BiTS 2016 March 6-9, 2016 Burn-in & Test Strategies Workshop www.bitsworkshop.org Proceedings Archive Archive- Session 2 March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona © 2016 BiTS Workshop Image: Stiop / Dollarphotoclub

Upload: dangbao

Post on 06-May-2018

217 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

BiTS 2016

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Proceedings Archive

Archive- Session 2

March 6 - 9, 2016

Hilton Phoenix / Mesa Hotel

Mesa, Arizona

© 2016 BiTS Workshop – Image: Stiop / Dollarphotoclub

Page 2: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

BiTS 2016

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Proceedings Archive

Presentation / Copyright Notice

The presentations in this publication comprise the pre-workshop Proceedings of the 2016 BiTS Workshop. They reflect the authors’ opinions and are reproduced here as they are planned to be presented at the 2016 BiTS Workshop. Updates from this version of the papers may occur in the version that is actually presented at the BiTSWorkshop. The inclusion of the papers in this publication does not constitute an endorsement by the BiTS Workshop or the sponsors.

There is NO copyright protection claimed by this publication. However, each presentation is the work of the authors and their respective companies: as such, it is strongly encouraged that any use reflect proper acknowledgement to the appropriate source. Any questions regarding the use of any materials presented should be directed to the author/s or their companies.

The BiTS logo and ‘Burn-in & Test Strategies Workshop’ are trademarks of BiTS Workshop.

2

Page 3: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

BiTS 2016

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Proceedings ArchiveBiTS Workshop 2016 Schedule

Session

Session Chair

Frontiers DayMonday March 7 - 1:30 pm

Material Matters

"Long Life Probe Pin by Electroforming Process"Makota Kondo & Hirotada Teranishi - Omron Corporation

Takahiro Sakai & Naoyuki Kimura - Omron Corporation

"Carbon Nanotube Polymer Composites as High Performance Thermal Interface Materials for Burn in and Test Applications"

Leonardo Prinzi - Georgia Institute of TechnologyCraig Green & Baratunde Cola - Carbice Nanotechnologies, Inc.

"Requirements and Solutions for Test PCBs"Markku Jamsa - Aspocomp Group Oyj

"PCB Test Fixture and Socket Challenges for mmWave Applications"Don Thompson Jose - R&D Altanova

Jose Moreira - Advantest Europe GmbHGiovanni Bianchi - Advantest

2Ashok Kabadi

Page 4: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

PCB Test Fixture and

Socket Challenges for

mmWave Applications

2016 BiTS Workshop

March 6 - 9, 2016

Don Thompson, R&D Altanova

Jose Moreira and Giovanni Bianchi, Advantest

Page 5: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Outline

Elastomeric Socket Evaluation at 77 GHz

• Review from last year

• Test Setup Interesting things– Material evaluation

– Balun

• Measurement Results– Insertion Loss

– Soldered down vs Socket

– Cycle Testing

• Conclusions

PCB Test Fixture and Socket Challenges for mmWave Applications

Page 6: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

mmWave Integrated ATE Solution

PCB Test Fixture/Socket Challenge

3

mmW DUT

ATE 6GHz RF

UDI (Universal DUT Interface) Framework

mmW components located between DUT and

ATE

Maintains high-performance ATE functionalitiesHVM handler/prober integration

High fidelity and short signal connections

Calibration/diagnostics

DUT PCB TEST

FIXTURE AND

SOCKET

Major Challenge 75-85 GHZ

UDI TEST FIXTURE INTERFACE

Waveguide Blind Mate Interface

PCB Test Fixture and Socket Challenges for mmWave Applications

Page 7: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

The Challenge

The Need:

• Automotive radar (77-85 GHz) and some high

frequency Near Field Communication (60 GHz)

applications are way outside the envelope of

traditional socket capabilities

• ATE test cells need a low loss, low cost, and well

behaved socket that works at these frequencies

The Challenge:

• Build and verify a proof of concept 76-77 GHz

socket for a 0.5 mm fine pitch package

4PCB Test Fixture and Socket Challenges for mmWave Applications

Page 8: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Results from BiTS 2015

• Confirmed Proof of Concept

• Results were Single Ended (Need Differential)

