channel - Red Colour

c) Recirculation Water Channel - Green Colour

d) Storm Water - Orange Colour

e) Domestic Sewer - Dotted Black Line

5. Dimensional Drawing of Air Pollution Control Device & effluent treatment plant.

6. Latest gross fixed assets value duly authenticated by CA.

7. Consent Application under Water (Prevention & Control of Pollution) Act, 1974 & Air (Prevention

& Control of Pollution) Act, 1981 Complete in all respect.

8. Proof of date of commissioning where the industrial unit/project has been commissioned

without obtaining NOC of the Board.

Note :Each & every document should be duly authenticated by the industry.

Page 44: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

83

Annexure-8

Documents required for renewal of consent to operate for existing industries. 1. Partnership Deed/Memorandum of Article of Association/Proprietorship certificate.

2. Latest gross value of fixed assets duly authenticated by CA.

3. Analysis Report of emissions/effluents.

4. Consent fee as per CA certificate as applicable.

5. Complete application form.

6. Compliance report of previous consent conditions.

Note :Each & every document should be duly authenticated by the industry.

Page 45: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

84

Annexure-9

GOVERNMENT OF PUNJAB

DEPARTMENT OF SCIENCE, TECHNOLOGY, ENVI RONMENT AND NON-CONVENTIONAL ENERGY.

ORDER

Whereas it is necessary and expedient to take immediate steps under section 5 & 7 of Environment

(Protection) Act, 1986 and rules framed there under to maintain ecological balancein the State, to prevent

environmental degradation and to avoid traffic and human health hazard.

And whereas Rice Shellers and Saila Plants in the State of Punjab have been causing grave air

pollution and causing hazard to traffic and human health, and Appellate Authority constituted bythe State

Government under the provisions of the Water (Prevention & Control of Pollution) Act,1974 and Air (Prevention &

Control of Pollution) Act, 1981 while considering the appeals of five rice mills established in violation to the siting

guidelines, issued an order directing the Board to review the siting criteria

And whereas to abate an pollution created by the Rice Sheller and Saila Plant units, Punjab

Pollution Control Board has recommended siting guidelines, emission standards and code of practices to be

followed in respect of these units in the State of Punjab.

Now, therefore, in supersession of orders issued vide endst. No. 10/48/2004/S TE4/1692 -

1708,dated 2.6.2005 and No. 10/ 48/2005/S TE4/ 2504-20, dated 23.6.2006 and in exercise of powers conferred

under section 5 of the Environment (Protection) Act, 1986 read with Government of India, Ministry of Environment

and Forest, Department of Environment, Forests, and wild life Notification No. S.O. 289 (E) dated the 14thApril,

1988 and in pursuance of the provisions of section 7 of the said Act and Rule 4 of t he Environment (Protection)

Rules, 1986 the Governor of Punjab, is pleased to issue following revised siting guidelines for the New Rice shallers

and Saila Plants in the State as under:-

A) New Rice Shellers and saila plants in the State of Punjab should be located at: -

i. In Focal Point and in designated Industrial Land use Zones,

ii. In rural zone of Master Plan (Statutory/Non-Statutory), rural zone of Local Planning Area and in the agriculture land outside the rural zone of Master Plan and Local Planning Area but shall be at the distance of 500 meters from urbanisable limits of Master Plan and 2 Kms from Local Body limits where the master plan are yet to be prepared.

iii. 500 meters away from the bye-pass, National Highway, State Highway and Scheduled Road

[Point No. (i) to (iii) to be certified by D. T.P.]

iv. 500 meters away from the village Lal Dora/Phirni, Wild Life Sanctuary, Zoo, residential area*, educational institution, historical, religious places and protected monuments.

*The residential areas means the area under a scheme notified by Punjab Urban & Development Authority (PUDA), Municipal Corporation, Municipal Council, Improvement Trust or any other authority/agency in the State. [Point No. (iv) to be certified by Revenue Authority

v. Punjab Pollution Control Board will ask for certificate from the District Town Planner/Revenue authorities within 15 days failing which Board will be at liberty to issue NOC and the rice millers will not have to approach the concerned authorities for obtaining the requisite certificate. The requisite fee to be charged by the Town & Country Planning Department will be deposited by the industry as a separate Bank Draft alongwith NOC fee of PPCB with the Board and PPCB will forward the fee of Town & Country Planning Department to the DTP with the request to

Page 46: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

85

report/comment regarding issues contained in A (I to III) as mentioned above within 15 days failing which Board will be at liberty to issue NOC.

vi. All the Rice Mills located outside the Municipal limits of town and cities and in the designated

areas within the cities established with NOC of Punjab Pollution Control Board will be allowed to expand (only dry process i.e., no generation of trade effluent)/ modernize within their existing premises, if pollution load of existing unit has been effectively taken care of by the industry and no

specific approval of District Town Planner will be required.

NOTE :

(I) No new Sheller shall be allowed between intersection of the municipal committees having distance less than 2 kilometers.

(II) Right of the way will be accepted as per revenue records and minimum width of 15 ft. to 16 ft of passage may be provided for easy transportation instead of 22 ft.

(III) The parking will be provided within the site. (IV) All distances shall be measured from right of the way upto pollution control device chimney. (V) All these siting criteria specified above will be applicable in toto and not in piece meal.

B) Emission Standards Emission Standards for Rice Shellers&saila Plants in the State of Punjab will be applicable as under:-

1. Emission Standards 750* SPM (mg/Nm3)

2. Inside the Building TLV of air ** SPM (mg/Nm3)

NOTE : * The existing units not meeting with the prescribed siting guidelines will meetstack emission standards of

SPM 500 mg/ Nm3

* To be controlled by Director of Factories

C) Code of Practices

I. All the processing sheds be covered and have minimum ventilation as per the recommendations of Director of Factories

II. All the processing sheds be covered and have minimum ventilation as per the recommendations of Director of Factories except ventilation as per (i) above.

III. The industry should provide proper rice husk/husk ash storage facilities inside the factory premises and the height of wall around the husk discharge point/ashstorage area should be 10 ft high.

IV. The industry should plant thick plantation of spreading crown varieties of evergreen trees all along the boundary wall of the Shellers/Saila plants.

V. All dust emitting points should be properly hooded and dust extracted to a common point. At this exhaust point, dust coming here will be passed through adust control system and air will be emitted through a stack of height 3 meters above the roof of the building.

VI. The industry shall not be located in High Tension Transmission Zone of Punjab State Electricity Board.

ROMILA DYBEY

Principal Secretary of Government of Punjab Dated the Chandigarh Department of Science, Technology, Environment the, 11th September 2006 And Non-Conventional Energy No. 3/48/2004-STE(4)/4063 Dated, 13.9.2006. A copy is forwarded to the following for information and necessary action.

1. Principal Secretary to Chief Minister, Punjab for the kind information of Hon‟ble Chief Minister,

Punjab.

Page 47: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

86

2. Secretary/Industries & Commerce and Environment Minister for the kind information of Hon‟ble Minister.

Page 48: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

87

Annexure-9(a)

GOVERNMENT OF PUNJAB DEPARTMENT OF SCIENCE, TECHNOLOGY, ENVI RONMENT

AND NON CONVENTIONAL ENERGY To The Member Secretary, Punjab Pollution Control Board, Patiala Memo No. 10/48/04/STE(4)/2629 Dated 26.6.2009 Subject : Regarding clarification on siting guidelines for rice shelling

units as laid down vide order dated 13.9.2006.

Kindly refer to your letter No. 3078 dated 24.6.2009 on the subject cited

above.

2. Your attention is invited to Govt. Memo No. 10/48/04/STE(4) 2054 dated

8.6.2007 vide which it was clarified that so far as granting of NOC to new rice shellers

/ Saila plants is concerned, either of condition laid down in part A (i) and (ii) shall be

applicable i.e. an industry should fulfill any one of these conditions. However, if the

industry fulfills condition No.A (ii) then other conditions i.e. A (iii) and A (iv) are

required to be complied with. Your proposal has been reconsidered and following

clarifications are given:

a) The Siting criteria as laid down in Part A (i) is independent of criteria stipulated in Part A (ii), (iii) & (iv) of the order dated 13.9.2006.

b) The Siting criteria as laid down in Part A (i) is to be implemented in conjunction with the criteria as laid down in Part A (iii) & (iv) of the Order dated 13.9.2006.

Sd/-

Additional Secretary

Page 49: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

88

Annexure-9(b)

GOVERNMENT OF PUNJAB DEPARTMENT OF SCIENCE, TECHNOLOGY AND ENVI RONMENT

(STE BRANCH)

ORDER

In partial modificationsin orders issued vide endst No. 10/48/04/STE(4)/ 4061-77 dated

13.9.2006 and in exercise to powers conferred u/s 5 of the Environment (Projection) Act, 1986 read

with Government of India Ministry of Forests & Environment (Deptt. of Environment Forest and Wild

Life) Notification No. SO 289(E) dated 14 April, 1988 and in pursuance of the previsions of section 7 of

the said act and rule 4 of the of the Environment (Projection) Act, 1986, the Governor of Punjab is

pleased to amend sub rule vi of part A except Note thereunder as follows :-

Vi Existing Rice Shellers/ SailaPlant shall be allowed to modernize and / or expand (dry/ wet expansions including saila plants) without specific approval of the DTP, in the following cases :

(a) In case of units within areas at A (1)(i) above if established with the NOC or have consent

to operate of the Punjab Pollution Control Board and pollution load of exiting unit has been

effectively taken care of by the industry.

(b) In the case of units located outside municipal limits of towns/ cities and areas not covered

at A(1) (i) above if they are established with the NOC/ Permission of DTP if required at the

time of establishment and with the consent to establish /operate of the Board have taken

effective care of existing pollution load and the proposed expansion is within their exiting

premises.

Viswajeet Khanna

Secretary of Government of Punjab Dated the Chandigarh Department of Science, Technology, Environment

7.6.2010 And Non Conventional Energy

Endst. No. 10/48/2004-STE(4)/2535 Dated : 11.06.2010

A copy is forwarded to the following for information and necessary action.

1. Principal Secretary to Chief Minister, Punjab for the kind information of Hon'ble Chief Minister,

Punjab.

2. The Chairman, Punjab Pollution Control Board, Patiala

3. The Chairman , Pb. State Electricity Board, Patiala

4. Principal Secretary to Government of Punjab, Deptt. of Local Self Government.

5. Principal Secretary to Government of Punjab, Deptt. of Food & Civil Supplies.

Page 50: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

89

6. Principal Secretary to Government of Punjab, Deptt. of Labour& Employment.

7. Principal Secretary to Government of Punjab, Deptt. of Industries and Commerce.

Annexure-9(C)

GOVERNMENT OF PUNJAB DEPARTMENT OF SCIENCE, TECHNOLOGY, ENVI RONMENT

AND NON CONVENTIONAL ENERGY ORDER

Whereas, the Govt. of Punjab, Department of Science, Technology,

Environment and Non-Conventional Energy, Chandigarh in pursuance of the provisions

of section 7 of the Environment (Protection) Act, 1986 and Rule 4 of the Environment

(Protection) Rules, 1986 vide order no. 10/48/2004-STE-4/4061-77 dated 13/9/2006

had laid down siting guidelines including code of practice for setting up of new rice

shellers and saila plants in the State of Punjab.

And whereas, the Govt. of Punjab, Department of Science, Technology,

Environment, vide Order No. 10/48/2003-STE(4)/3547 dated 19.12.2011 has made

certain amendments in Order No. 10/48/2004-STE-4/4061-77 dated 13/9/2006 and

one of the amendments in respect of siting guidelines for dry shelling units with

sundrying process is that the said units can be established at a distance of 300 m

from Wildlife Sanctuary/Zoo.

And whereas, LPA 197 of 2009, titled as Prem Goyal Vs State of Punjab

came up for hearing before the Hon'ble Punjab & Haryana High Court on 09.09.2009

and the operative part of the Interim Order passed by the Hon' ble Court is

reproduced as under:-

" We deem it appropriate to direct the Chief Secretary to constitute a

Committee of Officer not below the rank of Secretary/Head of the

Department representing various authorities concerned to find a just and

fair solution so as to maintain wildlife Sanctuary as well as protect the

interest of the petitioner-appellant and other Industrial Units. The

Committee be constituted within one week from today. It shall prepare

a report and place before this Court within a period of eight weeks

thereafter".

And whereas in compliance to above Orders of the Hon'ble Punjab &

Haryana High Court, the Hon'ble Chief Secretary to Govt. of Punjab has constituted a

Page 51: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

90

Committee comprising of six members and the said Committee in its report submitted

to the Hon'ble Punjab & Haryana High Court has recommended that no new

industrial unit shall be allowed to be established within 500 m radius of Wildlife

Sanctuary/Zoo w.e.f. 1.1.2010 unless and until a Committee comprising of Department of

Forests & Wildlife Preservation, Department of Industries & Deptt. of Science & Technology

specially recommends its establishments.

And whereas, LPA 197 of 2009 titled as Prem Goyal Vs State of Punjab has

been disposed of by the Hon' ble Punjab & Haryana High Court on 23.12.2011 and the

operative part of the order is reproduced as under:

"We would like to place on record our appreciation for excellent report submitted on 17.12.2009 by the Committee constituted by the Chief Secretary, Punjab. The respondent State shall in compliance with directive principle of State Policy given in Article 48-A of the constitution frame a policy guidelines keeping in view the recommendations made by the committee, which have been placed on record on 17.12.2009. The same be notified to all concerned within a period of two months from the date of receipt of a copy of this order."

In view of above and in exercise of powers conferred u/s 5 of the Environment

(Protection) Act,1986 read with Government of India, Ministry of Environment & Forests,

Department of Environment, Forests and wildlife Notification No. S.O. 289 (E) dated 14th

April, 1988 and in pursuance of the provisions of section 7 of the said Act and rule 4 of the

Environment (Protection) Rule,1986, the Governor of Punjab is pleased to make the following

amendments in office Order dated 19,12,2011 issued vide endst. no. 10/48/2003-STE

(4)/3547, dated 19.12.2011 of the Deptt. of Science, Technology & Environment:

1. The words "Wildlife Sanctuary / Zoo" in sub paragraph (IV) of paragraph (b) are, hereby, omitted.

2. Following words are, hereby, inserted in sub paragraph (IV) of paragraph (b) at the end of sentince after the words protected monuments : "The distance from Wildlife Sanctuary / Zoo shall be 500m.

Dated, Chandigarh Viswajeet Khanna the 27 February,2012 Principal Secretary to Govt. of Punjab, Department of Science, Technology & Environment, and Non-conventional Energy

Endst. No. 3/198/2008-STE(4)/453 Dated, Chandigarh, the 02.03.2012

A copy is forwarded to the following for information and necessary action :

1. Principal Secretary to Chief Minister, Punjab for the kind information of Hon'ble

Chief Minister, Punjab.

Page 52: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

91

2. Principal Secretary to Government of Punjab, Deptt. of Local Self Government.

3. Principal Secretary to Government of Punjab, Deptt. of Food & Civil Supplies.

4. Principal Secretary to Government of Punjab, Deptt. of Labour & Employment.

5. Principal Secretary to Government of Punjab, Deptt. of Industries and

Commerce.

6. Principal Secretary to Government of Punjab, Deptt. of Science, Technology,

Environment & Non-conventional Energy.

7. Principal Secretary to Government of Punjab, Department of Housing and

Urban Development.

8. Secretary to Government of Punjab, Department of P.W.D (B&R).

9. Chief Administrator, Punjab Urban Planning & Development Authority.

10. Managing Director, Punjab Small Industries & Export Corpn., Chandigarh.

11. Chairman, Punjab Pollution Control Board, Patiala.

12. Chairman, Punjab State Power Corporation Ltd., Patiala.

13. Director of Factories, Punjab, Chandigarh.

14. Chief Town Planner, Punjab, Chandigarh.

15. Director General of Police, Punjab, Chandigarh.

16. Advocate General, Punjab, Chandigarh.

17. All Chief Environmental Engineers, Zonal Offices and Regional Offices of Punjab

Pollution Control Board.

Sd/-

Deputy Secretary

Page 53: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

92

Annexure -10

PUNJAB POLLUTION CONTROL BOARD, NABHA ROAD, PATIALA BOARD NOTIFICATION August,1998

No. Admn/A-2/F.No.178/98/3 Date : 02.09.1998 The Punjab Pollution Control Board, Patiala in its 98th meeting held on 29th July,1998 approved the amended siting guidelines for rice Shellers and Saila Plants, Brick Kilns and Cement Plants. The siting guidelines and emission standards notified vide Board Notification No. Admn/A-2/F.No.178/94/232/5 dt.10.09.1997 are amended as follows: I. SITING GUIDELINES FOR RICE SHELLERS & SAILA PLANTS, BRICK

KILNS & CEMENT PLANTS/GRINDING UNITS. Distance from

I. Municipal Corporation Limits 5Km II. Class A Towns & Cities Limits 2Km

III. Other Towns & Cities Limits 1Km IV. Village Laldora, Phirni 500m V. Wild Life Sanctuary Zoo 500m

VI. National Highway* 500m VII. State Highway*/Scheduled Road 300m

VIII. Residential Area(15 pucca house) 300m IX. Educational Institute/Historical 300m

Religious Places/Protected Monuments. Provisions of Green Belt The industry should plant three rows of spreading crown varieties of evergreen broad leaved trees all along the boundary. * If the existing unit wants to convert to a integrated cement plants the minimum

distance should be 200m from National/State Highway. Note: Distance shall be calculated from the berms of the metalled road to the nearest

stack.

II. EMISSION STANDARDS FOR RICE SHELLERS AND SAILA PLANTS a) Emission Standards for S.P.M (mg/Nm3) 750* Inside the building(µg/Nm3) TI V of air (to be controlled by Director of factories)

Page 54: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

93

The existing units not meeting the prescribed siting guidelines will meet a stack emission standards of 500 mg/Nm3.

CODE OF PRACTICE

No Brick Jali or open structure is allowed in the processing shed.

All processing sheds should be enclosed.

Industry should provide proper rice husk storage facilities inside the industry

premises and the height of the wall around the discharge point should be 10ft.

All dust emitting point should be properly hooded and the dust extracted to a

common point. At this exhaust point dust carrying air will be passed through a

dust control system and air will be emitted through a stack of height 3m. above

the roof of building.

III. EMISSION STANDARDS FOR BRICK KILN S.P.M (mg/Nm3) 750* * The existing units not meeting the prescribed siting guidelines will meet a stack

emission standards of 500 mg/Nm3.

Page 55: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

94

CODE OF PRACTICE * Approach road within the premises of brick Kiln area should be pucca/stabilized

with brick bats etc. * They should use crushed coal for better burning efficiency. * Bricks should be laid in a staggered manner for baking to entrap maximum

particulate matter at the source itself. * They should use a properly designed gravity chamber. * Height of chimney/stack should be atleast be 30m. IV. EMISSION STANDARDS FOR CEMENT PLANTS & GRINDING UNITS. a) 200 tpd and less S.P.M (mg/Nm3) i) Existing unit 400* ii) New units 250 b) Greater than 200TPD 150 * Existing grinding units in the state can continue where they are but the emission standards applicable when they are located less than 200mts. from the National or State Highway or within Municipal or village limits will be 100 mg/Nm3.

Page 56: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

95

This notification supersedes the earlier notification of the Board regarding guidelines for siting of rice shellers, notification No. Admn/A-2/178/94/148 dated 10.09.1997 and any other notification issued by the Board in this respect. F. Lal Kansal Chairman Endst.No.Admn/SA-2/F.No.178/98/15053-103 Dated 02.09.1998 A copy of the above is forwarded to the following for information & necessary action:

1. The Principal Secretary to Government of Punjab, Deptt. of Science, Technology, Environment and Non-Conventional Energy, Chandigarh.

2. The Director of Industries, Punjab, 17-Bays Building, Sector-17, Chandigarh. 3. The Chairman, Punjab State Electricity Board, Patiala. 4. The Director Food & Supplies, Punjab, Sector-17, Chandigarh. 5. The Chief Co-ordinator, Udyog Sahayak, Udyog Bhawan, 18, Himalaya Marg, Sector-

17, Chandigarh. 6. The Managing Director, State Government, Industrial Development Corporation,

Sector-17, Chandigarh. 7. The Managing Director, Small Scale Industries and Export Corporation, Chandigarh. 8. The Managing Director, Punjab Financial Corporation, Sector-17, Chandigarh. 9. The General Manager, All District Industrial Centres in Punjab. 10. The Chief Engineer (Commercial), Punjab State Electricity Board, Patiala. 11. The Director (Commercial), Punjab State Electricity Board, Patiala. 12. The Sr. Environmental Engineer, Punjab Pollution Control Board, Patiala/ Ludhiana. 13. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/

Ludhiana -I/II/Jalandhar/Amritsar/Gurdaspur/Hoshiarpur/Sangrur/Bathinda/Faridkot and Nodal Office, Chandigarh.

14. The Incharge (P&G/EPS), Punjab Pollution Control Board, Patiala. 15. The Scientific Officer, Punjab Pollution Control Board, Patiala. 16. The Deputy Controller (F&A), Punjab Pollution Control Board, Patiala. 17. The Public Relations Officer/Asstt. Personnel Officer/P.S to Chairman/P.A to Member

Secretary, Punjab Pollution Control Board, Patiala. 18. All Asstt. Environmental Engineers.

PS for EE's: Five spare copies of the notification are enclosed for supplying to all AEE's. Sd/- (B.N. Gupta) Administrative Officer For Member Secretary.

Endst.No.Admn/SA-2/F.No.178/98/15104-27 Dated 02.09.1998 A copy of the above is forwarded to all Industrial Association in Punjab.

Sd/- Administrative Officer For Member Secretary.

Page 57: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

96

Annexure -11

PUNJAB POLLUTION CONTROL BOARD, NABHA ROAD, PATIALA.

BOARD NOTIFICATION

April,1999

No.Admn/SA-2/F.No.178/99/03 Dated: 26.04.199 The Punjab Pollution Control Board in 100th Board meeting held on 16.12.1998 has approved the following guidelines, Emission Standards and important points for prevention of pollution by Hot Mix Plant :

SITTING GUIDELINES:

Distance from

Municipal Corporation Limits 5Km Class A Towns & Cities Limits 2Km Other Towns & Cities Limits 1Km Village Laldora,Phirni 500m Wild Life Sanctuary Zoo 500m National Highway 500m State Highway*/Scheduled Road 300m Residential Area(15 pucca house) 300m Educational Institute/Historical 300m Religious Places/Protected Monuments.

Provision of Green Belt

The industry should plant three rows of spreading crown & fast growing varieties of evergreen broad

leaved trees all along the boundary.

Note: Distance shall be measured from the edge of the metalled road to the nearest stack of the hot

mix plant.

EMISSIONS STANDARDS FOR HOT MIX PLANT

S.P.M (mg/Nm3) 150

Note: There should be no smoke visible from the plant.

Important points for Prevention of Pollution by Hot Mix Plant

1. A suitable dust control system for the dryer and mixer to contain/recycle permissible lines in the

mix should be provided. It should be capable of preventing the exhaust of line dust into

atmosphere from both ends of the dryer drum by creating adequate negative pressure.

2. The plant should have centralized control panel/cabin capable of presetting controlling/synchronizing all operations, starting from feeding of cold aggregates to the

discharges of the hot mix to ensure proper mixing. It should have adequate water scrubbing

mechanism to completely remove/control the dust coming out the drier with proper provision of re-circulation system for the scrubber water.

3. Bitumen must be mixed with aggregate as soon as it is heated and second time lifting of the

dried aggregate for proper batching should be avoided.

Page 58: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

97

4. All roads/vehicular movement areas at the site of Hot Mix Plant should be pucca/stabilized with

stone aggregates and regular sprinkling of the water be ensured so that no dust is generated with vehicular movement.

5. Hot Mix Plant must have proper stack heights for its scrubbed fire gases and bitumen heating

system with proper platform and port holes as per the Punjab Pollution Control Board norms.

6. Fine dust arrested by water scrubber and collected in the re-circulation water tank should be

collected and filled in a pit to be covered with fresh earth. This exercise should be repeated as and when dust is removed from re-circulation tank.

Sd/-

F. Lal Kansal Chairman

Endst.No.Admn/SA-2/F.No.178/99/10683-710 Dated:26.4.1999

A copy of the above is forwarded to the following for information and

necessary action: 1. The Principal Secretary to Government of Punjab, Deptt. of Science, Technology, Environment

and Non-Conventional Energy, Chandigarh.

2. The Director of Industries and Commerce, Punjab, 17-Bays Building, Sector-17, Chandigarh. 3. The Chairman, Punjab State Electricity Board, Patiala.

4. The Director, Food and Supplies Department, Punjab, Sector-17, Chandigarh. 5. The Managing Director, State Government Industrial Development Corporation, Sector-17,

Chandigarh.

6. The Managing Director, Small Scale Industries and Export Corporation, Sector-17, Chandigarh. 7. The Chief Co-ordinator, UdyogSahayak, 18. Himalaya Marg, UdyogBhawan, Sector-17,

Chandigarh. 8. Sh.R.S. Bhangal, Environmental Engineer, 18. Himalaya Marg, UdyogBhawan, Sector-17,

Chandigarh. 9. The Managing Director, Punjab Financial Corporation, Sector-17, Chandigarh.

10. The General Manager, All District Industries Centres in Punjab.

11. The Chief Engineer (Commercial), Punjab State Electricity Board, Patiala. 12. The Director (Commercial), Punjab State Electricity Board, Patiala.

Sd/- ( B.N. Gupta )

Administrative Officer

Endst.No.Admn/SA-2/F.No.178/99/10711-32 Dated: 26.4.1999

A copy of the above is forwarded to All Industrial Associations, Punjab for information.

Sd/-

Administrative Officer

Endst.No.Admn/SA-2/F.No.178/99/10733-72 Dated: 26.4.1999

A copy of the above is forwarded in the following for information and necessary action.

1. The Senior Environmental Engineer, Punjab Pollution Control Board, Patiala/Ludhiana.

2. The incharge (P&G/EPS), Punjab Pollution Control Board, Patiala.

3. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/Ludhiana172/Jalandhar/Amritsar/Gurdaspur/Hoshiarpur/Sangrur/Bathinda/Faridkot and

Nodal Office, Chandigarh. 4. The Environmental Engineer-1/2/3/4/CSA/11WM/General-1/Construction, Punjab Pollution

control Board, Patiala.

5. The Scientific Officer, Punjab Pollution Control Board, Patiala.

Page 59: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

98

6. The Deputy Controller (F&A), Punjab Pollution Control Board, Patiala.

7. The Asstt. Personnel Officer/Law Officer, Punjab Pollution Control Board, Patiala. 8. All Assistant Environmental Engineer, Punjab Pollution Control Board, Head-Office, Patiala.

9. The P.S. to Chairman/P.A. to Member Secretary, Punjab Pollution Control Board, Patiala. Sd/-

Administrative Officer

Page 60: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

99

Annexure-12

GOVERNMENT OF PUNJAB

DEPARTMENT OF SCIENCE, TECHNOLOGY, ENVIRONMENT AND NON-CONVENTIONAL ENERGY.

Notification

The 17th March, 1998

No. 3/7/96-STE(5)562 Whereas, it is necessary and expedient to take immediate

steps under section 5 & 7 of the Environment (Protection) Act, 1986 and rules framed

thereunder to maintain ecological balance in the State, to prevent environmental

degradation and avoid traffic and human health hazards;

And whereas stone crusher units in the State of Punjab have been causing grave air

pollution and causing hazards to traffic and human health;

And whereas to abate air pollution created by the stone crusher units, the Punjab

Government notified a policy on the siting of stone crushers vide Notification dated

3/7/96-STE(4)/1120 dated 15th May, 1996;

And whereas various stone crusher owners have filed civil writ petition bearing Nos.

16520 of 1996, 16832 of 1996, 16853 of 1996, 17101 of 1996, 17647 of 1996, 17654

of 1996, 18106 of 1996 challenging the said notification dated 15th May, 1996 in the

Hon'ble High Court of Punjab & Haryana;

Now, therefore, in supersession of the said notification No. 3-7-96-STE(4)/1120 dated

15th May, 1996 and in exercise of powers conferred by Section 5 of the Environment

(Protection) Act, 1986 read with Government of India, Ministry of Environment and

Forests, Department of Environment, Forests and Wild Life Notification No.

S.O.389(E), dated the 14th April, 1988 and in pursuance of the provisions of Section 7

of the said Act and Rule 4 of the Environment (Protection) Rules, 1986, the Governor

of Punjab, hereby directs as under:-

1. FOR NEW STONE CRUSHER :-

No new stone crushing unit shall be allowed to be installed

Page 61: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

100

and operated within the limits of :-

A. (i) 500 meters on National Highway/ State Highway / Scheduled Roads in

plain areas and 250 meters in sub-mountainous areas.

(ii) 5 km. of the city limit of metropolitan cities / Municipal Corporations.

(iii) 2 km. of the city limits of A-Class Towns,

(iv) 1.5 km. of the city limits of B-Class Towns.

(v) 1.0 km. of other Cities/Towns.

(vi) 500 meters of village phirni / LalLakir/ Approved Residential Colony.

(vii) 300 meters of Historical Places / Educational Institutions / Zoological

Parks / Wild Life Sanctuaries/ Protected Monuments.

(viii) 100 meters of Link Roads and other district roads.

(ix) 300 meters of all major district roads in plain areas and 150 meters in

sub-mountainous area.

B. Stone crushers shall be located in a minimum area of 0.4 hectare which

should be owned by the stone crushing unit or by taking land on lease either by the

panchayats or in the private sector.

2. FOR EXISTING STONE CRUSHER :-

The existing stone crushers meeting the guidelines given below

alongwith standards notified under Environment (Protection) Act, 1986 and the code

of practice for pollution prevention as specified hereinafter should be allowed to

operate:-

(i) No dust emitting point within 100 meters from right of way of scheduled roads within the Chandigarh Capital Periphery Control Area /Communication Zone.

(ii) No dust emitting point within 30 meters from right of way of Highways/ Scheduled Roads in the other parts of the State.

(iii) 250 meters from Municipal/Notified Area Committee Limit/Village LalLakir/Approved Residential Colonies/Historical Places/Zoological Parks/ Wild Life Sanctuaries/ Protected Monuments.

NOTE :-

(i) Those limits which are not conforming to the

Page 62: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

101

above guidelines should be shifted from the present sites.

(ii) The Environment Impact of existing stone crushers may be studied and

their further continuation reviewed after a period of five years.

3. FOR NEW CLUSTERS OF STONE CRUSHERS :-

In addition to the guidelines for new stone crushers recommended

above, the following criteria shall be adopted where stone crushers are set up in

clusters :-

(i) A green belt of width as specified by the Punjab Pollution Control Board will be provided all around the clusters.

(ii) Only one approach from National Highway/ Scheduled Road will be provided to the cluster.

(iii) The approach road leading to a cluster of five or more stone crushers shall not pass through any village.

(iv) All new clusters of stone crushers shall get the layout plan approved

from Town and Country Planning Department, Punjab.

4. FOR EXISTING CLUSTERS OF STONE CRUSHERS:-

The approach road leading to a cluster of five or more stone crushers

shall not pass through any village.

5. CODE OF PRACTICE FOR POLLUTION PREVENTION:-

All the stone crushers shall take the following pollution control

measures:-

(i) All the dust emitting points like Jaw/ Roller crushers, screens/ classifiers

should be properly enclosed/ covered.

(ii) Conveyor belts should be of proper quality material instead of used

tyres.

(iii) The ends of conveyor belts should be covered with telescopic chute.

(iv) Regular water spray should be carried out at all dust emitting points and

transfer points.

(v) Water spray should be done on the boundary as per requirement.

Page 63: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

102

(vi) Regular cleaning of approach roads should be carried out.

(vii) All the approach roads and ramps should be metalled.

(viii) A green belt consisting of three rows of tress (out of which one

row of tall leaved trees and two rows of medium leaved dense

trees) should be provided along the periphery.

(ix) Annual health survey of the workers should be conducted.

(x) The openings of the housing for the movement of mechanical

drives, conveyor belts etc. should be properly sealed with flexible

rubber flaps.

(xi) The process waste i.e. file material should be dumped along the

road side and should be used for filing up of low lying areas.

(xii) The water spray system should be interlocked with the main

crushing operation.

(xiii) The stone crushers should conform to the emission standards load

down by the Punjab Pollution Control Board.

6. The existing stone crushers meeting the guidelines for existing

stone crushers, but not conforming to the guidelines for new stone crushers

shall, in addition to the above pollution control measures; provide a 10ft. brick

wall as boundary/ wind breaking wall facing the road as well as towards

residential area with a well defined single entry from the road.

7. Each stone crusher shall install suitable pollution control measures

to the satisfaction of the Punjab Pollution Control Board and shall

obtain 'No Objection Certificate' from Punjab Pollution Control

Board and shall obtain 'No Objection Certificate' from the Town

and Country Planning Department, Punjab and also conform to the

other statutory regulations, in any.

Page 64: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

103

8. The stone crusher unit henceforth should be

permitted anywhere subject to the restriction of the Department

of Town and Country Planning, Punjab and the Punjab Pollution Control

Board.

9. Existing stone crusher units which are not conforming to the parameters, as

detailed above, shall shift to sites conforming to the above parameters within the time frame given by the Punjab Pollution Control Board to them but not later than three months from the date of issue of this notification.

Dated Chandigarh the Y.S. RATRA 12th March, 1998 Principal Secretary to Govt. Punjab, Department of Science, Technology, Environment &Non Conventional Energy.

No. 3/7/96-STE(5)/571 Dated, Chandigarh the 17-3-98.

A copy is forwarded to the following for information and necessary action:-

1. Principal Secretary to Government Punjab, Department of Local Government, Punjab, Chandigarh.

2. Principal Secretary to Government Punjab, Department of Housing & Urban Development, Chandigarh.

3. Secretary to Government Punjab, Department of Industries & Commerce, Chandigarh.

4. Secretary to Government Punjab, Department of P.W.D.(B&R), Chandigarh.

5. Advocate General Punjab, Chandigarh.

6. Director General of Police, Punjab, Chandigarh.

7. Director of Industries, Punjab, Chandigarh.

8. Chief Administrator, Punjab Urban Planning and Development Authority, Chandigarh.

9. Chairman, Punjab Pollution Control Board, Patiala with the request that copy of the Notification may please be supplied to each existing stone crusher in the State of Punjab.

10. Managing Director, Punjab State Small Industries & Export Corporation,

Chandigarh.

11. Chief Town Planner, Town & Country Planning Department, Chandigarh.

12. Secretary to Chief Secretary to Government Punjab for kind information of Chief

Secretary.

13. Private Secretary to Principal Secretary, Science, Technology, Environment & Non-

Conventional Energy for the kind information of PSSTE.

