Market parties’ wishes for regional framework and trade through the day-ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

Upload: avery-terrill

Post on 01-Apr-2015

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

Market parties’ wishes for regional framework and trade through the day-ahead market.

Doug WoodGRI N/NW Ministerial Meeting 13 November 2008

Page 2: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

2

Contents

• Background and general objectives

• What we asked for…and what we got!

• Where are we now?

• Legal bottlenecks

• Regional framework / conclusions

• Where from here

Page 3: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

3

Background and objectives

• Two quotes from the Sector Inquiry:

− “Suppliers need to have transparent and non-discriminatory access to the transportation network on terms matching customer needs (This can include, for example, short term capacity on the secondary market, reasonable liabilities, etc.).”

− “Depending on market circumstances, long-term contracts can result in foreclosure. This is particularly the case where they lead to a good part of customers or an available input such as transport capacity being tied to a dominant player.”

Access to capacity is essential!

• Pilot was to test a number of objectives:

− TSOs / Network users to gain experience of the impact of smaller amounts of capacity being available then can extend

− Trial of auctions as delivery and price setting mechanism

− Trial of locations, to test for roll-out

− Trial delivery periods

− Identify and breakdown artificial contractual barriers

− Support initiatives by liquidity providers such as E.On Choice Market

Access to capacity is also essential for hub trading / risk management !

A goal without a plan is just a wish.

Page 4: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

4

What we asked for… …and what we got

• Daily auctioning

• Jointly organised

• Secondary firm capacity

• Primary interruptible capacity

• Cross border or linked

• 3 interconnection points

• Simple solution / common platform

• Starting 1 April 2007

• Daily product

• Continuous trading

• Secondary firm capacity tradable once in theory

• No interruptible / competing interruptible product (EUCABO)

• 1 interconnection point

• Two platforms – solutions on either side of border

• May 2008

Page 5: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

5

Where are we now

Dutch side

• Limited trades of GTS capacity on APX

• Non-watertight contracts for Dutch capacity trades, but some players prepared to accept the risks for the sake of the pilot

• APX up and running; agreement reached with trac-x

German side

• Ongoing lack of definition on German capacity trading “ueberlassung”

• Capacity overrun charges remain with primary holder – though calculation unclear

• Product not possible to contract in acceptable fashion

• Choice market is still running, for small volumes with no impact on market

• Legal bottlenecks identified

• Basis swaps continuing

General

• Some remaining operational issues being addressed (gate closure, fees, re-tradability)

Danish side

• No legal bottlenecks

• Ellund addition

Progress might have been all right once, but it has gone on too long. (Ogden Nash)

Page 6: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

6

Legal bottlenecks

Issue Priority Outlook

Dutch FCFS Not fatalMethodebesluit in discussion,

but is this on the agenda?

German FCFS Not fatal Will this be addressed?

German pricesEx post solution

proposedPragmatic. Support the proposal.

German platform Not helpfulClarify European law. Proposal to

embed is not realistic.

German tradabilityKoV restricts rights

allowed by NZVMust be addressed

What you see as a glass ceiling, I see as a protective barrier.

Page 7: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

7

Secondary Capacity TradingKoV II

Article 38Secondary Trading

1. Subject to Sections 2 and 3 of this Article 38, the shipper shall be entitled to sublet orassign acquired capacities to a third party. Section 14 of the Gas Network AccessOrdinance (GasNZV) shall remain unaffected.

2. The shipper shall be entitled to sublet capacity booked under an entry and/or exitcontract without the network operator's consent. In such case, the shipper shall remainliable to the network operator for the performance of its obligations under the entryand/or exit contract including, without limitation, the obligation to pay fees.

3. The shipper shall be entitled to assign the entry and/or exit contract wholly to a thirdparty subject to the network operator's consent. Such consent shall not be withheldexcept for reasonable cause. Without limitation of the generality of the foregoing, failureby the third party concerned to demonstrate its creditworthiness in accordance withArticle 45 or to provide the security required shall constitute reasonable cause for thenetwork operator to withhold such consent. Such assignment shall not be effective asagainst the network operator until expiry of 10 (ten) days after the granting of consent inaccordance with the first sentence of this Section 3 or notification in accordance with thefirst sentence of Section 2 of Article 54.

4. The network operator shall provide a bulletin board and ensure that the capacity rightsbookable with the network operator can be traded on a joint electronic trading platform.The first sentence of this Section 4 shall not apply to local distribution network operators(1st sentence of Section 8(1) of the Gas Network Access Ordinance (GasNZV)).

