MARRINER S. ECCLES BUILDING AND FEDERAL RESERVE BOARD-EAST BUILDING renovation and expansionCommission of fine arts - Revised Concept PackageMAY 21, 2020
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
AGENDA1. Project goals 2. Historic recap3. FRB-east Design Refinements4. Eccles Design Refinements 5. Eccles East Atrium6. Landscape Design
Marriner S. Eccles Building, 1937
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
Marriner S. Eccles Building, 1937
DESIGN GOALS• THE NEW ADDITIONS SHOULD EMPHASIZE THE FEDERAL
RESERVE’S CIVIC IMPORTANCE WHILE BEING MODEST and RESTRAINED
• WITHIN EACH BUILDING THE ADDITIONS SHOULD BE A SIMPLE, CALM COMPOSITION THAT CREATES A MORE UNIFIED CHARACTER
• THE ADDITIONS SHOULD RESPECT THE HISTORIC CHARACTER-DEFINING FEATURES, BUILT ON CLASSI-CAL PRINCIPLES BUT WITH CONTEMPORARY MATERI-ALS AND TECHNOLOGY
2HISTORY RECAP
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
Marriner S. Eccles Building, 1937
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
FRB-East Building, ca. 1933
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
MODEL PHOTOGRAPH SOUTHWEST AERIAL VIEW
FRB-EAST DESIGN REFINEMENTS 3
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
facade diagram Articulations
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
facade diagram PROJECTIONS
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
facade diagram continuation of historic fabric
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
facade diagram PARTI DIAGRAM
Marble Interlayer IGU
Daylight Di�using IGU
Vision IGU
Vision IGU
Vision Fritted IGU
Marble
ARTICULATED CORNEROF EXISTING BUILDING
ARTICULATED CORNEROF NEW ADDITION
West Elevation
East Elevation
North Elevation
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE FROM C Street and Virginia Avenue
N
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE FROM C Street and Virginia Avenue - UPDATED
N
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE FROM C ST and 20th Street
N
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE FROM C ST and 20th Street UPDATED
N
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE FROM 20th street
Add 20th street water color
N
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE FROM 20th street UPDATED
Add 20th street water color
N
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE FROM Constitution Avenue and 19th Street
N
Update with water color
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE FROM Constitution Avenue and 19th Street updated
N
Update with water color
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
MODEL PHOTOGRAPH FRB-EAST BUILDING EAST VIEW
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
MODEL PHOTOGRAPH FRB-EAST BUILDING NORTHEAST VIEW
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
MATERIALS BOARD
EXTERIOR MATERIALS
GLAZ
ING
LOW-IRON GLAZING
LS
CERAMIC FRIT DIFFUSING GLAZING
EXTERIOR MATERIALS
GLAZ
ING
LOW-IRON GLAZING
LS
CERAMIC FRIT DIFFUSING GLAZING
OR MATERIALS
RON GLAZING CERAMIC FRIT DIFFUSING GLAZING
EXTERIOR MATERIALS
GLAZ
ING
LOW-IRON GLAZING
MET
ALS
RANGE OF STAINLESS STEEL FINISHES (BEAD BLAST AND DIRECTIONAL)
CERAMIC FRIT DIFFUSING GLAZING
EXTERIOR MATERIALS
GLAZ
ING
LOW-IRON GLAZING
MET
ALS
RANGE OF STAINLESS STEEL FINISHES (BEAD BLAST AND DIRECTIONAL)
CERAMIC FRIT DIFFUSING GLAZING
EXTERIOR MATERIALS
GLAZ
ING
LOW-IRON GLAZING
COATED ALUMINUM
MET
ALS
RANGE OF STAINLESS STEEL FINISHES (BEAD BLAST AND DIRECTIONAL)
STON
E
CERAMIC FRIT DIFFUSING GLAZING
GLAZING