Sd/-

Additional Secretary

Page 65: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

104

Annexure-12(a)

Government of Punjab, Department of Science, Technology, Environment and

Non-Conventional Energy

NOTIFICATION

No. 3/7/96-STE(4)/523 The 1st February, 2006

In partial modification of Notification No. 3/7/96-STE (5)/562 dated 17/3/1998

and in exercise of powers conferred under section 5 of the Environment (Protection)

Act, 1986 read with Government of India, Ministry of Environment and Forests,

Department of Environment, Forests and Wild Life notification no. S.O 289 (E) dated

the 14/4/1998 and in pursuance of the provisions of section 7 of the said Act and Rule

4 of the Environment (Protection) Rules, 1986, the Governor of Punjab is pleased to

insert provision No.5 (A) as Code of Practice for Pollution Prevention" for stone

crushing units using wet raw material and having washing facilities at

screener/classifier as under:-

"5, A) WET PROCESS:-

i) The dust emitting namely jaw/roller crushers should be properly

enclosed/covered.

ii) Conveyor belts should be of good quality preferably thick sheet of rubber

material to avoid any kind of spillage of material carried by these belts and

consequently reducing air pollution.

iii) End of conveyor belts should be provided with conventional type Chute made

of rubber sheet/flapper of minimum 5 ft. height supported by Mild Steel

angles in place of telescopic chute at the end of the conveyor belt.

iv) Regular water spray should be carried out at jaw crushers and roller crushers.

v) Water spray should be done on the boundary wall at main entrance. Stone

Crushers should also provide proper water sprinkling system on the berms

of ramp and approach road to ensure that these are in wet condition during

the operation hours.

Page 66: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

105

vi) All the approach roads and ramps should be 30 cm. thick with washed river bed

material of size 10-53 mm. duly compacted with any mechanical means

such as road roller in conformance to IS: 6579-1981.

vii) A green belt consisting of three rows of trees (out of which one row of tall

leaved trees and two rows of medium leaved dense trees) should be

provided along the periphery. In case of cluster of stone crushing units, a

common green belt may be provided along the periphery of cluster.

viii) The stone crushing units should make the following provisions for the

management of wastewater:-

a) The stone crushing units shall provide settling tank(s) for wastewater of

adequate capacity, designed by taking surface loading rate of 25 m3/day/m2

and length to width ratio of 3:1 and clear water depth as 3 m excluding 0.3

m free board and 0.5 m depth for accumulation/storage of solids. The

treated effluent shall be discharged into inland surface water/onto land for

irrigation as per the mode of disposal allowed by Punjab Pollution Control

Board.

b) The units shall ensure that the settling tank(s) is/are cleaned regularly to

maintain minimum clear water depth of 3m.

c) For measuring the discharge of wastewater, the stone-crushing units shall

provide 90o V-notch at the outlet of settling tank(s) and maintain the record

of discharge in register on daily basis.

d) The process waste i.e. fine material and silt so produced from the settling

tank(s) will be disposed of in an environmentally sound manner such as

filling in low lying area with half meter height of silt layer followed by cover

of good earth of 15 cms. and so on with the prior approval of concerned

Environmental Engineer of Punjab Pollution Control Board.

All other provisions of the parent notification shall apply.

Dated: Chandigarh, the ROMILA DUBEY 31st January, 2006 Principal Secretary to Government of Punjab, Department of Science, Technology, Environment & Non-Conventional Energy.

Page 67: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

106

Endst. NO. 3/7/96-STE(4)/524 Dated :

01.02.2006

A copy alongwith a spare attested copy is forwarded to the Controller, Printing & Stationery Punjab, Chandigarh. He is requested to publish this notification in the ORDINARY GAZETTE of Punjab Government and send 50 copies to this department. Sd/-

Special Secretary Endst. NO. 3/7/96-STE(4)/525-38 Dated : 01.02.2006 A copy of the above is forwarded to the following for information

and necessary action :

1. Principal Secretary to Chief Minister, Punjab for the kind information of Hon'ble Chief Minister, Punjab.

2. Principal Secretary to Government of Punjab, Deptt. of Local Government. 3. Principal Secretary to Government of Punjab, Deptt. of Industries and

Commerce. 4. Secretary to Government of Punjab, Department of Housing and Urban

Development. 5. Secretary to Government of Punjab, Department of P.W.D (B&R). 6. Advocate General, Punjab, Chandigarh. 7. Director General, Punjab, Chandigarh. 8. Director of Industries, Punjab, Chandigarh. 9. Chief Administrator, Punjab Urban Planning and Dev. Authority, Mohali. 10. Managing Director, Punjab Small Industries & Export Corpn., Chandigarh. 11. Chief Town Planner, Punjab, Chandigarh. 12. Member Secretary, Punjab Pollution Control Board, Patiala. 13. PS/PSSTE for kind information of Principal Secretary, Science, Technology &

Environment, Punjab. 14. Sh. Ravinder Kumar Abhi, Chairman, Punjab Stone Crusher Association, G.T

Road, Mirthal, Tehsil Pathankot, Distt. Gurdaspur.

Sd/- Special Secretary

Endst. No. 3/7/96-STE(4)/539 Dated : 1.2.2006

A copy is forwarded to the Secretary to Government of India, Ministry of Environment & Forests, Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi for information.

Sd/- Special Secretary

Page 68: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

107

Annexure-12(b) Government of Punjab,

Department of Science, Technology, Environment and Non-Conventional Energy

Order

Whereas, the Govt. of Punjab, Department of Science,

Technology, Environment and Non-conventional Energy, Chandigarh in

pursuance of the provisions of section 5 of the Environment (Protection) Act,

1986 and read with Government of India, Ministry of Environment & Forests,

Notification No. S.O 389 (E) dated 14.4.1988 and in pursuance of the

provisions of section 7 of the said Act and Rule 4 of the Environment

(Protection) Rules, 1986 vide order no. 3/7/96-STE(5)/562 dated 17/3/1998

had laid down siting guidelines including code of practice for setting up of new

stone crushers in the State of Punjab.

And whereas, LPA 197 of 2009, titled as Prem Goyal Vs State of

Punjab came up for hearing before the Hon'ble Punjab & Haryana High Court

on 9.9.2009 and the operative part of the interim Order passed by the Hon'ble

Court is reproduced as under:

"We deem it appropriate to direct the Chief Secretary to constitute a

Committee of Officers not below the rank of Secretary/Head of the

Department representing various authorities concerned to find a just and

fair solution so as to maintain Wildlife Sanctuary as well as protect the

interest of the petitioner-appellant and other industrial units. The

Committee be constituted within the week from today. It shall prepare a

report and place before this Court within a period of eight weeks

thereafter."

And whereas in compliance to above orders of the Hon'ble Punjab

& Haryana High Court, the Hon'ble Chief Secretary to Government of Punjab

has constituted a Committee comprising of six members and the said

Committee in its report submitted to the Hon'ble Punjab & Haryana High Court

has recommended that no new industrial unit shall be allowed to be established

within 500 m radius of Wildlife Sanctuary / Zoo w.e.f. 1.1.2010 unless a

Page 69: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

108

Committee comprising of Department of Forests & Wildlife Preservation,

Department of Industries & Deptt. of Science & Technology specially

recommends its establishments.

And whereas, LPA 197 of 2009 titled as Prem Goyal Vs State of

Punjab has been disposed of by the Hon'ble Punjab & Haryana High Court on

23.12.2011 and the operative part of the order is reproduced as under:

"We would like to place on record our appreciation for excellent report submitted on 17.12.2009 by the Committee constituted by the Chief Secretary, Punjab. The responded State shall in compliance with directive principle of State Policy given in Article 48-A of the Constitution frame a policy guidelines keeping in view the recommendations made by the Committee, which have been placed on record on 17.12.2009. The same be notified to all concerned within a period of two months from the date of receipt of a copy of this order."

In view of above and in exercise of powers conferred u/s 5 of the

Environment (Protection) Act, 1986 read with Government of India, Ministry of

Environment & Forests, Department of Environment, Forests and Wildlife

Notification No. S.O. 289 (E) dated 14th April, 1988 and in pursuance of the

provisions of section 7 of the said Act and rule 4 of the Environment

(Protection) Rules, 1986, the Governor of Punjab is pleased to make the

following amendments in office order issued vide Endst. no. 3/7/96-

STE(5)/562, dated 17.3.1998 of the Department of Science, Technology &

Environment:-

1. The words "Wildlife Sanctuaries" in sub paragraph (vii) of paragraph (A) are, hereby, omitted.

2. Following sub paragraph (x) of paragraph (A) is, hereby, inserted after sub-paragraph (ix) of paragraph: (x) 500 meter of Wildlife Sanctuary/Zoo.

Dated: Chandigarh, the Viswajeet Khanna 27th February, 2012 Principal Secretary to Government of Punjab, Department of Science, Technology, Environment & Non-Conventional Energy.

Endst. NO. 3/198/2008-STE(4)/452 Dated :

02.03.2012

Page 70: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

109

A copy of the above is forwarded to the following for information

and necessary action:-

1. Principal Secretary to Chief Minister, Punjab for the kind information of Hon'ble

Chief Minister, Punjab.

2. Principal Secretary to Government of Punjab, Deptt. of Local Self Government.

3. Principal Secretary to Government of Punjab, Deptt. of Food & Civil Supplies.

4. Principal Secretary to Government of Punjab, Deptt. of Labour& Employment.

5. Principal Secretary to Government of Punjab, Deptt. of Industries and

Commerce.

6. Principal Secretary to Government of Punjab, Deptt. of Science, Technology,

Environment & Non-conventional Energy.

7. Principal Secretary to Government of Punjab, Department of Housing and

Urban Development.

8. Secretary to Government of Punjab, Department of P.W.D (B&R).

9. Chief Administrator, Punjab Urban Planning & Development Authority.

10. Advocate General, Punjab, Chandigarh.

11. Managing Director, Punjab Small Industries & Export Corpn., Chandigarh.

12. Chairman, Punjab Pollution Control Board, Patiala.

13. Director of Factories, Punjab, Chandigarh.

14. Chief Town Planner, Punjab, Chandigarh.

15. Director General of Police, Punjab, Chandigarh.

16. Advocate General, Punjab, Chandigarh.

17. All Chief Environmental Engineers, Zonal Offices and Regional Offices of Punjab

Pollution Control Board.

Sd/- Deputy Secretary

Page 71: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

110

Annexure-13

Government of Punjab, Department of Forests and Wildlife Preservation

(Forest Branch)

NOTIFICATION

No. 26/218/08-FT-5/4097 Chandigarh, dated the 5/6/2012

The Governor of Punjab is pleased to notify the Guidelines for

compliance by the existing/new industrial units/other projects and the activities

regulated/permitted or prohibited, in the Eco-sensitive zones around various

sanctuaries/zoos in the State, in compliance of Hon'ble Punjab & Haryana High

Court order dated 23.12.2011 passed in LPA No. 197 of 2009 – Prem Sagar Vs.

State of Punjab. All concerned shall follow the guidelines detailed in Annexure-

1 and the activities which are regulated/permitted or prohibited in the Eco-

sensitive zones around the sanctuaries/zoos which are enclosed to this

Notification as Annexure-2.

D.S. Bains, IAS Financial Commissioner & Secretary to Govt. of Punjab

Department of Forests & Wildlife Preservation Endst. No. 26/218/08-Ft-5/4098 Chandigarh, dated the 5/6/2012 A copy is forwarded to the following for information and necessary action: 1. Chief Secretary to Govt. of Punjab, Chandigarh. 2. A copy, with a spare copy, of the notification is forwarded to the Controller,

Printing & Stationery, Punjab, Chandigarh for publication of the same in the official gazette and with the request that 50 copies of the notification may be supplied to this department.

3. Financial Commissioner Revenue, Punjab. 4. Principal Secretary to Government of Punjab, Department of Science,

Technology & Environment, Mini Secretariat, Punjab, Sector-9, Chandigarh. 5. Director of Industries & Commerce, Punjab, Udyog Bhawan, Sector-17,

Chandigarh. 6. Chairman, Punjab Pollution Control Board, Patiala. 7. Principal Chief Conservator of Forests (HoFE), Punjab. 8. Chief Wildlife Warden, Punjab, Mohali.

Sd/-

Under Secretary Forest

Page 72: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

111

ANNEXURE-1

Policy Guidelines for Compliance

by Industrial Entrepreneurs/units

in the Eco Sensitive Zone surrounding Wildlife Sanctuaries/zoos

of Punjab State

Department of Forests and Wildlife Preservation

Punjab

April, 2012

Page 73: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

112

PREAMBLE

1.1 India is unique in terms of biological diversity due to its unique biogeographical

location, diversified climatic condition and enormous ecodiversity and

geodiversity. India contributes 10% to the world's Biological Diversity. Punjab,

the 'land of five rivers' is a relatively small state of India occupying an area of

50,362 Sq. Km. Situated between river Ravi in the North-West and Ghaggar in

the east, Punjab shares its boundaries with Jammu & Kashmir in the North,

Himachal Pradesh in the North-East and Haryana and Rajasthan to its South.

the state also shares a 300 km. long international border with Pakistan on the

western side.

1.2 Punjab has rich biodiversity which, however, is severely threatened and needs

to be conserved. The state has so far notified 16 Protected Areas out of which

there are 13 Wildlife Sanctuaries, 2 Community Reserves and one Conservation

Reserve. There is no National Park in the State. Most of the protected areas are

of small size and are hence extremely vulnerable to industrial and other

pollution sources in their immediate vicinity. These guidelines frame the policy

in respect of existing and future industry in the eco-sensitive areas around the

Protected Areas.

2. MISSION

The State shall endeavour to protect, conserve and maintain wildlife

sanctuaries and strive to safeguard the representative ecosystems, habitats and

species in them and shall discharge its responsibilities by providing pollution

free environment in the vicinity of wildlife sanctuaries/zoos and seeking strong

commitment from industrial units to fulfill their obligations for the careful

stewardship of wildlife sanctuaries whilst recognizing the need to integrate the

interests of people and nature.

Page 74: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

113

3. OBJECTIVES

To achieve the above mission, the policy seeks to pursue the following

objectives :

a) Identification of Industrial units/activities located within 500 meters

distance of wildlife sanctuaries/zoos of the State.

b) Categorisation of industrial units/activities as per "Siting Guidelines" of

Punjab Pollution Control Board issued from time to time.

c) Assessing the impact of existing industrial units/activities on the health

of ecosystem and fauna in the wildlife sanctuaries/zoos.

d) Establishing guidelines for the shifting of industrial units/activity or

monitoring the activities of existing units

or

Setting up of new industrial units within 500 meters distance of wildlife

sanctuaries/zoos.

e) Enforcement of standards and norms in the delineated 500 meter radius

zone around wildlife sanctuaries/zoos as per guidelines.

f) Enunciate mechanism/processes to declare the areas located within 500

meters of sanctuaries/zoos as an eco-sensitive zone and bringing it

under legal enactment for strict enforcement and compliance of the

directives.

4. STRATEGIES

The stated objectives would be achieved through following strategies.

4.1. DESIGNATED COMMITTEE

State Government will appoint a high powered Committee (hereinafter referred

to as this Designated Committee) comprising Senior Officers of the Forest &

Wildlife Preservation Department, Department of Industries, Department of

Science and Technology and the PPCB for framing rules, regulations and giving

effect of to these Guidelines.

Page 75: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

114

4.2 FOR EXISTING INDUSTRIAL ENTREPRENEURS UNITS

The following guidelines formulated in compliance of Hon'ble Punjab and

Haryana High Court order dated 23.12.2011 in LPA 197 of 2009 - Prem Sagar

versus Punjab State shall be followed by all the existing industrial

entrepreneurs units.

4.2.1 IDENTIFICATION OF INDUSTRIAL UNITS/ACTIVITIES WITHIN 500

METER RADIUS OF ALL WILDLIFE SANCTUARIES/ZOOS IN THE

STATE.

4.2.1.1 List of exiting industries within 500 meters from outer boundaries of

sanctuaries identified by High Powered Committee constituted by Chief

Secretary, Punjab in compliance of Hon'ble Punjab and Haryana High

Court order dated 09.09.2009 shall be conveyed to the executive

functionaries of allied departments such as Department of Industries and

Punjab Pollution Control Board, Department of Science, Technology and

Environment and Department of Revenue, Government of Punjab.

4.2.1.2 None of the industrial units within 500 m of the periphery of the

sanctuaries identified by the committee within 500 meters of wildlife

sanctuaries/zoos shall be allowed to continue but shall be monitored by

a Joint Committee of Department of Forests and Wildlife Preservation,

Department of Industry and Punjab Pollution Control Board after every

three months.

4.2.1.4 The existing Entertainment Park within 500 meters of wildlife

sanctuaries/zoos though belong to exempt category shall be brought

within the eco-tourism policy of the State Government duly approved by

the Department of Tourism. The park shall be given a time frame of six

months to follow the guidelines of Department of Tourism as laid out in

the ecotourism policy. The Department of Forests and Wildlife

Preservation along with representative of Department of Tourism shall

monitor the park after every six months to see that the guidelines of

Department of Tourism are followed strictly. The department of Tourism

Page 76: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

115

shall initiate due procedure to bring the park under Ecotourism Policy of

the State.

4.2.2 FOR EXISTING INDUSTRIAL UNITS/ACTIVITIES (GREEN

CATEGORY)

4.2.2.1 All the green category industrial units/activities identified by the

committee within 500 meters of wildlife sanctuaries/zoos except industry

located within 30 meters of sanctuaries shall allow to continue. However,

a committee (Department of Forests and Wildlife, Department of

Industries and Punjab Pollution Control Board) shall monitor these units

after every six months.

4.2.2.2 The department of industries shall initiate due procedure for the shifting

the green category industrial unit that fall within 30 meters of wildlife

sanctuaries/zoos. A Joint committee (Department of Forests and Wildlife,

Department of Industries and Punjab Pollution Control Board) shall

monitor its after every six months.

4.2.2.3 A Joint committee of Department of Forests and Wildlife, Department of

Industries and Punjab Pollution Control Board shall carryout stringent

monitoring after every six months in respect of sensitive green industries

such as Rubber/Plastic/Chilling Plant/Ice Plant.

4.2.2.4 Principal Chief Conservator of Forests, Punjab shall initiate action against

(small scale wood based industry) already identified by a Committee

within 500 mt. of wildlife sanctuaries/zoos as per Punjab Regulation of

Saw Mills, Veneer and Plywood Industries Rules, 2006.

4.2.3 FOR EXISTING INDUSTRIAL UNITS/ACTIVITIES (RED

CATEGORY)

4.2.3.1 RICE SHELLERS

(a) All the existing rice shellers within 500 meters of wildlife

sanctuaries/ zoos but not within 30 meters from boundary of

wildlife sanctuary shall be allowed to operate.

Page 77: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

116

(b) Those rice shellers which were in operation prior to siting

guidelines/ parameter of Punjab Pollution Control Board within

500 meters of wildlife sanctuaries/zoos be bound to follow the

norms of Punjab Pollution Control Board. For these rice shellers,

Punjab Pollution Control Board shall frame stringent norms and

shall notify the same. A Joint Committee comprising

representatives of Department of Forests and Wildlife,

Department of Industries and Punjab Pollution Control Board shall

monitor such rice shellers after every six months.

(c) Department of industries shall initiate due procedure for shifting

of all rice shellers that fall within 30 meters of Wildlife

Sanctuaries/zoos. The shifting of such units shall be monitored by

a Joint Committee comprising representatives of Department of

Forests and Wildlife, Department of Industries and Punjab

Pollution Control Board.

4.2.3.2 BRICK KILNS

(a) All the existing Brick kilns within 500 meters of wildlife

sanctuaries/ zoos but not within 30 meters from boundary of

wildlife sanctuary shall be allowed to operate.

(b) Those brick kilns which were in operation prior to siting

guidelines/ parameter of Punjab Pollution Control Board within

500 meters of wildlife sanctuaries/zoo be bound to follow the

norms of Punjab Pollution Control Board. For these brick kilns,

Punjab Pollution Control Board shall frame stringent norms and

shall notify the same. A Joint Committee comprising

representatives of Department of Forests and Wildlife,

Department of Industries and Punjab Pollution Control Board shall

monitor such brick kilns after every six months.

Page 78: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

117

(c) Department of industries shall initiate due procedure for shifting

of all brick kilns that fall within 30 meters of Wildlife

Sanctuaries/zoos. The shifting of such units shall be monitored by

a Joint Committee comprising representatives of Department of

Forests and Wildlife, Department of Industries and Punjab

Pollution Control Board.

(d) The brick kilns already in operation in the Abohar Wildlife

Sanctuary shall also be allowed to operate as the area of Abohar

Wildlife Sanctuary is privately owned and the rights of people

cannot be ignored. However, Punjab Pollution Control Board shall

frame stringent norms for them and strict monitoring of these

units shall be carried out by a Joint Committee comprising

representatives of Department of Forests and Wildlife,

Department of Industries and Punjab Pollution Control Board.

4.2.3.3 HOT MIX PLANTS

No Hot Mix Plant within 500 meter of wildlife sanctuaries/zoos shall be

allowed to operate. Any existing hot mix plant within 500 meters of

wildlife sanctuaries/zoos shall be closed down. Punjab Pollution Control

Board and Department of Industries shall initiate due procedure for its

closure and a close monitoring shall carried out by a Joint committee

comprising representatives of Department of Forests and Wildlife,

Department of Industries and Punjab Pollution Control Board.

4.2.3.4 STONE CRUSHERS

(a) All the existing stone crushers (boundaries or machinery) within

500 meters of wildlife sanctuaries/zoos but not within 30 meters

from boundary of wildlife sanctuary shall be allowed to operate.

(b) Those stone crushers which were in operation prior to siting

guidelines/parameter of Punjab Pollution Control Board within 500

meters of wildlife sanctuaries/zoos be bound to follow the norms

of Punjab Pollution Control Board. For these stone crushers,

Page 79: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

118

Punjab Pollution Control Board shall frame stringent norms and

shall notify the same. A Joint Committee comprising

representatives of Department of Forests and Wildlife

Preservation, Department of Industries and Punjab Pollution

Control Board shall monitor such stone crushers after every six

months.

(c) Department of industries shall initiate due procedure for shifting

of all stone crushers that fall within 30 meters of Wildlife

Sanctuaries/zoos. The shifting of such units shall be monitored by

a Joint Committee comprising representatives of Department of

Forests and Wildlife Preservation, Department of Industries and

Punjab Pollution Control Board.

4.2.3.5 MEDIA PAPER, CARDBOARD, SERVICE STATION/EFFLUENTS

TREATMENT PLANT

The existing media paper/card board unit, service station and Effluent

Treatment Plant shall be required to follow the norms of Punjab

Pollution Control Board and a Joint Committee comprising

representatives of Department of Forests and Wildlife, Department of

Industries and Punjab Pollution Control Board shall monitor on six

months basis.

4.2.3.6 IOC DEPOT

The existing IOC Depot within 500 meter of wildlife sanctuary shall be

shifted. IOC Depot shall submit its plan of shifting operation to

industries Department within 6 months. A Joint Committee comprising

representatives of Department of Forests and Wildlife Preservation,

Department of Industries and Punjab Pollution Control Board shall

review the action taken by unit for its shifting.

Page 80: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

119

4.3 GUIDELINES FOR NEW INDUSTRIAL UNITS/ACTIVITIES

WITHIN 500 METER OF WILDLIFE SANCTUARIES/ZOOS.

4.3.1 No new industrial unit shall be allowed to be established within 500

Meter periphery of any Wildlife Sanctuary/Zoo unless the Designated

Committee Specifically recommends its establishment. Till then the PPCB

shall not process any NOC/Consent/Clearance to those applicants who

have already applied for the establishment of units within 500 Meter

periphery of any Wildlife Sanctuary/Zoo.

4.3.2 None of the industrial units already in existence within 500 Meter of the

periphery of the sanctuaries shall henceforth be allowed to expand

without the approval of the Designated Committee.

4.3.3 Establishment of entertainment park/Eco-tourism activity within 500

meters periphery of any wildlife sanctuary shall be considered by the

Designated Committee only after obtaining NOC's from the Department

of Forests and Wildlife Preservation and Department of Tourism.

4.3.4 All pending applications with Punjab Pollution Control Board w.e.f.

01.01.2010 for setting up of new industrial units/activities within 500

meters of wildlife sanctuaries/zoos shall be placed before the Designated

Committee for its consideration. The Punjab Pollution Control Board shall

grant NOC/Consent/Clearance to only those applicants whose cases are

recommended by the Designated Committee. Applications which are not

recommended by the Designated Committee shall be rejected forthwith

by Punjab Pollution Control Board.

4.3.5 SEWAGE DRAINS/SOLID WASTE

(a) Municipal Corporations shall ensure that no untreated sewage is

discharged inside or within 500 Meter periphery of any Wildlife

Sanctuary/Zoos. In case Municipal Corporations have not installed

STPs for the treatment of sewage so far, same shall be done

within six months. The Designated Committee shall monitor the

same.

Page 81: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

120

(b) Municipal Corporations shall ensure that no municipal solid waste

is dumped within 500 meters of any wildlife sanctuary/zoos.

Municipal Corporations shall make alternative arrangements for

the disposal of municipal solid waste if any within a period of 6

months. The Designated Committee shall monitor the same on six

months basis.

4.4 ENUNCIATE MECHANISM/PROCESSES TO DECLARE 500

METERS PERIPHERY AREA AS "ECO-SENSITIVE ZONE" AND

BRINGING IT UNDER LEGAL ENACTMENT FOR STRICT

ENFORECEMENT AND COMPLIANCE OF DIRECTIVES.

The Department of Forests and Wildlife Preservation, Punjab in tune with

the policy of Government of India, Ministry of Environment and Forests

shall initiate process for the declaration of 500 meters area around

Wildlife sanctuaries/zoos of the State as Eco-sensitive Zone so as to

further enforce the standards and norms for safeguarding this zone.

4.5 Any matter/issue not explicitly covered in these guidelines shall be

decided by the competent authority after obtaining and considering the

recommendations of the "Designated Committee".

******

Page 82: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

121

Annexure-2

Activities which are regulated/prohibited or permitted in eco-sensitive zones around sanctuaries/zoos.

Sr.

No.

Activity Prohibited Regulated Permitted Remarks

1. Commercial Mining Y - - Commercial mining shall be

prohibited but mining for

bonafide domestic use shall be permitted by DFO.

2. Felling of trees - Y - Felling of only Ficus and

Mango trees may be regulated. For other species

there is no need of any regulation as it may affect

agro forestry.

3. Setting of saw mills - Y - To be regulated as per Punjab Regulation of Saw

Mills, Veneer and Plywood Industries Rules, 2006.

4. Setting of industries

causing pollution (Water, Air, Soil, Noise

etc.)

- Y - Approval shall be granted by

Committee headed by CWLW, Punjab, keeping in

view guidelines and norms

issued by Punjab Pollution Control Board.

5. Establishment of hotels and resorts

- Y - Approval shall be granted by Committee headed by

CWLW, Punjab, keeping in

view guidelines and norms issued by Punjab Heritage

Tourism Promotion Board and Punjab Pollution Control

Board.

6. Commercial use of firewood

- - Y As per Government of India, Ministry of Environment &

Forests Guidelines for ECO-sensitive zones around

National Parks and

Sanctuaries etc. vide F.No. 1-9/2007 WL-1 (pt) dated

11-01-2011.

7. Drastic change of agriculture systems

- - Y Farmers are free to choose changes in agriculture

system, no need of any regulation.

Page 83: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

122

Sr.

No.

Activity Prohibited Regulated Permitted Remarks

8. Commercial use of natural water resources

including ground water harvesting

- - Y No need any regulation.

9. Establishment of major hydroelectric

Y - - No major hydroelectric project is feasible.

10. Erection of electrical cables

- - Y No need of any regulation.

11. Ongoing agriculture and

horticulture practices by

local communities

- - Y No need of any regulation.

12. Rain water harvesting - - Y Vigorous efforts shall be

made to convince people for rain water harvesting.

13. Fencing of premises of

hotels and lodges

- - Y High fencing should be

discouraged.

14. Organic farming - - Y Organic farming to be

encouraged.

15. Use of polythene bags

by shopkeepers

Y - - Fully prohibited should not

to be allowed.

16. Use of renewable

energy sources

- - Y To be encouraged.

17. Widening of roads - Y - Approval shall be granted by

Committee headed by CWLW, Punjab.

18. Movement of vehicular traffic at night

- - Y No need of any regulation.

19. Introduction of exotic species

- Y - Approval shall be granted by Committee headed by

CWLW, Punjab.

Page 84: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

123

Sr.

No.

Activity Prohibited Regulated Permitted Remarks

20. Use of production of

any hazardous

substances

- Y - Approval shall be granted by

Committee headed by

CWLW, Punjab, keeping in view guidelines and norms

issued by Punjab Pollution Control Board.

21. Undertaking activities related to tourism like

over-flying the National

Park area by any aircraft, hot-air balloons

- Y - Approval shall be granted by Committee headed by

CWLW, Punjab, keeping in

view guidelines and norms issued by Punjab Heritage

Tourism Promotion Board.

22. Protection of hill slopes

and river banks

- - Y Active measures to be

taken.

23. Discharge of effluents

and solid waste in natural water bodies or

terrestrial area

- Y - Approval shall be granted by

Committee headed by CWLW, Punjab, keeping in

view guidelines and norms issued by Punjab Pollution

Control Board.

24. Air and vehicular

pollution

- Y - Awareness shall be

generated among local people to adopt pollution

free life style.

25. Sign boards &

hoardings

- - Y No need of any regulation.

26. Adoption of green technology for all

activities

- - Y to be encouraged.

******

Page 85: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

124

Annexure-14

Government of Punjab Department of Science, Technology, Environment

and Non Conventional Energy

NOTIFICATION No.3/6/07/STE(4)/2274 Dated;25th July,2008

Whereas, it is necessary and expedient to take steps under section 5 and

section 7 of Environment (Protection) Act, 1986 and the Rules framed their

under, to maintain ecological balance, to prevent environmental degradation

and to avoid human health hazard in the State.

2. And whereas, in order to resolve the complex issue regarding siting of

residential project in the vicinity of industrial units/industrial areas and to

frame consolidated guidelines after considering all other guidelines/

instructions/notifications issued by Govt. of India/State Government and

various Pollution Control Boards, the Govt. of Punjab constituted a

committee headed by the Chief Secretary , Punjab which in its meeting

held on 8.6.2007, observed that in case of knowledge based industry like

electronic/I.T. Parks etc. where there is no discharge of any type, there

may not be any necessity of any buffer distance between the industry

and the residents. In fact, the concept of walk to work is being

encouraged, world wide, in green industries. The SEZ policy of Govt. of

India also permits development and co-existence of non-polluting and

non-hazardous industries. Similarly, the Punjab State Industries and

export corporation policy/industrial policy of the State Govt. have

provision for co-existence of residential and industrial establishment in

industrial parks./focal points. The committee also observed that new

sophisticated technological development today enable us to curb the

levels of pollutants from various categories of industries eliminating or

substantially minimizing the ill effects of industrial emission/discharge.

Page 86: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

125

The pressure of ever increasing population, fast urbanization and nearly

double digit economic growth make it imperative that natural resources

including land, are optimally utilized. This calls for co-existence of

residential projects and industry of course, with proper safe guard

measures.

3. And whereas, it was noticed that no such minimum distance in locating

residential colony/ commercial complexes from existing industrial

complex has been fixed either by the Ministry of Housing and Urban

Development, the Ministry of Environment & Forest, Govt. of India, or

other State Pollution Control Boards from where information could be

obtained. Noticing further that in case of air and water pollution,

prescription of any such distance say 500 metres or even 100 metres,

may become more or less fruitless because pollution if created shall

spread beyond the prescribed distance. The Bhopal gas tragedy is too

recent to be forgotten. Therefore, the focus has to be on strict and rigid

pollution and risk control measures. Fortunately, the Pollution Control

Acts, provides a comprehensive system and mechanism, laying standard

and norms which the committee recommended, should be rigorously

enforced. Primarily, the committee observed that the need was to ensure

public safety for which the distance from source of hazard was relevant

for locating residential colony/commercial Complex.

4. And whereas, the committee also held a public hearing on the issue of

evolving the siting guidelines on 2.6.2007, which was attended by the

representatives of the industries as well as representatives of on going

residential complexes in the State. It was pointed out at the time of

public hearing that some of the existing and on going residential projects

are located as per the draft master plan in residential zones/Municipal

area etc. and some of these cases have got a detailed EIA study done

and obtained approval after proper public hearing. It was further

Page 87: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

126

represented that the committee should take into account the huge

investments made by the project promoters as well as the individual

buyers of these properties.

5. And whereas, it was resolved that to solve the issue of siting in a logical

manner and on permanent basis, there is an urgent need to immediately

prepare the Master Plans for the entire State, designating industrial and

residential zones. Once these plans are in position, the respective activity

should be allowed only in the designated zone, thus eliminating conflict

between industrial and residential usage of land.

6. Accordingly, in supersession of earlier guidelines framed by the Punjab

Pollution Control Board vide letter no. GPC/Gen/4/419/2006/876-96

dt.17.1.2006 and any other guidelines/notification issued by the Board

from time to time, the State Govt. vide its notification no. 3/6/07/STE

(4)/2851 dt.7.8.2007 laid down the siting policy/guidelines for

establishment of residential colonies, commercial establishment like

shopping malls, multiplexes in the State of Punjab, wherein, a minimum

distance of 100 metres from the source of pollution hazard of the

Maximum Accident Hazard (MAH) industries notified by Director General

Factory Service Labour Institute to the building line of residential

colonies/commercial complex was prescribed.

The above said notification was further reviewed by the committee under the

Chairmanship of Chief Secretary, Punjab as per the observations of Hon‟ble

High Court in CWP no.18632 of 2005. This committee further decided to

increase the distance of building line of the coming up residential settlement

from the Maximum Accident Hazardous source from 100 mts to 250 mts. in the

above said notification. It was also decided by this committee that minimum

buffer of 15 metres green belt of broadleaf trees should be provided by the

colonizer towards the air polluting industries, boundary of which are located

within 100 metres from the boundary of such air polluting industries.

Page 88: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

127

Now, therefore, in supersession of earlier notification no. 3/6/07/STE(4)/2851

dt. 7.8.2007 issued by the State Govt. and any other guidelines/notification

issued by the State Govt./Punjab Pollution Control Board from the existing

industries and in exercise of the powers conferred under section 5 of the

Environment (Protection) Act, 1986 read with Rules 5 (I) (vi) of the

Environment (Protection) Act, 1986, the Governor of Punjab is pleased to notify

the siting policy/guidelines for establishment of residential colonies, commercial

establishment like shopping malls, multiplexes in the State of Punjab as under;

1. The Master Plan is the final legal solution to planned development and

hence the master plans be prepared in a time bound manner on priority.

