march 7, 2007 clas12 drift chamber review mac mestayer clas12 drift chamber construction - mac...
TRANSCRIPT
![Page 1: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/1.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
CLAS12 Drift Chamber Construction-Mac Mestayer
Technical Details of Construction—buy endplates —build “box”—insert feedthroughs—string chambers
• Cost and Schedule
![Page 2: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/2.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
CLAS12 Drift Chambers
Design: same concept as present chambers:NIM A449(2000)81
•6 sectors, 3 regions•18 drift chambers•24192 sense wires
drift chambers
![Page 3: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/3.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Endplates: many precise holes
Number of Holes4925 feedthrough holes12 survey 3 datum & alignment28 bolt & attachment
1.7 m
First Order Placed-due back in March-large, modern milling machine
![Page 4: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/4.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Endplate Details
0.200 mmtrue position “50 m”
![Page 5: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/5.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Endplates fit into Frames
Receive endplates- inspect- measure hole positions- clean- shim- bolt and glue into frames
![Page 6: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/6.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Chamber Ready to String
Box Assembledendplates attachedattachment brackets affixed
Next ---- mount on stringing fixture- insert feedthroughs- pre-tension- string wires- attach circuit boards- QA/QC
![Page 7: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/7.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
CLAS12 Stringing Fixture
![Page 8: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/8.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Parts: wire circuit board
conductive rubber
circuit board
crimp pin
feedthrough
endplate
signal routing:wires pre-amp
wire
![Page 9: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/9.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Stringing wires between “slanted” endplates
endplates
“gravity” stringingwires: 9 cm - 4 m longwires strung individuallywires attached by crimpingwires positioned by “trumpet”
![Page 10: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/10.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Steps in Stringing
![Page 11: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/11.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Installing Pre-tensioning Wires
Pre-tensioning- before we start stringing- use springs on guard wires- gradual release of tension
![Page 12: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/12.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Stringing the Chamber
![Page 13: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/13.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Bussing Field Wires
Bussing Field Wires- under the circuit board- gold-plated copper wire- one “miscellaneous part”- e.g. 16,000 ft. - $6000
- do this before mountingcircuit boards
![Page 14: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/14.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Project Overview & Responsibilities
• Oversight: Jefferson Lab
• Design & BuildRegion 1: ODURegion 2: JLabRegion 3: Idaho State
• Prototypingfull-sized Reg. 1 prototype: Jlab, ODUplastic vs. metal-tipped feedthroughs: Jlab,
ODU, ISU
![Page 15: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/15.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Drift Chamber Schedule
PED
![Page 16: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/16.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
CLAS12 Drift Chamber PED
test prototype this summer
![Page 17: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/17.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Drift Chamber Construction Schedule
3 YEARS
![Page 18: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/18.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Details: Stringing the Chambers
~2 yrs./ 6 chambers
~1/2 time for stringing
![Page 19: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/19.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
• Estimate the time; use labor cost tables
• “Bottoms-up” estimate - based on previous experience2 people, 15 mins. per wire for stringing“stringing” per se takes 1/3 to 1/2 of the time3 crews of 5 stringers for ~ 2 years3 - 4 techs / scientists doing support, QA/QC
• “Top-down” - simple scaling of total elapsed time, accounting for fewer wires
Costs: Stringing the Chambers
![Page 20: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/20.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
CLAS12 Drift Chamber Procurements/Expenses
Forward Tracker Procurements and Expenses (K$)
0
200
400
600
800
1000
1200
1400
1600
1800
2000
Des
ign
cham
ber
Buy
End
plat
es
Wire
s, p
ins,
feed
thro
ughs
Mis
c. p
arts
Box
ass
embl
yD
esig
n st
ringe
rB
uild
stri
nger
Stri
ng c
ham
ber
Des
ign
stb/
hvtb
Buy
stb
/hvt
b
K$
Task
k$
stringing labor- estimate time- use labor rate
![Page 21: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/21.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
CLAS12 Drift Chamber: Construction Costs
Forward Tracker
Proj.