LOW-IRON GLAZING RANGE OF STAINLESS STEEL FINISHES (BEAD BLAST AND DIRECTIONAL)
MARBLE (POLISHED &HONED ‘WHITE GEORGIA’)
WHITE GEORGIA MARBLE INTERLAYER
CERAMIC FRITDIFFUSING GLAZING COATED ALUMINUM
METAL STONE
1951 EXTERIOR MATERIALS NEW CONSTRUCTION
EXTERIOR MATERIALS
GLAZ
ING
LOW-IRON GLAZING
MARBLE (POLISHED AND HONED ‘GEORGIA WHITE’)
COATED ALUMINUM
MET
ALS
RANGE OF STAINLESS STEEL FINISHES (BEAD BLAST AND DIRECTIONAL)
STON
E
CERAMIC FRIT DIFFUSING GLAZING
4ECCLES DESIGN REFINEMENTS
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
Marriner S. Eccles Building
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
MARCH 11, 2020 FORTUS | BOARD OF GOVERNERS – THE FEDERAL RECCLES materials
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
ECCLES INFILL close up - GLASS FINS
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
ECCLES INFILL close up - BRONZE FINS
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE OF Eccles entrance on 20th street
N
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE OF Eccles entrance on 20th street UPDATED
N
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE FROM 21st street AND C street looking east
N
Update with water color
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
PERSPECTIVE FROM 21st street AND C street looking east updated
N
Update with water color
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
MODEL PHOTOGRAPH Eccles SOUTHEAST VIEW
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
MODEL PHOTOGRAPH Eccles SOUTHEAST VIEW
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
MATERIALS BOARD
EXTERIOR MATERIALS
GLAZ
ING
LOW-IRON GLAZING
LS
CERAMIC FRIT DIFFUSING GLAZING
GLAZING
LOW-IRON GLAZING
METAL
RANGE OF OIL-RUBBED BRONZE (US10B: DARK TO LIGHT)
EXTERIOR MATERIALS
GLAZ
ING
LOW-IRON GLAZING
MARBLE (POLISHED AND HONED ‘GEORGIA WHITE’)
COATED ALUMINUM
MET
ALS
RANGE OF STAINLESS STEEL FINISHES (BEAD BLAST AND DIRECTIONAL)
STON
E
CERAMIC FRIT DIFFUSING GLAZING XTERIOR MATERIALS NEW CONSTRUCTIONGLAZING
LOW-IRON GLAZING
MARBLE (POLISHED AND HONED ‘GEORGIA WHITE’)
COATED ALUMINUM (US10A)
RANGE OF OIL-RUBBED BRONZE (US10B: DARK TO LIGHT)
STONEM
ETALS
STONE
MARBLE (POLISHED &HONED ‘WHITE GEORGIA’)
5ECCLES ATRIUM DESIGN
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATIONEccles / 1951 Design | cfa, NCPC, shpo staff MEETING
AERIAL VIEW SKYLIGHT AT LEVEL 5
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
Cornice (WHITE GEORGIA MARBLE)
BRONZE RAILING DETAIL
DOUBLE HEIGHT BRONZE WINDOWS W/ ALBERENE STONE SPANDREL PANELSCHARACTER DEFINING FEATURES
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
VISIBLE FROM CONSTITUTION AVE
VISIBLE FROM CONSTITUTION AVE
Site section from constitution Avenue through Eccles
save historic elementssave historic elements
reinforced center wing as reinforced center wing as a paviliona pavilion
section perspective through east courtyard
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
eccles ATRIUM perspective section dusk view
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
eccles ATRIUM interior dusk view
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
eccles ATRIUM interior dusk view
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
MODEL PHOTOGRAPH Eccles EAST VIEW
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
N
ECCLES skylight VIEW FROM CONSTITUTION AVENUE
6ELEVATIONS
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
Constitution Avenue ELEVATIONS
South Elevation from 18th to 23rd Street
South Elevation from 21st to 19th Street
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