2. All residential colonies, commercial establishments like shopping malls

multiplexes etc. shall maintain a minimum distance of 250 metres from the

hazardous (Maximum Accident Hazard) industries notified by Director

General Factory Advise Service Labour Institute. The distance should be

measured from the source of pollution/hazard (e.g. storage tank, gas

chamber etc.) in the industrial premises to the building lines as per Zoning

Plan, of residential colonies/commercial complex. This notification would not

have an overriding affect on any Act/Rules/Orders of the Govt. of India/

State Govt. which prescribe a distance of more than 250 metres from such

source of hazard and the said prescribed distance shall be maintained. The

notification/ orders issued by the State Govt./ Punjab Pollution Control

Board relating to siting of industries namely stone crushers, rice shellers,

saila plants, brick Kilns, cement plants, grinding units, hot mix plants and

other industries shall remain operative and unaffected by this

policy/notification. In order to resolve any dispute regarding measurement

or other related issues, an inspection committee comprising of Chairman,

Punjab Pollution Control Board or his nominee, Chief Inspector of Factories,

Punjab or his nominee, Chief Town Planner, Punjab or his nominee and a

nominee of the Department of Industries is hereby constituted. This

Page 89: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

128

inspection committee will be headed by the Chairman, Punjab Pollution

Control Board who will also act as convener of the said committee.

3. Minimum buffer of 15 metres green belt of broadleaf trees should be

provided by the colonizer towards the air polluting industries, boundary of

which are located within 100 metres from the boundary of such air polluting

industries. This would be included as a clause both by licencing authorities

of Housing Department as well by Punjab Pollution Control Board. The

species/varieties of trees shall be decided in consultation with Forest

Department.

4. In view of the fact that these guidelines may affect few existing housing

complexes and also that some projects in the pipeline may not be

conforming to the policy and also the fact that huge investments made by

the project proponents and the prospective buyers in the these project, it is

decided that all such project which are not covered under the policy, shall

be studied on unit to unit basis by the above said inspection committee as

per the guidelines prescribed above with Public safety being the prime

concern.

Sd/- A.S. Chhatwal

Secretary to Government of Punjab, Deptt.of Science, Technology, Environment

and Non Conventional Energy Endst. No. 3/6/07/STE(4)/2275 Dated, Chandigarh the 25th July, 2008 A copy is forwarded to the Controller, Printing & Stationery, Punjab, Chandigarh with the request that the above notification may be published in the ordinary gazette and 50 (Fifty) copies thereof may be sent for record.

Sd/- Secretary Endst No. 3/6/08/STE(4)/2276-84 Dated, Chandigarh 25th July,2008 A copy is forwarded to the following for information & necessary action:

1. The Advocate General, Punjab.

Page 90: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

129

2. The Director of Industries, Udyog Bhawan, Sector-17, Chandigarh. 3. The Director, Local Government, Punjab, SCO 131-132 Sector-17,

Chandigarh. 4. The Director of Factories, Punjab, SCO 87-88, Sector-17D,Chandigarh. 5. The Managing Director, Punjab State Industries & Export Corporation,

Chandigarh. 6. The Chief Administrator, PUDA, Chandigarh. 7. The Chairman, Punjab Pollution Control Board, Nabha Road, Patiala. 8. The Chief Town Planner, Pb.,Chandigarh. 9. The Executive Director, PunjabState Council for Science and

Technology, Chandigarh.

Secretary

A copy is forwarded to the following for information & necessary action: 1. The Principal Secretary to Chief Minister, Punjab for the kind

information of Hon‟ble C.M. Punjab. 2. The Secretary to Science, Tech. and Environment Minister Punjab for

the kind information of Hon‟ble Minister. 3. The Chief Secretary to Government of Punjab. 4. The Principal Secretary to Govt. of Punjab, Deptt. of Labour &

Employment, Chandigarh. 5. The Financial Commissioner to Govt. of Punjab, Department of Forest,

Chandigarh. 6. The Principal Secretary to Govt. of Punjab, Department of Local

Government, Chandigarh. 7. The Principal Secretary to Govt. of Punjab, Department of Industries &

Commerce, Chandigarh. 8. The Secretary to Govt. of Punjab, Department of Housing & Urban

Development, Chandigarh.

Secretary

ID No. 3/6/07/STE(4)/2285-2292 Dated, Chandigarh 25th July 2008

Page 91: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

130

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN,PATIALA

Tel. Fax : 0175-2215802 PBX : 2200282, 2200557 Extn. 208 Web: http:// www.ppcb.gov.in

No. EE/(Mega)/Gen/419/2009/4426-49 Date 5/2/2009

To

1. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office-I/II, Patiala/Ludhiana & Jalandhar.

2. The Senior Environmental Engineer (HQ)/EPA,

Punjab Pollution Control Board, Head Office, Patiala.

3. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/ Ludhiana-I/II/III/ Jalandhar/Amritsar/ Hoshiarpur/Batala/Sangrur/Bathinda/Faridkot & Nodal Office, Mohali

Sub: Govt. notification no. 3/6/07/STE(4)/2274 dated 25th

July, 2008 regarding siting policy/guidelines for the establishment of residential colonies/commercial establishment etc. in the State of Punjab.

Ref: Board’s Office order no. 227 dated 30/7/2008.

This has reference to the notification no. 3/6/07/STE(4)/2274

dated 25th July, 2008 issued by Department of Science, Technology, Environment and

Non-Conventional Energy regarding siting policy/guidelines for the establishment of

residential colonies/commercial establishments in the State. It has been mentioned in

this notification that notifications/orders issued by the State Govt./Punjab Pollution

Control Board relating to siting of industries namely stone crushers, rice shellers, saila

plants, brick kilns, cement plants, cement grinding units, hot-mix plants and other

industries shall remain operative and unaffected by this policy/notification.

Page 92: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

131

The distances prescribed for the above said categories of

industries under various notifications issued by the State Govt./PPCB, from the

residential area/approved residential colonies are as under :-

1. The distance of rice shellers/saila plants from the approved residential area

should be 500 meters as per Govt. order no. 4073 dated 13/9/2006.

2. The distance of stone crushers from the approved residential area should be

500 meters as per Govt. notification no. 562 dted 17/3/1998.

3. The distance of brick kilns/cement plants/cement grinding units from the

residential area should be 300 meters as per Punjab Pollution Control Board

notification no. 178/98/3 dated 2/9/1998.

4. The distance of hot mix plants from the residential area should be 300 meters

as per Punjab Pollution Control Board notification no. 178/99/03 dated

26/4/1999.

The matter as to whether prescribed distances are to be

maintained or not from various categories of above mentioned industries (i.e. rice

shellers/ saila plants/stone crushers / brick kilns/ cement plants/ cement grinding

units/ hot mix plants) for establishments of residential colonies/ commercial

establishments, was discussed in a meeting held under the chairmanship of Chief

Secretary, Punjab on 13/1/2009 and it was decided as under :

1. The distance of 500 metres and 300 metres as prescribed in the above

mentioned notification for establishment of rice shellers/saila plants/stone

crushers and brick kilns/ cement plants/ cement grinding units/ hot mix plants,

respectively, would be maintained by the new residential colonies to be

established outside the local planning area (LPA) i.e. these notifications would

be deemed to be operative vice-versa also.

2. The residential/commercial establishments shall be allowed within the Local

Planning area as per the land use prescribed in the master plan / draft master

plan of the area irrespective of their distance from the rice shellers/ saila plants

/ stone crushers /brick kilns/ cement plants / cement grinding units/ hot mix

plants. However, minimum buffer of 15 metres green belt of broadleaf trees

should be provided by the colonizer towards the air polluting industries,

Page 93: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

132

boundary of which are located within 100 metres from the boundary of such

projects.

It is, therefore, requested that the above said clarification may be kept

in view while processing the cases of residential colonies / commercial establishments.

Sd/- Member Secretary

Page 94: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

133

Annexure-15

Government of Punjab Department of Science, Technology, Environment

and Non Conventional Energy

NOTIFICATION

No.3/6/07/STE(4)/ Dated________ In exercise of the powers conferred under section 5 of the

Environment (Protection) Act, 1986 read with Rule 5 (I) (vi) of the Environment

(Protection) Act, 1986, and in partial modification of Notification No.

3/6/07/STE(4)/2274 dated 25/7/2008, the Governor of Punjab is pleased to

amend and substitute para (6(i) as under :-

“The Master Plan is the final legal solution to planned development

and hence the master plans be prepared in a time bound manner on priority.

Where statutory master plan has been notified under the Punjab Regional and

Town Planning and Development Act, 1995 (Amended) 2006, mixed land use

or any other development/construction which come up as per the earmarked

zone, in case of new residential, commercial, there is no need to keep any

additional distance from the existing industry from the environment point of

view because these factors have already been considered while earmarking the

use of land for different categories in the master plan, as per Notification No.

6312 dated 11th August, 2009 issued by Department of Housing & Urban

Development.

Viswajeet Khanna

Secretary to Government of Punjab, Department of Science, Technology,

Environment and Non Conventional Energy

Page 95: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

134

Endst. No. 3/6/07/STE(4)______ Dated; Chandigarh the A copy is forwarded to the Controller, Printing & Stationery, Punjab, Chandigarh with the request that the above notification may be published in the ordinary gazette and 50 (fifty) copies thereof may be sent for record.

Additional Secretary

Endst. No. 3/6/07/STE(4)3770 Dated : 30/10/2009 A copy is forwarded to the following for information & necessary action:

1. The Advocate General, Punjab 2. The Director of Industries, Udyog Bhawan, Sector-17, Chandigarh 3. The Director, Local Government Punjab, SCO 131-132, Sector-17,

Chandigarh.

Page 96: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

135

Annexure-16

Punjab Pollution Control Board, Nabha Road, Patiala

BOARD NOTIFICATION

No. EE-II/Gen-I/198 Dated 21/11/1995

The Board in its 92nd meeting held on 10.10.1995 has decided that the

consent to establish be issued only to such industries which are located in the

following designated areas:

1. Industrial area or FEZ areas as demarcated by Town & Country Deptt. of

Punjab/Govt. of Punjab.

2. Out side “Lal Lakir‟ as notified in each village and in case the industry propos to

uses solid fuel it should be located beyond 100 meters from „Lal Lakir‟.

These guide lines are also applicable to all those industries which are

exempted by Punjab Pollution Control Board for obtaining consent to establish vide

notification No. EE-II/Gen-I/199 dated 21/11/1995.

The above notification is not applicable to all such category of industries

for which specific guidelines for siting have already been issued and may be issued

subsequently.

Sd/-

Chairman

Endst. No. 16745-51 Dated 21/11/1995

A copy of the above is forwarded to the following for information and necessary action :-

1. Senior Environmental Engineer (EPS), PPCB, Patiala/Ludhiana. 2. Environmental Engineer-I & II, PPCB, Head Office, Patiala. 3. All Environmental Engineer, PPCB, Regional Office. 4. P.S. to Chairman, PPCB, Patiala 5. P.A. to Member Secretary, PPCB, Patiala

Sd/- For Member Secretary

Page 97: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

136

Annexure-17

PUNJAB POLLUTION CONTROL BOARD

VATAVARN BHAWAN, NABHA ROAD, PATIALA.

No.GPC/NIP/F-10/2010/4

Dated17/2/2010

OFFICE ORDER Subject: Policy guidelines regarding categorization of industries &

procedure for Consent Management mechanism and validity period for various categories of industries.

The Punjab Pollution Control Board in its 145th meeting held on

30/11/2009 and 146th meeting held on 12/1/2010 considered the matter cited above

and decided to categorize the industries into red, orange & green category. The

industries categorized as Red &Orange areas per Annexure- 1& 2 respectively. The

industries, which are not covered under the list of Red & Orange category, may be

termed as green category. The Board further decided as under: -

A. Delegation of powers:

# Designation of the Officer

Competency

1. Chairman To decide consent to establish/operate of all

categories of large and medium scale industries.

2. Senior Environmental Engineer

To decide consent to establish/operate of all small

Red/Orange category of industries.

3. Environmental Engineer, Regional Office/Nodal Office.

To decide consent to establish/operate of all small

scale green category of industries.

Grant of consent to establish/operate to dry rice

shelling units without mechanical dryer.

Grant of consent to establish/operate to brick kilns.

NOTE:

Cases of all categories of large and medium scale industries will be routed

through Member Secretary of the Board.

Page 98: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

137

Notice/directions u/s 33-A of the Water (Prevention & Control of Pollution)

Act, 1974 and 31-A of Air (Prevention & Control of Pollution) Act, 1981 will be

issued with the approval of Chairman of the Board.

Directions u/s 33-A of the Water (Prevention & Control of Pollution) Act, 1974

and 31-A of Air (Prevention & Control of Pollution) Act, 1981 of all large and

medium Red category of industries will be signed by the Member Secretary of

the Board.

Notice/directions u/s 33-A of the Water (Prevention & Control of Pollution)

Act, 1974 and 31-A of Air (Prevention & Control of Pollution) Act, 1981 of all

categories except directions under the said acts to large and medium Red

category industries will be signed by the Senior Environmental Engineers.

B. Siting criteria:

All Red/Orange/Green category of industries will only be allowed to set up in

the designated industries zones in the cities/towns where statutory/non-

statutory Master Plan/Local Planning area have been prepared/notified by the

Town & Country Planning Department, Punjab and designated industrial areas

/FEZ declared by the Govt. of Punjab, Department of

Industries/PSIEC/PSIDC/any other Govt. Authority.

All Red/Orange/Green categories of industries will only be allowed to set within

the Local Planning area, where the statutory/non-statutory Master Plan of the

said area is yet to be prepared/notified, after getting change of land use/NOC

from the Town & Country Planning Department, Punjab/Competent Authority of

the State. Furthermore, in case, any existing industry of red/orange/green

category within the municipal limits/local planning area intends to carryout

expansion/ modification, where the statutory/non-statutory master plans have

not been prepared/notified by the Town and Country Planning Department,

Punjab, after getting change of land use/NOC from the Town and Country

Planning Department, Punjab/Competent Authority of the State.

All Red/Orange/Green category of industries, where statutory/non-statutory

Master Plans/Local Planning area have not been prepared/ notified by the Town

& Country Planning Department, Punjab, will be allowed to set up at a distance

of 100m outside the Municipal Council limits/ phirni of village/ designated

residential area approved by the Competent Authority of the State.

NOTE

Office order no. 198 dated 21/11/1995 stands omitted.

Page 99: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

138

Office Order No. GPC/1999-2000/Gen-434/F-1 dated 16/08/2000 as amended

from time to time will remain operative copy of which is annexed herewith as

Annexure-3.

Orange category of industries will be treated at par with Red category of

industries as far as siting criteria/shifting of industries from non-designated

area to designated industrial area is concerned. As such, all circulars/office

orders/notifications/ clarifications issued by the Board for siting criteria for

Red category of industries, will be applicable to Orange category of industries.

The siting guidelines issued for rice shelling units/parboiling plants/cement

plants including cement grinding units/hot mix plant/brick kilns/stone

crushers will remain operative and implemented independently from the

aforesaid siting criteria.

C. Consent Fee:

a) Consent to Establish/Operate fee to be charged w.e.f. 22/10/2009. Consent to establish/operate fee from large/medium/small scale Red/Orange/

Green category of industries will be charged as specified by the Board vide

office order No. Admn./SA-2/F.No.563/2009/6 dated 22/10/2009 (Annexure-

4).

b)Criteria for calculating the consent to operate fee prior 22/10/2009.

The credit of consent fee already deposited prior to 1/10/2004 under the Water

(Prevention & Control of Pollution) Act, 1974 & the Air (Prevention & Control of

Pollution) Act, 1981 for 15 years will be calculated by using the following

formula:

A– A(1XT/15) Where T is time period from the date of deposit of consent fee for 15 years upto 30/9/2004.

A is the Amount of Consent fee deposited for 15 years prior to

30/9/2004.

In case any industry had not deposited consent fee for 15 years prior to

30/9/2004, then for calculating the consent fee of such industry, yearly consent

fee applicable to the industry as per slab will be taken into account. Similarly,

consent to operate fee will be charged on yearly basis for the period 1/10/2004

to 22/10/2009.

Page 100: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

139

In case consent to any industry is refused/revoked/cancelled due to violation of

the provisions of the Water (Prevention & Control of Pollution) Act, 1974 & the

Air (Prevention & Control of Pollution) Act, 1981, the consent fee will be

deducted from already deposited amount or the industry will deposit the fee

equal to the amount applicable to the industry for one year, if the industry

applies for the same afresh within one year. In case, the industry applies for

obtaining the said consent after the elapse of one year but before the elapse of

two years, then such amount will be equal to the double the yearly fee

applicable to the industry and so on.

The consent fee for the period 1/4/1992 to 9/10/1994 will be calculated as per

fee criteria given in Annexure-5. The consent fee for the period 10/10/1994

to 30/9/2004 will be calculated as per fee criteria given in Annexure-6 and

consent fee for the period 1/10/2004 to 21/10/2009 will be calculated as per

fee criteria given in Annexure-7.

D. Application form for consent to establish/operate & the procedure for processing the cases:

The application form presently prescribed for Red category of industries for

consent to establish/operate will be applicable for Red and Orange category of

industries. All Green category of industries, irrespective of their scale, will apply

for consent to establish/operate on the proforma presently prescribed for small

scale Green category of industries.

The application for consent to establish/operate/clearance certificate under the

Water (Prevention & Control of Pollution) Act, 1974 & the Air (Prevention &

Control of Pollution) Act, 1981 shall be attached with documents as mentioned

in Board's letter no. 4441-51 dated 3/5/2002 (Annexure-8). The case will be

processed by all the Regional Offices/Nodal Office as per circular no. 14442-52

dated 26/11/1999 (Annexure-9).

Restoration cases of supply of electricity will be processed as per Board's

circular no. 975-96 dated 9/3/2000 as amended on 3/5/2001. A copy of these

circulars is annexed herewith as Annexure -10&11.

Circular no. CSA/03/21st meet/10149-63 dated 8/3/2005 (Annexure-12) for

grant of NOC from pollution angle to the industries, which are covered under

the Factories Act, 1948, will remain operative.

Page 101: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

140

E. Validity period of consent tooperate:

The validity period of consent to operate under the Water (Prevention

&Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act,

1981 for various categories of industries is as under:

Category Validity Period

Large/Medium scale Small scale

Red 3 years 4 years

Orange 4 Years 5 years

Green 5 Years 10 Years

The consent to operate alongwith clearance certificate irrespective of category

of industries shall be initially granted for 6 months and shall be extended after

commissioning/expansion/modernization of the industrial unit under the Water

(Prevention & Control of Pollution) Act, 1974&the Air (Prevention & Control of

Pollution) Act, 1981 for the period as mentioned above, only after assessing the

adequacy of the pollution control devices within the validity period of 6 months.

F. Frequency of visit/sampling:

Frequency of visit/sampling of the units shall be as under:

Sr. No.

Category of industry Frequency of visit/sampling

1. Large and medium Red category Four times in a year.

2. Large and medium Orange category Two times in a year.

3. Large & Medium Green category Once in a year

4. Small Scale Red category Two times in a year

5. Small Scale Orange category One in a year

6. Small scale Green Once in 5 years or as and when public complaint is received against the industry.

G. Procedure for industries exempted from consent management:

The Board's order no. EE-I/Gen-214/F-2 dated 31/8/2000 as partially

amended vide office order no. 2 dated 16/9/2002 will remain operative as far as

exemption of 95 category of tiny/ small industries are concerned. The list of which is

annexed herewith as Annexure 13& 14.

Page 102: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

141

H. Procedure for power load to the existing industries:

The existing industries may be permitted an extension in power load upto 25%

of the sanctioned load for the purpose of modernization/expansion as per

procedure laid down in circular no. Gen./F. No. GEN-192/2001/3001-3100

dated 10/8/2001 & no. 5558-68 dated 24/7/2002. A copy of the said circulars is

enclosed herewith as Annexure-15 & 16.

The circular no. GPC/Gen/F. No. 434/2005/173 dated 7/3/2005 for power load

to green category of industries located in non-designated areas, will remain

operative. A copy of the said circular is enclosed herewith as Annexure-17.

For increase in the power load for running of effluent treatment plants/ air

pollution control devices, each industry shall apply for consent to establish

(NOC)/ clearance certificate at Regional Office of the Board containing

information in respect of following points:

i) Detail of the existing power load with each component of the effluent treatment plant/ air pollution control device.

ii) Additional components of the effluent treatment plant/ air pollution control device installed and detail of power load for each component.

iii) Completion certificate of the consultant regarding upgradation/ installation of the effluent treatment plant/ air pollution control device.

iv) An undertaking to the effect that the industry will not utilize this electric load for any other purposes except for running of effluent treatment plant/air pollution control devices and its standby motors meant for this purpose only.

The Regional Office will examine the case thoroughly and the

case will be decided by the respective Competent Authority of the Board as

per delegation of powers given in Para-A above.

I. Period prescribed for grant of consent to establish/ operate

The Govt. of Punjab has prescribed the following time period for

deciding the application for consent to establish/ operate under the Water (Prevention

& Control of Pollution) Act, 1974 & the Air (Prevention & Control of Pollution) Act,

1981 under the Punjab Industrial Facilitation Act, 2005:

Page 103: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

142

S. N. Approval/ clearances required

Time limit

1. Consent to establish (NOC)

Green Category 15 days Red Category Large & Medium 21 days Small Scale 15 days SAC-Cum-CSA 21 days

2. Clearance certificate and consent to operate

Green Category 15 days Large & Medium 30 days

All Regional Offices will ensure that the application for consent to

establish/ operate under the Water (Prevention & Control of Pollution) Act, 1974 & the

Air (Prevention & Control of Pollution) Act, 1981 and clearance certificate will be

processed within the time frame prescribed vide Office Order no. 21 dated 12/6/2003.

A copy of which is enclosed as Annexure-18.

Provided the facts which are not covered under paragraph A to I of this order above, with regard to any specific parameter/condition/procedure etc., provided for orange category of industries, will be treated at par with that of Red category of industry.

The Office Order No. Admn./A-2/F.No. 178/94/93 dated 26/5/1994,

Office Order no. GPC/GEN/2004/214/8 dated 11/10/1994 & Office Order no. Admn/A-

2/F.No. 178/94/176 dated 9/11/1994 stands superseded by the present order.

This order will take immediate effect.

Sd/-

(Rajat Aggarwal, IAS) Chairman

Endst No.GPC/NIP/F-10/2010/1122-44 Dated: 17/2/2010

A copy of the above alongwith Annexures-1 to 18 as mentioned in the order is forwarded to the following for information and necessary action:

1. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Patiala-I/Patiala-II/Jalandhar/Ludhiana/ EPA & HQ.

2. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/ Ludhiana-I/II/III/Sangrur/ Faridkot/ Hoshiarpur/Jalandhar/ Amritsar/Batala/Bathinda & Nodal Office, Mohali.

3. The Environmental Engineer (P-I/II,J/L/Const./HWM/CSA/ GPC/EPA, Punjab Pollution Control Board, Patiala.

4. The Deputy Secretary, Punjab Pollution Control Board, CampOffice, Mohali/Head Office, Patiala/Deputy Director (PR).

Page 104: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

143

5. The Deputy Controller (F&A)/Administrative Officer, Punjab Pollution Control Board, Patiala.

6. All Asstt. Environmental Engineers of Punjab Pollution Control Board. 7. Law Officers, Punjab Pollution Control Board, Patiala. 8. P. S. to Chairman/P. A. to Member Secretary, Punjab Pollution Control Board,

Patiala. D.A/ Order alongwith Annexures-1 to 18

Sd/-

( Dr. Babu Ram ) Member Secretary

Page 105: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

144

ANNEXURE-18

A. Consent fee before 10/10/1994

Sr. No.

Particulars Application fee to be charged for obtaining consent to establish (NOC)

Application fee to be charged for obtaining consent to operate per year

1. Industries having total investment below Rs.10 lakhs

200 200

2. Industries having total investment more than Rs. 10.00 lakhs but below Rs.35.00 lakhs

500 500

3. Industries having total investment more than Rs. 35.00 lakhs but below Rs.1.00 crores

1000 1000

4. Industries having total investment more than Rs. 1.00 crore but below Rs.5.00 crores

2500 2500

5. Industries having total investment more than Rs. 5.00 crores but below Rs.10.00 crores

5000 5000

6. Industries having total investment more than Rs. 10.00 crores

10000 10000

Page 106: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

145

Annexure-19 B. Consent fee effective from 10/10/1994 to 1/10/2004

Sr. No.

Particulars Application fee to be charged for obtaining consent to establish (NOC)

Application fee to be charged for obtaining consent to operate for one year

Application fee to be charged for obtaining consent to operate for five years

Application fee to be charged for obtaining consent to operate for fifteen years

1. Industries having total investment below Rs.10 lakhs

500 500 1000 1400

2. Industries having total investment exceeding Rs. 10.00 lakhs but not exceeding Rs.25.00 lakhs

750 750 2500 3500

3. Industries having total investment exceeding Rs.25.00 lakhs but not exceeding Rs.50.00 lacs

1250 1250 6250 7000

4. Industries having total investment exceeding Rs.50.00 lakhs but not exceeding Rs.1.00 crores

2500 2500 12500 15000

5. Industries having total investment exceeding Rs.1.00 crores but not exceeding Rs.5.00 crores

5000 5000 25000 35000

6. Industries having total investment exceeding Rs.5.00 crores but not exceeding Rs.10.00 crores

10000 10000 50000 70000

7. Industries having total investment

20000 20000 100000 140000

Page 107: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

146

exceeding Rs.10.00 crores but not exceeding Rs.25.00 crores

8. Industries having total investment exceeding Rs.25.00 crores but not exceeding Rs.50.00 crores

30000 30000 150000 210000

9. Industries having total investment exceeding Rs.50.00 crores but not exceeding Rs.100.00 crores

40000 40000 200000 280000

10. Industries having total investment exceeding Rs.100.00 crores but not exceeding Rs.200.00 crores

50000 50000 250000 350000

11. Industries having total investment exceeding Rs.200.00 crores

100000 100000 500000 700000

Page 108: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

147

ANNEXURE-20

B. Consent fee effective from 1/10/2004

Sr. No.

Particulars Application fee to be charged for obtaining consent to establish (NOC)

Application fee to be charged for obtaining consent to operate for one year

Application fee to be charged for obtaining consent to operate for five years

Application fee to be charged for obtaining consent to operate for fifteen years

1. Industries having total investment below Rs.10 lakhs

500 500 1000 7500

2. Industries having total investment exceeding Rs. 10.00 lakhs but not exceeding Rs.25.00 lakhs

750 750 2500 11250

3. Industries having total investment exceeding Rs.25.00 lakhs but not exceeding Rs.50.00 lacs

1250 1250 6250 18750

4. Industries having total investment exceeding Rs.50.00 lakhs but not exceeding Rs.1.00 crores

2500 2500 12500 37500

5. Industries having total investment exceeding Rs.1.00 crores but not exceeding Rs.5.00 crores

5000 5000 25000 75000

6. Industries having total investment exceeding Rs.5.00 crores but not exceeding Rs.10.00 crores

10000 10000 50000 150000

7. Industries having total investment exceeding Rs.10.00

20000 20000 100000 300000

Page 109: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

148

crores but not exceeding Rs.25.00 crores

8. Industries having total investment exceeding Rs.25.00 crores but not exceeding Rs.50.00 crores

30000 30000 150000 450000

9. Industries having total investment exceeding Rs.50.00 crores but not exceeding Rs.100.00 crores

40000 40000 200000 600000

10. Industries having total investment exceeding Rs.100.00 crores but not exceeding Rs.200.00 crores

50000 50000 250000 750000

11. Industries having total investment exceeding Rs.200.00 crores

100000 100000 500000 1500000

Page 110: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

149

Annexure-21

How to calculate the fee to be deposited by the industry on a/c of increase in the value of fixed capital investment

The industries, which are applying first time, the calculation of consent

fee shall be @ as applicable at that time and subsequently increased rates in the

following years. The investment for calculating the fee will be as per the C.A certificate

w.r.t gross fixed assets (GFA) at that time. The industry will submit the year wise C.A

certificate for all the previous years for which consent fee is to be calculated. In case

of non-availability of records of the gross fixed assets of the previous years, the last

available value of the gross fixed assets as certified by the C.A. will be taken as the

base of calculating the consent fee for the previous years. In addition to the consent

to operate fee, the industry will also deposit the consent to establish fee for the

increased component of the gross fixed assets wherever there is an increase in the

gross fixed assets.

An illustrative example for calculating the fee in the above mentioned is

as under:

Suppose, the industry was commissioned in October, 1996 and the gross

fixed assets at the time of commissioning were Rs. 'A' and its gross fixed assets

increased to Rs. 'B' in the year 1999 and then to Rs. 'C' in the financial year 2005-06.

Sr. No.

Description of fee Period Amount

1. CTE 1996 As applicable against the investment 'A' Slab @ as applicable in the year 1996.

2. CTO October, 1996 to 31.03.1999

3 years x fee applicable against the investment 'A' Slab @ as applicable during this period.

3. CTE (on a/c of increase in the value of GFA in the year 1999)

One year As applicable against the increased component of GFA as applicable in the year 1999.

4. CTO 01.04.1999 to 31.03.2004

5 years x fee applicable against the investment 'B' Slab @ as applicable during this period.

Page 111: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

150

5. CTO 01.04.2004 to 31.03.2005

1 year x fee applicable against the investment 'B' Slab @ as applicable during this period.

6. CTE ( on a/c of increase in the value of GFA in the year 2005-06)

One year As applicable against the increased component of GFA as applicable in the year 2005-06.

7. CTO 01.04.2005 to 31.03.2009

4 years x fee applicable against the investment 'C' Slab @ as applicable during this period.

8. CTO 01.04.2009 to 31.03.2013

4 years x fee applicable against the investment 'C' Slab @ as applicable during this period.

9. CTO 01.04.2013 to 31.03.2016

3 years x fee applicable against the investment 'C' Slab @ as applicable during this period.

Page 112: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

151

Annexure-22

Criteria as to how the fee is to be charged for adjusting the validity period of different category of industries upto the

culminating period

Sr. No.

Category of Industries Date of expiry

1. Red category (Large/Medium Scale)

31st March of the year

2. Red category (Small Scale excluding brick kilns)

30th June of the year

3. Orange Category and Brick kilns (Large/Medium/Small Scale)

30th September of the year

4. Green Category (Large/Medium/Small Scale)

31st December of the year

In order to smooth the system of grant of consents to the industry under

the provisions of the said Acts, the first time consent shall be granted by getting

deposit the fee valid upto end of the particular month as mentioned above. For

example, if a particular small scale red category industry has applied for consent for

four years and the consent to the industry is approved for grant by the Competent

Authority on 22/1/2013 and as per the present practice followed by the Board, the

expiry period of the consent becomes 21/1/2017, but as per the proposal the industry

needs to grant consent upto 30/6/2017. Thus, in case the industry has capital

investment of 8 crore and it has deposited Rs. 60,000/- (Rs. 15,000/- per year) as

consent fee for four years i.e. upto 21/1/2017 but in order to grant consent to this

industry upto 30/6/2017, the industry has deposit the additional consent fee as

under:-

15000 x 5 15000 x 9 15000 x M15000 x D

--------------- + ------------- = Rs. 6250+Rs. 370 = Rs. 6620 i.e. ---------------- + -----------------

12 365 12 365

Where M = Number of Months in excess of prescribed validity period,

Where D = Number of Days in excess of prescribed validity period

Therefore, the industry has to deposit Rs. 60,000/- + Rs. 6620/- = Rs.

66620/- to make the consent valid for four years with expiry date on 30/6/2017, in the

Page 113: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

152

case the consent is issued on 22/1/2013. Such practice may be adopted for other

category of industries i.e. Large, Medium, Small (Red/Orange/Green) as per Table-II

mentioned above.

Page 114: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

153

Annexure-23

How to calculate the fee to be consumed out of the fee deposited for 15 years

In cases, where the industry had already obtained consent to operate for

15 years and the same is still valid, but the industry has applied for varied consent

the fee is to be calculated as under:-

Suppose the industry was granted consent to operate for 15 years in year 2002 and it

had deposited Rs. 'M' on account on consent fee against Gross Fixed Assets of Rs. 'A'.

The said consent is valid upto 31/3/2017 and suppose the industry also made

expansion in the year 2006-07 but did not obtain varied consent at that time. The

value of Gross Fixed Assets had become Rs. 'B' in the year 2006-07.

The fee consumed for the year 1/4/2002 to 31/3/2006 = 'M' x 4/15

Balance fee available from Rs. 'M' already deposited = M-('M' x 4/15)

Further the fee is to be calculated as illustrated in Annexure-21.

Page 115: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

154

Annexure-24

PUNJABPOLLUTIONCONTROLBOARD

VATAVARANBHAWAN,PATIALA

Tel.Fax:0175-215793,215802PBX :200282, 200557 Extn. 245 FAX:0175-215636

E:mail : [email protected]:http:// www.ppcb.gov.in

No.14442-52Dated26/1/99

To

The EnvironmentalEngineer, PunjabPollutionControlBoard, RegionalOffice,Patiala/ Ludhiana-I/II/Jalandhar/ Amritsar/Gurdaspur/Bathinda/Faridkot/Hohiarpur/Sangrur andNodalOffice,Chandigarh.

Subject: InspectionreportsoftheindustrytobesubmittedbytheRegional

Officesforrelease/ restorationof PowerConnection/ grant of Consents.

Ithasbeenobserved thatwhileforwarding casestotheHeadoffice,

regarding installationofeffluenttreatmentplants/ Air PollutionControl Devices etc.,

the RegionalOfficerecommendationsare very criptiveandarbitratory.Similarlythe

recommendationsforissue of directionsforclosure of the industriesundersection33-Aof

the Water Act and31-Aof the Air Act, u/s5of the

EPAandgrant/refusalrevocationofconsent/authorizationundervariousstatutes are

withoutsupporting factswhichcouldsubstantiate the actionrecommended.

On perusalofcertaincasessubmittedforconsideration to the Competent

Authority,ithasbeenobservedthatmostofthe reportssubmittedarenon-descriptiveand

devoidoffactswhichleadsofwastageof the time which,on turn,breeds discontentment

among the public. Hence all the recommendations made shall be accompanied

by inspection reportfrom the R.O. The inspection reportshall be selfexplanatoryand

supported bynecessary documents,dulyauthenticatedbyhim. Thereportshouldbroadly

coveras towhyactionrecommendedisnecessitated.

In the case of recommendationsfor:

(i) Release of electric connection. (ii) Restorationofthe electric connection. (iii) Grantof consents tooperate.

Page 116: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

155

(iv) Issue of authorization HWM.

The reportshouldcover.