Sub-tasks MT ET ME EE MD ED VU S US Proj man-wks k$Design chamber 21 10 21 21 36 1 110 135 135
Buy Endplates 690 1 3 7 5 3 6 25 29 719
Wires, pins, feedthroughs 380 1 2 4 5 3 6 21 23 403
Misc. parts 200 2 4 5 5 4 9 29 32 232
Box assembly 400 16 8 8 40 9 22 103 101 501
Design stringing fixture 9 2 9 6 26 44 44
Build stringer 50 10 2 35 3 9 59 49 99
String chamber 1791 56 6 150 40 130 4 386 298 2,089
Design stb/hvtb 15 15 45 15 100 190 159 159
Buy stb/hvtb 325 10 1 5 2 10 28 29 354
Mount stb/hvtb 10 10 40 2 24 2 6 84 95 105
Total $3,846 126 65 37 18 54 50 264 108 334 5 1061 $994 $4,840
PED 30 15 12 15 30 45 0 42 136 1 326 $338 $338
CONSTRUCTION $3,846 96 50 25 3 24 5 264 66 198 4 735 $656 $4,502
Total (k$)
Total Labor
Labor (man-weeks)
Outside Costs
Techs. Engrs. Designers Scientists
PED: 0.34 M$Const: 4.50 M$
Total: 4.84 M$
![Page 22: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/22.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
CLAS12 Drift Chambers: Cost
• Same concept as present CLAS chambers• Small extrapolations from current designs
smaller cells, thicker wire, faster gas• Cost estimates based on prior experience
180$ / sense wire : mechanical costsmajor cost is “wire-stringing”re-use most electronics
• Schedule and manpower allocation: prior experience
• Experts on staff and in CLAS collaboration
![Page 23: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/23.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
• Phenix DC’s (“jet-cell” type with 36 super-modules)Mechanical costs:
• $250/sense wire (but 7-8 other wires per sense wire)• $50/total wire
• CLEO-c DC’s (“open-cell” with “square” cells)Mechanical costs:
• $40/total wire (labor not included)
• CLAS12 DC’s (“open-cell” with hexagonal cells)Mechanical costs:
• $180/sense wire• $49/total wire (labor included)
Cost Comparison: Other Drift Chambers
![Page 24: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/24.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
• “Harder to do”Region 1: 7.5 mm cell; 1.8 m long wire
• Easier to do”smaller chambers
• 7 m endplate 4 m endplate
chambers are flat • stereo wires are all parallel
sense wire: 20 m 30 m • less breakage, easier to see !
Risks: Stringing the Chambers
![Page 25: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/25.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
CLAS Drift Chambers : History
• Operating successfully for ~10 years ….
![Page 26: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/26.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
CLAS Drift Chambers : History
…. with good resolution
• mid-cell resolution is 200 - 250 m
• whole-cell average: 310, 315, 380 m; for R1, R2, R3
…. at the same voltage, with same efficiency Ar/CO2 shows no
conventional aging
![Page 27: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/27.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Conclusions
Large project: 18 chambers, 90K total wires
Reliable design: should achieve resolution and efficiency
goals
Low risk cost and schedule: based on detailed knowledge from CLAS
High probability of success: experienced people
![Page 28: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/28.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
• Broken wiresmore extensive “shake-down”better temperature control (already
implemented)• Circuit board corrosion
go to encapsulated SIP’s better humidity control (partially implemented)finer segmentation (partially implemented)
• High current drawstricter irradiation procedures (already
implemented)better humidity control (partially implemented)more HV channels (planned for near-term)
Operational Problems & Solutions
![Page 29: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/29.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
Desig
n ch
amber
Buy E
ndpl
ates
Wire
s, pi
ns, f
eedt
hrou
ghs
Misc
. par
ts
Box a
ssem
bly
Desig
n str
ingin
g fix
ture
Build
strin
ger
String
cha
mbe
r
Desig
n stb
/hvtb
Buy st
b/hv
tb
Mou