C STREET ELEVATIONS
North Elevation from 18th to 23rd Street
North Elevation from 21st to 19th Street
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
Eccles elevations
eaST ELEVATION
weST ELEVATION
2)
LOBBY/SCREENING (C1)
OFFICE (L1)
OFFICE (L2)
OFFICE (L3)
OFFICE (L4)
OFFICE (L3)
OFFICE (L2)
OFFICE (L1)
OFFICE (C1)
OFFICE (L2)
OFFICE (L1)
OFFICE (C1)
OFFICE (L3)
CONF./TRAINING (C4)
CAFE/DINING (C2)
PARKING (P4)
PARKING (P3)
PARKING (P2)CONFERENCE (C3)
PEDESTRIAN TUNNEL (C2/P1) B.O.H. (C2)
PARKING RAMP
ATRIUM
SKYLIGHT
LOBBY (C1) CONF. (C1)
CONF. (L1)
CONF. (L2)
ADDITION BEYOND
MECH. PENTHOUSE BEYOND
0' 50' 100'10' 25'
20TH ST
FRB-EAST
MARTIN BUILDING BEYOND
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
FRB-EASt ELEVATIONs
2)
LOBBY/SCREENING (C1)
OFFICE (L1)
OFFICE (L2)
OFFICE (L3)
OFFICE (L4)
OFFICE (L3)
OFFICE (L2)
OFFICE (L1)
OFFICE (C1)
OFFICE (L2)
OFFICE (L1)
OFFICE (C1)
OFFICE (L3)
CONF./TRAINING (C4)
CAFE/DINING (C2)
PARKING (P4)
PARKING (P3)
PARKING (P2)CONFERENCE (C3)
PEDESTRIAN TUNNEL (C2/P1) B.O.H. (C2)
PARKING RAMP
ATRIUM
SKYLIGHT
LOBBY (C1) CONF. (C1)
CONF. (L1)
CONF. (L2)
ADDITION BEYOND
MECH. PENTHOUSE BEYOND
0' 50' 100'10' 25'
20TH ST
FRB-EAST
MARTIN BUILDING BEYOND
WEST ELEVATION
EAST ELEVATION
7 LANDSCAPEDESIGN
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
eccles
Constitution ave nw
C street nw
21st s
tree
t nw
20th
stre
et n
w
19th s
tree
t nw
frb-east
virginia AVe nw
N
SCALE: 1” = 60’-0”15’0’ 30’ 60’ 120’
Property line Property line
landscape PLAN
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
Eccles - Heavy bronze bollards at 20th St. near accessible entrance FRB-EAST Building - Sloped planted area at terrace wall @ 19th St.
FRB-EAST BUILDING - 2OTH STREET WITH NO STREET TREES OR PLANTING AT CURBEccles - Heavy bronze bollards at Southern Garden Terrace
Existing security measures & deterrents
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
444’
- 6”
1.5%
1.0%
2.3%
Constitution ave nw
C street nw
21st s
tree
t nw
20th
stre
et n
w
19th s
tree
t nw
eccles frb-east
+18.2
+24.828.8+
18.8+ 18.2+ +17.2
+21.724.8+
+17.8
+21.8
+30.2+25.7
+23.6
+25.7
+19.4
+23.5
+30.9
+23.0 +23.0
+23.0
+19.524.0+
+23.0
21.5++17.3 17.5+
+18.8
21.9++22.020.5++20.526.3+
23.5+
+25.0 +24.5
+20.0
+25.7+25.7
+27.5
+24.0
+17.2519.6+
+23.920.6+
+25.2
+22.2
+19.1
+21.3
virginia AVe nw
N
SCALE: 1” = 60’-0”15’0’ 30’ 60’ 120’
Property line Property line407’ - 6” 311’ - 8”
444’
455’ 365’40’
449.
5’
8’ Walk 12’ Walk6’ -7’ Walk 8’-10’ Walk
9’ Walk 14’ Walk
Eccles Tree Planting = 7’ wide FRB-EAST Tree Planting = 5’ wide
EXISTING ANALYSIS SIDEWALK widths & grading
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
N
SCALE: 1” = 60’-0”15’0’ 30’ 60’ 120’
Property line Property line
eccles frb-east
Constitution ave nw
C street nw
21st s
tree
t nw
20th
stre
et n
w
19th s
tree
t nw
virginia AVe nw
395 394 393 392 391 390 389 388 387 386
263422
421
420
419
418
417
416
415
414
413
371
217
216
215
214
376
377
378
379
380
381
207
206
205
201
209
208
212
211210
404
403
402
401
400
399
398
397
396
existing tree analysis tree health & size
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
Existing tree analysis health & size
Existing Street Trees to be removed & replaced (Not including trees inboard of sidewalk):
trees removed: 35 trees (Based on DDOT database) Caliper range: 7” to 12” Average Caliper: +/- 9” Average health: moderate to poor Typical Condition: Many of the street trees show basal damage all the way around, Gloomy scale, Restricted rooting area.