1. Complianceofconditions ofconsenttoestablish be givenincleartermsandthe

useoftermslike'complied&noted'beavoided,remarks/observationshould be descriptive

asto complete factsonrecord.

a) DrawingofthefactorylayoutindicatingEFFLUENT TREATMENT PLANT/APCDplantandHWM storage positions.

b) The completiondrawingsof APCD/EFFLUENT TREATMENT PLANTboth

planandsectional view.

c) Installationofelectrical;andmechanicalequipmentsupportedbybillsand vouchersinclaimof the installations.

d) The layoutof the variouschannels pipe /sewersdulymarkedon the layout

plan of the industry –fresh water (blue Colour), effluent channel (redColour),recirculationwaterchannel(greenColour), stormwater(orange Colour)& domestic sewer(dotted blackline).

e) Incasetheeffluentisusedforirrigationthefollowingdetailsbegiven. - Landunderirrigationinhectare.

- Landunderirrigationmarkedonthe locationmap ofthe industry. - Whetherlandisadequateforconsumingwholeofeffluentwithout

causinganyenvironmentpollution problem.

f) If theHazardous waste generating industries, details of the arrangementmade forstorage of Hazardous Waste.

Intheabsenceoftheseinformation,itisadvisetotheconcernedconsent

managementauthoritynottoacceptanysuchcase till the recommendationsare

complete.

Itisfurthermentioned thatin followingcasesEnvironmental Engineer,

RegionalOffice will personallyprepare report.

i) Powerrelease clearanceof alllarge andmediumscale units.

ii) Powerrestorationcasesafterdirectionsu/s33-AoftheWaterAct,31-Aof the AirActirrespectiveofthe scale of industry.

iii) RandomcheckshallbemadebyEnvironmentalEngineer,RegionalOffice.

Page 117: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

156

Samplesizeforrandomcheckshallbehisprerogative.Hewillcertifythat the recommendations are in an order if they are proposed by his subordinates/teammembers.

In viewof the above,ithas been decidedthatEnvironmental Engineeror

otherCompetent Officer,asthecasemay be, willinspecttheindustry personallyand

EnvironmentalEngineershallauthenticateallrelevantrecords,vizsitedrawings,detailsofpl

antmachineryinstalled,itssupportinginformationforpurchasesandotherrelevant

aspects,whichconfirmsthatthe systemisinorder.

The otherinformationregardingthe arrangements for the storage ofthe

Hazardoussludge,recordregardinguse of chemicals /nutrientsfortreatmentof the

effluent,logbookforrunningandmaintainingofeffluent treatment plant/air pollution

control devices givingdetailsofbackwashing offilter,changingof

filterbedmaterialetc.,shallalsobe providedwhilemaking recommendationsforrenewalof

consent/authorizationetc.

The above instructionsare applicable withimmediate effect.

Sd/- MemberSecretary

Endst. No.14453-58Dated 26/11/1999

Acopy of the above isforwardedto:-

1. The Senior Environmental Engineer, Punjab Pollution Control Board, Patiala /

Ludhiana forinformationandcompliance of the above instructions. 2. Incharge(Policy&General),Incharge(EPS)PunjabPollutionControlBoard,Patiala

forinformation. 3. The EnvironmentalEngineer, I/II/III/IV &HWM/ Gen. for informationand

necessaryaction.

Sd/- MemberSecretary

Endst. No.14459Dated 26/11/1999

Acopyoftheaboveis forwardedtoallAssistantEnvironmental Engineer,

Punjab Pollution ControlBoard,workingin HeadOffice /RegionalOffice's for information andnecessaryaction.

Sd/-

[MalvinderSingh] Incharge (GPC)

Annexure-25

Page 118: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

157

PUNJABPOLLUTIONCONTROLBOARD

VATAVARANBHAWAN,PATIALA

Tel.Fax:0175-215793,215802PBX :200282, 200557 Extn. 245 FAX:0175-215636

E:mail : [email protected]:http:// www.ppcb.gov.in

No.975-76 Dated9/3/2000

To

The EnvironmentalEngineer, PunjabPollutionControlBoard,

RegionalOffice,Patiala/Ludhiana-I/II/Hoshiarpur/

Gurdaspur/ Bathinda/Jalandhar/Sangrur/Faridkot/Amritsar/ NodalOffice,Chandigarh.

Subject: Uniform policyforthe Permanent Restoration of PowerSupply.

Ithasbeendecidedthatinfuture thereshouldbe auniformpolicyforthe

permanentrestorationof powersupplyandfilingof directionsissuedu/s33-Aof theWater

(Prevention&ControlofPollution)Act,1974andu/s31-AoftheAir(Prevention&Control of

Pollution) Act,1981,whichisasunder:

1. Temporary power connection may be restoredfor twomonthsfor assessing the adequacyof pollution control devices installed once the reportas per circular dated25/11/99isreceived.RegionalOfficesmayretain theconsent applicationforsuchaperiodtillthe performance studyof pollutioncontrol devicesisreceived.

2. RegionalOfficesshouldsendthe consentapplicationalongwiththe recommendationsfor permanentpowerconnection.

3. Consent application should be decided simultaneously along with the permanentpowerconnectioncase anddroppingof actionu/s31-Aof theAir Act,1981oru/s33-Aofthe Water Act,1974andconsentsshouldbe issued before the ordersforpermanentpowerconnectionare issued.

The above instructionsare applicablewithimmediate effect.

Sd/- MemberSecretary

Page 119: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

158

Annexure-26

No 1849-1925 Dated 8.5.2001

To

Allthe Asstt.Environmental Engineers,

PunjabPollutionControlBoard, Patiala.

Subject: Uniform policyforthe Permanent Restoration of PowerSupply. Reference: Boardletterno. 975-96dt. 09/03/2000.

InpartialmodificationofthePart-3oftheorderno.975-96dt.09/03/2000

(copyenclosed),the followingamendmenthasbeenmade withimmediate effect:

3(i) Atfirstinstance,theconsentunder Water&AirActsfor the periodto be

granted shall be decided by the competentauthority.

(1) Thereafter,thematterregardingtherestorationofpowerconnection/filingof

noticeu/s31-AofAir(Prevention&Controlof Pollution)Act,1981oru/s33-Aof

Water(Prevention&Controlof Pollution)Act,1974 shall be submittedfor

considerationof the CompetentAuthority. Thisissueswiththe approvalof worthyChairman.

DA/Asabove

Sd/- [MalvinderSingh]

Sr.EnvironmentalEngineer-II (GPC)

Page 120: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

159

Annexure-27

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN, NABHA ROAD, PATIALA

OFFICE ORDER

No. 144

Dated: 24.6.2009

For the effective implementation of the provisions of the Water (Prevention & Control

of Pollution) Act, 1974, Air Act, 1981 and Environment Protection Act (EPA), 1986 and

Rules framed there under, it is imperative that the monitoring of effluent treatment

plants, air pollution control systems, ground water quality are required to be carried

out by the Board.

In some of the cases, the Board gets Bank Guarantee from the industries/project

proponents as an assurance to achieve the standards prescribed by the Board/comply

with the various conditions imposed by the Board.

Also, in some of the cases, the Board issues necessary directions u/s 33-A of the

Water (Prevention & Control of Pollution) Act, 1974, 31-A of the Air Act, 1981 and

section-5 of the EPA to the industries which violate the provisions of the said Acts for

closure of the industries and refusal/revocation of consents.

However, it has been observed that after making necessary compliance of the

provisions of the said Acts, the concerned industry submits its report with the request

to restore the power connection of the industry and/or release of Bank Guarantee

submitted by the industry/project proponent. Accordingly, the concerned Regional

Office/Zonal Office recommends the case of the industry for permanent restoration of

electric connection of the industry and/or release of Bank Guarantee submitted by the

industry as an assurance to comply with the provisions of the relevant Act on the

basis of analysis results of single sample of effluent/emission sample, which is not

sufficient to adjudge the adequacy/efficacy of the treatment system. Thus, on the

basis of analysis results of single sample of effluent/air emission, it is not appropriate

Page 121: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

160

to restore the power connection of the industry permanently and/or release the Bank

Guarantee of the industry.

In view of the above, the competent authority of the Board had decided that as and

when the request of the industry/project regarding permanent restoration of electric

connection of the industry/project and/or release of Bank Guarantee is received by

the Board, the concerned Regional Office/Zonal Office shall make recommendations

for the restoration of permanent electric connection and/or release of Bank

Guarantee only after adjudging the adequacy/efficacy of the treatment system on the

basis of three effluent/emission samples collected on different dates and these

samples must comply with the effluent/emission samples.

These orders shall come into force with immediate effect.

Sd/- ( Yogesh Goyal ) Chairman Endst. No. Admn. Gen Tech. 263/21677-711 Dated 24.6.2009 A copy of the above is forwarded to the following for information & necessary action:-

1. The Senior Environmental Engineer (EPA)/(Computer)/(HQ), Punjab Pollution Control Board, Patiala.

2. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office-I/II, Patiala/Ludhiana/Jalandhar.

3. The Deputy Secretary, Punjab Pollution Control Board, Nodal Office, Mohali.

4. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/ Ludhiana-I/II/III/ Jalandhar/ Hoshiarpur/ Amritsar/ Batala/ Sangrur/ Bathinda/Faridkot & Nodal Office, Mohali.

5. The Environmental Engineer, Punjab Pollution Control Board, P-I/II, Ludhiana/Jalandhar/GPC/EPA/Mega/HWM/Construction, Patiala.

6. The Deputy Controller (F&A)/Law Officer/Superintendent(G)/Public Relation Officer, Punjab Pollution Control Board, Patiala.

7. P.S to Chairman/P.A to Member Secretary, Punjab Pollution Control Board, Patiala. Sd/-

Member Secretary

Page 122: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

161

Annexure- 28

Final Report

REPORT OF DEVARAJ COMMITTEE

ON UNIFORM CONSENT PROCEDURE TO BE FOLLOWED BY SPCBs/PCCs

CENTRAL POLLUTION CONTROL BOARD (Ministry of Environment & Forests)

DELHI 110 032

FEBRUARY, 1999

Page 123: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

162

SCHEDULE-IV FREQUENCY OF INSPECTION AND SAMPLING

Sr. No.

Size of industry Category of industry

Quantity of industrial effluent (m3/day)

Frequency of visit and effluent sampling

1. Non-polluting SSI/tiny units covered under procedure of simplified consent.

Green Nil Once in 3 years on random check basis.

2. Small Scale Orange Irrespective of quantum Once in 3 years

3. Small Scale Red a) Upto and inclusive of 50 b) 51 and above

Once in 6 months Once in 3 months

4. Large & Medium Scale

Green a) Upto and inclusive of 250 b) 251 and above

Once in a year Once in 6 months

5. Large & Medium Scale

Orange a) Upto and inclusive of 250 b) 251 and above

Once in 6 months Once in 3 months

6. Large & Medium Scale

Red a) Upto and inclusive of 50 b) Between 51 and 100 c) 101 and above

Once in a month Once in a month Once in a month

Note: Sampling frequency for air emission (point source and ambient) shall be in

accordance with the details given in CPCB Document entitled "Emission Regulations Part III" December, 1985. SPCB/PCC may specify sampling frequency separately for the industries not covered in this document.

______________________________________________________________________

Report of Devaraj Committee on Uniform Consent Procedure

Page 124: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

163

Annexure-29

Sr. No.

Table-D: List of industries exempted from obtaining NOC/Consent of the Punjab Pollution Control Board.

1 Aggarbatti and cosmetic products manufactured by blending (Dry Process).

2 Air conditioners, Room Coolers, water Coolers & heaters without, wet

process.

3 All types of toys & Doll making electrical without wet process.

4 Aluminium utensils from aluminium circles (without any wet process)

5 Aluminium, Stainless Steel, Brass Vessel marking units having only process,

spinning without use of buffing, polishing and pickling, washing, Hot/Cold

rolling annealing furnace and anodizing processes.

6 Assembling of Door closer and Rings.

7 Assembly of air coolers/conditioners repairing and servicing

8 Assembly of bicycles baby carriage and other small non-motorized vehicles

9 Assembly of Computer, Computer peripherals and Computer Software.

10 Atta Chakki and Millet grinding.

11 Audio, Video and consumer electronic equipment assembly only.

12 Automobile Body building without wet process.

13 Automobile Repair Workshop. (without any wet process)

14 Ayurvedic and Homeopathic medicine (without boiler)

15 Bailing (hydraulic press) of waste papers(without any wet process)

16 Beauty Parlour.

17 Bee keeping.

18 Belt Fastner units without wet process.

19 Bindi making units.

20 Bio-gas.

21 Biscuit trays etc. from rolled PVC sheet (using automatic vaccum forming

machine)

22 Biscuits, Pastries, Cakes, Confectionery, Bread, Bakery upto 100 kg/day.

Page 125: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

164

23 Black Smithy Shop.

24 Blending and packaging of Tea

25 Block making for printing without foundry (excluding wooden block making)

26 Block making, Printing, Offset Printing.

27 Book Binding.

28 Brass & Bell metal utensils manufacturing from circle (without re-rolling

facility)

29 Brush making units with fibre/plastic wire.

30 Candle manufacture.

31 Carpentry & furniture units without Seasoning.

32 Carpentry and wooden furniture manufacturing(excluding saw mill) with the

help of electrical (motorized) machines such as electric wood planner, steel

saw cutting circular blade etc.

33 Carpet weaving.

34 Cement products (without using Asbestos) like pipe, pillar, jafri, well ring,

blocks/tiles etc. should be done under closed covered shed to control

fugitive emissions)

35 Ceramic colour manufacturing (not using boiler and wastewater recycling

process)

36 Chewing Tobacco.

37 Coated electrode manufacturing

38 Cotton Belts and Tapes/Cotton Nilwar etc.

39 Cotton cloth Knitting.

40 Cotton quilt and mattresses making.

41 Cotton socks-knitting.

42 Crown cork making units.

43 Dairy farming (Rural Area focal points periphery of ½ K.M)

44 Decoration of ceramic cups & plates by electric furnace

45 Diesel Generator sets upto 15 KVA

Page 126: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

165

46 Diesel pump repairing & servicing

47 DPC coating of copper and aluminium wire without any wet process.

48 Drawing, Surveying and Scientific instrument making with no wet process.

49 Dry Grinding of spices.

50 Electrical & electronic items assembling

51 Electrical Switches, accessories making and Panel Board without wet

process.

52 Electrical/electronics testing and measuring instruments without wet

process.

53 Electronic Components without use of chemicals.

54 Embroidery.

55 Engineering good mfg. Units without wet process.

56 Engineering Workshops, Machine Shop, Press Shop, Sheet Metal fabrications

including steel furniture rolling shutters grinding, fabrication (without

foundry, pickling, electroplating, galvanizing and without any discharge of

water/oil).

57 Fabrication units connected with animal drawn vehicles, trailers without any

heat treatment, furnace use i.e. with no emissions.

58 Finished leather goods, conversion of finished without wet process.

59 Fish Ponds.

60 Flavoured bettle nut production/grinding.

61 Floor Polish, Nail Polish, Tooth Powder, Hair Oil, Shampoo and Tooth Paste

with blending only.

62 Fountain pen manufacturing

63 Garments manufacturing without wet process.

64 General Wire Industries like wire drawing, barbed wire, Chain links, making

units without wet process.

65 Glass ampoules & vials making from glass tubes.

66 Gold/Silver smithy shops with no water or chemical use.

Page 127: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

166

67 Green House/Floriculture under Mechanized process under controlled

temperature.

68 Groundnut decorticating (dry)

69 Hand Tools without casting.

70 Handicraft.

71 Handlooms without wet process.

72 Household appliances and kitchen equipment, without wet process.

73 Insulation and other coated papers (excluding paper or pulp manufacturing)

manufacturing

74 Jobbing and machining

75 Knitting cloth/Fabrics (Small Scale) Dry process.

76 Lathe and Welding sets (only electrical) without casting.

77 Leather cutting and stitching (more than 10 machines and using motor)

78 Leather footwear and leather products (excluding tanning and hide

processing) (except cottage scale)

79 Manufacture of Cement Blocks/Jallies etc.

80 Manufacture of Steel trunks/boxes/drums/Shutters.

81 Manufacturing of optical lenses (using electrical furnace)

82 Manufacturing of shoe brush & wire brush

83 Marketing/Industrial Consultancy/Advertising Agencies.

84 Mechanical clock/watches etc.

85 Medical & Surgical Instruments and equipments without wet process.

86 Mfg. of Transformers without poly chlorinated Hydrocarbon.

87 Mosaic tiles, cement pipes. Spun pipes manufacturing units.

88 Motor and Pump Making without foundry and wet process.

89 Mushroom cultivation under controlled conditions/temperature.

90 Musical instrument with no wet process.

91 Non-conventional Energy items.

92 Nut cracking & roasting.

Page 128: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

167

93 Oil extraction by kohlus or expellors without Boiler.

94 Oil mill ghani & extraction (no hydrogenation/refining)

95 Optical Frames and glasses without wet process.

96 Organic manure (manual mixing).

97 Orthopedic equipment's without casting/wet process.

98 Packing and Processing of items using Mechanized Process.

99 Packing materials manufacturing from non asbestos fibre, vegetable fibre

yarn

100 Packing of Agricultural/Forest Produce under controlled Temperature

(Mechanised Process).

101 Packing of powdered milk

102 Paints and varnishes (mixing and blending) (without ball mill) (without any

wet process)

103 Paper Pins, 'U' Clips, pen Holders, pen & paper products without wet

process.

104 Paper Products without wet process.

105 Plastic Niwar from monofilament yarn.

106 Polythene Bags from Monofilament Sheets/polythene sheets.

107 Powerloom Weaving (Small Scale) Dry process.

108 Preparation of Photo identify card by using video camera-laser printing.

109 Puffed rice (muri) (using oil gas or electrical heating system)

110 R.C.C Bricks.

111 Repairing of electric motor & generator

112 Seed Processing Units/hybrid Seeds- Mechanized process.

113 Sericulture units.

114 Small restaurants, coffee/Tea shops and Snack Bars.

115 Solar Energy Panel makings.

116 Spinning (Small Scale) Dry process.

117 Sports Goods without leather tanning & other wet process.

Page 129: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

168

118 STD Booth/cable T.V Net Work/EPBAX.

119 Steel furniture without spray painting

120 Surgical and medical products not involving effluent/ emission generating

processes

121 Tailoring Shop as SSSBI.

122 Tea Grading and packing.

123 Telecommunication equipment without wet process.

124 Typing Centre/Xeroxing.

125 Tyre retreading (only cold processing).

126 Umbrellas, Raincoats, Tarpaullins without wet process.

127 Weigh Bridge.

128 Weighing machines with no wet process.

129 Welding Electrodes.

130 Wooden and corrugated Crates and Boxes.

131 Zip Fasteners.

The exemption from obtaining consent of the Board under the provisions

of the Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention &

Control of Pollution) Act, 1981 and Hazardous Waste (Management & Handling &

Transboundary Movement) Rules, 2008, for the above 131 category of industries, if

the unit satisfies the following conditions:

1. That the industry is established/being established in the demarcated Industrial

Estates /Zones classified by the State Authorities viz PSIEC, Department of

Industries, PUDA, CTP under draft master plan or in mixed category area or

predominantly industrial areas within Municipal limit of a town/city after

classification of the area by CTP/STP/DTP.

2. That the investment of the industry is not more than Rs. 1 Crore on

plant and machinery.

3. That the investment of the industry is not more than Rs. 2 Crore on

plant and machinery for hosiery units.

Page 130: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

169

4. That there will not be any discharge of trade effluent from the industry into

stream or well or sewer or onto land and/or that industry will not discharge any

air pollution including noise into the atmosphere.

5. That the industry will not discharge any toxic/hazardous wastes and will not

handle any toxic /hazardous chemical.

In case the industry is found to create conditions that generate any type of pollution

or if there is any objection from the surrounding community and if on verification, it is

found that such objection has some substance, the Board shall be free to take legal

action against the industry under the provisions of the Water (Prevention & Control of

Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 or

Environment (Protection) Act, 1986 as considered appropriate.

Page 131: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

170

Annexure-30

Punjab Pollution Control Board, Nabha Road, Patiala.

BOARD ORDER

No.EE-1/Gen.-1/F.No.Gen-214/F-2 Dated31.08.2000

In partial modification of the Board notification No. EE-1/Gen-

1/F.No.Gen-214/F-178/2 dated 28.4.1998. Punjab Pollution Control Board, Patiala

in its 107th meeting held on 07.07.2000 has decided to exempt 32 additional types

of tiny/small scale industries in addition to 63 types of tiny small scale industries

already exempted by the Board vide above referrednotification. Accordingly, 95

industries under tiny/small scale sector as per Annexure-I are exempted from

obtaining consent of the Board under the provisions of the Water (Prevention &

Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981

and Hazardous Waste(Management & Handling) Rules, 1989, subject to the

respective industry satisfying the following conditions:

1. That the industry is established/ being established in the State demarcated Industrial Estates/Zones classified by the State authorities viz PSIEC, Department of Industries, PUDA, Chief Town Planner under draft master plan or any other authority appointed under the statute of the State for the development of industrial experts and shall not be applicable to the category of industries established/ being establishedin predominantly residential are as and approved residential areas.

2. That the investment of theindustry is not more than Rs.25 lacs on plantand

machinery.

3. That there will not be any discharge of trade effluent from the industry into stream or well or sewer or onto land or/and that the industry will not discharge any air pollution including noise into the atmosphere.

4. That the industry will not discharge any toxic/hazardous wastes and will not

handle anytoxic/hazardous chemical.

In case the industry is found to create conditions that generate any type of pollution or if there is any objection from the surrounding community and if on verification, it is found that such objection has some substance, the Board shall be free to take legal action under the provisionsof the Water(Prevention&Controlof Pollution)Act, 1974 and Air (Prevention&ControlofPollution) Act, 1981 or Environment (Protection)Act, 1986 as considered appropriate.

Sd/- Chairman

Page 132: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

171

Annexure-I

ListofindustriesexemptedfromobtainingNOC/ConsentofthePunjabPollutionControlBoard.

1. Fabrication units connected with animal drawn vehicles, trailers without any heat treatment, furnace use i.e.with no emissions.

2. Block making, Printing, Offset Printing.

3. Black Smithy Shop.

4. Drawing, Surveyingand Scientific instrument making with no wet process.

5. Weighing machines with no wet process.

6. Carpentry & furniture units without Seasoning.

7. Brush making units with fibre/plastic wire.

8. Musical instrument with no wet process.

9. Crown cork making units.

10. Paper Pins, 'U' Clips, pen Holders, pen &paper products without wet process.

11. Household appliances and kitchen equipment,without wetprocess.

12. Sports Goods without leather tanning & other wetprocess.

13. All types of toys & Dollmaking electrical without wet process.

14. Umbrellas, Rain coats,Tarpaullins without wet process.

15. Electrical Switches, accessories making and Panel Board without wetprocess.

16. Finished leathergoods, conversion of finished leather without wet process.

17. Aggarbattiand cosmetic products manufactured by blending (Dry Process).

18. Floor Polish, Nail Polish, Tooth Powder, Hair Oil, Shampoo and ToothPaste with blending only.

19. Candle manufacture.

20. Atta Chakki and Millet grinding.

21. Biscuits, Pastries,Cakes, Confectionery, Bread, Bakery upto100 kg/day.

22. Wooden and corrugated Crates and Boxes.

23. Garments manufacturing without wetprocess.

24. Gold/Silver smithy shops with no water or chemical use.

25. Small restaurants, coffee/Teashops and Snack Bars.

26. Oil extraction by kohlusor expellors without Boiler.

27. DPC coating of copper and aluminium wire without any wetprocess.

28. Chewing Tobacco.

29. Bio-gas.

30. Book Binding.

31. Optical Frames and glasses without wetprocess.

32. Welding Electrodes.

33. Electrical/electronics testing and measuring instrument swithout wetprocess.

34. Audio,Video and consumer electronic equipment assembly only.

Page 133: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

172

35. Telecommunication equipment without wet process.

36. Electronic Components without use of chemicals.

37. Medical & Surgical Instruments and equipments without wetprocess.

38. Computer, Computer peripheralsand Computer Software.

39. Latheand Welding sets(only electrical) withoutcasting.

40. Engineering good mfg.Units without wetprocess.

41. Engineering Workshops, Machine Shop, Press Shop,Sheet Metal fabrications including steel furniture rolling shutters grinding, fabrication (without foundry, pickling, electroplating, galvanizing and without any discharge of water/oil).

42. Motor and Pump Making without foundry and wet process.

43. Mfg. of Transformers without poly chlorinated Hydrocarbon.

44. General Wire Industries likewire drawing, barbed wire, Chainlinks, making units without wetprocess.

45. Aluminium, Stainless Steel, Brass Vessel marking units having only process, spinning without use of buffing, polishing and pickling, washing, Hot/Coldrolling annealing furnace and anodizing processes.

46. Air conditioners, Room Coolers, water Coolers & heaters without wet

process.

47. Tyre retreading (only cold processing).

48. Automobile Repair Workshop.

49. Automobile Body building without wet process.

50. Handlooms without wet process.

51. Handicraft.

52. Belt Fastner units without wet process.

53. Mosaictiles, cement pipes, Spun pipes manufacturing units.

54. Paper Products without wet process.

55. Sericulture units.

56. Nut cracking & roasting.

57. Bindi making units.

58. Manufacture of Steel trunks/boxes/drums/Shutters.

59. Carpet weaving.

60. Cotton quilt and mattresses making.

61. Fish Ponds.

62. Tea Grading and packing.

63. Dry Grinding of spices.

64. Knitting cloth/ Fabrics(Small Scale) Dry process.

65. Embroidery.

66. Powerloom Weaving (Small Scale) Dry process.

67. Spinning (Small Scale) Dry process.

Page 134: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

173

68. Mushroom cultivation under controlled conditions/temperature.

69. Seed Processing Units/ hybrid Seeds- Mechanized process.

70. Green House/Floriculture under Mechanized process under controlled temperature.

71. Bee keeping.

72. Dairy farming (Rural Area focal points periphery of½ K.M)

73. Plastic Niwar from monofilamentyarn.

74. Typing Centre/Xeroxing.

75. Weigh Bridge.

76. STD Booth/cableT.V NetWork/EPBAX.

77. Packing of Agricultural/Forest Produce under controlled Temperature(MechanisedProcess).

78. Manufactureof CementBlocks/Jalliesetc.

79. Polythene Bags from Monofilament Sheets/polythene sheets.

80. Beauty Parlour.

81. HandTools without casting.

82. Cotton Belts and Tapes/Cotton Nilwar etc.

83. Cotton socks-knitting.

84. Zip Fasteners.

85. Orthopedic equipment's without casting/wetprocess.

86. Mechanical clock/watches etc.

87. Non-conventional Energy items.

88. Solar Energy Panel makings.

89. Preparation of Photo identify card by using video camera-laser printing.

90. Packing and Processing of items using Mechanized Process.

91. Marketing/Industrial Consultancy/Advertising Agencies.

92. Tailoring Shop as SSSBE.

93. R.C.C Bricks.

94. Assembling of Doorcloser and Rings.

95. Cotton cloth Knitting.

Endst.Office Order no.3209-3284 Dated 11/9/2000

A copy of the above is forwarded to the following for information and necessary action:-

1. The Sr.Environmental Engineer-I/II/III/IV, Punjab Pollution Control

Board, Patiala.

2. The Environmental Engineer-/II/III/IV/V/CMC/EPS/CSA/General, Punjab Pollution Control Board, Patiala.

Page 135: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

174

3. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala /Ludhiana-I/II/ Amritsar/ Jalandhar/Gurdaspur/Bathinda/ Faridkot/Hoshiarpur/Sangrur and Nodal Office,Chandigarh.

4. All Asstt. Environmental Engineers, Punjab Pollution Control Board, Patiala.

Sd/- [ Malvinder Singh ]

SeniorEnvironmentalEngineer-II

Page 136: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 175 -

Annexure-31

PunjabPollutionControlBoard,NabhaRoad,Patiala.

OfficeOrderNo.02 Date:16/9/2002

OFFICE ORDER

Subject: Amendment in the exemption from obtaining Consent to Establish (NOC) Consent to Operate an industrial plant under the Water (Prevention &Controlof Pollution)Act, '1974 and the Air (Prevention & Control of Pollution)Act,1981.

The Board, in its115thmeeting held on 2.8.2002,decided to amend

condition No.1 approved by the Board in its 107thmeeting held on 7.7.2000 for

exemption of 95 types of industries under tiny/small scale sector from obtaining

consent of the Board under the provisions of Water (Prevention & Control of

Pollution)Act, 1974 and Air (Prevention &Control of Pollution)Act, 1981 and

Hazardous Waste (Management and Handling) Rules, 1989, accordingly, in

superceeding the condition No.1 of the Board's Office Order No.EE-I/Gen-

1/F.no.Gen-214/F2 dated 31.8.2000 which will, now, be read as:

"That the industry is established/being established in the demarcated industrial Estates/Zones classified by the State Authorities viz PSIEC, Department of Industries, PUDA, CTP under draft Master Plan or in mixed category area or predominantly industrial areas within Municipal limit of a Town/City after classification of the area by CTP/ STP/ DTP."

All other conditions remains the same.

Sd/- Chairman

Endst.Office Order no.GPC/EE-II/2002/Gen.214/6739-99 Dated 16/9/2002

A copy of the above is forwarded to the following for information and necessary action:-

1. The Sr.Environmental Engineer-I/II/III/IV, Punjab Pollution Control

Board, Patiala.

2. The Sr.Scientific Officer, Punjab Pollution Control Board, Patiala.

3. The Environmental Engineer, Consent Management Cell-I/II/III/IV/V/CSA/ MSW/BMW/ General-I/II,Punjab Pollution Control Board, Patiala.

Page 137: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 176 -

4. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Amritsar/ Jalandhar/Ludhiana-I/II/ Patiala/ Bathinda /Faridkot/ Hoshiarpur/Batala/ Sangrur & Nodal Office, Chandigarh.

5. The Deputy Sectary (P&G), Punjab Pollution Control Board, Patiala.

6. The Administrative Officer, Punjab Pollution Control Board, Patiala.

7. All Asstt. Environmental Engineers, Punjab Pollution Control Board,Patiala.

Sd/-

SeniorEnvironmentalEngineer-II

Page 138: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 177 -

Annexure-32

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

No. GPC/Hosiery Inds./F-203/2010…………

Dated 27/1/2010 OFFICE ORDER

Subject: Raising of the investment limit from Rs. 25 lacs to Rs. 1 crores in case of Hosiery industries falling in the list of 95 types of tiny / small scale industries.

The Punjab Pollution Control Board in its 107th meeting held on

7/7/2000 vide item no. 107.25, has decided to exempt some green category

industries for obtaining the consent under the provisions of the Water (Prevention

& Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act,

1981. Accordingly, the Board vide its notification no. EE-1/Gen-1/F.No. Gen 214/F-

2 dated 31/8/2000 has exempted 95 types of tiny / small scale industries for

obtaining the consent of the Board under the provisions of the Water (Prevention &

Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981

and the Hazardous Waste (Management, Handling & Transboundary Movement)

Rules, 1989, if the unit satisfies some conditions as mentioned in the said

notification dated 31/8/2000.

Now, the Punjab Pollution Control Board in its 145th meeting held on

30/11/2009 vide item no. 145.08 has decided to raise the investment limit in

machinery from the existing Rs. 25 lacs to Rs. 1 crores for units relating to Hosiery

manufacturing as mentioned at Sr. No. 64, 65, 66 & 67 in the list of 95 types of

industries already exempted vide Board's notification no. EE-1/Gen-1/F.No. Gen

214/F-2 dated 31/8/2000 for obtaining the consent under the provisions of the

Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention &

Control of Pollution) Act, 1981.

However, the other conditions as mentioned in the said notification dated 31/8/2000, shall remain the same.

Sd/-

Member Secretary

Page 139: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 178 -

Endst no. GPC/Hosiery Inds/F-203/2010/…………

Dated…………………..

A copy of the above is forwarded to the followings for information

and necessary action:

1. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Patiala-I / Patiala-II / Jalandhar / Ludhiana / EPA & HQ.

2. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala / Sangrur / Faridkot/Ludhiana-I / II / III / IV / Hoshiarpur /Amritsar / Jalandhar / Bathinda / Fatehgarh Sahib /SAS Nagar.

3. The Environmental Engineer (P-I/II, J/L/Const./HWM/CSA/GPC/Mega/ EPA, Punjab Pollution Control Board, Patiala.

4. The Deputy Secretary, Punjab Pollution Control Board, Camp Office, Mohali / Deputy Director (PR).

5. The Deputy Controller (F&A)/ Administrative Officer, Punjab Pollution Control Board, Patiala.

6. All Asstt. Environmental Engineers of Punjab Pollution Control Board. 7. Law Officers, Punjab Pollution Control Board, Patiala. 8. P. S. to Chairman/P.S. to Member Secretary, Punjab Pollution Control Board,

Patiala.

Sd/- Member Secretary

Page 140: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 179 -

Annexure-33

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN, NABHA ROAD, PATIALA

No. GPC/Inf.Tech/F-53/2010/3

Dated 16/2/2010 OFFICE ORDER

Subject: Exemption from Consent Management of the Board for Information Technology industry in the State of Punjab.

The Punjab Pollution Control Board in its 109th meeting held on

25/1/2001 vide item no. 109.32, has decided to exempt IT industry (which is not

covered under the Board's notification no. EE-1/Gen-1/F.No. Gen 214/F-2 dated

31/8/2000) from the consent management of the Board under the provisions of the

Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention &

Control of Pollution) Act, 1981 and the Hazardous Waste (Management, Handling &

Transboundary Movement) Rules, 1989, subject to certain conditions for 2 years.

Thereafter, the Board kept on extending this period from time to time and lastly

vide Board's notification no. GPC/Gen/460/2008-09/14 dated 22/1/2009 issued in

compliance of Board's decision taken in 140th meeting held on 18/12/2008, the

time period was extended for another 2 years i.e. upto 18/11/2010.

Now, the Punjab Pollution Control Board in its 146th meeting held on

12/1/2010 vide item no. 146.07 has decided to exempt IT industry / knowledge

industries as per Annexure-I of Chapter 11 of the Punjab Industrial Policy, 20098

for 5 years for obtaining the consent of the Board under the provisions of the

Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention &

Control of Pollution) Act, 1981 subject to the following conditions:

1. That the IT/ Knowledge industry shall mean:

i) Companies in the IT hardware, IT software and other knowledge industry unit such as bio-technology, Nanotechnology and Telecommunications etc. IT software industry includes IT software, IT

services and IT enabled services.

ii) A biotech company refers to Research and Development and / or non polluting manufacturing of products or processes, which use or are derived by using specific living systems (plants, animals and microbes or parts thereof) and or enzymes /biocatalysts-derived there from. The company also includes activities such as Genetic engineering or cell culture or microbiology or biochemistry and bio-informatics.