nt stb
/hvtb
Tota
l
CLAS12 / CLAS costs (not labor)
rati
o
task
CLAS12 DC’s have 70% as many wires
Some tasks don’t depend on wire count
![Page 30: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/30.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Forward Tracker Labor (man-weeks)
0
50
100
150
200
250
300
350
400
450D
esig
n ch
ambe
rB
uy E
ndpl
ates
Wire
s, p
ins,
feed
thro
ughs
Mis
c. p
arts
Box
ass
embl
yD
esig
n st
ringe
rB
uild
stri
nger
Stri
ng c
ham
ber
Des
ign
stb/
hvtb
Buy
stb
/hvt
bM
ount
stb
/hvt
b
man
-wee
ks
USSVUEDMDEEMEETMT
CLAS12 Drift Chambers : Labor
task
man
-wee
ks
PED tasks
![Page 31: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/31.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Methods of Cost Estimation
Endplates: cost = (a + b * nwires) * inflation; a = .2, b = .8
“boxes”: cost = old cost * 0.75 * inflationWires, pins, feedthroughs; cost = old_cost *
wire_ratio * inflation
![Page 32: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/32.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Recent cost estimates (06/-07)
• Recent Estimates from Tom Hartlove (with backup documents)• Region I endplates, 12ea, @ $36K (quote from Master Machine)• Region II endplates, 12ea, @ $50.6K (machined, quote from
Stesalit)• Region III endplates, 12ea, @41.6K (machined, quote from Martel
Marine)• Region I inserts, reduced tolerances, 80K parts @ $6.2K
(~$0.08/part) (quote from 4slide)• Field wire, 140um Al, 106km @ $94.9K (~$0.9/m)(quote from
CFW)• Sense wire, 20um Tungsten, 40km @$27.7K (~$0.69/m)(quote
from CFW, probably cheaper from Luma)• DC Wire Setup charges, $135/2000ft. i.e. fresh die every 2k ft.
(quote from CFW)• Region I crimp pins, 70K parts @ $95.2K (~$1.36/part)(quote
from Medelec)• Conductive rubber tubing, 100 ft @ $330 (quote from Chomerics)• Prototype HV boards 6 ea. @ $1120 (quote from Accurate Circuit)
![Page 33: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/33.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Possible Sources of Cost-Saving
• use “angle-iron” for chamber framespros: won’t warp, much cheapercons: need fixture to assemble full frame
• increase tolerance: stainless-steel “trumpets”pros: can find a willing vendorcons: may not be as accurate or take longer
to accept
![Page 34: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/34.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Detailed CLAS Costs from P.O.’s
• Region II• Endplates, 12ea. @ $30K/plate,
$420K• Installer, $24.5K• Stringing booms, $3K• Scaffolding, $3.8K• Attachment parts, $27K• Trapezoid, $9.5K• Strongback, $4.8K• U-channels, $3K• Posts, $11.2K• Crane for cleanroom, $4.6K• Cable supports, $20K• Misc. stringing stuff, $13K• Inserts, 125K parts, @ $ 19.6K• Crimp pins, 125K parts, @ $19.3K• Feedthroughs, 125K parts, @
$17.5K•
•
Region I Boss Ring, $10k Prototype chamber, $49.5K Finite element analysis, $13.1K Additional prototyping costs, $9.2K Helmholtz coils, $14K Transport cart, $5K Endplates, 12 ea. @ $50K Procure feedthrough assemblies, etc. $75K Procure parts, fabricate 6 chambers, $250K
![Page 35: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/35.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
Original Detailed CLAS Costs from P.O.’s
• WIRE, all regions combined.• Sense, 20um Tungsten, 118 km, $15.5K (~$0.13/m)• Field, 140um Aluminum, 344 km, $357.1k (~$1.04/m)• Guard, No records found.• Bus wire, $7K• • Region III• Skin connectors, $61.8K• Skins, $234.9K• Endplate material and machining, $400.2K• Closure bars, $70.2K• Hole inspection, $5K• Alignment fixture materials, $17K• Stringing platform, $36.3K• Chamber to Torus mounting posts, $72K• Eagle claws, $8K• Transporter, $6K• U-channels, $3K• Inserts, 110K parts @ $31.3K (~$0.29/part) + additional parts from inferior
vendor• Feedthroughs, 122K parts @ $54K (~$0.44/part)• Crimp pins, 152K parts @ $34.3K (~$0.23/part)• Plastic plugs for rubber connectors, $0.9K• Rubber connectors, $15K (approx.)