DC heritage tree 215
Figure 13: A northern red oak (Quercus rubra) exhibit-ing generally good structure with well-spaced, horizontalbranching and a clear leader for most of its height. Compareto Figure 14.
Figure 14: An oak exhibiting poor structure. Most scaffoldbranches originate near the same area of the trunk, andmany are oriented vertically with bark inclusions present.Note the many large pruning cuts near the same area. Theseissues could have been greatly limited when these brancheswere small, eliminating the need for large cuts.
Figure 15: The flat side of the trunk entering the soil sug-gests that this street tree has a belowground girdling root.
Figure 16: Basal damage and decay on an oak. Extensivewoundwood formation suggests good vigor, but this is amajor wound that will become life-limiting. This tree alsoexhibits an excessive lean.
WSSI #30766.01Page 14 of 15
Figure 13: A northern red oak (Quercus rubra) exhibit-ing generally good structure with well-spaced, horizontalbranching and a clear leader for most of its height. Compareto Figure 14.
Figure 14: An oak exhibiting poor structure. Most scaffoldbranches originate near the same area of the trunk, andmany are oriented vertically with bark inclusions present.Note the many large pruning cuts near the same area. Theseissues could have been greatly limited when these brancheswere small, eliminating the need for large cuts.
Figure 15: The flat side of the trunk entering the soil sug-gests that this street tree has a belowground girdling root.
Figure 16: Basal damage and decay on an oak. Extensivewoundwood formation suggests good vigor, but this is amajor wound that will become life-limiting. This tree alsoexhibits an excessive lean.
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
Emergency exit only
Parking EXIT
parking Entry/loading
N
SCALE: 1” = 60’-0”15’0’ 30’ 60’ 120’
Constitution ave nw
C street nw
21st s
tree
t nw
20th
stre
et n
w
19th s
tree
t nw
eccles
Universal Accessibility to fountain being studied
Universal Accessibility to fountain being studied
+18.2
+24.828.8+
18.2+ +17.2
+21.724.8+
+17.8
+21.8
+30.2+25.7
+23.6
+25.7
+19.4
+23.5
+30.9
+23.0 +23.0
+22.6
+19.524.0+
+23.0
21.5+
18.8+
21.9++22.520.5++20.526.3+
23.5+
+25.0 +24.5
+20.0
+25.7+25.7
+27.5
+24.0
+17.2519.6++23.920.6+
+25.2
+22.2
+18.8
+21.4
18.8+
Sloped Walk or Ramp: Spot Elevation:
1’-0” Contour:+0.0
frb-east
virginia AVe nw
Property line Property line
proposed grading and accessibility
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
N
SCALE: 1” = 60’-0”15’0’ 30’ 60’ 120’
site security diagram
Constitution ave nw
C street nw
21st s
tree
t nw
20th
stre
et n
w
19th s
tree
t nw
Ex. Barrier Wall: Barrier Wall:
Retractable Bollards: Wedge Barrier:
New Bollard Alignment; Provide Post-and-Chain, Typical
Retaining Wall as a Barrier Use Existing Wall, Typical
Post-and-Rail, Typical
Post-and-Rail, Typical
Wedge Barrier & Retractable Bollards, Typical
ecclesRetractable Bollards, Typical
Bollards, Typical
Post & Chain, Typical
frb-east
virginia AVe nw
Post & Chain:
Property line Property linePost-and-Rail, Typical Post-and-Chain, Typical
Security Booth
Security Booth
Security Booth, Typ
Security Booth Security Booth
Bollard:Post and Rail:
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
FRB-EAST BUILDING constitution ave section north/south
N
CONSTITUTION AVE NWPUBLIC SIDEWALKPLANTED slopeLAWN TERRACE
post and rail barrier in planting
NEW WALKWAY
FBR-EASTECCLES