Page 141: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 180 -

iii) Telecommunications companies include Basic Telecom Service Providers (fixed) VSAT, Cellular (Mobile) companies, Telecom Infrastructure companies, ISPs and any other value added services

licensed by Ministry of Communications & IT, Government of India.

iv) Knowledge industries refer to those industries which are relatively intensive in their inputs of technology and / or human capital. These include IT/ITES, Nanotechnology, Consulting, Biotechnology, Electronics and Telecommunications. This will also include Research

and Development services and other specialized institutions.

v) Institutions offering specialized education and training for IT and knowledge industries such as finishing schools, Entrepneurship Development Cells, Incubation Centres, Institutes of higher learning and other knowledge industries, which are part of an IT park / Knowledge Park would be eligible for the benefits under this policy at

par with IT units.

vi) IT projects refers to investment from infrastructure developers and the IT units / companies as describes in Annexure.

vii) Infrastructure developers or builders refer to real estate infrastructure companies constructing built up space for sale / lease / or sale-cum-

lease to the IT / Knowledge industries.

viii) SMEs: Small & Medium Enterprises are IT units with a fixed capital investment of upto Rs. 10 crores.

ix) Mega IT projects for developers refers to projects with fixed capital investment of Rsa. 50 crores and with a minimum area requirement

of 10 acres.

x) Mega IT projects for units refers to projects with fixed capital

investment of Rs. 25 crores.

xi) IT parks are defines as follows:

a) IT parks providing built up space to IT / knowledge industry. b) Integrated IT parks providing built up space and plotted

infrastructure for it units / companies as well as necessary support infrastructure in terms of residential, commercial, recreational and other facilities.

2. That the industry is proposed to be established in industrial zone / industrial estate / industrial area / industrial focal point / industrial parks / IT parks as declared by Competent

Authority or at any other site for which permission has been granted / deemed by Competent Authority.

3. Where no. of workers in a industry exceeds 500 and there exits no sewage treatment

facility exemption shall not be available. However, if the industry has been permitted to connect its domestic discharge to sewerage line of local authority and local authority has

sewerage treatment facility exemption shall be available.

4. Exemption shall not be available to an industry, if it uses DG set beyond 200 KVA or if its DG set does not conform to the criteria standards as laid down by the MOEF vide

notification no. GSR 371 (E) dated 17/5/2002 as amended from time to time.

5 i) IT / Knowledge industries as in para 1 above shall however required to obtain

authorization under Rule 5 of Hazardous Waste (Management, Handling & Transboundary Movement) Rules, 2008, if applicable. Normally, it shall be granted

for 5 years at a time.

Page 142: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 181 -

ii) However, it shall exempted from obtaining authorization under category 5.1 of the

said rules, if it installs DG set of not more than 10 KVA capacity maintain record and disposes off / recycles used oil as per the provisions of the said rules.

6. That the industry will not discharge any toxic / hazardous waste and will not handle any

toxic / hazardous chemical.

Chairman

Endst no. GPC/Hosiery Inds/F-203/2010/…………

Dated…………………..

A copy of the above is forwarded to the followings for information

and necessary action:

1. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Patiala-I / Patiala-II / Jalandhar / Ludhiana / EPA & HQ.

2. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala / Sangrur / Faridkot/Ludhiana-I / II / III / IV / Hoshiarpur /Amritsar / Jalandhar / Bathinda / Fatehgarh Sahib /SAS Nagar.

3. The Environmental Engineer (P-I/II, J/L/Const./HWM/CSA/GPC/Mega/EPA, Punjab Pollution Control Board, Patiala.

4. The Deputy Secretary, Punjab Pollution Control Board, Camp Office, Mohali / Deputy Director (PR).

5. The Deputy Controller (F&A)/ Administrative Officer, Punjab Pollution Control Board, Patiala.

6. All Asstt. Environmental Engineers of Punjab Pollution Control Board. 7. Law Officers, Punjab Pollution Control Board, Patiala. 8. P. S. to Chairman / P. S. to Member Secretary, Punjab Pollution Control Board, Patiala.

Sd/-

Member Secretary

Page 143: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 182 -

Annexure-34

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

No. GPC/Inf.Tech/F-53/2011/268

Dated 04/10/2011 OFFICE ORDER

Subject: Exemption from consent Management of the Board for Information Technology Industry in the State of Punjab.

In pursuance to the decision of the Board taken in its 153rd meeting

held on 9/9/2011, Board's office order no. GPC/Inf.Tech/F-53/2010/3 dated

16/2/2010.The subject cited above is partially modified to the extent that the

capacity of DG sets mentioned in condition no. 4 may now be read as 500 KVA in

place of 200 KVA. Rest of the contents of the said office order shall remain the

same.

Sd/-

Chairman

Endst no. 39564-97 Dated

4/10/2011

A copy of the above is forwarded to the followings for information

and necessary action:

1. The Chief Environmental Engineer-1 / 2 / 3, Punjab Pollution Control Board, Patiala.

2. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Patiala-I / Patiala-II / Jalandhar / Ludhiana / Amritsar / Bathinda.

3. The Senior Environmental Engineer, Punjab Pollution Control Board, Head Quarter-1 & 2, Patiala.

4. The Environmental Engineer, Punjab Pollution Control Board, HQ-I (EE-1&2)/HQ-2 (EE-1&2)/ Mega, Head Office, Patiala.

5. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala / Sangrur / Faridkot/Ludhiana-I / II / III / IV / Hoshiarpur /Amritsar / Jalandhar / Bathinda / Fatehgarh Sahib /SAS Nagar.

6. The Addl. Secretary, (P&G), Punjab Pollution Control Board, Nodal Office, Mohali.

7. The Deputy Director (PR), Punjab Pollution Control Board, Patiala. 8. The Deputy Controller (F&A), Punjab Pollution Control Board, Patiala. 9. The Administrative Officer, Punjab Pollution Control Board, Patiala. 10. The Law Officer, Punjab Pollution Control Board, Patiala. 11. P. S. to Chairman, Punjab Pollution Control Board, Patiala. 12. P. S. to Member Secretary, Punjab Pollution Control Board, Patiala.

Sd/-

Page 144: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 183 -

Member Secretary

Page 145: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 184 -

Annexure-35

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

OFFICE ORDER

Office Order No.___________ Dated

:________

The Punjab Pollution Control Board in its 111th meeting held on

9/7/2001 vide item no. 111.03 decided that existing industries may be permitted an

extension in power load upto 25% of the sanctioned load for the purpose of

modernization / expansion based on the affidavit as follows:

"That there will be no addition of plant and machinery generating pollution load. Consequent upon the increase in power load upto 25% of the existing load at the same location there will be no increase in pollution load either on modernization or by expansion."

The above relaxation is extended subject to the following:

1. That there will be no addition of plant and machinery generating pollution load.

2. That there will be no increase in pollution load either or modernization or by expansion.

3. That the industry must have either valid consent of the Board or should have applied for the consents of the Board.

4. That the industry shall deposit the requisite 'Consent to establish' application fee as applicable for expansion / modernization project.

5. That this facility will not be extended to the industries established in Approved Residential Areas / Approved Town Planning Schemes etc.

6. That this relaxation is applicable only for modernization / expansion of the industry restricted as one time benefit only and that the industry shall submit details of plant and machinery to be installed to Punjab Pollution Control Board with tentative / estimated load factor.

Sd/- Chairman

Page 146: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 185 -

Endst no.Gen/F.No. Gen-192/2001/3001-3100 Dated

10/08/2001

A copy of the above is forwarded to the followings for information

and necessary action:

1. The Senior Environmental Engineer-I / II / III / IV, Punjab Pollution Control Board, Patiala.

2. The Senior Scientific Officer, Punjab Pollution Control Board, Head Office, Patiala.

3. The Environmental Engineer, Punjab Pollution Control Board, Consent Management Cell-I / II / III / IV / V, CSA/MSW/General-I/II, Head Office, Patiala.

4. The Environmental Engineer, Punjab Pollution Control Board, Zoning Atlas, Ludhiana.

5. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Amritsar / Jalandhar / Patiala / Gurdaspur / Bathinda / Faridkot / Hoshiarpur / Sangrur / Ludhiana-I / II & Nodal Office, Chandigarh.

6. The Deputy Secretary, (P&G), Punjab Pollution Control Board, Patiala. 7. The Administrative Officer, Punjab Pollution Control Board, Patiala. 8. The Deputy Controller (F&A), Punjab Pollution Control Board, Patiala. 9. All Asstt. Environmental Engineers, Punjab Pollution Control Board, Patiala. 10. All Industrial Association in Punjab.

Sd/- ( Sandeep

Behl )

Environmental Engineer-II (GPC)

Page 147: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 186 -

Annexure-36

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN, PATIALA Phone No. 0175 – 2215793 PBX No. 227925, 200282 Extn. 215 E-mail: [email protected]

Fax;0175 – 216636

No. 5558-68 Dated 24/7/2002

To The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Amritsar / Jalandhar / Patiala / Gurdaspur / Bathinda / Faridkot / Hoshiarpur / Sangrur / Ludhiana-I / II & Nodal Office, Chandigarh.

Subject: Implementation of the Office Order no. 2 dated 10/8/2001, regarding extension in power load upto 25% of the sanctioned load for the purposes of expansion / modernization.

It is intimated that all the all the Regional Offices of the Board are implementing the subject cited office order in its own manner / style, which created problem.

Keeping in view, the Board has decided that all Regional Offices in respect of implementation of subject cited office order will ask the industry to file the application for one time clearance for expansion in power load upto 25% of sanctioned load alongwith an affidavit & to complete all the six conditions laid in the said office order. The competent authority (as the case may be) will issue clearance certificate. It is made clear that in case of any deviation from the above, it will be the sole responsibility of the concerned Regional Office / Official. The sample performa of clearance certificate is on the reverse of this letter.

Sd/- Senior Environmental Engineer

Endst no. 5569-5624 Dated 24/07/2002

A copy of the above is forwarded to the followings for information

and necessary action:

1. The Senior Environmental Engineer-I / II / III / IV, Punjab Pollution Control Board, Patiala.

2. The Environmental Engineer- I / II / III / IV / V (CMC)/Gen-I/II, Punjab Pollution Control Board, Patiala.

3. All Asstt. Environmental Engineers, Punjab Pollution Control Board. 4. All Junior. Environmental Engineers, Punjab Pollution Control Board.

Sd/- (Malwinder Singh)

Senior Environmental Engineer

Page 148: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 187 -

Annexure-37

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

No. Tech./GPC/199-2000/1 Dated

27/4/1999

CIRCULAR

Subject: Consent to establish (NOC) / Clearance Certificate for extension in power load for running of Effluent treatment plants and Air pollution control devices.

To redress the problems faced by various industrial units, it has been

decided by the Board as under:

In case any industry wants "No Objection Certificate / Clearance

Certificate for extension in electric load, only for running of its Effluent treatment

plants and Air pollution control devices and its standby motors, the Regional Offices

/ Senior Environmental Engineer Office should immediately grant No Objection

Certificate / Clearance Certificate on priority basis subject to the following

condition:

1. That the Regional Office will examine the case thoroughly and record in

writing that the extension in load is meant only for operating of the Effluent

treatment plant / Air pollution control devices and its standby motors.

2. That the industry shall submit an undertaking to the fact that the industry

will not utilize this electric load for any other purposes except for running of

effluent treatment plant / air pollution control devices and its standby

motors meant for this purpose only.

Sd/-

Chairman

Page 149: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 188 -

fgZm nzeD10138-57 fwsh4/5/1999

T[go'es dk T[skok j/m fbfynk B[z ;{uBk ns/ fJzB fpB gkbDk fjZs G/fink iKdk j?

1 ;hBhno tksktoD fJzihBhno,gzikp gqd{;aD o'eEkw p'ov,b[fXnkDk$gfNnkbk 2 nc;o fJzukoi (Jh gh n?;) gzikp gqd;{D o'eEkw p'ov,w[Zy dcso gfNnkbk 3 tksktoD fJzihBhno -1,11,111, IV, ezB;?N w?Biw?N ;?b gzikp gqd{;D o'eEkw p'ov, w[Zy

dcso gfnnkbk 4 tksktoD fJzihBhno ( ih gh ;h ) gzikp gqd;{D o'eEkw p'ov, w[Zy dcso gfNnkbk 5 tksktoD fJzihBhno gzikp gqd;{D o'eEkw p'ov y/soh dcso gfNnkbk $ b[fXnkDk -

1,11 $ ibzXo $ j[f;nkog[o $ nfwqs;o $ r[odk;g[o $ ;zro{o $ pfmzvk $ codhe'N ns/ B'vb dcso uzvhrV .

6 gh n?; N{ u?now?B gzikp gqd;{D o'eEkw p'ov w[Zy dcso gfNnkbk. 7 gh J/ N{ w?po ;Zeso ,gzikp gqd;{D o'eEkw p'ov w[Zy dcso gfNnkbk.

(wkbftzdo f;zx)

fJzukoi (ih gh

;h )

fgzm nzeD Bzpo L fwsh

gzi ^ gzi ekghnk tksktoD fJzihBhno gzikp gqd;{D o'eEkw p'ov, y/soh dcso,gfNnkbk$b[fXnkDk -1,II$ibzXo$j[f;nkog[o$ nzfws;o$ r[odk;g[o$ ;zro{o$pfmzvk$cohde'N ns/ B'vb dcso uzvhrV B[z T[jBK nXhB g?dhnK wkBsk gqkgs fJzv;nohnb n?;';hn?;B$ ;z;Ek B[z tzvD fjZs G/ihnk iKdhnk jB.

(wkbftzdo f;zx)

fJzukoi (ih gh

;h )

Page 150: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 189 -

Annexure-38

PUNJAB POLLUTION CONTROL BOARD VATAVATAN NABHA ROAD, PATIALA

No.GPC/Gen/F.No.434/2005/173

Dated. 7/3/2005 OFFICE ORDER

Ludhiana is an industrial hub of State of Punjab and there are

approximately more than 20,000 nos. of industries operating in the city of

Ludhiana. Out of which 200 nos. are large and medium scale industries, 2500 nos.

are small scale industries of red category and approximately more than 17,500 nos.

of industries are of green category. So more than 80% of total industries operating

in Ludhiana are small scale tiny units of green category mainly engaged in

manufacturing Hosiery garments, machining of sewing machine parts, cycle parts,

auto parts, hand tools etc.

Punjab Pollution Control Board has mainly laid stress in pollution

control in red category of industries. The Board has laid down the policy for red

category of industries operating in non-designated area and as per the policy, the

industries are required to be shifted to designated area. The time period has been

extended in the past few years and recently the time period has been extended by

the Board upto 30/6/2005. The main motive behind the policy of the Board is not

to allow the establishment of any designated area of five highly polluting towns of

the State of Punjab. Ludhiana city, is one of them. The main stress of the Board

was on red category of industries but the policy was implemented in totality in all

type of industries, which included green category of industries also.

The Board has been receiving large number of representations from

various Industrial Associations of Ludhiana and also from the office of Chairman,

Page 151: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 190 -

PSEB to allow extension in electric connection to existing green category of

industries in Ludhiana.

The process involved in existing Hosiery units are knitting on flat knit

machine and stitching of garments. The trade in the International market has been

opened to all. The hosiery units in particular when go in for modernization /

expansion, has to purchase computerized knitting machinery which cost them 1

crore to 5 crores investment in plant and machinery and also requires

enhancement of electric connection to operate these machinery so that they can

complete the product manufactured at international level. Further, due to the

addition of such type of computerized knitting machine, there is neither any

increase in pollution load of water or air.

A letter has been received from PSEB vide which it has been

intimated that a large number of green category industries are operating

particularly in Ludhiana in non designated area but predominantly resident area,

the industries are operating overload thus causing revenue loss to PSEB. The PSEB

has requested to release one time 100% load to such industries with certain

conditions, which will not cause any increase in pollution load.

The Board vide its notification no. 178/98/1 dated 20/1/1998 decided

that marginally polluting industries as per Schedule-I which cater to the daily need

of the community shall be permitted to be set up within commercial and other than

residential area of the town after obtaining consent to establish from the Punjab

Pollution Control Board under green category and in municipal areas other than

residential and commercial, consent to establish will be granted on merit after

assessing the suitability in each individual case. Though the Board is pressurizing to

shift the industries from the residential areas, however, till date there is no such

concrete policy to shift the existing industries from the non-designated areas to

Page 152: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 191 -

designated areas. The main green category industry in Ludhiana is relating to

hosiery goods manufacturing. Due to modernization to improve the quality of the

product the latest machinery is being installed and for which additional electric load

is required. With this modernization or increase in production there be no increase

in pollution load.

In view of the above, it has now been decided that the existing green

category of industries located in non-designated areas may be permitted an

extension in power load upto 100% of their existing sanctioned load for the

purpose or modernization / expansion / regularization of over load subject to the

following conditions:

1. The industry will submit an affidavit that there will be no addition of plant and machinery generating pollution load consequent upon the increase in power load upto 100% of the existing sanctioned load at the same location and there will be no increase or addition in pollution load either on modernization or by expansion.

2. That the industry must have either valid consent to operate of the Board or should have applied for the consent to operate of the Board for the existing unit.

3. That the industry shall apply for the „consent to establish‟ on simplified green category prescribed proforma and shall deposit the requisite consent to establish fee as applicable for the expansion / modernization of the project irrespective of cost. The industry shall submit details of the plant and machinery to be installed with tentative extension in electric load.

4. That this facility will be extended to the existing green category of industries operating in non designated area.

5. That this relaxation is applicable only for modernization / expansion of the industry restricted as one time benefit only.

6. That this facility will not be extended for the establishment of new green category of industries in non-designated area.

7. This benefit of power load extension would be extended to small scale units only and subject to the notification of Govt. of India no. 477(E) dated 25/7/1991.

8. The industry shall shift its premises to designated area as and when the Govt. formulates the policy of shifting of industries in future.

9. The NOC shall not be any ground for not shifting the industry to the designated areas as and when Govt. frames the policy for shifting of industries.

These orders shall come into effect immediately.

Sd/- (Tripat Rajinder Singh Bajwa)

Page 153: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 192 -

MLA, Chairman

Endst no.GPC/Gen/F.No. 434/2005/5551-73 Dated 7/3/2005

A copy of the above is forwarded to the following for information &

necessary action:

1. The Senior Environmental Engineer (EPA), Punjab Pollution Control Board, Patiala.

2. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Jalandhar / Patiala / Ludhiana.

3. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/ Ludhiana-1 / 2 /Jalandhar / Amritsar / Hoshiarpur / Batala / Sangrur / Bathinda / Faridkot and Nodal Office, Chandigarh.

4. The Environmental Engineer, P /J /L, HWM/EPA/HQ/CSA, Punjab Pollution Control Board, Patiala

Sd/-

Member Secretary

Page 154: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 193 -

Annexure-40

PUNJAB POLLUTION CONTROL BOARD

VATAVATAN NABHA ROAD, PATIALA No.GPC/1999-2000/Gen-434/F-1 Dated. 16/8/2000

BOARD ORDER

In partial modification of the Board notification no. Admn/A-2/F.no.

178/98/1 dated 20/1/1998. Punjab Pollution Control Board in its 107th meeting held

on 7/7/2000 decided that the cases of the industries for grant of consent to

establish / consent to operate in non-designated areas of the State shall be decided

as per the following policy:

1. No new industry of any category shall be allowed in the approved residential

area of any town of the State of Punjab. The approved residential area shall

be designated either by PUDA, Municipal Corporation /Improvement Trust or

any other designated authority of the State and it should be duly reflected in

the Master Plan.

2. No red category industry shall be given consent to establish within the

municipal limits except in the designated industrial area of the State.

3. The Board may continue to grant consent to establish to green category of

industries which are proposed to be located in mixed category areas or

predominantly industrial areas within the municipal limit of a Town/ City

after classification of the area by CTP / STP/ DTP.

4. The Board may grant consent to operate to the entire existing green

category of industries in mixed category areas or predominantly industrial

areas.

5. The Board may grant „consent to operate‟ to old red category of industries

operating in approved residential areas or mixed areas but required to be

shifted, if they have installed adequate effluent treatment plants and air

pollution control devices as per below:

Page 155: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 194 -

i) Initial consent to operate shall be for a period of one year with the

condition that it shall shift to the designated industrial area within

stipulate period.

ii) The Board may further extend this period or merit after the expiry of

one year in the rarest of the cases subject to the approval of the

Board of Directors.

Sd/- (Ajay K. Mahajan)

Chairman

Endst no. 3062-3132 Dated 20/8/2000

A copy of the above is forwarded to the following for information &

necessary action:

1. The Senior Environmental Engineer-I/II/III/IV, Punjab Pollution Control Board, Patiala.

2. The Environmental Engineer-I/II/III/IV/V/CMC/EPS/CSA/General, Punjab Pollution Control Board, Patiala.

3. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/ Ludhiana-1 / 2 /Jalandhar / Amritsar / Hoshiarpur / Batala / Sangrur / Bathinda / Faridkot and Nodal Office, Chandigarh.

4. All Asstt. Environmental Engineers, Punjab Pollution Control Board.

Sd/-

( Gulshan Rai ) Environmental Engineer (GPC)

Page 156: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 195 -

Annexure-41

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN, PATIALA Phone No. 0175 – 2215793 PBX No. 227925, 200282 Extn. 215 E-mail: [email protected]

Fax;0175 – 216636

No.Admn/SA-4/F.No.96/2001/89

Dated.4/4/2001 BOARDS ORDER

In partial modification of letter no. Admn/S.A-2/F.No.96/308 dated

27/12/1996, the Senior Environmental Engineer of the Board are delegated powers

as under:

To grant „Consent to operate‟ to the small scale industries in non-designated

areas, in case the industry has been issued NOC by the Chairman or Member

Secretary of the Board.

In case the industry has been established prior to 16/8/2000 without

obtaining „consent to establish‟ of the Board and applies for „consent to

operate‟ of the Board, then Senior Environmental Engineers may consider

grant of „consent to operate‟ as per the following decision of the Board

taken in its 107th meeting held on 7/7/2000.

“The Board may grant „consent to operate‟ to old red category of industries

operating in approved residential areas or mixed areas but required to be

shifted, if they have installed adequate effluent treatment plant and air

pollution control devices. Initial „consent to operate‟ shall be for a period of

one year with the condition that it will shift to the designated industrial

areas within stipulated period.”

This delegation will be in addition to the existing powers of the Senior

Environmental Engineer.

Sd/-

Page 157: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 196 -

(Ajay K. Mahajan)

Chairman

Endst no Admn./S.A-4/F.No.___/2001/ 10813-40 Dated

5/4/2001

A copy of the above is forwarded to the following for information &

necessary action:

1. The Senior Environmental Engineer-I/II/III/IV, Punjab Pollution Control Board, Head Office, Patiala.

2. The Senior Scientific Officer, Punjab Pollution Control Board, Patiala. 3. The Deputy Secretary (P&G), Punjab Pollution Control Board, Patiala. 4. The Environmental Engineer-1/2/3/4/CSA/Const./General, Punjab Pollution

Control Board, Head Office, Patiala. 5. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/ Ludhiana-1 / 2 /Jalandhar / Amritsar / Hoshiarpur / Batala / Sangrur / Bathinda / Faridkot and Nodal Office, Chandigarh.

6. The Deputy Controller (F&A), Punjab Pollution Control Board, Head Office, Patiala.

7. The Asstt. Personnel Officer / Law Officer, Punjab Pollution Control Board, Head Office, Patiala.

Sd/- ( B.N. Gupta )

Administrative Officer for Member Secretary

Page 158: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 197 -

Annexure-42

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN, PATIALA Phone No. 0175 – 2215793 PBX No. 227925, 200282 Extn. 215 E-mail: [email protected]

Fax;0175 – 216636

No. Admn/SA-2/F.No.178/2001/98 Dated.11/4/2001

OFFICE ORDER

In partial modification of the Board notification no. Admn/A-2/F.no.

178/98/1 dated 20/1/1998. Punjab Pollution Control Board in its 107th meeting held

on 7/7/2000 decided that the cases of the industries for grant of consent to

establish / consent to operate in non-designated areas of the State shall be decided

as per the following policy:

1. No new industry of any category shall be allowed in the approved residential

area of any town of the State of Punjab. The approved residential area shall

be designated either by PUDA, Municipal Corporation /Improvement Trust or

any other designated authority of the State and it should be duly reflected in

the Master Plan.

2. No red category industry shall be given consent to establish within the

municipal limits except in the designated industrial area of the State.

3. The Board may continue to grant consent to establish to green category of

industries which are proposed to be located in mixed category areas or

predominantly industrial areas within the municipal limit of a Town/ City

after classification of the area by CTP / STP/ DTP.

4. The Board may grant consent to operate to the entire existing green

category of industries in mixed category areas or predominantly industrial

areas.

5. The Board may grant „consent to operate‟ to old red category of industries

operating in approved residential areas or mixed areas but required to be

shifted, if they have installed adequate effluent treatment plants and air

pollution control devices as per below:

i) Initial consent to operate shall be for a period of one year with the

condition that it shall shift to the designated industrial area within

stipulate period.

Page 159: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 198 -

ii) The Board may further extend this period or merit after the expiry of

one year in the rarest of the cases subject to the approval of the

Board of Directors.

Accordingly, Board order no. GPC/1999-2000/Gen-434/F-1 dated

16/8/2000 was issued to notify the above said decision of the Board.

This issue was again considered by the Board in its 108th meeting

held on 29/9/2000 and the Board decided to replace clause no. 2 of the above said

Board order as under:

"No red category of industries shall be given „consent to establish‟ within

area of the Municipal Corporation / Committee limits except in the

designated industrial areas declared by the CTP/STP/DTP and also in the

areas classified by Department of Industries and Commerce through press

note or circular issued by them from time to time besides the areas /

industries exempted by the Government, while acquiring land for such

purposes".

The Board in its 109th meeting held on 25/1/2001 further decided that

the clause no. 5 of the Board order dated 16/8/2000 regarding grant of „consent to

establish‟ / „consent to operate‟ to the industries situated in the non-designated

areas of the State will be restricted only to 5 cities namely Ludhiana, Jalandhar,

Amritsar, Batala and Mandi Gobindgarh.

The Board order no. GPC/1999-2000/Gen-434/F-1 dated 16/8/2000

stands partially amended as per the decisions taken by the Board in its 108th

meeting held on 29/9/2000 and 109th meeting held on 25/1/2001 as per above.

Sd/- (Ajay Kumar Mahajan)

Chairman

Endst no Admn./S.A-2/F.No.178/2000/10986-11014 Dated 11/4/2001

A copy of the above is forwarded to the following for information &

necessary action:

1. The Senior Environmental Engineer-I/II/III/IV, Punjab Pollution Control Board, Ho, Patiala.

2. The Senior Scientific Officer, Punjab Pollution Control Board, Patiala. 3. The Deputy Secretary (P&G), Punjab Pollution Control Board, Patiala. 4. The Environmental Engineer-1 /2/3/4/CSA/Const./General, Punjab Pollution

Control Board, Head Office, Patiala.

Page 160: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 199 -

5. The Zoning Atlas, Punjab Pollution Control Board, Ludhiana. 6. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/ Ludhiana-1 / 2 /Jalandhar / Amritsar / Hoshiarpur / Batala / Sangrur / Bathinda / Faridkot and Nodal Office, Chandigarh.

7. The Deputy Controller (F&A), Punjab Pollution Control Board, Patiala. 8. The Asstt. Personnel Officer / Law Officer, Punjab Pollution Control Board,

Head Office, Patiala.

Sd/- ( B.N. Gupta )

Administrative Officer for Member Secretary

Page 161: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 200 -

Annexure-43

PUNJAB POLLUTION CONTROL BOARD VATAVATAN NABHA ROAD, PATIALA

BOARD ORDER

Office Order no. 1 Dated.

23/5/2001

The Punjab Government has prescribed the following time period for

deciding the „consent to establish‟ applications of various industries.

Red Category Within one month after submission of complete application.

Green category

i) Moderately Polluting Within one month after submission of complete application

ii) Marginally Polluting Within 15 days after submission of complete application.

However, it has been observed that a no. of consent applications are

not disposed off by the Board within the above said prescribed period. Sometimes,

the show cause notice is issued to the industry on the last date of the expiry of

prescribed time period. In view of the above, it has been decided that henceforth

the following procedure shall be adopted for dealing „consent to establish‟

applications of various industries.

1. Regional Offices should convey the observations, if any, on the application

of the industry within 2 days from the date of receipt of application. No

observations at the later stage be raised after the first set of queries are

raised.

2. Cases of the green category of industries which fall in the competency of

Regional Offices should be decided within the prescribed time period failing

which Environmental Engineers of the Regional Offices will be held

personally responsible for the delay.

3. Where the „Consent to establish‟ application falls in the competency of Head

Office, such applications maybe sent to Head Office within a period of 15

Page 162: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 201 -

days from the date of receipt of applications after completing all the

formalities.

4. As soon as „consent to establish‟ application is received in the Head Office,

the same may be sent to the concerned Environmental Engineer by the

Administrative Officer and photocopy of the forwarding letter may be sent in

the dak for the information of the Chairman / Member Secretary.

5. Environmental Engineers, Consent Management Cell should get all „consent

to establish‟ applications cleared from the Competent Authority at personal

level and ensure that time does not over-shoot in any case.

Sd/- Chairman

Endst No.Gen/F.No./Gen-192/2001/2237-2262 Dated : 23/5/2001

A copy of the above is forwarded to the following for information &

necessary action :

1. The Senior Environmental Engineer-I/II/III/IV, Punjab Pollution Control Board, Head Office, Patiala.

2. The Senior Scientific Officer, Punjab Pollution Control Board, Patiala. 3. The Environmental Engineer, Punjab Pollution Control Board, CMC-

I/II/III/IV/CSA/MSW/Gen-I/II, Head Office, Patiala. 4. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/ Ludhiana-1 / 2 /Jalandhar / Amritsar / Hoshiarpur / Batala / Sangrur / Bathinda / Faridkot and Nodal Office, Chandigarh.

5. The Deputy Secretary (P&G), Punjab Pollution Control Board, Patiala. 6. The Administrative Officer, Punjab Pollution Control Board, Patiala 7. All Asstt. Environmental Engineers, Punjab Pollution Control Bod, Head

Office, Patiala. Sd/-

Senior Environmental Engineer-II

Page 163: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 202 -

Annexure-44

Punjab Pollution Control Board

Office Order Office order No. 2911 Dated: 10-8-2011

The Punjab Pollution Control Board in its 111th meeting held on 9.7.2001

vide item No. 111.04 considered the matter regarding change in the definition of

capital investment for the purpose of calculating consent fee and approved the

proposal for change in definition of 'Capital Investment' prescribed under the

Punjab State Board for the Prevention & Control of Water Pollution Rules, 1977 and

any other rules as may be notified or modified by the Government. The definition

of 'Fixed Capital Investment' shall be as notified by Director of Industries &

Commerce, Punjab Vide notification No. Inc.11/15/43/96-5/IB/4176 dated 1st June,

1996 in its industrial policy or in consequent amendment or notification carried out

or to be carried out from time to time for the purpose of defining fixed capital

investment definition.

The consent fee shall be charged by the Board on the basis of "Fixed Capital

Investment" certificate issued by the General Manager, Distt. Industries Centre or

by the certifying Chartered Accountant regarding Fixed Capital Investment.

Sd/-

Chairman Endst. No. Gen/F.No.GEN-192/2001/2912-3000 Dated: 10-8-2001

A copy of the above is forwarded to the following for information and

necessary action:-

1. The Sr. Environmental Engineer-I/II/III/IV, Punjab Pollution Control Board,

Patiala.

2. The Senior Scientific Officer, Punjab Pollution Control Board, Head Office,

Patiala.

Page 164: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 203 -

3. The Environmental Engineer, Punjab Pollution Control Board, Consent

Management Cell-I/II/III/IV/V, CSA/MSW/General-I/II, Head Office, Patiala.

4. The Environmental Engineer, Punjab Pollution Control Board, Zoning Atlas,

Ludhiana.

5. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office,

Amritsar/Jalandhar/Patiala/Gurdaspur/Bathinda/Faridkot/Hoshiapur/Sangrur/

Ludhiana-I/II & Nodal Office, Chandigarh.

6. The Deputy Secretary (P&G), Punjab Pollution Control Board, Patiala.

7. The Administrative Officer, Punjab Pollution Control Board, Patiala.

8. The Deputy Controller (F&A), Punjab Pollution Control Board, Patiala.

9. All Asstt. Environmental Engineer, Punjab Pollution Control Board, Patiala.

10. All Industrial Association in Punjab.

Sd/-

( Sandeep Behl ) Environmental Engineer-II(GPC)

Page 165: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 204 -

Annexure-44

Punjab Pollution Control Board

Office order No. 2 Dated: 16-9-2002

Office Order

Subject: Amendment in the exemption from obtaining Consent to Establish (NOC)/Consent to Operate an industrial Plant under the Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981.

The Board in its 115th meeting held on 2.8.2002, decided to amend

the condition No. 1 approved by the Board in its 107th meeting held on 7.7.2000 for

exemption of 95 types of industries under tiny/small scale sector from obtaining

consent of the Board under the provisions of Water (Prevention & Control of

Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 and

Hazardous Waste(Management & Handling) Rules, 1989. Accordingly, in

superceding the condition No. 1 of the Board's office order No. EE-I/Gen-

1/F.No.Gen-214/F2 dated 31.8.2000 which will, now be read as:

"That the industry is established/being established in the demarcated industrial Estates/Zones classified by the State authorities vizPSIEC, Department of Industries, PUDA, CTP under draft Master Plan or in mixed category area or predominantly industrial areas within Municipal Limit of a Town/City after classification of the area by CTP/STP/DTP".

All other conditions remains the same.

Sd/- Chairman

Endst.Office order No. GPC/EE-II/2002/GEN-214/6739-99 Dated: 16-9-2002 A copy of the above is forwarded to the following for information and

necessary action:-

1. The Sr. Environmental Engineer-I/II/III/IV, Punjab Pollution Control Board,

Patiala.

2. The Senior Scientific Officer, Punjab Pollution Control Board, Head Office,

Patiala.

Page 166: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 205 -

3. The Environmental Engineer, Consent Management Cell-I/II/III/IV/V,

CSA/MSW/BMW/General-I/II, Punjab Pollution Control Board , Patiala.

4. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office,

Amritsar/Jalandhar/Patiala/Gurdaspur/Bathinda/Faridkot/Hoshiapur/Sangrur/

Ludhiana-I/II & Nodal Office, Chandigarh.

5. The Deputy Secretary (P&G), Punjab Pollution Control Board, Patiala.

6. The Administrative Officer, Punjab Pollution Control Board, Patiala.

7. All Asstt. Environmental Engineer, Punjab Pollution Control Board, Patiala.

Sd/- ( Malwinder Singh )

Senior Environmental Engineer –II

Page 167: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 206 -

Annexure-46

Punjab Pollution Control Board

Office Order Office order No. 3 Dated: 16-9-2002 Subject: Simplification of the procedure for grant of consent to

establish (NOC) to the Small Scale Green Category units.