![Page 36: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/36.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
On-chamber electronics - 310K$ estimate
Signal Translator Boards -- Board Only
R1_STB QTY # Sectors Totals Cost Each Total $
Layer 1 7 6 42 $315.00 $13,230.00
Layer 2 7 6 42 $315.00 $13,230.00
R2_STB QTY # Sectors
Layer 1 7 6 42 $335.00 $14,070.00
Layer 2 7 6 42 $335.00 $14,070.00
R3_STB QTY # Sectors
Layer 1 7 6 42 $375.00 $15,750.00
Layer 2 7 6 42 $375.00 $15,750.00
252 $86,100.00
STB Components Per Board Board Mult Total QTY Cost Each
HV Capacitors 110 252 27720 $1.25 $34,650.00
PreAmp 96 252 24192 $3.00 $72,576.00
Regulator 16 252 4032 $1.65 $6,652.80
Power Connector 1 252 252 $1.75 $441.00
Output Connector 6 252 1512 $3.15 $4,762.80
Resistors 20 252 5040 $0.05 $252.00
Capacitors 20 252 5040 $0.05 $252.00
$119,586.60
![Page 37: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/37.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
High Voltage Boards
R1_HVB QTY # Sectors Totals Cost Each Total $
Layer 1 7 6 42 $125.00 $5,250.00
Layer 2 7 6 42 $125.00 $5,250.00
R2_HVB QTY # Sectors
Layer 1 7 6 42 $125.00 $5,250.00
Layer 2 7 6 42 $125.00 $5,250.00
R3_HVB QTY # Sectors
Layer 1 7 6 42 $200.00 $8,400.00
Layer 2 7 6 42 $200.00 $8,400.00
$37,800.00
HVB Components Per Board Board Mult Total QTY Cost Each
HV Capacitors 10 252 2520 $1.25 $3,150.00
Resistors 110 252 27720 $0.05 $1,386.00
Solder Posts 16 252 4032 $0.25 $1,008.00
$5,544.00
![Page 38: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/38.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
LOW VOLTAGE CABLE
R1_STB QTY # Sectors Totals Cost/Ft Length(Ft) Total $
Layer 1 7 6 42 $1.25 6 $315.00
Layer 2 7 6 42 $1.25 6 $315.00
Cable Connectors 28 6 168 $1.50 $252.00
R2_STB QTY # Sectors
Layer 1 7 6 42 $1.25 7 $367.50
Layer 2 7 6 42 $1.25 7 $367.50
Cable Connectors 28 6 168 $1.50 $252.00
R3_STB QTY # Sectors
Layer 1 7 6 42 $1.25 8 $420.00
Layer 2 7 6 42 $1.25 8 $420.00
Cable Connectors 28 6 168 $1.50 $252.00
$2,961.00
HIGH VOLTAGE CABLE
R1_STB QTY # Sectors Totals Cost/Ft Length(Ft) Total $
Layer 1 7 6 42 $3.00 6 $756.00
Layer 2 7 6 42 $3.00 6 $756.00
Cable Connectors 14 6 84 $5.00 $420.00
R2_STB QTY # Sectors
Layer 1 7 6 42 $3.00 7 $882.00
Layer 2 7 6 42 $3.00 7 $882.00
Cable Connectors 14 6 84 $5.00 $420.00
R3_STB QTY # Sectors
Layer 1 7 6 42 $3.00 8 $1,008.00
Layer 2 7 6 42 $3.00 8 $1,008.00
Cable Connectors 14 6 84 $5.00 $420.00
$6,552.00
![Page 39: March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates](https://reader035.vdocument.in/reader035/viewer/2022070418/5697c02e1a28abf838cda427/html5/thumbnails/39.jpg)
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer
PreAmp Output Cables -- (0.025" Pitch)
R1_STB QTY # Sectors Totals Cost/Ft Length(Ft) Total $
Layer 1 42 6 252 $4.00 6 $6,048.00
Layer 2 42 6 252 $4.00 6 $6,048.00
Cable Connectors 168 6 1008 $3.15 $3,175.20
R2_STB QTY # Sectors
Layer 1 42 6 252 $4.00 7 $7,056.00
Layer 2 42 6 252 $4.00 7 $7,056.00
Cable Connectors 168 6 1008 $3.15 $3,175.20
R3_STB QTY # Sectors
Layer 1 42 6 252 $4.00 8 $8,064.00
Layer 2 42 6 252 $4.00 8 $8,064.00
Cable Connectors 168 6 1008 $3.15 $3,175.20
$51,861.60