root system from existing tree
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
FRB-EAST BUILDING constitution ave view post and rail barrier
CONSTITUTION AVE NWPUBLIC SIDEWALKPLANTED slopeLAWN TERRACE NEW WALKWAY
root system from existing tree
post and rail barrier in planting
post and rail barrier in planting
bollard at existing wall and stairs
existing tree
bollard at 20th street
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
HOOVER BUILDING SITE SECURITY (CRTKL)
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
Post & RAIL vehicular barrier
30”17-1/2”
4-1/2”
2-1/2”
8”
6-1/2” 2-3/4”
5’-0” 5’-0” 11’-0”
mid-post Section mid-post elevation
Internal cable system
end-post Sectionbollard
6-1/2” 6-1/2”
30”
2-1/2”
30”
4” 4”
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
Post & RAIL vehicular barrier
EXISTING Conditions
bollard, bronze
roadway
end bollard, bronze
flush curb
Intermediate bollard, bronzecable barrier in
bronze sleeve
planting zone
5-6” caliper tree
Standard DC curb and gutter
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
DDOT Soil Volumes
• Large trees: 1500 cubic feet of soil within a 27-foot radius• Medium trees: 1000 cubic feet of soil within a 22-foot radius• Small trees: 600 cubic feet of soil within a 16-foot radius
*Soil volume is calculated as: (Area of Open Soil x Depth of Soil) + (Area of Covered Soil x Depth of Soil).
Extended soil area, structural
PLANTING SOIL
underdrainage
Post & rail BARRIERgranite paver edge
sidewalk paving
Tree planting, 5-6” caliper
root ball
standard DC curb and gutter
right of way
• Trees to be selected from the DDOT approved list • Trees shall be planted a min. of 30 feet apart• Tree planting widths exceed the minimum of 4’ wide and range from a minimum of 4.5’ to 7’ wide.
STREET TREE PLANTER SOIL VOLUMES
Typical Tree 7’ wide planter (max)Average soil volume = 1600 cu ft (850 cu ft uncovered, 750 cu ft covered)7’ wide planter (4.5’ deep) + 7’ extended planting soil area (4’ deep)
Typical Tree 4.5’ wide planter (min)Average soil volume = 1518 cu ft (546 cu ft uncovered, 972 cu ft covered)7’ wide planter (4.5’ deep) + 7’ extended planting soil area (4.5’ deep)
*Trees shall have the minimum allowable soil volume for tree rooting per (DEM 37.5.3):• Large trees: 1500 cubic feet of soil within a R27’;• Medium trees: 1000 cubic feet of soil within R22’• Small trees: 600 cubic feet of soil within a R16’
TYPICAL STREET TREE PLANTING DETAIL
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
eccles
Constitution ave nw
C street nw
21st s
tree
t nw
20th
stre
et n
w
19th s
tree
t nw
frb-east
Virginia Ave nw
N
SCALE: 1” = 60’-0”15’0’ 30’ 60’ 120’
Property line Property line
Landscape PLAN
PLANTING ADJUSTMENTS
FRB-EAST ENTRY
ECCLES ENTRY
FRB-EAST GARDENSPLANTING ADJUSTMENTS
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
20th st nw
eccles planting adjustments
REMOVE EXISTING YEWS to achieve original design intent
Limb-up existingmagnolia trees
paving and/or 12-18” mature height groundcover within 15’ of building
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
eccles
frB-EASTECCLES
raised mid-block crosswalk at eccles and martin building
eccles ENTRY PLAN ENLARGEMENT
raised crosswalk, granite
20th
stre
et nw
FFE 20.5 +22.5
granite paving, typ+22.7
+22.0
N
22.5+
+22.1
20.4+
bollard, typ.22.5++22.7+22.620.8+ 21.8++21.7
+22.7
20.4+ 226+
concrete paving, typ
planter w/ street tree, typ
5% slope
5% slope
MARBLE CURB/wall, typ.