The Board in its 115th meeting held on 2-8-2002 to encourage the

industries to come in the designated / demarcated industrial areas, decided that

the consent to establish (NOC) to the green category units proposed to be located

in the designated /demarcated industrial areas classified by the State Authorities

like PSIEC/DOI etc. shall be granted within 48 hours on the basis of their self

certification. However, if at the latest stage, it is found that the industry has given

wrong information, then the industry will be responsible for misguiding the Board

and action will be taken for revoking of consent to establish (NOC) and closure of

the industry. However, for the Red Category units and Green Category in other

areas, the procedure shall remain the same as already in practice.

Sd/- Chairm

an Endst.office order No.GPC/EE-11/2002/Gen-214/6800-60 Dated: 16-9-2002 A copy of the above is forwarded to the following for information and

necessary action:-

1. The Sr. Environmental Engineer-I/II/III/IV, Punjab Pollution Control Board, Patiala. 2. The Senior Scientific Officer, Punjab Pollution Control Board, Head Office, Patiala. 3. The Environmental Engineer, Punjab Pollution Control Board, Consent

Management Cell-I/II/III/IV/V, CSA/MSW/BMW/General-I/II, Head Office, Patiala.

4. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Amritsar/Jalandhar/Patiala/Gurdaspur/Bathinda/Faridkot/Hoshiapur/Sangrur/Ludhiana-I/II & Nodal Office, Chandigarh.

5. The Deputy Secretary (P&G), Punjab Pollution Control Board, Patiala. 6. The Administrative Officer, Punjab Pollution Control Board, Patiala.

7. All Asstt. Environmental Engineer, Punjab Pollution Control Board, Patiala.

Page 168: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 207 -

Sd/- ( Malwinder Singh )

Senior Environmental Engineer –II

Annexure- 47

Punjab Pollution Control Board, Vatavaran Bhawan, Patiala

No. Admn/SA-4/F.No.96/2003/150

Dated:27-3-2003 Office order No.

The Board in its 118th meeting held on 10-3-2003 vide item no. 118.09

delegated the following powers to Senior Environmental Engineer under the Water

Act, 1974 and Air Act, 1981 as under:-

i) To grant/refuse consents / NOC to Small Scale Red Category

industries.

ii) To take action against small scale Industries u/s 41 to 48 of the

Water Act, 1974 and u/s 37 to 41 of the Air Act, 1981.

iii) To issue directions to all the categories of industries in small scale

sector u/s 33-A of the Water Act, 1974 and/or u/s 31-A of the Air Act,

1981.

2) The Board also noted that the Environmental Engineer of Regional

Office/Nodal Office, have already been delegated the powers for

grant of consent to establish (NOC)/consent to operate and to refuse

the consent to establish (NOC)/consent to operate to green category

units in small scale sector under Water (Prevention & Control of

Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act,

1981 and shall continue to exercise these powers.

However, the above powers shall be subject to :

a) Guidelines to be prescribed by the Board from time to time to

grant /refuse consent/NOC, prosecute or order closure of the

industry.

b) The Chairman may suo moto or on request by any person

concerned take action in any case which is pending before any

officer of the Board.

Page 169: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 208 -

3) The above delegations will come into effect immediately.

Sd/- (N.S. Tiwana)

Chairman

Page 170: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 209 -

Annexure- 48

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

Ph: 2215793, 2215802 PBX: 2200282, Extn. 210 FAX: 0175- 2215636, 2215802 Email address:[email protected] Web: www.ppcb.gov.in

No. EE (EPA)/ 2003/3987-408 Date: 5-11-

2003 To The Senior Environmental Engineer, Punjab Pollution Control Board, Head Office, Patiala. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Jalandhar/Patiala/Ludhiana. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/Ludhiana-I/II/Jalandhar/

Hoshiapur/Batala/Faridkot/Amritsar Sangrur/ Bathinda/ Nodal Office, Chandigarh.

The Environmemntal Engineer(L/J/P)/

GPC-I/ Const./EPA/EPS, Punjab Pollution Control Board, Head Office, Patiala. Sub: Policy to be adopted for installation of sewage treatment

plant for colonies proposed to be established/being established.

It has been decided to adopt following policy for installation of

sewage treatment plant for colonies proposed to be established/being established:-

If the colony is proposed to establish /being established within the municipal

limits of a city/town of the State and proposes to discharge its entire

sewage into one sewer and the local body of that city / town has no

proposal for installation of sewage treatment plant, then the promoter of the

colony shall submit feasibility report and install adequate and appropriate

individual sewage treatment plant.

Page 171: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 210 -

If the colony is proposed to establish /being established within the municipal

limit of a city/town of the State and proposes to discharge its entire sewage

into sewer and the local body of that city town has a proposal to install

sewage treatment plant or that city /town is covered under the Sutlaj Action

Plan/West Bein Project /PUDA STP project, then the promoter of the colony

shall not be insisted upon by the Board for installation of individual sewage

treatment plant.

If the colony is proposed outside the municipal limit of a city/town of the

State and the promoter gives undertaking to discharge its entire sewage into

sewer having sufficient capacity by laying his own sewer line up to the

sewage of that city / town and the local body of that city / town has no

proposal for installation of sewage treatment plant, then the promoter of the

colony should install adequate and appropriate individual sewage treatment

plant.

If the colony is proposed outside the municipal limit of a city/town of the

State and the promoter gives undertaking to discharge its entire sewage into

sewer having sufficient capacity by laying his own sewer line up to the

sewage of that city / town and the local body of that city / town has a

proposal to install sewage treatment plant or that city/town is covered under

the Sutlaj Action Plan/West Bein Project /PUDA STP project, then the

promoter of the colony should not be insisted upon by the Board for

installation of individual sewage treatment plant.

If the colony is proposed to establish/being established outside the

municipal limit of a city/town of the State and the promoter has no facility

for discharge of sewage into sewer, then, the promoter should install

individual adequate sewage treatment plant and the promoter should also

submit the distribution scheme of sewage for discharge of sewage onto land

for irrigation/forestry.

This will come into effect immediately and issued with the approval of

worthy Chairman.

Sd/- ( Malwinder Singh )

Member Secretary

Page 172: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 211 -

Annexure-49

Punjab Pollution Control Board, Vatavaran Bhawan, Patiala

No. Admn/SA-4/F.No.783/2004/419

Dated:4-10-2004 Office order

In supersession of this office order no. Admn/A-5/F.No.783/2004/355 dated

9-8-2004, the following officers of the Board are, hereby, authorized to sign the

orders of directions/restoration under section 33-A of the Water (Prevention &

Control of Pollution) Act, 1974, 31-A of the Air (Prevention & Control of Pollution)

Act, 1981 and the Hazardous Waste (Management & Handling) Rules, 1989, u/s 5

of the Environment (Protection) Act, 1986 for and on behalf of Chairman Punjab

Pollution Control Board after the approval has been granted on the concerned

office file.

Sr. No. Scale of industry Authority

1. Large/Medium scale Member Secretary

2. Small Scale Senior Environmental Engineer, Zonal Office,

Patiala/Ludhiana & Jalandhar/Senior Scientific

Offier, Head Office, Patiala.

These orders shall take effect immediately.

Sd/- Tripat Rajinder Singh Bajwa

MLA Chairman

Endst. No. Admn/SA-1/F.N.783/2004/19636-71 Dtd. 4-10-

2004

A copy of the above is forwarded to the following for information and

necessary action please:

1. The Chairman, Punjab State Electricity Board, Head Office, Patiala.

2. The Director, Food & Supplies, Punjab, Chandigarh.

3. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal

Office, Patiala/Ludhiana & Jalandhar.

Page 173: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 212 -

4. The Senior Environmental Engineer (EPA), Punjab Pollution Control Board,

Patiala.

5. The Senior Scientific Officer, Punjab Pollution Control Board, Patiala.

6. The Deputy Secretary (P&G) Punjab Pollution Control Board, Camp Office,

Chandigarh.

7. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/Ludhiana-I/II/III/Jalandhar / Amritsar / Hoshiarpur / Batala /

Sangrur / Bathinda /Faridkot and Nodal Office, Chandigarh/EPS, Ludhiana.

8. The Environmental Engineer

(HQ)/P/J/L/CSA/Const./HWM/Computerization/EPS/EPA, Punjab Pollution

Control Board, Patiala.

9. The Deputy Controller(F&A)Punjab Pollution Control Board, Patiala.

10. The Asstt. Personal Officer /PS to Chairman/PA to Member Secretary /Law

Officer, Punjab Pollution Control Board, Patiala.

Sd/- ( Malwinder Singh )

Member Secretary

Page 174: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 213 -

Annexure- 50

Punjab Pollution Control Board

VatavaranBhawan, Nabha Road,Patiala CSA/04/P-48/427

Dated : 08.10.2004 OFFICE ORDER

Whereas 32 categories of projects are covered under the Environment

Impact Assessment Notification 1994 which are required to obtain environmental

clearance from GOI, MoEF, Public hearing is required to be conducted by the State

Pollution Control Board covered under this notification. The whole process of public

hearing takes about 3-4 months time.

And whereas, many of these 32 categories are also required to obtain

environmental clearance by the State Competent Authority as required under Press

Note 17 (1984 series) of GOI, Ministry of Environment & Forests.

And whereas, as per the present procedure, the State Competent Authority

considers the grant of environmental clearance only after the public hearing which

take another 40-45 days. As such, the total time taken for the grant of

environmental clearance by the State Competent Authority comes out to be about

5 months i.e. (150 days).

And whereas, to cut short this time, following suggestions were placed

before the Board in its 123th meeting, vide item no. 123.15 held on 6/9/2004 and

decided as under:-

That CSA-cum-SAC should consider the environmental clearance in its meeting without waiting for the public hearing. This clearance can be granted subject to the clearance in the public hearing.

That all the Deputy Commissioners of the Districts in the State may be requested to prepare a Standing Panel of members for conducting personel hearings. They should provide this panel to the Board within 15 days. The panel should also include the Commissioners of Municipal Corporations.

In view of the above decisions of the Board, comments of the Board, in

cases should be sent to CSA-cum-SAC without waiting for the public hearing.

This order come into force with immediate effect.

Sd/- Tripat Rajinder Singh Bajwa

MLA Chairman

Page 175: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 214 -

Endst. No. Admn/SA-5/F.N.783/2004/20113-35 Dtd. 8-10-

2004

A copy of the above is forwarded to the following for information and

necessary action please:-

1. The Senior Environmental Engineer (EPA) Punjab Pollution Control Board,

Patiala.

2. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal

Office, Patiala/Ludhiana & Jalandhar.

3. Senior Scientific Officer, Punjab Pollution Control Board, Patiala.

4. The Deputy Secretary (P&G) Punjab Pollution Control Board, Camp Office,

Chandigarh.

5. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/Ludhiana-I/II/III / Jalandhar / Amritsar / Hoshiarpur / Batala

/ Sangrur / Bathinda /Faridkot and Nodal Office, Chandigarh/HWM/EPS,

Ludhiana.

Page 176: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 215 -

Annexure- 51

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

Ph: 2215793, 2215802 PBX: 2200282, Extn. 210 FAX: 0175- 2215636, 2215802 Email address:[email protected] Web: www.ppcb.gov.in

No. 473

Date: 17-11-

2004

Office order

It has been decided to delegate power to Senior Environmental Engineer „s,

Zonal Offices to grant consent to establish/operate to common effluent treatment

plant, where common effluent treatment plant are installed/in use exclusively for

the small scale industries, Senior Environmental Engineer, Zonal Office, shall grant

consent to such a common effluent treatment plant after ensuring that the treated

trade effluent discharge conforms to the standards prescribed by the Board for

such nature of discharges. After the grant of the consent, Zonal Office will be

required to send a copy of the consent granted to respective branch in the Head

Office dealing with the subject matter of Common Effluent Treatment Plant.

2. Power to grant consent to common effluent treatment plant„s other than

exclusively for small scale industries will remain with Chairman of the Board ,

however, Zonal Offices/Regional Offices shall intimate the complete consent status

and pollution control arrangements provided by each industrial unit discharging

effluents in the common effluent treatment plant‟s with clear-cut recommendations

in the matter, while sending consent cases of common effluent treatment plant to

Head Office.

These orders will be applicable with immediate effect.

Sd/- Tripat Rajinder Singh Bajwa

MLA Chairman

Page 177: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 216 -

Endst. No. Admn/SA-5/F.N.783/2004/22130-62 Dtd. 17-11-

2004

A copy of the above is forwarded to the following for information and

necessary action please:-

1. The Senior Environmental Engineer (EPA) Punjab Pollution Control Board,

Patiala.

2. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal

Office, Patiala/Ludhiana & Jalandhar.

3. Senior Scientific Officer, Punjab Pollution Control Board, Patiala.

4. The Deputy Secretary (P&G) Punjab Pollution Control Board, Camp Office,

Chandigarh.

5. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/Ludhiana-I/II / III / Jalandhar / Amritsar / Hoshiarpur / Batala

/ Sangrur / Bathinda /Faridkot and Nodal Office, Chandigarh/HWM/EPS,

Ludhiana.

6. The Environmental Engineer (P/J/L/)CSAHWM/Const. /Computer Punjab

Pollution Control Board, Patiala.

7. The Deputy Controller(F&A)Punjab Pollution Control Board, Patiala.

8. The Asstt. Personal Officer/Law Officer /PS to Chairman/PA to Member

Secretary, Punjab Pollution Control Board, Patiala.

Sd/- ( B.N. Gupta )

Administrative Officer

Page 178: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 217 -

Annexure- 52

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

Ph: 2215793, 2215802 PBX: 2200282, Extn. 210 FAX: 0175- 2215636, 2215802 Email address:[email protected] Web: www.ppcb.gov.in

Office order

No. GPC/GEN/2004/214/8 Date: 11.10.2014

Subject: Review of the validity period of consent to operate granted

by the Board under the provisions of Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 .

The Board in its 123th meeting held on 6/9/2004 considered the

subject cited matter and reviewed the rate of consent fee to be charged and

validity period of consent granted by the Board under the provisions of Water

(Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of

Pollution) Act, 1981. The Board decided that onward the validity period of grant of

consent and the rate of consent fee to be charged from the industries under the

said Acts, in the State of Punjab will be as per the following policy:

Sr. No. Particulars Maximum validity

period

1. First time after obtaining consent to

establish irrespective of category of units

One year

2. All large and medium scale industries Five years

3. Small scale industries (Red Categories) Five years

4. Small scale industries (Green Categories) 15 years

5. Units with ISO-14000 certificate

irrespective of category (Not for fresh

cases)

One year over and above

the period specified at Sr.

No. 2&3

2. Rate of consent fee to be charged from the industries at Sr. No. 2&3 for

grant of consent under the provisions of Air (Prevention & Control of Pollution) Act,

1981 and Water (Prevention & Control of Pollution) Act, 1974 will be as per

Annexure‟ A‟ attached herewith.

Page 179: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 218 -

3. Rate of consent fee to be charged from the industries at Sr. No. 4 for grant

of consent under the provisions of Air (Prevention & Control of Pollution) Act, 1981

and Water (Prevention & Control of Pollution) Act, 1974 will be as per Annexure‟ A‟

attached herewith. However, the Board shall continue to charge application fee

from the industries falling under green category @ 50% of the consent fee to be

charged for 15 years.

4. Consent to the industries may be granted, even for lesser period specified

above, where the industry apply for consent to operate for lesser period due to

poor financial position or industry is taken on lease for a limited period or due to

administrative reasons for implementation of the provisions of Water (Prevention &

Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act,

1981.

5. Separate consent fee will continue to be charged under the provisions of

Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control

of Pollution) Act, 1981.

These order only supersedes the orders/circulars issued pertaining to validity

period of consent granted and the rate of consent fee charged from the industries

under the provisions of Water (Prevention & Control of Pollution) Act, 1974 and Air

(Prevention & Control of Pollution) Act, 1981.

These orders will be applicable with effect from 01/02/2004.

-Sd- Tripat Rajinder Singh Bajwa

MLA Chairman

Endst. No. GPC/GEN/2004/ 214/20855-81 Dated: 11-10-2004

A copy of the above is forwarded to the following for information and

necessary action:-

1. The Sr. Environmental Engineer, Punjab Pollution Control Board, HQ-

II/EPA/Head Office Patiala.

2. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal

Office, Patiala/Ludhiana/Jalandhar.

3. Environmental Engineer-L/P/J/EPA/HWM/EPS(P)/ EPS(L)/HQ, Punjab

Pollution Control Board, Head Office, Patiala.

Page 180: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 219 -

4. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office,

Patiala/Amritsar/Jalandhar/Hoshiarpur/Batala/Sangur/Bathinda/Faridkot/

/Ludhiana-I/II/III & Nodal Office, Chandigarh.

5. The Deputy Controller (F&A), Punjab Pollution Control Board, Patiala.

6. All Asstt. Environmental Engineers of the Board.

D.A./As above.

Sd/- ( Malwinder Singh )

Member Secretary Endst. No. GPC/GEN/2004/ 214/ Dated:

A copy of the above is forwarded to the following for circulation to industrial

Associations in the State of Punjab:-

1. The Chief Coordinator, Udyog Sahak, DOI, Udyog Bhawan, Sector-17,

Chandigarh.

2. CII, Punjab State Council,Sector-31-A, Chandigarh.

D.A./As above.

Sd/- Member Secretary

Page 181: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 220 -

Annexure-‘A’

Sr. No.

Particulars Application fee to be

charged for obtaining consent to establish

Application fee to be

charged for obtaining consent to operate for

one year

Application fee to be

charged for obtaining consent to operate for five years

Application fee to be

charged for obtaining consent to operate for

fifteen years

1. 2. 3. 4. 5. 6.

1. Industries having total investment upto Rs. 10.00 lacs

500 500 1000 7500

2. Industries having total investment exceeding Rs. 10.00 lacs but not exceeding Rs. 25.00 lacs.

750 750 2500 11250

3. Industries having total investment exceeding Rs. 25.00 lacs but not exceeding Rs. 50.00 lacs.

1250 1250 6250 18750

4. Industries having total investment exceeding Rs. 50.00 lacs but not exceeding Rs. 1.00 Crore.

2500 2500 12500 37500

5. Industries having total investment exceeding Rs. 1.00 Crores but not exceeding Rs. 5.00 Crore.

5000 5000 25000 75000

6. Industries having total investment exceeding Rs. 5.00 Crores but not exceeding Rs. 10.00 Crore.

10000 10000 50000 150000

7. Industries having total investment exceeding Rs. 10.00 Crores but not exceeding

20000 20000 100000 300000

Page 182: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 221 -

Rs. 25.00 Crore.

8. Industries having total investment exceeding Rs. 25.00 Crores but not exceeding Rs. 50.00 Crore.

30000 30000 150000 450000

9. Industries having total investment exceeding Rs. 50.00 Crores but not exceeding Rs. 100.00 Crore.

40000 40000 200000 600000

10. Industries having total investment exceeding Rs. 100.00 Crores but not exceeding Rs. 200.00 Crore.

50000 50000 250000 750000

11. Industries having total investment exceeding Rs. 200.00 Crores

100000 100000 500000 1500000

NOTE:

i) The application fee to be charged from the industries falling under

green category, as notified by the Board from time to time, shall

be the 50% of the consent fee to be charged.

ii) Separate consent fee shall be charged under the provisions of

Water (Prevention & Control of Pollution) Act, 1974 and Air

(Prevention & Control of Pollution) Act, 1981.

Page 183: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 222 -

Annexure- 53

Punjab Pollution Control Board, Head Office, Patiala No. CSA/06/P-48/7845

Dated: 08-12-2006 Office Order

The Board in its 133th meeting held on 26/10/2006, while discussing the

matter regarding shifting of industries from non-designated areas has taken a

serious view about the industries which, though, are operating in the designated

areas but are not properly operating their pollution control devices and also have

made substantial expansions creating problem to the existing infrastructure

available in the designated area. The Board, therefore, desired that to ensure

regular operation of pollution control devices, the industries be directed to :

1. Provide separate energy meters on their pollution control devices.

2. Maintain chemical register showing the consumption of chemicals for

running the pollution control devices.

3. Provide manhole outside the premises of the industry for collection of

sample of the trade effluent without entering the industry.

4. Direct the industry to stick to original capacity for which the infrastructure

such as CETP/Sewerage grid etc. are designed and in case the industry

wants to enhance the capacity over and above the designed capacity, it

would be required to take care of the additional quantity of the effluent,

itself without damaging the existing infrastructure.

All the industries discharging their effluent should be directed to comply with

the above decisions of the Board.

Sd/-

Tripat Rajinder Singh Bajwa MLA

Chairman

Page 184: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 223 -

Endst. No. Admn/SA-2/F.N.784/2006/873-98 Dated : 15.01.2007

A copy of the above is forwarded to the following for information and

necessary action please:-

1. The Senior Environmental Engineer (EPA/HQ), Punjab Pollution Control

Board, Patiala.

2. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal

Office, Patiala/Ludhiana & Jalandhar.

3. Senior Scientific Officer, Punjab Pollution Control Board, Patiala.

4. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/Ludhiana-I /II / III / Jalandhar / Amritsar / Hoshiarpur /

Batala / Sangrur / Bathinda /Faridkot and Nodal Office, Mohali.

5. The Environmental Engineer /P/J/L/EPA/EPS/ Punjab Pollution Control

Board, Patiala.

6. The Environmental Engineer (HWM)Punjab Pollution Control Board,

Patiala/Ludhiana.

7. The Administrative Officer, Punjab Pollution Control Board, Head Office,

Patiala.

Sd/- ( Birinderjit Singh ) Member Secretary

Page 185: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 224 -

Annexure- 54

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

Ph: 2215793, 2215802 PBX: 2200282, Extn. 210 FAX: 0175- 2215636, 2215802

Email address:[email protected] Web: www.ppcb.gov.in

OFFICE CIRCULAR

Computer/07/53 Dated: 09.02.2007

It has been noticed that violation of various provisions of the Water

Act, 1974 and Air Act, 1981 by the industries as observed by Regional

Offices, are not concluded to their logical end and the matter remains

pending at various levels due to one reason or the other.

It is, therefore, decided that in future, copy of all such notice issued

to the industries for violation of various provisions of Water Act, 1974 & Air

Act, 1981 by Regional Offices, Zonal Offices/Head Office, shall be endorsed

to the Environmental Engineer (Computer) in Head Office for keeping

record/monitoring purpose. After entering data into the MIS, the copies of

such notices will be forwarded to SEE(Headquarters), for monitoring till the

notices come to a logical end.

These orders will come into force immediately.

Sd/- (BirinderjitSingh ) Member Secretary

Endst.No. Computer/07/3298-3317 Dated: 9-2-2007

A copy of the above is forwarded to the following for information and

compliance. It is also requested that the list of the pending notices alongwith

number and date issued to the industries for violation of the various provisions of

the Water Act and Air Act as on 31.1.2007, may be supplied to Environmental

Engineer (Computer), Head Office, Punjab Pollution Control Board, Patiala within 7

days, as per the MIS performa attached:-

1. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal

Office, Patiala/Ludhiana & Jalandhar.

Page 186: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 225 -

2. Senior Environmental Engineer(Headquarter), Punjab Pollution Control

Board, Patiala.

3. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/Ludhiana-I /II / III / Jalandhar / Amritsar / Hoshiarpur /

Batala / Sangrur / Bathinda /Faridkot and Nodal Office, Mohali.

4. The Environmental Engineer (P/J/L/Comp.) Punjab Pollution Control Board,

Head Office, Patiala.

D.A./As above.

Sd/- (Birinderjit Singh ) Member Secretary

Page 187: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 226 -

CIMS Form-A-11/12

Notice u/s 33-A /U/S 31-A (Please use capital letters to fill the form)

_______________________________________________________________

Form No. .................................

Industry Code ..........................

Industry Name &Address ..................................................................................... ..................................................................................... ..................................................................................... ..................................................................................... Notice No. .............. Date of issue ............/........... Date of

hearing....../..../.........

Decision of hearing

................................................................................................

............................................................................................................

............................................................................................................

........................................ Final Status(Tick appropriate option)

Dropped/Pending/Decided

Remarks .................................................................................................................

............................................................................................................

............................................................................................................

........................................

Description Name Designation Signature

Entered by

Authorized

Page 188: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 227 -

by

CIMS Form-A-13/14

Direction u/s 33-A /u/s 31-A (Please use capital letters to fill the form)

_______________________________________________________________

Form No. .................................

Industry Code ..........................

Industry Name &Address ..................................................................................... ..................................................................................... ..................................................................................... Notice No. .............. Date of issue ............/........... Direction issued .................................................................................................... ................................................................................................................................................................................................................................................................ Status of Compliance ............................................................................................. ................................................................................................................................................................................................................................................................ Latest Status ......................................................................................................... ................................................................................................................................................................................................................................................................ Remarks ................................................................................................................. ................................................................................................................................................................................................................................................................

Description Name Designation Signature

Entered by

Authorized

by

Page 189: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 228 -

Annexure- 55 Punjab Pollution Control Board, Head Office, Patiala

No. 210/PTA/12 Dated: 15-5-2007

Office Order

The Board has recognized laboratories u/s 17 (2) of the Water Act,

1974 and u/s 17(2) of the Air Act, 1981 for the analysis of Physical,

Chemical, Metals, Organic & Micro-biological parameters in the effluent,

stack and ambient air samples. As per the terms and conditions of the

Recognition Certificates, the laboratories are required to intimate their

programme normally two days in advance to the concerned Regional Offices

to monitor an industry. In case, the pre-decided programme is changed

during the day, the Regional Office will be informed on telephone/Fax

immediately before or after monitoring. Regional Offices will send a

consolidated report of each laboratory by 10th of next month.

Now, it has been decided by the Board that whenever any recognized

laboratory u/s 17 (2) of the Water Act, 1974 and u/s 17(2) of the Air Act,

1981 intend to collect effluent and / or air emission samples on the request

made by the industry / Board, the said laboratories will inform to the

concerned Regional Offices of the Board well in advance and the

Environmental Engineer of the said office will depute his officer on the day

of sample collection of the industry and it will be ensured that the industry is

operating its all processes at optimum capacities.

The analysis results of the samples collected in violation of the

said instructions will not be accepted by the Board.

These orders will come into the force with immediate

effect.

Yogesh Goel Chairman

Endst. No.3564-77 Dtd. 15-05-

2007

Page 190: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 229 -

A copy of the above is forwarded to the following for information and

necessary action please:-

1. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/Ludhiana-I /II / III / Jalandhar / Amritsar / Hoshiarpur /

Batala / Sangrur / Bathinda / Faridkot and Nodal Office, Mohali.

2. M/s Shri Ram Institute for Industrial Research, 19, University Road, New

Delhi.

3. Thapar Centre for Industrial Research & Development, Bhadson Road,

Patiala.

Sd/- (Birinderjit Singh ) Member Secretary

Page 191: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 230 -

Annexure- 56

Punjab Pollution Control Board, Head Office, Patiala

BOARD NOTIFICATION No.GPC/F.No.133/Admn/F.No./783/2007/265 Date: 17-9-2007

The provisions of the Water (Prevention & Control of Pollution) Act,

1974 and the Air (Prevention & Control of Pollution) Act, 1981 made it

mandatory that each industrial unit should establish/operate with consent to

establish /operate from the State Board under these Acts. Accordingly,

under the provisions of section 25/26 of the Water (Prevention & Control of

Pollution) Act, 1974 and section 21 of the Air (Prevention & Control of

Pollution) Act, 1981, each industrial plant gets itself registered, in terms of

consent, with the Board. New Industrial Plants are commissioned after

obtaining consent to establish and clearance certificate from the Board for

release of electric connection by Punjab State Electricity Board. But some

times due to dispute between the partners/Directors of the Firms or some

other reasons such as financial loss or bankruptcy, the firms are closed by

owners of these industries without surrounding the electric connection. The

owners of such industries some time inform the Board about closing of their

unit. Accordingly, the Board closes the files of such industries maintained

under the provisions of Water (Prevention & Control of Pollution) Act, 1974,

the Air (Prevention & Control of Pollution) Act, 1981 and the Environment

(Protection) Act, 1986 .But it has been observed by the Board that with the

passage of time, these industries are sold or lease to new owners, which

start process/operation in such premises of highly polluting in nature. The

owners/lessee of these firms never apply to the Board for consent to

establish/operate as required under the provisions of said Acts and continue

to cause environmental pollution without taking any preventive measures.

The matter was placed before the Board in its 135th meeting held on

30/05/2007 and it was decided by the Board that in future whenever any

industry is closed on its own, its electric connection must be got

disconnected from the Punjab State Electricity Board so that it could not be

restarted without the NOC clearance of the Board. The PSEB will restore the

Page 192: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 231 -

electric connection on production of NOC/Consent obtained from Board by

the operator of new unit.

Sd/-

Yogesh Goel Chairman

Endst. No. GPC/F.No.133/2007/20474-514 Dtd.

17-09-2007

A copy of the above is forwarded to the following for information and

necessary action:-

1. The Secretary to Govt. of Punjab, Deptt. Of Science, Technology &

Environmental & Non Conventional Energy, Chandigarh.

2. The Director of Industries, Punjab 17-Bays Building, Sector-17, Chandigarh.

3. The Chairman, Punjab State Electricity Board, Head Office, Patiala.

4. The Chief Co-ordinator, Udyog Sahayak, Udyog Bhawan, 18 Himalaya Marg,

Sector-17, Chandigarh.

5. The Managing Director, State Govt. Industrial Development Corporations,

Sector-17, Chandigarh.

6. The Managing Director, Small Scale Industries & Export Corporation,

Chandigarh, Chandigarh.

7. The Managing Director, Punjab Financial Corporation, Sector 17,

Chandigarh.

8. The General Managers, all District Industrial Centres in Punjab.

9. The Chief Engineer (Commercial) Punjab State Electricity Board, Patiala.

10. The Director (Commercial) Punjab State Electricity Board, Patiala.

11. The Director Food & Supply, Punjab Sector 17, Chandigarh.

12. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal

Office, Patiala-I/II/Ludhiana / Jalandhar/GPC/HWM/BMW.

13. The Senior Scientific Officer, Punjab Pollution Control Board, Patiala.

14. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/Ludhiana-

I/II/III/Jalandhar/Amritsar/Hoshiarpur/Batala/Gurdaspur/Sangrur/ Bathinda

/Faridkot and Nodal Office, Chandigarh/GPC/HWM/BMW.

15. The Scientific Officer, Punjab Pollution Control Board, Patiala.

Page 193: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 232 -

16. The Administrative Officer, Punjab Pollution Control Board, Head Office,

Patiala.

17. The Deputy Controller(F&A)Punjab Pollution Control Board, Patiala.

18. The Public Relation Officer/Asstt. Personal Officer /PS to Chairman/PA to

Member Secretary Punjab Pollution Control Board, Patiala.

19. All Asstt. Environmental Engineer, Punjab Pollution Control Board.

Sd/- ( Birinderjit Singh ) Member Secretary

Page 194: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 233 -

Annexure- 57

Punjab Pollution Control Board, Head Office, Patiala

No. Admn/SA-2/F.No./2008/70

Dated: 10-03-2008

Office Order

It has been decided that if analysis results of trade effluent/emission

collected/analysed under the provisions of Water (Prevention & Control of

Pollution) Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981

/monitoring of industries fails to meet the norms prescribed by the Board for such

discharges, then any subsequent sampling, if industry desires, to monitor its trade

effluent/emission shall be undertaken with the permission of Board under the

supervisions of Board.

These orders will come into force with immediate effect.

Sd/- ( Yogesh Goel )

Chairman

Endst.No. SA-2/F.N. /2008/9922-34 Dtd. 10-03-

2008

A copy of the above is forwarded to the following for information and

necessary action:-

1. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Patiala-I/II/Ludhiana & Jalandhar.

2. The Senior Environmental Engineer (EPA/Lab/HQ), Punjab Pollution Control Board, Patiala.

3. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/Ludhiana-I /II / III / HWM Cell/ Jalandhar / Amritsar / Hoshiarpur / Batala / Sangrur / Bathinda /Faridkot and Nodal Office, Mohali.

4. The Environmental Engineer /P-I/II/J/L/EPA/Computer/Const./HQ, Punjab Pollution Control Board, Patiala.

5. The Deputy Controller (F&A)Punjab Pollution Control Board, Patiala. 6. Law Officer/Asst. Personnal Officer/Public Relation officer, Punjab

Pollution Control Board, Patiala. 7. PS to Chairman/PA to Member Secretary Punjab Pollution Control Board,

Patiala. Sd/-

(Birinderjit Singh)

Page 195: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 234 -

Member Secretary

Page 196: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 235 -

Annexure- 58

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

No. 27329-49 Date: 15-07-2008 To 1. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Patiala-I/II/Ludhiana/

Jalandhar.

2. The Senior Environmental Engineer(HQ), Punjab Pollution Control Board, Patiala.

3. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/Ludhiana-I/II/III/

Jalandhar/ Hoshiapur/Batala/Faridkot/Amritsar/ Sangrur/ Bathinda/ Nodal Office, Chandigarh.

4. The Environmental Engineer,

Punjab Pollution Control Board, Zonal Office, Patiala-I/II/Ludhiana/

Jalandhar. Sub: Regarding exercising of powers delegated to Senior

Environmental Engineers, Zonal Offices & Environmental Engineers, Regional Offices of the Board.

It is intimated that the Board vide Office Order No. Admn/SA-4/F-

96/2003/150 dated 27/03/2003 has brought out that the Board in its 118th meeting

held on 10-03-2003 vide item no. 118.09 delegated following powers to the Sr.

Environmental Engineers of the Board under the Water (Prevention & Control of

Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981:-

i) To grant /refusal of consent to establish/operate to Small Scale, Red

Category industries.

ii) To take action against small scale industries u/s 41 to 48 of the Water

Act, 1974 and u/s 37 to 41 of the Air Act, 1981.

Page 197: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 236 -

Further, the Board has also delegated powers to the Environmental

Engineer of the Regional Office/Nodal Office for grant/refusal of

consent to establish/operate to small scale industries falling under

green category under the Water (Prevention & Control of Pollution)

Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981.

But it has generally been noticed that the officers are not exercising

the powers delegated to them by the Board and sending the cases of their

competency to the higher authorities of the Board, which unnecessarily increases

the work load with them. It has also been noticed that cases of small scale

industries, where the report is to be sent to the Ministry of Environment &

Forests/Central Pollution Control Board/State Govt./ District Authorities, prior

approval of Chairman is not taken. The Chairman of the Board took a very serious

note of it.

It is, therefore, requested that in future, all the officers will exercise

the power delegated to them by the Board and decide the cases of their

comptetency on merits. Aslo, the cases of small scale industries, where the report

is to be sent to the Ministry of Environment& Forests/Central Pollution Control

Board/State Govt./District Authorities, prior approval of the Chairman of the Board

is required to be taken. In case of any deviation in exercising the powers as

delegated by the Board, will be viewed seriously.

