marpol annex vi amedments practical consequences
DESCRIPTION
MARPOL ANNEX VI AMEDMENTS PRACTICAL CONSEQUENCES. INTERTANKO Latin American Panel Cancun October 28/29, 2008. AMENDMENTS TO MARPOL Annex VI. AMEDMENTS. New regulation on SOx and PM Primary compliance through fuel - PowerPoint PPT PresentationTRANSCRIPT
MARPOL ANNEX VI AMEDMENTSPRACTICAL CONSEQUENCES
INTERTANKOLatin American Panel
CancunOctober 28/29, 2008
AMENDMENTS TO MARPOL Annex VI
GLOBAL
S cap
ECA
S cap
Tier II Tier III
ECA only
2010 4.50% 1.00% - - - - - - - - - -
2011 yes - - - - -
2012 3.50% - - - - -
2015 0.10% - - - - -
2016 yes
2020/2025 0.50%
AMEDMENTS
• New regulation on SOx and PM• Primary compliance through fuel• Alternative methodologies (e.g. scrubbers)
accepted as Equivalent Measures (first to be approved by Administrations)
• Marine fuel oil quality to be further improved• No measures on ships that do not receive
adequate supply• if BDN data is challenged by PSC or test
results - Guidelines how to assess compliance • NOx Tier I on large engines from the 1990s• NOx Tier II and Tier III on new engines
GENERAL ASSESSMENT OF THE AMENDMENTS
• Positive but not perfect
• Positive:– contributes to a long-term and predictable
global regulatory regime– ensures a solid platform of requirements – is realistic and feasible– achieves a global, long-term and positive
reduction of air emissions from ships
• BUT practical consequences need to be carefully assessed
IMO & CARB SULPHUR REQUIREMENTS
Regional Requirements- Still a potential problem
Planned new ECA for 2013
Could be extended to entire N. A.
Up to 200 nm on the West Coast
Plan to require 0.1% or 0.2% S fuels
PRACTICAL CONSEQUENCES
• Need to use 2/3 fuels per voyage for few more years
• Need for greater and diversified (segregation) of bunker tanks and pipelines able to receive 3 different grades of bunkers
• If not = loss of expensive grade bunkers during fuel change over periods
• Need for two differing cylinder lube oil systems (one for HSFO and one for LSFO/Distillate)
• Back to simple and safe uni-fuel operation when MDO will be used on world wide basis (2020)
PRACTICAL CONSEQUENCESFUEL CHANGE OVER
• Risk of incompatibility between differing grades of bunker during change over periods (sludging problem)
• Increased average density• Increased of average cat fines level (Al+Si)• Fuels with reduced ignition/combustion quality• Increased problems with chemical waste (liquid
waste with low/no sulphur used as blend to “make” the LSFO)
• Switch from HFO to MDO in boilers (EU and California) = Risk of human error poses safety risks and cross contamination
LOW-SULPHUR FUEL OPERATIONAl - Si
Source: DNVPS database of 1,012 analysis results (from 1 October – 10 November 2007)
A reduction of the low-sulphur content in HFO has seen a corresponding increase in the abrasives content
LOW SULPHUR OPERATION
ENFORCEMENT (PSC & Flag)(today’s practice)
• Most PSC target controls on:– Bunker Delivery Note (BDN)– Availability of the MARPOL fuel sample– fuel change-over recordings in log books (ships need
written fuel change-over procedures)
• Some PSC:– requires to see commercial fuel test reports and
make a decision– take fuel samples from service tanks
• ADVICE: only the MARPOL fuel sample is to be used to test sulphur level
• Test of 2 sub-samples at accredited lab. • If Δ of two results ≦ 0.07, S content is
the average of the two results • If average is ≥ 1.58%, then non-compliant• If average is ≦ 1.58%, then 2nd lab does
similar tests• However compliance is only proved if
the average of the 4 results is ≦ 1.50%
MARPOL Sample verification test procedure
ENFORCEMENT (PSC & Flag)(today’s practice)
• Many Flags do not respond to ship Notifications on non-compliant fuel delivery
• Not unified interpretation for sulphur content limit, e.g.: 1.50%, 1.54%, 1.58%....
• BUT some good news . . . .
