Protecting People. Protecting Assets Protecting People. Protecting Assets INTEROPERABILITY OF DATA FOR IMPROVING THE PRODUCTIVITY OF RAIL OPERATIONS Tony Crosby, GM Services Mark Wood, GM Communications & Electronics 4Tel Pty Ltd 12 August, 2014 4Tel Pty Ltd Page - 1

Upload: informa-australia

Post on 06-May-2015

221 views

Category:

Business


4 download

DESCRIPTION

Mark Wood & Tony Crosby, 4Tel delivered the presentation at ARA’s Telecommunications & Train Control Conference 2014. The ARA’s Telecommunications & Train Control Conference 2014 brought together passenger and freight rail operators, transport agencies, track owners, regulators and technology suppliers to assess telecommunications solutions and explored the capabilities of a shared future. For more information about the event, please visit: http://bit.ly/traincontrol14

TRANSCRIPT

Page 1: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

INTEROPERABILITY OF DATA FOR IMPROVING THE PRODUCTIVITY OF

RAIL OPERATIONS

Tony Crosby, GM Services

Mark Wood, GM Communications & Electronics

4Tel Pty Ltd

12 August, 2014 4Tel Pty Ltd Page - 1

Page 2: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Background

• Operation and maintenance contract for the NSW Country Regional Network awarded to John Holland

• 4Tel contracted to design, implement and maintain train control technology

• Interoperability approach has been applied successfully to achieve system integration

12 August, 2014 4Tel Pty Ltd Page - 2

Page 3: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

CRN

JHR operates and maintains the CRN for 10 years as a public RIM

12 August, 20144Tel Pty Ltd

Page - 3

4Tel has the technology Design, Construct and Maintenance role for the Network Management Centre

Rail Vehicle Detection – 160km

Train Order Working – 2,246km

Page 4: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

NMC Systems

12 August, 2014 4Tel Pty Ltd Page - 4

Page 5: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Use of System Interoperability

• Interfaces have been created for propriety systems

• Public networks are used for system connectivity

• Interoperability approach used to interface between systems

• Proven for transfer of Rail Safety data

12 August, 2014 4Tel Pty Ltd Page - 5

Page 6: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Presentation Topics

• What is interoperability?

• Interoperability model for rail systems

• Use of public networks

• Use of interoperable data for rail safety applications

• Use of Interoperable data at the NSW Country Regional Network

12 August, 2014 4Tel Pty Ltd Page - 6

Page 7: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

WHAT IS INTEROPERABILITY?

12 August, 2014 4Tel Pty Ltd Page - 7

Page 8: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Interoperability Versus Harmonisation

• Harmonisation

– The preferred railway systems approach

– ‘One way’ lowers deployment risks

BUT

–Creates monopoly rents

– Stifles innovation

– Limits system integration

12 August, 2014 4Tel Pty Ltd Page - 8

Page 9: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Interoperability Versus Harmonisation

• Interoperability

– Is demanding on standards & certification

BUT

–Promotes innovation

– Enables system integration

–Allows separation of complex system tasks

12 August, 2014 4Tel Pty Ltd Page - 9

Page 10: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Interoperability Versus Harmonisation

12 August, 2014 4Tel Pty Ltd Page - 10

Page 11: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 11

INTEROPERABILITY MODEL FOR RAIL SYSTEMS

Page 12: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Interoperability in Open Systems

1. Network connectivity

2. Methodology for describing data

3. Methodology for achieving security and operational integrity

12 August, 2014 4Tel Pty Ltd Page - 12

Page 13: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Standardise Interfaces, not Systems

12 August, 2014 4Tel Pty Ltd Page - 13

Page 14: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Provide system connectivity

12 August, 2014 4Tel Pty Ltd Page - 14

Page 15: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Standardise Message Structure

12 August, 2014 4Tel Pty Ltd Page - 15

Page 16: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Apply security settings, Encryption

12 August, 2014 4Tel Pty Ltd Page - 16

Page 17: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 17

System Interoperability

Page 18: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 18

System Interoperability is expandable

Page 19: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 19

USING PUBLIC NETWORKS

Page 20: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Using Public Networks