Sd/- ( Dr. Babu Ram )

Member Secretary

Page 198: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 237 -

Annexure- 59

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD,PATIALA

No./Admn/SA-4/F-96/2003/264

Dated: 4/9/2008

OFFICE ORDER

The Water (Prevention & Control of Pollution) Act, 1974 provides that

the analysis results of a sample of any sewage or trade effluent collected u/s 21 of

the saidAct shall be admissible in evidence of any legal proceedings, in case, the

provisions of sub-sections(3), (4) & (5) are complied with.

The Board is practicing to collect monitoring grab or composite

samples of sewage or trade effluent where the adequacy of the STP/ETP is to be

ascertained. Further, the samples of sewage or trade effluent are collected u/s 21

of the Water (Prevention & Control of Pollution) Act, 1974, where any industry is

operating its industrial plant in violation of provisions of the said Act. But it has

generally been noticed that sewage or trade effluent samples are collected without

ascertaining the situation of the case, therefore, such analysis results of sewage or

trade effluent became futile exercise. As such, to overcome such type of hurdles, it

has been decided by the Chairman of the Board that:-

1. Samples of the sewage or effluent treatment plant is to be collected u/s 21

of the Water (Prevention & Control of Pollution) Act, 1974 strictly as per the

procedure laid down in the said section and the relevant Rule, from the final

outlet of the industry in the following cases.

i) Where no STP/ETP has been installed by the industry.

ii) Where the STP/ETP has been installed but the industry is persistent

violation in respect of achieving the standards as laid down by the

Board.

iii) The industry has adopted any bye-pass for discharge of sewage or

trade effluent from STP/ETP.

iv) In case, the industry is found operating the outlet without operating

the STP/ETP and even partially the components of the STP/ETP.

v) Any industry is found operating any unauthorized mode of disposal.

Page 199: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 238 -

2. Monitoring sewage or trade effluent samples is to be collected only when:

i) Where the industry has installed STP/ETP and the same is

found in operation and the samples of sewage or trade effluent

is to be collected first time.

ii) The industry has installed STP/ETP and the same is found in

operation and the previous record indicates that the industry is

achieving the standards laid down by the Board.

3. The sample collecting officer may collect samples of sewage or trade effluent

from different components of STP/ETP, if he feels so, to draw any inference

in the case as mentioned above at Para 1(ii)

All the concerned officer/official shall collect samples of trade effluent

or sewage strictly as stated above and any deviation in this regard will be viewed

seriously.

This issues with the approval of the Worthy Chairman of the Board.

Sd/- Member Secretary

Endst. No. Admn/SA-4/F-96/2003/33523-47 Dated 4/9/2008

A copy of the above is forwarded to the following of information and

necessary action:

1. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal

office-I/II, Patiala/Ludhiana/Jalandhar/HQ/EPA.

2. The Environmental Engineer, Punjab Pollution Control Board, Zonal office-

I/II, Patiala/Ludhiana/Jalandhar/HQ/EPA/ Computer.

3. The Environmental Engineer, Punjab Pollution Control Board, Regional office,

Patiala/Sangrur/Bathinda/Faridkot/LudhianaI/II/III/Jalandhar/Hoshiarpur/

Amritsar/ Batala & Nodal office, Mohali

Sd/- (Birinderjit Singh) Member Secretary

Page 200: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 239 -

Annexure- 60

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN, NABHA ROAD,PATIALA

OFFICE ORDER

No. 307

Dated 15/10/2008

In order to check the pollution potential and/ or monitor the

performance of the pollution control system installed by the industries, teams of

the officers of the Board are constituted from time to time. The mandate of the

teams is to check surprising the performance of the pollution control systems

installed by the industries to control water, air, noise and management of

hazardous waste/bio-medical waste/solid waste/any other pollution. However, it

has been observed that the inspection reports of the visiting teams are not

received in time and these are submitted even after period of one month from the

date of inspection of the industry. Thus, the very purpose of inspection of the

industry is defeated.

It has, therefore, been decided that all the inspection teams should

submit their inspection reports including the analysis results of effluent, air

emissions, noise levels, water samples, soil samples and any other parameters

pertaining to the particular industry within a period of 7 days from the date of

inspection of the industry. The visiting teams are liable to be answerable in case

the visiting reports are not received within the period of 7 days. Further, the Head

of Visiting Team will hand over the observation sheet including copy of data sheet

to the Member Secretary of the Board on the same day on which the industry is

inspected. Also, the Head of the team will attend the office of the Chairman with

complete documents on the day of hearing given to the industry for its violation

under the provisions of the various Environmental Laws/Rules.

These orders shall come into force with immediate effect.

Sd/- (Yogesh Goel)

Chairman

Page 201: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 240 -

Endst. No. 37973-38007 Dated 15/10/2008

A copy of the above is forwarded to the following of information and

necessary action:

1. The Senior Environmental Engineer,(EPA),(Computer),(HQ), Punjab Pollution

Control Board, Patiala.

2. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal

office-I/II, Patiala/Ludhiana/Jalandhar.

3. The Deputy Secretary, Punjab Pollution Control Board, Nodal office, Mohali.

4. The Environmental Engineer, Punjab Pollution Control Board, Regional office,

Patiala/Sangrur/Bathinda/Faridkot/LudhianaI/II/III/Jalandhar/Hoshiarpur/

Amritsar/ Batala & Nodal office, Mohali.

5. The Environmental Engineer, Punjab Pollution Control Board, P-I/II,

Ludhiana/Jalandhar/GPC/EPA/Mega/HWM/ Construction, Patiala

6. The Deputy Controller (F&A)/Law Officer/Superintendent(G)/Public Relation

Officer, Punjab Pollution Control Board, Patiala

7. P.S to Chairman/P.A to Member Secretary, Punjab Pollution Control Board,

Patiala.

Sd/- (Dr. Babu Ram)

Member Secretary

Page 202: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 241 -

Annexure- 61

Punjab Pollution Control Board, Head Office,

Patiala

No.Estt./SA-1/F.No.182-111/2008/228

Dated: 26.02.2008

OFFICE ORDER

After considering representation dated 4.01.2008 of Law

Officers working in the Board, it has been decided that all show cause

notices prepared under section 33-A of the Water (Prevention & Control

of Pollution) Act, 1974 & under section 31-A of the Water (Prevention &

Control of Pollution) Act, 1981 alongwith closure orders under the

above said provisions will be got vetted from Law Officer, posted in

Zonal Offices/wherever required by Senior Environmental Engineer

concerned. This work is given to them in addition to already work

allotted vide this office order No.938 dated 26.12.2005.

Sd/- Chairman

Endst. No. Estt./SA-1/F.No.182-111/2008/8264-75 Dated:

26.02.2008

A copy of the above is forwarded to the following for

information & necessary action:

1. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office-I/II, Patiala/Ludhiana/Jalandhar.

2. The Senior Environmental Engineer, EPA/GPC, Punjab Pollution Control Board, Head Office, Patiala

3. All Law Officers/Legal Assistant, Punjab Pollution Control Board, Patiala.

4. P.S. to Chairman/PA to Member Secretary, Punjab Pollution Control Board, Patiala.

Page 203: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 242 -

Sd/- (Birinderjit Singh) Member Secretary

Page 204: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 243 -

Annexure- 62

gzikp gqd{;aD o'eEkw p'ov w[Zy dcaso, tksktoD GtB, BkGk o'v, gfNnkbk

BzpoL nwbk$;n^1$cHBzL$2008$876 fwshL 01$12$2008

;oe{bo

p'ov tZb" gkDh (gqd{;aD o'eEkw ns/ fB:zsoD) fB:w, 1974 ns/

jtk(gqd{;aD o'eEkw ns/ fB:zsoD) fB:w, 1981 nXhB “eB;?AN N{

n;N?pfb;a$Ugo/N” ikoh eoB ;w/A iao{oh ;aosK s'A fJbktk j/m fbyhnK ;aosK th

brkJhnK iKdhnK jBL

1. The industry shall plant 2 rows of spreading crown varieties of evergreen trees at the density not less than 40 trees per kanal along the boundary of the industrial premises.

Or 2. The industry shall provide thick plantation of spreading crown varieties of

evergreen trees all along the boundary wall of the sheller. Or

3. The industry shall plant minimum of three suitable varieties of trees at the density of not less than 1000 trees per hectare all along the boundary of the industrial premises.

fJj t/yD ftZu nkfJnk j? fe ya/soh dcasoK tZb'A d"o/ d"okB fJ; rZb B{z

soihj BjhA fdZsh iKdh fe ;BnZs B/ T[go'es ;aosK dh g{osh ehsh j? iK BjhA.

fJ; s'_ fJbktk id'A e'Jh e/; w[Zy dcaso B{z G/fink iKdk j? sK T[es ;aosK dh

g{osh pko/ e'Jh fNZgDh BjhA ehsh iKdh. g"d/ e[dosh s"o s/ gqd{;aD xNkT[D ftZu

;jkJh j[zd/ jB ns/ fJ; s' fJbktk g"d/ e[dosh s"o s/ gkDh d/ ;kJheb B{z g{ok

eoB ftZu th :'rdkB gkT[d/ jB. fJ; bJh p'ov tZbA g"d/ brkT[D ;zpzXh brkJh

;aos dh ;BnZs tZb' g{osh eoBh nfs iao{oh j?.

fJj c?;bk ehsk frnk j? fe i/eo GftZy ftZu ;zpzXs nfXekoh tZb'A d"o/

d"okB iK ;BnZs dk e/; gq';?; eoB d"okB T[es ;aosK dh g{osh Bk t/yh rJh iK

fJ; ;zpzXh e/; ftZu fNZgDh Bk ehsh rJh sK ;zpzXs nfXekoh fto[ZX fB:wK

nB[;ko pDdh nB[;k;afBe ekotkJh ehsh ikt/rh.

Page 205: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 244 -

;jh$^ ( vkH pkp{ okw)

w?Apo ;eZso

fgZm BzpoL nwbk$;n^1$cHBzL$2008$42526^57 fwshL

2$12H2008

T[go'es dk T[skok j/m fbfynK B{z ;{uBk ns/ nrbh ekotkJh bJh G/id/ j'J/ p/Bsh ehsh iKdh j? fe T[es jdkfJsK B{z nkgD/ nXhB ezw eo oj/ ;ko/ nfXekohnK B{z fJzB-^fpzB gkbDk bJh B'N eotk fdZshnK ikD ihL 1H ;hBhno tksktoD fJizhBhno (j?v e[nkNo), gzikp gqD{;aD o'eEkw p'ov,

gfNnkbk. 2H ;hBhno tksktoD fJizhBhno (JhHghHJ/$ezfgT{No), gzikp gqD{;aD o'eEkw

p'ov, gfNnkbk. 3H ;hBhno tksktoD fJizhBhno, gzikp gqD{;aD o'eEkw p'ov, ia'Bb dcaso-

1$2, gfNnkbk$b[fXnkDk ns/ ibzXo (jv e[nkNo n?N gfNnkbk). 4H fvgNh ;eZso (gkfb;h s/ IBob), gzikp gqD{;aD o'eEkw p'ov, e?_g dcaso,

w'jkbh. 5H tksktoD fJzihBhno, gzikp gqD{;aD o'eEkw p'ov, ya/soh dcaso,

gfNnkbk$b[fXnkDk^1$2$3$ibzXo$nzfwqs;o$j[f;ankog[o$pNkbk$;zro{o$pfmzvk$cohde'N ns/ B'vb dcaso, w'jkbh.

5H tksktoD fJzihBhno (gh^1$2$i/Hn?b$w?rk$)$;hHn?;HJ/$j?v e[nkNo$JhHghHJ/, gzikp gqD{;aD o'eEkw p'ov,gfNnkbk.

6H ftfrnkBe nca;o, tksktoD fJzihBhno, gzikp gqD{;aD o'eEkw p'ov, gfNnkbk. 7H ghHn?;HN{H u/now?B$ghHJ/H N{ w?Apo ;eZso, gzikp gqd{;aD o'eEkw p'ov, gfNnkbk.

;jh$^ ( vkH pkp{ okw )

w?Apo ;eZso

Page 206: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 245 -

Annexure- 63

PUNJAB POLLUTION CONTROL BOARD Vatavaran Bhawan, Nabha Road, Patiala

No.GPC/_____/NIP/92/7776-96 Dated :21.12.2009 To The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Jalandhar/Patiala/Ludhiana The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/Ludhiana-I/II/III/ Jalandhar/Hoshiarpur/Batala/Faridkot/ Amritsar/Sangrur/Bathinda/ Nodal Office, Chandigarh.

The Environmental Engineer (L/J/P), GPC-1/Const./EPA/EPS, Punjab Pollution Control Board, Head Office, Patiala.

Subject: Policy to be adopted for installation of sewage treatment

plant for Hotels/Restaurants/Marriage Palaces/Resorts in operation and proposed to establish/being established.

In continuation to Board‟s letter No.EE(EPA)/2003/3987-4008 dated

5/11/2003, considering the installation of sewage treatment plants of certain

cities/towns, it has been decided to adopt following policy for installation of sewage

treatment plant for Hotels/Restaurants/Marriage Palaces/Resorts in

operation/proposed to establish/being established and having disposal of domestic

effluent into sewer leading to sewage treatment plant of the town/city:

The existing member units shall provide oil and great trap and septic tank

(as primary treatment plant) before discharging effluent into local body‟s

sewer leading to STP of town/city, individually.

The member units which are outside municipal limit/not connected to the

sewerage system leading to STP/where adequate surplus capacity in existing

STP is not available, shall provide its own sewage treatment plant.

Page 207: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 246 -

All the member units shall submit NOC/Acceptance Certificate of local body

regarding discharge of effluent into sewer leading to STP and adequacy of

STP to take pollution load of the unit.

All the member units shall be responsible for working of sewer lines within

his area and shall be specifically banned to dispose of solid waste through

sewer and shall dispose of solid wastage in environment friendly manner.

All the member units shall get „consent to operate‟ of the Board under the

Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention

& Control of Pollution) Act, 1981 and will comply with all the provisions of

the said acts.

Sd/-

( Dr. Babu Ram ) Member Secretary

Page 208: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 247 -

Annexure- 64

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, PATIALA

No.EPA/F.No./2010/Gen-

2/389

Dated: 25.3.2010

OFFICE ORDER

The Central Pollution Control Board vide its letter No.B-

31011(BMW)/30/93/HWMD/3712 dated 4.8.2009 clarified that consent to establish

& operate under Water (Prevention & Control of Pollution) Act, 1974 and the Air

(Prevention & Control of Pollution) Act, 1981 are also required to be obtained by

the HCFs/Testing Labs/Blood Banks/Vet. Clinics and Common Biomedical Waste

Treatment Facilities etc.

Accordingly, the matter was placed before the Board in its 146th

meeting held on 12.01.2010 regarding coverage of Health Care

Establishments/Testing Labs/Blood Banks/Vet. Clinics & CBWTFs under the ambit of

Water (Prevention & Control of Pollution) Act, 1974 and the Air (Prevention &

Control of Pollution) Act, 1981. The Board decided that the Health Care

Establishments/Testing Labs/Blood Banks/Vet. Clinics & CBWTFs should be covered

under the ambit of Water (Prevention & Control of Pollution) Act, 1974 and the Air

(Prevention & Control of Pollution) Act, 1981. Provided these establishments shall

not be covered under the provisions of the said Acts, in case:

i) The Health Care Establishments/Testing Labs/Blood Banks/Vet. Clinics,

which are established/being established in towns other than having

Municipal Corporation/councils and have capital investment (including

land/building and machinery) below Rs.50 Lacs shall be exempted from

the ambit of Water (Prevention & Control of Pollution) Act, 1974 and the

Air (Prevention & Control of Pollution) Act, 1981 for 5 years.

ii) The Health Care Establishments/Testing Labs/Blood Banks/Vet.

ClinicsCBWFTs, which are established/being established in towns other

than having Municipal Corporation/councils and have capital investment

Page 209: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 248 -

(including land/building and machinery) below Rs.1 Crore shall be

exempted from the ambit of Water (Prevention & Control of Pollution)

Act, 1974 and the Air (Prevention & Control of Pollution) Act, 1981 for

____ years.

These orders shall come into force with immediate effect.

Sd/- Chairman

Page 210: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 249 -

Annexure- 65

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, PATIALA

No.SEE(HQ-

1)/Gen./175/2010/464 Dated: 30.6.2010

OFFICE ORDER

Subject: Regarding compliance of the directions issued u/s 33-A of the Water (Prevention & Control of Pollution) Act, 1974, u/s 31-A of the Air (Prevention & Control of Pollution) Act, 1981 and u/s 5 of the Environment (Protection) Act, 1986.

As you are aware of the facts that the Board issued directions 33-A

of Water (Prevention & Control of Pollution) Act, 1974 and/or u/s 31-A of Air

(Prevention & Control of Pollution) Act, 1981 or u/s 5 of the Environment

(Protection) Act, 1986 to the industries/development projects generating hazardous

waste for violations of provisions of the said Acts and Rules. But it has been

observed that the compliance of the directions are not monitored in true spirit and

meticulously by concerned Regional Officers/Zonal Officers. Many times it has been

found that the temporary electric connection/restoration permitted to the industrial

units for short period are not brought to the notice of the competent authority after

the expiry of the stipulated period, resulting in operation of the industries/units

without any permission in violation of the compliance of the directions issued by

the Board. Moreover, the effluent/air samples of these industries are not collected

within the stipulated period which also results in delay for taking further action on

these directions.

Thus, the timely monitoring of compliance of the directions issued by

the Board is quite indispensable i.e. monitoring report alongwith recommendations

should be made available to the Board atleast 15 days before the expiry of the

temporary power connection.

Therefore, it has been decided by the competent authority that timely

report on monitoring of compliance of directions including the sample collection

and analysis data alongwith recommendations should be sent to the competent

authority

Page 211: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 250 -

Any deviation from the above shall be viewed seriously and shall

attract disciplinary action against erring officers.

Sd/- Chairman

Endst. No.GPC/Guidelines RS-SP/F-33/2010/29457-92 Dated: 30.06.2010 A copy of the above is forwarded to the following for information & necessary action:

1. The Member Secretary-cum-Chief Environmental Engineer, Punjab Pollution Control Board, Patiala.

2. The Chief Environmental Engineer, Punjab Pollution Control Board, Patiala. 3. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal

Office-Ludhiana-I/II, Patiala-I/II/Jalandhar/Amritsar/Bathinda. 4. The Senior Scientific Officer, Punjab Pollution Control Board, H.O., Patiala. 5. The Environmental Engineer, Punjab Pollution Control Board, Zonal Office-

Ludhiana-I/II, Patiala-I/II/Jalandhar/Amritsar/Bathinda/HQ-I/II/EPS 6. Additional Secretary, Punjab Pollution Control Board, N.O., Mohali. 7. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/Ludhiana-I/II/III/IV/Jalandhar/Amritsar/Hoshiarpur/Fatehgarh Sahib/Sangrur/Bathinda/Faridkot & Nodal Office, Mohali.

8. Law Officers, Punjab Pollution Control Board, Head Office, Patiala 9. The Admn. Officer, Punjab Pollution Control Board, Patiala.

Sd/- ( Dr. Babu Ram )

Member Secretary

Page 212: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 251 -

Annexure- 66

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

No.HQ-I/PetCoke/F-200/2010/478

Dated: 20.7.2010

The Punjab Pollution Control Board in its 148th meeting held on

23.6.2010 vide item No.148.15 permitted the use of pet coke as fuel in the

boilers/furnaces subject to the following conditions:

1. The boilers/furnace emissions shall conform to SO2 standards of 400

mg/Nm3 as laid down by Ministry of Environment & Forests for the small

boilers.

2. The industry shall p;rovide well designed two stages desulphurization i.e. at

combustion stage and of flue gas emissions.

3. The industry shall install dry type air pollution control device, such as,

cyclone/multicyclone followed by spray type alkali scrubber and packed bed

alkali scrubber. The packed bed scrubber to be installed should conform to

the guide parameters as mentioned below and the industry shall use only

caustic soda as scrubbing media:-

i) Velocity of gas through the lower is commended to be 1.5-2.5

m/s.

ii) Liquid gas ratio is recommended to be 3.5-4.0 liter/m3 of gas

flow or 80-325 lpm/m3 of lower cross sectional area.

iii) Pressure drop is recommended to 15-150 mm W.G./m of

packed bed height.

iv) Maximum inlet concentration – 5000 ppm by volume.

4. The industry shall install on line monitor for SO2 with the stack of the boiler.

5. The industry shall provide interlocking of online SO2 monitor with the feeding

system of the boiler, so as to ensure that the feeding system of fuel in the

boiler furnace should become in shut down condition, in case, the conc. of

SO2 increases beyond the prescribed standard of 400 mg/Nm3 at any time.

Page 213: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 252 -

6. The industry shall provide online pH meter on the recirculation tank of

scrubbing liquor, from where the said liquor is fed to the air pollution control

device and ensure that the pH of the feed scrubbing liquor should remain

within the range of 10-12.

7. The industry shall provide flow meter and pressure gauge at the outlet of

the pump used to supply the scrubbing liquor to the alkali scrubber, so as to

ensure that the scrubbing liquor is fed to the air pollution control device at

the desired rate and pressure.

8. The industry shall provide a stack of height calculated by using the formula

H=14 Q0.3 and the emission rate of SO2 (value of Q in kg/hr.) should be

calculated by using the volume of flue gas emissions and the standards for

SO2 (400 mg/Nm3) or 30 m, whichever is higher.

9. The sludge produced in the recirculation tank of the scrubbing liquor shall be

disposed off in an environmentally sound manner.

These order shall come into force with immediate effect.

Sd/ Chairman

Endst. No. HQ-I/Pet Coke/F-200/2010/32506-52 Dated: 20.7.2010 A copy of the above is forwarded to the following for information & necessary action:

1. The Member Secretary-cum-Chief Environmental Engineer, Punjab Pollution Control Board, Patiala.

2. The Chief Environmental Engineer, Punjab Pollution Control Board, Patiala. 3. The Senior Environmental Engineer, Punjab Pollution Control Board, HQ-

I/II/EPS, Patiala. 4. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal

Office-Ludhiana-I/II, Patiala-I/II/Jalandhar/Amritsar/Bathinda. 5. The Additional Secretary (Gen. & Planning, Punjab Pollution Control Board,

Nodal Office, Mohali. 6. The Senior Scientific Officer, Punjab Pollution Control Board, Patiala. 7. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/Ludhiana-I/II/III/IV/Jalandhar/Amritsar/Hoshiarpur/Fatehgarh Sahib/ Sangrur/ Bathinda/Faridkot & Nodal Office, Mohali.

8. The Deputy Controller (F&A)/Administrative Officer, Punjab Pollution Control Board, Patiala

9. Law Officer, P.S. Chairman/.P.A. to Member Secretary, Punjab Pollution Control Board, Patiala

Page 214: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 253 -

Sd/- ( Dr. Babu Ram )

Member Secretary

Page 215: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 254 -

Annexure- 67

gzikp gqd{;aD o'eEkw p'ov tksktoD GtB, BkGk o'v, gfNnkbk

BzpoL (j?He[^1)$n?BHvhHJ/H^n?c^60$2010$485

fwshL 23H7H2010 dcasoh j[ew

ft;ak L gzikp oki ftZu BkB^v?firB/fNv J/ohnk ftZu bZrhnK j'JhnK c?eNohnK B{z tkNo (gqht?B;aB ns/ ezNo'b nkca g'b{;aB) n?eN, 1974 ns/ J/no (gqht?B;aB ns/ ezNo'b nkca g'b{;aB) n?eN, 1981 nXhB p'ov dh gkfb;h nB[;ko roKN ehshnK ezB;?AN N{ ngo/N dh fwnkd ftZu tkXk eoB ;zpzXh.

gzikp gqd{;aD o'eEkw p'ov tZb'_ nkgDh 148thA whfNzr I' fwsh 23H06H2010 B{z

j'Jh, dh nkJhNw Bzpo 148H17 nB[;ko gzikp oki ftZu BkB^v?firB/fNv J/ohnk ftZu uZb

ojhnK c?eNohnK B{z tkNo (gqht?B;aB ns/ ezNo'b nkca g'b{;aB) n?eN, 1974 ns/ J/no

(gqht?B;aB ns/ ezNo'b nkca g'b{;aB) n?eN, 1981 nXhB p'ov tZb'_ eB;?ANK roKN eoB ;zpzXh

j/m fby/ nB[;ko c?;bk fbnk frnkL-

1H T[j ;afjo fiBQK dk wk;No gb?B ckJhBb j' frnk j?, d/ BkB^v?firB/fNv J/ohJ/ ftZu

bZrhnK c?eNohnK d/ tkNo (gqht?B;aB ns/ ezNo'b nkca g'b{;aB) n?eN, 1974 ns/ J/no

(gqht?B;aB ns/ ezNo'b nkca g'b{;aB) n?eN, 1981 d/ nXhB eB;?AN e/; w?foN d/ nkXko

s/ tZX s'_ tZX nBn?e;gkfJov T[; ;w/_ bJh roKN ehs/ ikDr/ i' fe fJBK c?eNohnK B{z

wk;No gb?B ftZu (f;caN eoB bJh) fdZsh frnk j? iK T[j p'ov dh o?v$Uo/Ai$rohB

e?Nkroh dhnK tZvh$dofwnkBh$S'N/ gZXo dh c?eNohnK bJh gkfb;h w[skfpe j't/, i' th

;wK gfjbK ysw j[zdk j't/. fJ; d/ Bkb^Bkb fJjBK c?eNohnK B/ Y[Zet/A ib^;'Xe :zso

iK jtk ;'Xe :zso ;w/s ;a'o gqd{;aD o'eEkw :zso bkJ/ j'D ns/ T[j fwZE/ j'J/ ;N?AvovK

dh gkbDk eod/ j'D.

2H T[j ;afjo fiBQK dk wk;No gb?B ckJhBb BjhA j'fJnk j?, d/ BkB^v?firB/fNv J/ohJ/

ftZu bZrhnK c?eNohnK d/ tkNo (gqht?B;aB ns/ ezNo'b nkca g'b{;aB) n?eN, 1974 ns/

J/no (gqht?B;aB ns/ ezNo'b nkca g'b{;aB) n?eN, 1981 d/ nXhB eB;?AN e/; w?foN d/

nkXko s/ p'ov dh Utonkb gkfb;h (;fjwsh d/ ;w/A) B{z w[Zy oZyd/ j'J/ ;fjwsh bJh

roKN ehs/ ikDr/. p;aos/ fJjBK c?eNohnK B/ Y[Zet/A ib^;'Xe :zso iK jtk ;'Xe

:zso ;w/s ;a'o gqd{;aD o'eEkw :zso bkJ/ j'D ns/ T[j fwZE/ j'J/ ;N?AvovK dh gkbDk

eod/ j'D. fJBQK c?eNohnK d/ ;w/A ftZu tkXk fJBQK c?eNohnK B{z f;caN eotkT[D bJh

oki ;oeko dhnK e'Jh th jdkfJsK$gkbh;hnK$c?;fbnK d/ w[skfpe j't/rk.

Page 216: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 255 -

fJj ;ko/ ezB;?AN e/;K s/ T[jh nEkoNhnK c?;bk d/DrhnK i' fe v?firB/fNv

J/ohJ/ ftZu fJj' fij/ e/;K s/ ;w/A^;w/A f;o p'ov d[nkok fdZshnK rJhnK gktoK w[skfpe

c?;bk d/D d/ ;woZE jB.

;jh$^

u/now?B

fgZm BzpoL (j?He[^1)$n?BHvhHJ/H^n?c^60$2010$3325^86 fwshL

23H7H2010

T[go'es dk T[skok j/m fbfynK B{z ;{uBk ns/ nrbh ekotkJh fjZs G/fink iKdk j?L 1H w?Apo ;eZso^ew^w[Zy tksktoD fJzihBhno, gzikp gqd{;aD o'eEkw p'ov, gfNnkbk. 2H w[Zy tksktoD fJzihBhno, gzikp gqd{;aD o'eEkw p'ov, w[Zy dcaso, gfNnkbk. 3H ;hBhno tksktoD fJizhBhno (j?v e[nkNo-1 s/ 2)$JhHghHn?;, gzikp gqD{;aD o'eEkw

p'ov, w[Zy dcso, gfNnkbk. 4H ;hBhno tksktoD fJizhBhno, gzikp gqD{;aD o'eEkw p'ov, ia'Bb dcaso^1$2,

gfNnkbk$ibzXo$nzfwqs;o$b[fXnkDk-1 ns/ 2$pfmzvk. 5H tXhe ;eZso (iBob ns/ gbkfBzr), gzikp gqD{;aD o'eEkw p'ov, B'vb dcaso, w'jkbh. 6H ;hBhno ftfrnkBe nca;o, gzikp gqD{;aD o'eEkw p'ov, gfNnkbk. 7H tksktoD fJzihBhno, gzikp gqD{;aD o'eEkw p'ov, ya/soh dcaso,

gfNnkbk$b[fXnkDk^1$2$3$4 ibzXo$nzfwqs;o$j[f;ankog[o $;zro{o$pfmzvk$cohde'N, cfsjrVQ ;kfjp$ w'jkbh.

8H fvgNh vkfJo?eNo (b'e ;zgoe), gzikp gqD{;aD o'eEkw p'ov,gfNnkbk. 9H T[-g ezNo'bo (ftZs s/ b/yk), gzikp gqD{;aD o'eEkw p'ov, gfNnkbk. 10H ;jkfJe gqpzXeh nca;o$ekB{zBh nca;o$ ghHJ/HN{H u/now?B$ghHJ/H N{ w?Apo

;eZso$;[govzN (ioBb), gzikp gqd{;aD o'eEkw p'ov, gfNnkbk.

;jh$^ ( vkH pkp{ okw)

w?Apo ;eZso

Page 217: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 256 -

Anneuxre-68

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN, NABHA ROAD, PATIALA

No.GPC/Mobile Stn/F-122/2010/521 Dated : 3.9.2010

OFFICE ORDER

The earlier orders issued vide No.Admn./SA-1/F.No./2007/754 dated

23.8.2007 regarding consent to establish/consent to operate to industrial units

related to Information Technology and Communication Network such as

Telecommunication Towers have been reviewed.

Now, it has been decided to deal such cases as under:

(a) Every company will file an application in the concerned Regional Office of

the Board on green category form for individual Telecommunication Tower

instead of single application for group of towers of the same company.

(b) The application so received shall be accompanied by NOC from Local

authorities/DTP as the case may, regarding suitability of site alongwith other

documents as prescribed by the Board. The Regional Office shall decide the

application after proper field verification and taking care of the following

points:

i) The DG set installed with the Telecommunication Tower must

conform to the Noise Level Standards as prescribed for DG sets under

the EPA, 1986.

ii) The foundation of the DG set should be properly designed to control

vibrations from the DG set.

Sd/- (Rajat Aggarwal, IAS)

Chairman Endst. No.HQ-1/Mobile Stn/F-122/2010/39203-40 Dated : 3.9.2010 A copy of the above is forwarded to the following for information & necessary action:

1. The Member Secretary, Punjab Pollution Control Board, Patiala. 2. The Chief Environmental Engineer, Punjab Pollution Control Board, Patiala. 3. The Senior Environmental Engineer( HQ-I/II), Punjab Pollution Control

Board, Patiala

Page 218: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 257 -

4. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office-Ludhiana-I/II, Patiala-I/II/Jalandhar/Amritsar/Bathinda.

5. The Senior Scientific Officer, Punjab Pollution Control Board, Patiala. 6. The Additional Secretary (General &Planning , Punjab Pollution Control

Board, Nodal Office, Mohali. 7. The Environmental Engineer, EPS-I/II/III, HWM, HWM (Bathinda), CSA,

Punjab Pollution Control Board, Patiala 8. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/Fatehgarh Sahib/Ludhiana-I/II/III/IV/Jalandhar/Amritsar/Hoshiarpur/Sangrur/ Bathinda/Faridkot & Nodal Office, Mohali.

9. The Deputy Director/The Administrative Officer/Law Officers/Deputy Controller (F&A), Punjab Pollution Control Board, Patiala

10. P.S. Chairman/.P.A. to Member Secretary, Punjab Pollution Control Board, Patiala

Sd/-

(Dr. Babu Ram ) Member Secretary

Page 219: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 258 -

Anneuxre-69

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

No. SEE (HQ-I)/F-175/2010/579

Dated :15.12.2010

OFFICE ORDER

The Central Ground Water Authority (CGWA) has been constituted in the

year 1997 by the Government of India, Ministry of Environment and Forests under

the Environment (Protection) Act, 1986 in pursuance of directions from the Hon‟ble

Supreme Court of India for the purpose of regulation and Control of Ground Water

Development and Management in the country.

CGWA has identified Ludhiana City and 5 blocks i.e. Moga-I and II in Moga

District, Sangrur and Malerkotla-II (Ahmedgarh) in Sangrur District and Mehal

Kalan in Barnala District in the State of Punjab as Critical Area(s) in view of the

overexploitation of Ground Water Resources in the region and has declared these

as Notified Area(s). CGWA in exercise of its powers and functions under Section 5

of Environment (Protection) Act, 1986 had issued directions to regulate the Ground

Water Development and Management in these Notified Area(s) in order to improve

Ground Water regime.

In compliance to Central Ground Water Authority and Punjab State Water

Resources Committee (WRC) directions, the District Advisory Committees have

been constituted in the above mentioned Districts to regulate Ground Water

Develoment and Management in the Notified Areas by completely banning the

process of drilling, construction, installation of any Ground Water abstraction

structure for Commercial/Industrial use or by farmers having holdings above 4

Hectare of Land and to issue prior specific approval for construction of any new

structure and scheme/project of Ground Water Development as per the guidelines

of CGWA and to perform some other functions.

As the Industrial/Commercial units are required to obtain the consent to

establish (NOC) of the Punjab Pollution Control Board at the time of establishment,

under the relevant provisions of the Water (Prevention & Control of Pollution) Act,

1974 and Air (Prevention & Control of Pollution) Act, 1981, it has been decided that

at the time of grant of consent to establish (NOC) to the Commercial/Industrial

Page 220: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 259 -

establishments in the above mentioned Notified Area(s), the Board shall impose a

special condition as under:

“That the Commercial/Industrial establishment shall seek and obtain the

prior specific approval of the District Advisory Committee for the purpose of

drilling, construction, installation of any ground water abstraction structure

for Commercial/Industrial use and submit the same to the office of the

Board at the time of obtaining clearance certificate for release of Power and

consent to operate.”

Clearance certificate for release of Power and consent to operate will be

granted to the Commercial/Industrial establishments only on the furnishing of

specific approval of the District Advisory Committee of the respective notified

area(s).

These orders shall come into force with immediate effect.