• Evaluation Board only

5

De-embedding Structures

Good performance to 90 GHz

PCB Test Fixture and Socket Challenges for mmWave Applications

Page 9: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Invisipin 77 GHz Socket Solution

• Step 1: Proof of Concept in lab

• Step 2: Demonstrate performance using

actual part in lab

– Select test part and evaluate for that part using

exact part footprint

– Create full socket

• Step 3: Evaluate on a Customer Test

floor

PCB Test Fixture and Socket Challenges for mmWave Applications 6

Page 10: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Test Environment

1. Trace construction

2. Balun construction

7PCB Test Fixture and Socket Challenges for mmWave Applications

Page 11: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Signal Trace Loss

8

5 dB

PCB Test Fixture and Socket Challenges for mmWave Applications

DUT

2X THRU

• 17.8 mil microstrip

• Taconic EZ-IO dielectric

• Rolled copper

6 CM MICROSTRIP

Page 12: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Nickel-Gold vs. Silver Plating

9

6 cm microstrip

Ag vs NiAu

• Silver plating does not show

any significant loss

improvement.

• Adding soldermask has a

significant impact.

PCB Test Fixture and Socket Challenges for mmWave Applications

Soldermask on NiAu

467μm

482μm

35μm

213μm

NiAu

Ag

Page 13: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

mmWave Baluns (1)

10PCB Test Fixture and Socket Challenges for mmWave Applications

• Automotive radar ICs use differential mmWave signals

• mmWave measurement instrumentation uses single-ended inputs

• This requires the use of baluns for coaxial connectors (waveguide

transitions can be designed to function as a balun).

• Three designs were evaluated: “Delay-Line”, “Rat-Race” and “Marchand”

DELAY-LINE MARCHAND

RAT-RACE

(MATCHED BALUN)

NOTE THAT PICTURES

HAVE DIFFERENT

SCALES

LOAD

Page 14: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

mmWave Baluns (2)

11PCB Test Fixture and Socket Challenges for mmWave Applications

DELAY-LINE

SIMULATION BASED DE-EMBEDDING

AFR BASED DE-EMBEDDING

• AFR based de-embedding

presented problems due to the

small loss of the delay-line

balun

• Delay-line balun showed the

best performance and was used

for the socket measurements

Page 15: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Socket vs Solder

12PCB Test Fixture and Socket Challenges for mmWave Applications

Page 16: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Performance of a Live Part

• Create a fully functional test board for a customer

part and test two ways– Socketed device

– Soldered device

• Compare results against de-embedded VNA

measurements (76 GHz – 77 GHz)

13PCB Test Fixture and Socket Challenges for mmWave Applications

Page 17: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Invisipin Socket

14PCB Test Fixture and Socket Challenges for mmWave Applications

• Discrete elastomeric column

• Pick-and-place solder-able contact

• Available in multiple sizes for different package

pitches

• *** Can have an air dielectric ***

BUT We’re still limited to package pinout

TOP View

TOP View

Page 18: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Socket vs. Soldered Part

• All comparison data was normalized to 0 dB using the

soldered part output power average as baseline

• Programmed Device on Advantest Tester

• Output frequency varied from 76 to 77 GHz and

recorded in 0.25 GHz steps

• Same part was used in both tests

Socketed PartSoldered Part

BASELINE (0 dB) Compare

15PCB Test Fixture and Socket Challenges for mmWave Applications

Page 19: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

DUT Measurements

16PCB Test Fixture and Socket Challenges for mmWave Applications

Signal Generator (Keysight E8257)

POWER SENSOR

(Keysight E8486A)

SPI AND POWER

V93000 ATE

WITH DUT SOLDERED

WITH DUT IN SOCKET

Page 20: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Soldered vs. Socketed Output Power

17PCB Test Fixture and Socket Challenges for mmWave Applications

Page 21: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Standard Deviation

Socketed Part

Soldered Part

Soldered part - all equipment was power cycled

Socketed part – Power Cycled and part removed/reinserted

18PCB Test Fixture and Socket Challenges for mmWave Applications

Page 22: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

VNA Measured Insertion Loss

76 to 77 GHz

Test Board Only

Test Board + Socket

Socket Only (De-embedded)