• Exploit the $Billions invested into public networks for rail operations

• Public networks provide robust services for carriage of train control data

• Minimises the need for field infrastructure

• Reduced through life cost

• Network upgrade costs are with the carrier

12 August, 2014 4Tel Pty Ltd Page - 20

Page 21: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

ARTC paid for extra Telstra 3G Sites

12 August, 2014 4Tel Pty Ltd Page - 21

Some 90 ‘rail’ sites installed

All sites are part of the Telstra Network and therefore are spt’d by Telstra

Page 22: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 22

USE OF INTEROPERABILITY FOR RAIL SAFETY APPLICATIONS

Page 23: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Safety is an Application Layer Issue

12 August, 2014 4Tel Pty Ltd Page - 23

• Digital systems work differently

• Safety is an app issue; not media or host!!

• Interfaces between Layers in a system

• Protocols between same Layers

• The Internet uses Open Systems standards

Ho

stM

ed

iaA

pp

Interoperability is achieved via network connection interfaces

Page 24: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Use for Rail Safety Applications

12 August, 2014 4Tel Pty Ltd Page - 24

Page 25: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Use for Rail Safety Applications

12 August, 2014 4Tel Pty Ltd Page - 25

Page 26: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 26

INTEROPERABILITY IN THE NSW COUNTRY REGION NETWORK (CRN)

Page 27: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

NSW CRN IP Network

12 August 2014 4Tel Pty Ltd 27

Page 28: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 28

Inte

rfa

ce

Inte

rface

Proprietary System 2

Proprietary System 1

NSW CRN IP Network

Page 29: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 29

NSW CRN IP Network

Page 30: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

CRN XML structure definition

12 August, 2014 4Tel Pty Ltd Page - 30

X

Page 31: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 31

Dedicated

VPN

Inte

rfa

ce

Inte

rface

Proprietary System 2

Proprietary System 1

Open Message

<Vehicle>

<ID>RL4537</ID>

<Time>2013-04-12

19:50:23</Time>

<Type>SC3T</Type>

<Loc>

<Lat>-31.4564</Lat>

<Lon>151.242</Lon>

</Loc>

</Vehicle>

CRN XML structure definition

Page 32: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 32

CRN XML structure definition

Page 33: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 33

Interoperable Data on the CRN

Page 34: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 34

Rail Safety Data on the CRNfor Electronic Authorities

Page 35: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 35

Rail Safety Data on the CRNfor Electronic Authorities

Page 36: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

TMACS Electronic Authorities

Encrypted XML

messaging and

Safety

Processing

Authority type selection added

Authority transmission status added

12 August, 2014 4Tel Pty Ltd Page - 36

Page 37: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Electronic Authorities over ICE

Train Orders

Shunt Orders

Alarms

ICE Display

12 August, 2014 4Tel Pty Ltd Page - 37

Page 38: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

12 August, 2014 4Tel Pty Ltd Page - 38

CONCLUSION

Page 39: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

Interoperability in Open Systems

• Three core elements are needed to achieve interoperability between systems:– Methodology for network connections

– Methodology for describing data

– Methodology for achieving security and operational integrity

• Interoperability is NOT Harmonisation

• Benefits from interoperability are being realised for the Country Regional Network

12 August, 2014 4Tel Pty Ltd Page - 39

Page 40: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

• All systems can interoperate

• Create competition to reduce monopoly rents

• Promote innovation

• Improve efficiency and effectiveness

• Reduce operating costs

12 August, 2014 4Tel Pty Ltd Page - 40

Interoperability in Open Systems

Page 41: Mark Wood & Tony Crosby, 4Tel - CASE STUDY: Interoperability of data between train control systems

Protecting People. Protecting AssetsProtecting People. Protecting Assets

For more information:

Tony Crosby

GM Services

4Tel

+61 409 360 393

[email protected]

12 August, 2014 4Tel Pty Ltd Page - 41