• Ships not liable if strictly keep records & evidence on Fuel Availability
Revised Regulation 18
• Authorities shall take all reasonable steps to promote the availability of fuel oils to comply with Annex VI
• If compliant fuel not available, ships not required to delay departure or deviate from the planned voyage
• The ship will have to notify its Administration and the relevant port of call each time it cannot find the compliant fuel
• The ship should present evidence/record it attempted to buy the compliant fuel in accordance with the voyage plan
• If evidence is provided, there should be no measures against the ship
PRACTICAL CONSEQUENCES
Evidence/records/actions taken by ships:
(a) Bunker quotation/correspondence
(b) Voyage plan
(c) Bunker Delivery Note (BDN)
(d) Fuel Quality Test report
(e) Notification to Flag, Port Authority & PSC
(f) Report/indication that obtaining compliant fuel will cause deviation/or undue delay
IMO Circular encouraging earlier application of new Regulation 18
FUEL OIL QUALITY
• IMO Secretariat invited ISO to consider a revision of a marine fuel oil specification (ISO 8217) addressing :
-air quality,
-ship safety,
-engine performance,
-crew health
possible PRACTICAL CONSEQUENCES
• Fuel Quality better defined
• IMO may regulate quality of marine fuels
• Ship operators could share expereince with Flags and demand assistance
• May accellerate the transit to better & uni-fuel usage
• New Guidelines to test MARPOL fuel sample complaince
Regulation 4 – Equivalent measures
• An Administration may allow any alternative method only if this is at least as effective in terms of emissions reductions as the emission reductions by using LSFO
• This means the Administration (and not the ship) have to acknowledge that alternative methods:– have equivalent efficiency in terms of SOx, PM &
NOx– do not harm the environment – operate within the requirements of the IMO
guidelines
PRACTICAL CONSEQUENCES
• Positive outcome for ship operators
• Adminstrations and not ships responsible to asses the efficiency and the reliability of the alternative measures
• Adminstrations and not the ships responsible that certified alternatives do not harm the environment
NOx emissions – Pre-2000 engines”Upgrade Methodology”
• Retroactive measures on engines:– installed onboard ships constructed between
1 Jan 1990 and 31 Dec 1999– power output > 5,000 kW; and – per cylinder displacement at or > 90 litres
• NOx emissions at Tier I level
• If the engine already meets Tier I NOx emission limits, simple certification is sufficient
NOx emissions – Pre-2000 enginesUpgrade Methodology
• If the engine does not meet the Tier I NOx emission limitations, it is subject to measures:– ONLY if there is an upgrading system certified by a Party
to MARPOL Annex VI– ONLY if it certifies that such a system reduces the
emissions of that particular engine to Tier I limits– the upgrading system is considered commercially
available 12 months after a Party to MARPOL Annex VI deposits the notification on certification to IMO
– upgrade at the ship’s first renewal survey after the upgrading system becomes commercially available
– in case the upgrading system is not available at the time of completion of the renewal survey (ship owner has to document that), the flag would give an extension until the next Annual Survey
NOx emissions – Pre-2000 engines
• The upgrading system should not– decrease the engine rating by more than 1%,– increase fuel consumption by more than 2%– have other adverse effect on the durability or
reliability of the engine
• Upgrading to an acceptable cost/benefit
Cost of approved method x 10**6Ce =
P(kW) x 0.768 x 6000 hr/yr x 5 years x Δ NOx (g/kWh)
Ce < 375 SDR/metric ton of NOx reduction; SDR = Special Drawing Rights; 1 SDR = US$ 0.632
Ce < $237/metric ton of NOx reduction
NOx Kits – Example forIMO max. retrifitting costs (US$)
Power (kW)
Re
duction
10% 20% 30% 40% 50%
(g/kWh) 1.7 3.4 5.1 6.8 8.5
5,000 46,414 92,828 139,242 185,656 232,070
8,000 74,263 148,525 222,788 297,050 371,313
12,000 111,394 222,788 334,181 445,575 556,969
15,000 139,242 278,484 417,727 556,969 696,211
NOx Kit Retrofitting Prices - IMO Maximum
0
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
10% 20% 30% 40% 50%
NOx Reduction
5000 kW
8000 kW
12000 kW
15000 kW
NOx Kits – IMO Max. Costs (US$)
NOx emissions – Tier II (new engines)
• Tier II standards (emission reductions related to Tier I limits):– 15.5% reduction (engines with n<130 rpm)
(i.e. 14.36 g/kWh)– reductions between 15.5% and 21.8%
depending on the engine’s rpm (engines with 130 rpm < n < 2000 rpm)
– 21.8% reduction (engines n > 2000 rpm) (i.e. 7.66 g/kWh)
• Applies to engines installed on ships constructed on and after 1 January 2011
NOx emissions-Tier III (new engines)
• Tier III standards – 80% reductions from Tier I limits, applicable when ships in ECA only
• Tier III limits apply to engines:– installed on ships constructed on & after 1 Jan 2016– power output of > 130 kW
(but engines between 130 kW – 750 kW may be exempted by the Administration)
• Outside ECAs - Tier II limits only• Emission levels for Tier III are as follows:
– 3.40 g/kWh (engines with n<130 rpm)– 9*n(-0.2) g/kWh (engines with 130 rpm < n < 2000 rpm)– 1.96 g/kWh (engines n > 2000 rpm
PRACTICAL CONSEQUENCES
• Not a responsibility for ship operators• Tier III compliance with SCRs (latest news –
possible solution through in engine technology)• If compliance through SCR only
– existing SCR technology not efficient at low engine loads– compliance might not be achieved in ECAs (close to port,
through estuaries and straits ships slow down) because the engine runs at a lowwe load
• Engine manufacturers to demonstrate compliance• Class/Administration to certify• BUT, in the long run, how would be Tier II
compliant ships (delivered between 2011 and 2016) be treated in ECAs?
• Good advice: if possible, plan for Tier III compliant ships as from 2011
Regulation 15Volatile Organic Compounds
• All tankers carrying crude oil shall have on board an approved VOC-Management Plan describing all the procedures the ship is applying in order to minimize the emissions of VOC
• Apart from that, there is no requirement for equipment or technical installations to limit the emissions
• INTERTANKO works with DNV to a draft VOC Management Plan model to be submitted to IMO
OUTCOME ON MARPOL ANNEX VI
THANK YOU VERY MUCH