Previous Slide data

Rosenberger

1mm

SOCKET

Surrogate Package

Test Board

Rosenberger

1mm

MEASUREMENT SETUP IS DEFFERENTIAL

19PCB Test Fixture and Socket Challenges for mmWave Applications

Page 23: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Performance vs Cycling

20PCB Test Fixture and Socket Challenges for mmWave Applications

Page 24: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Cycle Testing Process

Start

Measure 10 Cycles

Offline Cycle

X Times

Rep

eat

in i

ncr

easi

ng

in

crem

ents

Stop at 100,000

• Every time offline cycling is

done everything must be

disassembled and reassembled

• Offline cycling was done

rapidly, ~ 1 second per cycle

• Offline cycling is a test of the

elastomer, not the solder ball

and contact surface. Solder ball

and contact surface test must be

done at customer site.

0

100

1250

5000

20000

40000

50

500

2500

10000

30000

50000

80000

60000

100000

21PCB Test Fixture and Socket Challenges for mmWave Applications

Page 25: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Part Measured Versus Cycling

Performance Loss due to loose Connector

22PCB Test Fixture and Socket Challenges for mmWave Applications

2 SOCKETS EVALUATED

Number of Cycles

Page 26: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Conclusions

• Socket Loss < 1.15dB between 76-77 GHz

• Adjusting for assembly variations:– Standard Deviation = < 0.1 dB over 100,000 cycles

• No loss in RF performance seen up to

100,000 cycles

23PCB Test Fixture and Socket Challenges for mmWave Applications

Page 27: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Acknowledgments

• We would like to thank Sui-Xia Yang and

Roger McAleenan for their measurement

support.

• We would also like to thank Yoko Kato and

the FA team at Advantest Gunma for the

cross section analysis.

PCB Test Fixture and Socket Challenges for mmWave Applications 24

Page 28: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Reference Material

25PCB Test Fixture and Socket Challenges for mmWave Applications

Page 29: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

Balanced to Unbalanced Transduction

2

1

2

1

2

12

1

2

1

2

12

1

2

10

3,

j

j

jj

S PBalun

0

02,2,

j

jSS PTMagicPBalun

002

1

002

12

1

2

10

3,

j

j

jj

S PTMagic

Balun and magic-T behaves

identically in the case of

antisymmetric excitation.

P2, P3 of the balun (seen as 3-

port) are not isolated and not

matched. One problem on one

generator affects also the

transmission of the other one.

On a magic-T, P2, P3 are

matched and isolated

(s22=s33=s23=s32=0).

Balun is a loss-free network

while a magic-T is a dissipative

network.

.

Our problem is to combine two antisymmetric sources to

one single-ended port. This is totally equivalent to deliver

the signal of a single generator to two identical loads, with

a 180-deg phase shift between them.

PCB Test Fixture and Socket Challenges for mmWave Applications 26

Page 30: March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa ... · March 6 - 9, 2016 Hilton Phoenix / Mesa Hotel Mesa, Arizona ... Ashok Kabadi. BiTS 2016 Material ... • Measurement Results

Material Matters – Advanced Materials & ManufacturingBiTS 2016Session 2 Presentation 4

March 6-9, 2016Burn-in & Test Strategies Workshop www.bitsworkshop.org

0.75 1.00 1.25-4

-2

0

2

Transmission coefficient (as 2-ports)

Phase umbalance (relative to 180-deg, as 3-ports)

Amplitude umbalance (as 3-ports)

dB

(S2

1/S

31)

0.75 1.00 1.25-90

-45

0

45

90

Pha

se

(S2

1/S

31)+

18

0

0.75 1.00 1.25-1

0

1

dB

(S2

1),

(2

P)

f/f0

a), b) are baluns: if P2 (P3) is open-CKT there is no

transmission from P3 (P2) to P1 too. c) is a magic-T.

The first one is the most simple. b) presents zero

phase and amplitude unbalance.

In our realizations,

a) the line from P2 to P3 is folded

b) The short-circuits are replaced by radial stubs

c) The load operates at RF only

PCB Test Fixture and Socket Challenges for mmWave Applications 27

Semi-Ideal Baluns and Magic-T