market drivers for improving the performance of our solution · market drivers for improving the...

14
CLARITY @ AIR SENSORS 2019 Market drivers for improving the performance of our solution

Upload: others

Post on 07-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

C L A R I T Y @ A I R S E N S O R S 2 0 1 9Market drivers for improving the performance of our solution

C L A R I T Y A I R Q U A L I T Y M O N I T O R I N G

2

01CLARITY NODE• Particulate Matter• Nitrogen Dioxide• Total VOC• Temperature• Relative Humidity

02CLARITY CLOUD

• Sensor and reference air quality measurements repository

• Data quality assurance algorithms

03CLAIRTY INSIGHTS

• Data visualization• Data analysis• Data download• Data sharing• Sensor network management

Q U E S T I O N

3

WHAT IS PERFORMANCE? From a system perspective

ACCURACY

CONSISTENCY

COST OF OWNERSHIP

EASE OF DEPLOYMENT

RELIABILITY

A C C U R A C Y

4

PROJECT LOCATION: Paris, FranceDATA USE CASE: Exposure study and modellingMAIN REQUIREMENT: Good accuracy

A C C U R A C Y

5

PROJECT LOCATION: Paris, FranceDATA USE CASE: Exposure study and modellingMAIN REQUIREMENT: Good accuracy

C O N S I S T E N C Y

6

PROJECT LOCATION: Richmond, CADATA USE CASE: Hotspot detectionMAIN REQUIREMENT: Good device-to-device consistency

C O N S I S T E N C Y

7

PROJECT LOCATION: Richmond, CADATA USE CASE: Hotspot detectionMAIN REQUIREMENT: Good device-to-device consistency

E A S E O F D E P L O Y M E N T

8

PROJECT LOCATION: Houston, TXDATA USE CASE: Emergency responseMAIN REQUIREMENT: Fast deployment

E A S E O F D E P L O Y M E N T

9

PROJECT LOCATION: Houston, TXDATA USE CASE: Emergency responseMAIN REQUIREMENT: Fast deployment

DEER PARK FIRE DEPLOYMENT TIMELINE

Call received: Sunday March 17th

Devices shipped: Monday March 18th

20 Devices deployed: Tuesday March 19th

C O S T O F O W N E R S H I P

10

PROJECT LOCATION: Bengaluru, IndiaDATA USE CASE: Awareness generationMAIN REQUIREMENT: Low cost of ownership

R E L I A B I L I T Y

11

PROJECT LOCATION: Kolkata, IndiaDATA USE CASE: Policy impact analysisMAIN REQUIREMENT: Reliability

R E L I A B I L I T Y

12

PROJECT LOCATION: Kolkata, IndiaDATA USE CASE: Policy impact analysisMAIN REQUIREMENT: Reliability

13

C O N C L U S I O N

PERFORMANCE STANDARDS OF A SYSTEMDepend on use case of generated data

EXPOSURE STUDY AND MODELLING

HOTSPOT DETECTION

EMERGENCY RESPONSE

AWARENESS GENERATION

POLICY IMPACT ANALYSIS

T H A N K Y O U ! L E A R N M O R E A T C L A R I T Y . I O