MARBLE CURB, EXISTING
GRANITE STAIRS
POST-AND -RAIL BARRIER
LAWN
LAWN
ENTRY PLAZA
plant bed & green wall
HISTORIC WALL OPENING WIDENED
plant bed & stone seat
trench drain20.5+
building overhang
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
N
frB-EASTECCLES
eccles
20th st nw
post & rail barrier street tree and planterbollard, minimal
SCALE: 1” = 20’-0”
5’0’ 10’ 20 40’
C st nwsloped walk & Stairs Historic wall
eccles main ENTRY EAST ELEVATION at 20th ST NW
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
N
eccles
eccles entrance plaza 20th st nwnew bollards
new tree plantings
new plantingplanter
new accessible walk & stairs
Property line
20.50’
22.00’
eccles main entrance section EAST/WEST
frB-EASTECCLES
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
N
eccles
20th st nw
post & rail barrier street tree and planterbollard, minimal
SCALE: 1” = 20’-0”
5’0’ 10’ 20 40’
C st nwsloped walk & Stairs Historic wall
frB-EASTECCLES
FRB-EAST GARDEN ENLARGEMENT PLAN
N
guard booth
19.3+
bollard, typ.
+2 1.4
tree planting in historic tree locations, typ.
lawn terrace
flag polegranite paving, typ
granite paving
granite curb granite paving
granite reflecting pool with subtle jets
stone seating element, typ.
sloped planting
planter w/ street tree
stone seating element, typ.
building terrace and stairs
post-and-rail barrier
+21.83
+2 2.75+2 2.6+2 2.5
+2 1.6
+2 3.0
+2 3.0
+2 2.5
+18.79
+2 1.5
modified wall with sloped walk
reset existing granite curbmaintain planted slope
structural soil below paving
frB-EASTECCLES
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
frb-east constitution ave section north/south
LAWN TERRACE NEW WALKWAY
N
SCALE: 1/16” = 1’-0”
4’0’ 8’ 16’ 32’
LAWN TERRACE LAWN TERRACE GARDENGARDEN20TH ST NW 19TH ST NWENTRANCE PLAZA
frB-EASTECCLES
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
stair to terrace
FRB-EAST BUILDING OUTDOOR SEATING TERRACE | PLAN ENLARGEMENT
N
SCALE: 1/16” = 1’-0”
4’0’ 8’ 16’ 32’
stairs
Accessible ramp
special pavingat crossing
water feature wall planted slope
Movable tables & chairs
Building overhang
plant bed, typ.
area way, typ.
property line
MOVABLE planters
FRB-EAST outdoor seating terrace
building Entrance
bollards, typ.
Post & rail bollard
20th
stre
et nw
c street nw post & rail bollard/guardrail
planter w/ street tree
entry plaza
frB-EASTECCLES
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
N
FRB-EAST ENTRY PLAZA
20th st nw
BUILDING entry
Sloped planting
stairs water feature wall
Vehicular barrier / guardrail in planting
vehicular barrier / guardrail in planting
sloped planting (beyond)
Prop
erty
line
FRB-EAST BUILDING main entrance section east/west
SCALE: 1/16” = 1’-0”
4’0’ 8’ 16’ 32’
frb-eastfrb-east
Npr
oper
ty li
ne
OUTDOOR SEATING TERRACE
WATER FEATURE WALL
FRB EAST BUILDING - section looking east at 20th street FRB EAST BUILDING - section looking NORTH at 20th street
Ornamental tree
street tree
18.80’
23.50’
frB-EASTECCLESfrB-EASTECCLES
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
N
20th street NWCrosswalk
FRB-EAST BUILDING main entrance ELEVATION AT 20TH ST NW NORTH/SOUTH
FRB-EAST - Signage at 20th street connection / building entry
FRB-EAST -elevation looking east at 20th street
signagebollard
Post & rail barrier
Ornamental tree street tree in linear planter
frB-EASTECCLES
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
frb-east entry plaza BIRD’s EYE VIEW
UPDATE REQUIRED
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
frb-east entry plaza PERSPECTIVE
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
frb-east entry plaza PERSPECTIVE
May 21, 2020 Fortus | Board of Governors - The federal reserve systemEccles / FRB-EAST Design | cfa PRESENTATION
eccles
Constitution ave nw
C street nw
21st s
tree
t nw
20th
stre
et n
w
19th s
tree
t nw
frb-east
virginia AVe nw
N
SCALE: 1” = 60’-0”15’0’ 30’ 60’ 120’
Property line Property line
landscape PLAN