Sd/- Chairman

Endst. No. SEE(HQ-I)//F-175/2010/50313-36 Dated:

15.12.2010

A copy of the above is forwarded to the following for information & necessary action:

1. The Chief Environmental Engineer-I/II/III, Punjab Pollution Control Board, Patiala.

2. The Senior Environmental Engineer, HQ-I/II, Punjab Pollution Control Board, Patiala

3. The Senior Environmental Engineer, Punjab Pollution Control Board, Zonal Office- Patiala-I/II/ Ludhiana-I/II, Jalandhar/ /Bathinda and Amritsar

4. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Patiala/Sangrur/Fatehgarh Sahib Ludhiana-I/II/III/IV/ Hoshiarpur/Jalandhar/ Amritsar/ Bathinda/Faridkot & Nodal Office, Mohali.

5. The Environmental Engineer, EE(ZP-I)/ZP-II/HWM/EE-I,II (HQ-I)/EE-I/II

(HQ-II)/CSA, Punjab Pollution Control Board, Patiala

The copy of the minutes of the 5th meeting of Punjab State Water Resources Committee (WRC) held on 07-07-10 at Chandigarh under the Chairmanship of Hon‟ble Chief Secretary, Punjab along with a draft copy of the notification to be issued for constitution of District Advisory Committee by the respective Deputy Commissioner, is enclosed herewith for information and necessary action please.

Sd/- Member Secretary

Endst. No. SEE(HQ-I)//F-175/2010/ Dated:

Page 221: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 260 -

1. The Additional Secretary (P&G), Punjab Pollution Control Board, Nodal Office, Mohali.

2. The Senior Scientific Officer, Punjab Pollution Control Board, Patiala. 3. The Deputy Secretary (PR), Punjab Pollution Control Board, Patiala. 4. The Law Officer, Punjab Pollution Control Board, Patiala. 5. P.A. to Chairman/P.S. to Member Secretary, Punjab Pollution Control Board,

Patiala. Sd/-

( Dr. Babu Ram ) Member Secretary

Page 222: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 261 -

Annexure-70

gzikp gqd{;aD o'eEkw p'ov, gfNnkbk

BzpoL gqpzXeh$;n-3$cHBzL$2011$29

fwsh 18H1H2011

dcasoh j[ew

p'ov dh 149th_ whfNzr i' fe fwsh 20$10$2010 B{z j'Jh, dh

nkJhNw Bzpo 149H07 okjh_ j'J/ c?;b/ nB[;ko tZy-tZy e?NkrohnK dhnK

fJzv;NohnK tZb'_ p'ov d[nkok tkNo n?eN, 1974 ns/ J/no n?eN, 1981 nXhB

ikoh ehs/ rJ/ j[ewK fto[ZX n?ghb/N nEkoNh e'b nghb eoB ;zpzXh ch;

1,000$- o[gJ/ s'_ tXk e/ j/m fby/ nB[;ko ukoi eoB dk c?;bk ehsk frnk

j?L

bVh Bzpo e?Nkroh ch;

1H bkb ozr 5,000$- o[gJ/

2H ;zsoh ozr 3,000$- o[gJ/

3H jok ozr 2,000$- o[gJ/

;jh$-

vkH pkp{ okw

w?_po ;eZso

fgZm nzeD BzpoL gqpzXeh$;n-3$cHBzL$2011$3075-105 fwshL

18H1H2011

T[go'es dk T[skok j/m fbfynK B{z ;{uBk ns/ nrbh ekotkJh bJh

G/fink iKdk j? L

1H w[Zy tksktoD fJzihBhno-1$2$3, gzikp gqD{;aD o'eEkw p'ov, gfNnkbk.

2H ;hBhno tksktoD fJizhBhno, gzikp gqD{;aD o'eEkw p'ov, ia'Bb dcaso-

1$2, gfNnkbk, i'Bb dcaso-1$2, b[fXnkDk$$pfmzvk$ibzXo ns/

nzfwqs;o.

3H tXhe ;eZso (gbkfBzr s/ iBob), gzikp gqD{;aD o'eEkw p'ov,

gfNnkbk.

4H ;hBhno ftfrnkBe nca;o, gzikp gqD{;aD o'eEkw p'ov, gfNnkbk.

5H tksktoD fJzihBhno, gzikp gqD{;aD o'eEkw p'ov, ya/soh dcaso,

gfNnkbk$ b[fXnkDk-1$2$3$4 $ ibzXo$ nzfwqs;o$$j[f;ankog[o$;zro{o$

pfmzvk$ cohde'N$cfsjrVQ ;kfjp ns/ w'jkbh.

6H tksktoD fJzihBhno (;hHn?;HJ/), gzikp gqD{;aD o'eEkw p'ov, gfNnkbk.

7H fvgNh ezNo'bo (ftZs ns/ b/yk), gzikp gqD{;aD o'eEkw p'ov, gfNnkbk.

8H fvgNh vkfJo?eNo (b'e ;zgoe)$ ekBz{Bh nca;o$ ghHn?;H N{

u/now?B$ghHJ/H N{ w?Apo ;eZso, gzikp gqd{;aD o'eEkw p'ov, gfNnkbk.

;jh$-

Page 223: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 262 -

w?_po ;eZso

Page 224: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 263 -

Annexure-71

Punjab Pollution Control Board Vatavaran Bhawan, Nabha Road, Patiala

No.GPC/Guidelines-RS-SP/F.33/2011/227

Dated : 8.8.2011

OFFICE ORDER In partial modification of office order No.GPC/Guidelines-RS-

SP/F.33/2009/9 dated 13.1.2010; the Board has decided to omit the condition

No.(ii) in the said order. Therefore, now only following condition be imposed while

granting NOC to the industrial units:

That the industry shall get its building plans approved under the provisions of section 3-A of Punjab Factory Rules, 1952.

Sd/-

Member Secretary

Endst. No. 32588-620 Dated: 08.08.2011 A copy of the above is forwarded to the following for information and necessary action:

1. The Chief Environmental Engineer-I/II/III, Punjab Pollution Control Board, Patiala

2. The Sr. Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Patiala-I/II/Amritsar/Bathinda/Jalandhar/Ludhiana-I/II, HQ-1/HQ-2.

3. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Amritsar/Bathinda/Fatehgarh Sahib/Faridkot/Hoshiarpur/Jalandhar/Ludhiana-I/II/III/IV, Patiala, Sangrur & Nodal Office, Mohali.

4. The Environmental Engineer, Punjab Pollution Control Board, HQ-1/HQ-2/Mega/HWM/ Const., Head Office, Patiala.

5. The Deputy Secretary, Punjab Pollution Control Board, Camp Office: Mohali. 6. The Deputy Director (PR), Punjab Pollution Control Board, Patiala. 7. The Deputy Controller (F&A)/Administrative Officer, Punjab Pollution Control

Board, Patiala. 8. All Asstt. Environmental Engineers of Punjab Pollution Control Board. 9. Law Officers, Punjab Pollution Control Board, Patiala. 10. P.S. to Chairman/P.A. to Member Secretary, Punjab Pollution Control Board,

Patiala. 11. Sh. Gursharan Dass, AEE, CHD.

Sd/- ( Dr. Babu Ram )

Member Secretary

Page 225: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 264 -

Annexure-72

PUNJAB POLLUTION CONTROL BOARD VATAVARAN BHAWAN, NABHA ROAD, PATIALA

No.SEE (HQ-1)/ F-244/22011/271

Dated : 10.10.2011

OFFICE ORDER

Subject: Siting guidelines for Hotel/Motel/Restaurant/ Lodge/ Inn/ Guest House/ Banquet Hall/Marriage Palace.

The matter regarding framing of siting guidelines for

Hotel/Motel/Restaurant/Lodge/Inn/Guest House/Banquet Hall/Marriage Palace as

well as effluent treatment guidelines was considered by the Board in its153rd

meeting held on 9.9.2011 and it was decided as under:

A) Regarding siting criteria for Hotel/Motel/Restaurant/Lodge/Inn/Guest House/Banquet Hall/Marriage Palace

1. The project proponent shall be allowed to set up

Hotel/Motel/Restaurant/Lodge/Inn/Guest House/Banquet Hall/Marriage

Palace within M.C. limits,in case, the project proponent submits a certificate

issued by the concerned Municipal Corporation/Municipal Council/Nagar

Panchayat/Notified Area Committee to the effect that the site is suitable as

per statutory/non-statutory Master Plan and their bye-laws or submits

building plan duly approved by the said authority.

2. The project proponent shall be allowed to set up

Hotel/Motel/Restaurant/Lodge/Inn/Guest House/Banquet Hall/Marriage

Palace outside M.C. limits,in case, the project proponent submits a certificate

issued by the District Town Planner of the concerned area to the effect that

the site is suitable as per statutory/non-statutory Master Plan and their bye-

laws or submits building plan duly approved by the said authority.

B) Regarding requirement of STP/Septic Tank for treatment of wastewater generated from Hotel/Motel/Restaurant/Lodge/Inn/Guest House/Banquet Hall/Marriage Palace

Page 226: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 265 -

1. If the effluent generated from Hotel/Motel/Restaurant/Lodge/Inn/Guest

House/Banquet Hall/Marriage Palace is discharged into a municipal sewer

leading to a STP/discharged into a Municipal Sewer but no STP has been

installed onto land for irrigation, the establishments shall comply with the

following standards:

Hotel or a Banquet hall with minimum floor area of 100 m2 or a restaurant with minimum seating capacity of 36

Parameter Effluent Standards Limiting concentration in mg/l except

pH

Inland surface

water

On land for

irrigation

pH 5.5-9.0 5.5-9.0

BOD 3 days, 27oC 30 100

Total Suspended

Solids

50 100

Oil & Grease 10 10

Phosphates as P 1.0 -

1. If, the effluent is discharged into a municipal sewer leading to a sewage treatment plant, the hotel or restaurant or banquet hall, as the case may be, shall provide a proper oil & grease trap for effluent arising from its kitchen and laundry and shall have to comply with the General Standards for discharge of Environmental Pollutants Part-A Effluents notified under Schedule-VI appended to the Environment (Protection) Rules, 1986 vide notification no.GSR-322(E) dated 19.05.1993.

2. The project proponent shall provide an acoustic enclosure (Canopy) with the

DG set, so as to contain the sound pressure level within the standards

prescribed by the MoEF vide Notification No.371(E) dated 17.5.2002 as

amended from time to time.

3. In case, the Hotel/Motel/Restaurant/Lodge/Inn/Guest House/Banquet

Hall/Marriage Palace is located within M.C. limits, the project proponent shall

obtain permission from the concerned Municipal Corporation/Municipal

Page 227: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 266 -

Council/Nagar Panchayat/Notified Area Committee for the management &

handling of solid waste.

4. In case, the Hotel/Motel/Restaurant/Lodge/Inn/Guest House/Banquet

Hall/Marriage Palace is located outside M.C. limits, the project proponent

shall provide adequate facility for the management & handling of solid waste

in an environmentally sound manner within/adjoining the premises of the

establishment.

NOTE: In case of any above provision, which is/will be rendered

contrary to any Notification, Law/Rules/Guidelines as issued

by the MoEF, Govt. of India, the later shall prevail.

These orders shall come into force with immediate effect.

Sd/- Chairman

Endst. No.40083-123 Dated: 10.10.2011 A copy of the above is forwarded to the following for information and necessary action:

1. The Chief Environmental Engineer-I/II/III, Punjab Pollution Control Board, Head Office, Patiala

2. The Sr. Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Patiala-I/II/Amritsar/Bathinda/Jalandhar/Ludhiana-I/II, HQ-1/HQ-2.

3. The Environmental Engineer, Punjab Pollution Control Board, Regional Office, Amritsar/Bathinda/Fatehgarh Sahib/Faridkot/Hoshiarpur/Jalandhar/Ludhiana-I/II/III/IV, Patiala, Sangrur & Mohali.

4. The Environmental Engineer, Punjab Pollution Control Board, HQ-1/HQ-2/Mega/HWM/ Const., Head Office, Patiala.

5. The Additional Secretary (G&P), Punjab Pollution Control Board, Camp Office: Mohali.

6. The Deputy Director (PR), Punjab Pollution Control Board, Patiala. 7. The Deputy Controller (F&A)/Administrative Officer, Punjab Pollution Control

Board, Patiala. 8. All Asstt. Environmental Engineers of Punjab Pollution Control Board. 9. Law Officers, Punjab Pollution Control Board, Patiala. 10. P.S. to Chairman/P.A. to Member Secretary, Punjab Pollution Control Board,

Patiala.

Sd/- ( Dr. Babu Ram )

Member Secretary

Page 228: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 267 -

Annexure-73

gzikp gqd{;aD o'eEkw p'ov

BkGk o'v, gfNnkbk

Bzpo$;hHtkHfJz-1$315

Fwsh 29H11H2011

dcasoh j[ew

ft;ak L b'eb pkvhia$Bro e"_;bK tZb'_ gkDh (gqht?_;aB ns/ ezNo'b nkca

g'b{;aB) n?eN, 1974 nXhB iwK eotkJh ezB;?_N n?gbhe/;aB B{z

gq';?; eoB bJh ezB;?_N ch; B{z ftukoB ;zpzXh.

b'eb pkvhia$Bro e"_;bK tZb'_ gkDh (gqht?_;aB ns/ ezNo'b nkca

g'b{;aB) n?eN, 1974 nXhB ezB;?_N b?D bJh iwK eotkJh n?gbhe/;aB B{z gq';?;

eoB bJh t;{b ehsh ik ojh ezB;?_N ch; d/ YKu/ dk wkwbk fwsh 9H9H2011

B{z j'Jh p'ov dh 153th_ whfNzr ftu ftukfonk frnk ns/ fJj c?;bk ehsk

frnk fe tkNo (gqht?_;aB ns/ ezNo'b nkca g'b{;aB) n?eN, 1974 dhnK XkoktK

dh gkbDk eodhnK b'eb pkvhia$Bro e"_;bK tZb'_ ezB;?_N ch; j/mK do;kJ/

YKu/ nB[;ko t;{b ehsh ikt/L

bVh

BzL

t/otk fJe ;kb bJh

ezB;?_N ch; (o[gJ/)

gzi ;kb bJh ezB;?_N

ch; (o[gJ/)

1H Bro fBrw 1,00,000 5,00,000

2H J/ ebk; Bro fBrw 50,000 2,50,000

3H ph ebk; Bro fBrw 25,000 1,25,000

fJj ezB;?_N ch; p'ov tZb'_ ikoh j'D tkbh B'fNfce/;aB dh fwsh

s'_ bkr{ j't/rh. fJ; s'_ gfjbK d/ ;w/_ dh ezB;?_N ch; p'ov tZb'_ fce; ehs/

rJ/ o/NK w[skfpe bJh ikt/rh.

fJj j[ew s[ozs bkr{ j'Dr/.

;jh$-

u/now?B

fgZm nzeD Bzpo$;hHtkHfJz-1$45972-46008 fwshL

29$11H2011

T[go'es dk T[skok j/m fbfynK B{z ;{uBk ns/ nrbh ekotkJh bJh

G/fink iKdk j? L

1H w[Zy tksktoD fJzihBhno-1$2$3, gzikp gqD{;aD o'eEkw p'ov, gfNnkbk.

Page 229: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 268 -

2H ;hBhno tksktoD fJizhBhno, gzikp gqD{;aD o'eEkw p'ov, ia'Bb dcaso,

gfNnkbk-1$2, nzfwqs;o$ibzXo$pfmzvk$b[fXnkDk-1$2, j?e[-1$2H

3H tksktoD fJzihBhno, gzikp gqD{;aD o'eEkw p'ov, ya/soh dcaso,

nzfwqs;o$ ibzXo$ pfmzvk$ b[fXnkDk-1$2$3$4 $ gfNnkbk$ ;zro{o$

$cohde'N $j[f;ankog[o ns/ w'jkbh.

4H tksktoD fJzihBhno gzikp gqD{;aD o'eEkw p'ov, j?e[-1 (fJfJ-1$2), j?e[-

2 (fJfJ-1$2) w?rk, j?v nkfc;, gfNnkbk.

5H n?vh;aBb ;?eNoh (ih ns/ gh), gzikp gqD{;aD o'eEkw p'ov, w'jkbh.

6H fvgNh vkfJo?eNo (ghHnko), gzikp gqD{;aD o'eEkw p'ov, gfNnkbk.

7H fvgNh ezNo'bo (ftZs ns/ b/yk), gzikp gqD{;aD o'eEkw p'ov, gfNnkbk.

8H ekBz{Bh nca;o, gzikp gqD{;aD o'eEkw p'ov, gfNnkbk.

9H fBZih ;eZso, u/now?B$fBZih ;eZso, w?Apo ;eZso, gzikp gqd{;aD o'eEkw

p'ov, gfNnkbk.

;jh$-

w?po ;eZso

Page 230: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 269 -

Annexure-74

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN, NABHA ROAD, PATIALA

No.SEE (HQ-1)/

2011/270 Dated : 10.10.2011

OFFICE ORDER

Subject: Regularization of consents for operation of additional Machinery/ Modification/Increase in production capacity by industries/project proponent under the various provisions of Water (Prevention & Control of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981.

It has been observed that there are some industries, which had been

established and commissioned without obtaining the consent to establish/operate

of the Board required under the provisions of the Water (Prevention & Control of

Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981. Some of

the industries had carried out expansion of their existing industrial plants without

the prior approval of the Board. Some of such units are also covered under the

First Schedule of The Factories Act, 1948 and/or Press Note 17 (1984 series) but

they have not obtained site clearance/environmental clearance from SCA-cum-SAC

as required under the Law. Later on, such units have voluntarily approached the

Board for obtaining the consent to operate and/or SCA-cum-SAC for obtaining the

site clearance / environmental clearance for regularization of their establishment.

Furthermore, many other such units are still operating without approaching the

Board and/or SCA-cum-SAC. The matter was considered by the Board in its 153rd

meeting held on 9.9.2011 and it has been decided as under:

i) Units covered under the First Schedule of Factories Act, 1948 and/or Press Note 17 (1984 series) as well as EIA Notification dated 14.9.2006.

In case, such units are established and commissioned without

obtaining the consent to establish/operate of the Board / have carried out

expansion of their existing industrial plants without the prior approval of the Board

/ have made alterations or variations without the consent to establish of the Board,

then such units should be granted consent to operate by the Board only after they

Page 231: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 270 -

obtain site clearance/ environmental clearance from SCA-cum-SAC as well as

environmental clearance under the provisions of EIA Notification dated 14.9.2006,

if required. However, the consent fee for the period prior to submission of consent

application to the Board should be charged at higher rate i.e. 2 times of the normal

fee presently being charged by the Board for each financial year. The fraction of

year shall be counted as a full financial year.

ii) Units covered under the First Schedule of Factories Act, 1948 and/or Press Note 17 (1984 series) but not under EIA Notification dated 14.9.2006.

In case, such units are established and commissioned without

obtaining the consent to establish/operate of the Board / have carried out

expansion of their existing industrial plants without the prior approval of the Board

/ have made alterations or variations without the consent to establish of the Board,

then such units should be granted consent to operate by the Board only after they

obtain site clearance/ environmental clearance from SCA-cum-SAC, as the case

may be. However, the consent fee for the period prior to submission of consent

application to the Board should be charged at higher rate i.e. 2 times of the normal

fee presently being charged by the Board for each financial year. The fraction of

year shall be counted as a full financial year.

iii) Units covered under EIA Notification dated 14.9.2006 but not under the First Schedule of Factories Act, 1948 and/or Press Note 17 (1984 series).

In case, such units are established and commissioned without

obtaining the consent to establish/operate of the Board / have carried out

expansion of their existing industrial plants without the prior approval of the Board

/ have made alterations or variations without the consent to establish of the Board,

then such units should be granted consent to operate by the Board only after they

obtain environmental clearance under the provisions of EIA Notification dated

14.9.2006. However, the consent fee for the period prior to submission of consent

application to the Board should be charged at higher rate i.e. 2 times of the normal

fee presently being charged by the Board for each financial year. The fraction of

year shall be counted as a full financial year.

iv) Units neither covered under the First Schedule of Factories Act, 1948 and/or Press Note 17 (1984 series) nor the EIA Notification dated 14.9.2006.

Page 232: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 271 -

In case, such units are established and commissioned without

obtaining the consent to establish/operate of the Board / have carried out

expansion of their existing industrial plants without the prior approval of the Board

/ have made alterations or variations without the consent to establish of the

Board/have failed to get the consent renewed in time, then such units should be

granted consent to operate by the Board only in case such industrial units are

meeting with the prescribed siting criteria prescribed by the Board and they have

taken adequate and appropriate pollution control measures. However, the consent

fee for the period prior to submission of consent application to the Board should be

charged at higher rate i.e. one and half times of the normal fee presently being

charged by the Board for each financial year. The fraction of year shall be counted

as a full financial year.

In case, such units are not meeting with the prescribed siting criteria

of the Board, then such units should be issued directions for closure of their units

or revert back to the sanctioned capacity, as the case may be.

These orders shall come into force with immediate effect.

Sd/- Chairman

Endst. No.40038-82 Dated : 10.10.2011 A copy of the above is forwarded to the following for information and necessary action: 1. The Chief Environmental Engineer-I/II/III, Punjab Pollution Control Board, Patiala 2. The Sr. Environmental Engineer, Punjab Pollution Control Board, Zonal

Office, Patiala-I/II/Amritsar/Jalandhar/Ludhiana-I/II, HQ-1/HQ-2. 3. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Amritsar/Bathinda/Fatehgarh Sahib/Faridkot/Hoshiarpur/Jalandhar/Ludhiana-I/II/III/IV, Patiala, Sangrur & Mohali.

4. The Environmental Engineer, Punjab Pollution Control Board, HQ-1/HQ-2/Mega/HWM/ Const., Head Office, Patiala.

5. The Additional Secretary (G&P), Punjab Pollution Control Board, Camp Office: Mohali.

6. The Deputy Director (PR), Punjab Pollution Control Board, Patiala. 7. The Deputy Controller (F&A)/Administrative Officer, Punjab Pollution

Control Board, Patiala.

Page 233: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 272 -

8. All Asstt. Environmental Engineers of Punjab Pollution Control Board. 9. Law Officers, Punjab Pollution Control Board, Patiala. 10. P.S. to Chairman/P.A. to Member Secretary, Punjab Pollution Control

Board, Patiala.

Sd/- ( Dr. Babu Ram )

Member Secretary

Page 234: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 273 -

Annexure-75

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN, NABHA ROAD, PATIALA

OFFICE ORDER

No.SEE (HQ-1)/ 2012/65 Dated :

12.03.2012

Subject: Permissions for the disposal of material confiscated under NDPS Act, by the police authorities and other agencies.

The Board is receiving regular requests from the police authorities

seeking permission for the disposal of drugs and other materials confiscated under

the NDPS Act. These authorities sought such permission at a very short notice. As

per present practice, such requests are routed through various channels causing lot

of time for final issuance of such permissions.

To overcome this problem, the competent authority has decided that,

in future, such permissions will be granted by the concerned Regional Officer in

whose jurisdiction the Bio-Medical Waste Treatment Facility or the industry having

incinerator falls, where these material has to be disposed off. The concerned

Regional Officer may issue such permissions after checking the surplus capacity of

the incinerators provided by such facility/industry and send the copy of the

permission to the Additional Secretary, BMW Cell, SAS Nagar for his information

and record.

This issues with the approval of the Chairman of the Board.

Sd/- Member Secretary

Endst.No.SEE(HQ-1)/2012/11560-95 Dated:

12.3.2012

A copy of the above is forwarded to the following for information and necessary action:

1. The Chief Environmental Engineer-I/II/III, Punjab Pollution Control Board, Patiala 2. The Senior Environmental Engineer, Punjab Pollution Control Board-HQ-1/2,

Patiala, Zonal Office, Patiala-1/2, Ludhiana-1/2, Amritsar, Jalandhar, Bathinda.

3. The Additional Secretary, Punjab Pollution Control Board, Mohali. 4. The Senior Scientific Officer, Punjab Pollution Control Board, Head Office

Laboratory, Patiala.

Page 235: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 274 -

5. The Environmental Engineer, Punjab Pollution Control Board, HWM/EPA/(BMW)/Mega/ Const., Regional Office, Patiala/Fatehgarh Sahib/Ludhiana-I/II/III/IV/ Sangrur/ Faridkot/ Hoshiarpur/Jalandhar/ Amritsar/Bathinda & SAS Nagar

6. The Administrative Officer, Punjab Pollution Control Board, Patiala. 7. The Law Officers, Punjab Pollution Control Board,

Patiala/Ludhiana/Jalandhar 8. The P.S. to Chairman/PA to Member Secretary, Punjab Pollution Control

Board, Patiala. Sd/-

( Dr. Babu Ram ) Member Secretary

Page 236: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 275 -

Annexure-76

gzikp gqd{FD o'eEkw p'ov tksktoD GtB, BkGk o'v, gfNnkbk.

Bzpo L 1398-1420 fwsh L 19H03H2012

;/tk fty/

1 w[Zy tksktoD fJzihBhno-1$2$3,

gzikp gqd{FD o'eEkw p'ov,

gfNnkbk.

2 ;hBhno tksktoD fJzihBhno,

gzikp gqd{FD o'eEkw p'ov,

i'Bb dcso-1$2, gfNnkbk$b[fXnkDk-1$2$

ibzXo$nzfwqs;o ns/ pfmzvk.

3 tksktoD fJzihBhno,

gzikp gqd{FD o'eEkw p'ov,

y/soh dcso, gfNnkbk$b[fXnkDk-1$2$3$4$

ibzXo$nzfwqs;o$pfmzvk$cohde'N$j[fFnkog[o$

csfjrVQ ;kfjp$;zro{o ns/ n?;HJ/Hn?;H Bro.

ft;akL w[Zy ;eZso, gzikp ih d/ gZXo s/ oki ftZu o/s nkfd dhnK ykDK ftZu'_

r?o-ekB{zBh fBek;h B{z o'eD nXhB ehs/ ikD tkb/ T[gokfbnK ;zpzXh

j'D tkbh whfNzr pko/.

T[go'es d/ ;zpzX ftZu dZf;nk iKdk j? fe ;N'B eo;aoK B{z p'ov tZb'_

n?BHUH;hH d/D s'_ gfjbK ;oeko tZb'_ ikoh ehsh rJh B'Nhfce/;aB BzL 3$7$96-

n?;HNhHJhH(5)$562 fwsh 17H3H1998 ftu fBoXkos ;kJhfNzr rkJhvbkJhBia dh gVQskb

ehsh iKdh j?. i/eo ;N'B eo;ao dh irQk T[es B'Nhfce/;aB ftZu fBoXkos wkgdzv

g{ok eodh j?, sK p'ov tZb'_ ;N"B eo;ao ;Ekfgs eoB bJh n?BHUH;hH (Consent to

Eastablish) ikoh ehsk iKdk j?. fJZE/ fJj dZ;Dk :'r j't/rk fe ;oeko tZb'_ ikoh

T[es B'Nhfce/;aB ftZu fJ; soQK dk e'Jh gq'thiaB Bjh_ j? fe p'ov n?BHUH;hH ikoh

eoB s'_ gfjbK fJj d/y/ fe bZrD tkbk ;N'B eo;ao feZE'_ okn-wNhohnb (gZEo)

gqkgs eo/rk.

fJ; s'_ pknd id'_ e'Jh th ;N'B eo;ao gbKN ubkT[D dh fJiakias

wzrdk j? sK p'ov tZb'_ fJj :ehBh pDkfJnk iKdk j? fe ;zpzXs ;N'B eo;ao B/

gqd{;aD B{z ezNo'b eoB bJh b'Vh_d/ gqpzX eo bJ/ jB.

e/_doh n?eN, wkJhBia n?_v fwBob (fvt?bgw?_N n?_v o?r{b/;aB) n?eN,

1957 nXhB pD/ gzikp wkJhBo fwBob ezB;?;aB o{bia, 1964 d/ nXhB o/sk ns/

pioh S'N/ yfDi jB. fJj S'N/ yfDi T[d:'r ns/ ekwo; ftGkr, gzikp tZb'_ gzikp

wkJhBo fwBobia ezB;?;aB o{bia, 1964 nXhB o?r{b/N ehs/ iKd/ jB. fJj ftGkr

Page 237: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 276 -

S'N/ yfDiK dh fBek;h bJh th yZvK m/e/ s/ fdzdk j?. fJ; bJh S'N/ yfDiK dh r?o-

ekB{zBh fBek;h th T[es n?eN nXhB nkT[_dh j?.

S'N/ yfDiK dh r?o-ekB{zBh fBek;h B{z wZd/Biao oZyd/ j'J/, p'ov tb'I

;kfJz;, seBhe, tksktoD ns/ r?o otkfJsh T{oik ftGkr Bz{ gZso Bzpo 6300 fwsh

4$11$2011 okjhI ;[Mkn fdZsk frnk fe ;oeko tZb'_ ikoh B'Nhfce/;aB BzL 3$7$96-

n?;HNhHJhH (5)$562 fwsh 17H3H1998 ftZu ;'X eoB dh iao{os j? ns/ fJ; ftZu fJj

gq'thiaB ;akfwb ehsk ikt/ fe ;N'B eo;ao p'ov s'_ gbKN ubkT[D dh fJiakias

(Consent to Operate) s'_ gfjbK ;zpzXs ftGkr s'_ ;oNhfce/N gqkgs eo/rk fe ;N'B

eo;ao d/ okn-wNhohnb (gZEo) dk eh ;o's j? ns/ T[; ;o's s'_ ;N'B eo;ao B{z

g{o/ ;kb fezBh wksok ftZu okn-wNhohnb (gZEo) gqkgs j't/rk.

T[es Bz{ wZd/ Biao oZyd/ j'J/ gqwZ[y ;eZso, gzikp ;oeko, ;kfJz;,

seBhe, tksktoD ns/ r?o-otkfJsh T{oik ftGkr B/ nkgD/ fg nz BzL 8$29$2011-

;st(4)$3597 fwsh 21H12H2011 oKjh gqw[Zy ;eZso, T[d:'r ns/ ewo; ftGkr Bz{

p'ov tb' U[go"es gZso okjh_ fdZs/ rJ/ ;[Mkn Bz{ Minor Mineral Concession Rules, 1964

ftZu ;akfwb eoB bJh b'Vhdh ekotkJh eoB dh p/Bsh ehsh rJh j?.

fJ;h d"okB T[d:'r ns/ ewo; ftGkr B/ fwsh 22$12$2011 B{z

wkB:'r w[Zy ;eZso, gzikp dh gqXkBrh j/m o/s nkfd dh r?oekB{zBh fBek;h B{z o"eD

nXhB ehs/ ikD tkb/ T[gokb/ ;pzXh whfNzr d"okB c?;bk fbnk frnk j?L-

1H gzikp gqd{;aD o'eEkw p'ov tb' i' ftfrnkB, seBkb'ih s/ tksktoD ns/ r?o

T[gukoe T[oik ftGkr tZb' ikoh B'Nhfce/;aB fwsh 17$3$1998 nB[;ko oki

ftu ;N''B eo;aoi B[z n?BHUH;hH ikoh eod/ j'J/ ofi;Nov ehs/ ik oj/ jB,

GftZy ftu T[d:'r ns/ ewo; ftGkr tb' gqtkB $ ;fjwsh pr?o n?BHUH;hH

$ ofi;Nov Bk ehs/ ikD.

2H oki ftu gzikp b?v gqhiot/;aB n?eN, 1900 d/ ;?e;aB 4 ns/ 5 nXhB i'

oep/ pzd jB T[jBK ftu' jo fe;w dh r?o ekB[zBh fBek;h ;pzXh g?oth ns/

b'Vhdh ekotkJh izrbks ns/ izrbh iht ;[oZfynk ftGkr eo/rk.

fJj nkg ih dh ;{uBk ns/ fJzB-fpzB gkbDk fjZs j?.

;jh$-

w?Ipo ;eZso

Page 238: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 277 -

Annexure-77

PUNJAB POLLUTION CONTROL BOARD

VATAVARAN BHAWAN, NABHA ROAD, PATIALA

No.HQ-2/Solar PV/F-322/2010/08

Dated : 05.01.2011

OFFICE ORDER

The Board in it 149th meeting held on 20.10.2010 vide item No.149.03 has

decided to exempt the Solar Photovoltaic Plants less than 5 MW for obtaining the

consent to establish/operate from the Board under the Water (Prevention & Control

of Pollution) Act, 1974 and Air (Prevention & Control of Pollution) Act, 1981 for a

period of five years subject to the following conditions:

1. That there will not be any discharge of trade effluent from the industry into the stream or well or sewer or onto land for irrigation and it will not cause any air pollution including noise.

2. That the industry will not discharge any toxic/hazardous waste and will not handle any toxic/hazardous chemicals.

3. This exemption shall be valid for Solar P.V. Plants having capacity less than 5 MW and having maximum manpower employed upto 25 only.

4. Domestic effluent after treatment in septic tanks shall be used for gardening/plantation purpose inside their premises.

Sd/- ( Rajat Aggarwal, IAS )

Chairman Endst. No. HQ-2/Solar PV/F-322/2010/630-678 Dated: 5.01.2011

A copy of the above is forwarded to the following for information & necessary action:-

1. The Member Secretary-cum-Chief Environmental Engineer, Punjab Pollution Control Board, Patiala.

2. The Chief Environmental Engineer-I/II/III, Punjab Pollution Control Board, Patiala

3. The Senior Environmental Engineer (HQ-I/II)/EPS,, Punjab Pollution Control Board, Patiala.

4. The Senior Environmental Engineer, Zonal Office, Patiala-I/II, Ludhiana-I/II, Jalandhar/Amritsar/Bathinda.

5. The Additional Secretary (General & Planning), Punjab Pollution Control Board, Mohali.

6. The Senior Scientific Officer, Punjab Pollution Control Board, Patiala. 7. The Environmental Engineer, Punjab Pollution Control Board, Regional

Office, Patiala/Fatehgarh Sahib/Ludhiana-

Page 239: Manual No. 4 NORMS SET FOR THE DISCHARGE OF …ppcb.gov.in/Attachments/RTI/Manual 4.pdfNORMS SET FOR THE DISCHARGE OF FUNCTIONS TECHNICAL MATTERS The Punjab Pollution Control Board,

- 278 -

I/II/III/IV/Sangrur/Faridkot/Hoshiarpur/Jalandhar/ Amritsar/Bathinda & Nodal Office, Mohali.

8. The Environmental Engineer, Punjab Pollution Control Board, Zonal Office, Patiala-I/II, Ludhiana-I/II, Jalandhar/Amritsar/Bathinda/EE (1/2-HQ-1), EE (1/2/3-HQ-2)/EE, EPA, Mohali.

9. Deputy Director (PR), Punjab Pollution Control Board, Patiala. 10. The Administrative Officer, Punjab Pollution Control Board, Patiala. 11. The Deputy Controller (F&A), Punjab Pollution Control Board, Patiala. 12. The Law Officers, Punjab Pollution Control Board, Patiala. 13. The PA to Chairman/PA to Member Secretary for kind information of Hon‟ble

Chairman & Member Secretary.

Sd/- Member Secretary