Page 8: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

8

Secondary Capacity TradingSuggested Changes

Article 38Secondary Trading

1. Subject to Sections 2 and 3 of this Article 38, the shipper shall be entitled to sublet orassign acquired capacities to a third party. Section 14 of the Gas Network AccessOrdinance (GasNZV) shall remain unaffected.

2. The shipper shall be entitled to sublet capacity booked under an entry and/or exitcontract without the network operator's consent. In such case, the shipper shall remainliable to the network operator for the performance of its obligations under the entryand/or exit contract including, without limitation, the obligation to pay fees.

3. The shipper shall be entitled to assign the entry and/or exit contract wholly to a thirdparty subject to the network operator's consent. Such consent shall not be withheldexcept for reasonable cause. Without limitation of the generality of the foregoing, failureby the third party concerned to demonstrate its creditworthiness in accordance withArticle 45 or to provide the security required shall constitute reasonable cause for thenetwork operator to withhold such consent. Such assignment shall not be effective asagainst the network operator until expiry of 10 (ten) days after the granting of consent inaccordance with the first sentence of this Section 3 or notification in accordance with thefirst sentence of Section 2 of Article 54.

4. The network operator shall provide a bulletin board and ensure that the capacity rightsbookable with the network operator can be traded on a joint electronic trading platform.The first sentence of this Section 4 shall not apply to local distribution network operators(1st sentence of Section 8(1) of the Gas Network Access Ordinance (GasNZV)).

(other than penalties for overrunning the transferred capacity which shall be paid by the shipper acquiring the capacity). Any capacity so transferred shall be included in the balancing group contract of the shipper acquiring the capacity for the duration of the transfer period within [ ] working days of notification of the transfer to the network operator by the shippers. If the entry and/or exit contract from which the capacity is transferred is terminated before the end of the transfer period then [the capacity shall remain in the balancing group contract of the acquiring shipper and the acquiring shipper shall become liable to the network operator for the performance of all obligations in respect of the transferred capacity including, without limitation, the obligation to pay fees.]

transfer

transfer any

for all or part of the remaining term of such capacity

all or part of the capacity in any

Page 9: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

9

Secondary Capacity TradingKoV III

Article 43Secondary Trading

1. Subject to Sections 2 and 3 of this Article 38, the shipper shall be entitled to sublet orassign acquired capacities to a third party. Section 14 of the Gas Network AccessOrdinance (GasNZV) shall remain unaffected.

2. The shipper shall be entitled to sublet capacity (with or without nomination rights) booked under an entry and/or exit contract without the network operator's consent. In such case, the shipper shall remain liable to the network operator for the performance of its obligations under the entry and/or exit contract including, without limitation, the obligation to pay fees.

3. The shipper shall be entitled to assign the entry and/or exit contract wholly to a thirdparty subject to the network operator's consent. Such consent shall not be withheldexcept for reasons that would have prevented the conclusion of an entry and/or exit contract with the third party in the first place. Without limitation of the generality of the foregoing, failure by the third party concerned to demonstrate its creditworthiness in accordance withArticle 50 or to provide the security required shall constitute reasonable cause for thenetwork operator to withhold such consent. Such assignment shall not be effective asagainst the network operator until expiry of 10 (ten) days after the granting of consent inaccordance with the first sentence of this Section 3 or notification in accordance with thefirst sentence of Section 2 of Article 59.

4. The network operator shall provide a bulletin board and ensure that the capacity rightsbookable with the network operator can be traded on a joint electronic trading platform.The first sentence of this Section 4 shall not apply to local distribution network operators(1st sentence of Section 8(1) of the Gas Network Access Ordinance (GasNZV)).

Page 10: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

10

Regional framework / conclusions

Transparency

Capacity availability

Hub liquidity

New capacityCapacity

reallocation

TSO incentives

TSO incentives

Page 11: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

11

Learnings for Capsquare?

• Platform should be optional

• OTC trades of gas with capacity should not be mandatorily separated

• Capacity trade registration is “ordinarily required”

• Introduction of a fee will encourage more basis swaps

• Imposition of a single platform contravenes European law.

• Priority should be to sort out other confusing issues (units, transport service conditions, fee clarity)

Page 12: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008

12

Where from here

• Review of platform success

• Extension sought while we look at other issues around gate closure, fees, onward tradability – where some progress has been made.

• Will this make the pilot successful?

• Will this lead to a solution which will help address the capacity problem?

• Will this help the regional convergence process?

• Convergence of capacity service at regional level

• Application of EASEE-Gas capacity trading CBP on uniform basis

• Clear terms in network access conditions

Page 13: Market parties’ wishes for regional framework and trade through the day- ahead market. Doug Wood GRI N/NW Ministerial Meeting 13 November 2008