TRANSCRIPT
Mary-Cruz Fouz
CIEMAT-Madrid
Muon Week Bologna Apr03
Madrid Status Report
COMPLETED
CERN CIEMATSLs
testedSLs
being tested
SLs mechanicall
y assembled
SLsbeing
assembled
#1 to
#24#25 #26 #27
#28#29#30
#31
Chamber construction StatusChamber construction StatusChamber construction StatusChamber construction Status
CHAMBER
Serial
Number
Superlayers
Chambers
Production RateProduction RateProduction RateProduction Rate
SL QC-TESTSSL QC-TESTSSL QC-TESTSSL QC-TESTS
SL QC-TESTSSL QC-TESTSSL QC-TESTSSL QC-TESTS
CHAMBER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Positive or Negative ++++++++- - - - - - - - +++
To be recycled(consider
it as Spare)
X
RPC padsto be glued
X X X X X X X X X X
Big leaks XBad HV Boards (16 Ch)
X X X X X X ? ? ?HC gluing mistake X
MB2 Chambers at CERN (last CMS Week - Feb 2003)
CHAMBER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Positive or Negative ++++++++- - - - - - - - ++++++++
To be recycled(consider
it as Spare)
X
RPC padsto be glued
X
Big leaks XBad HV Boards (16 Ch)
X X X X X X ? ? ?HC gluing mistake X
MB2 Chambers at CERN(April 2003)
MB2 MB2 ChamberChamberss at CERNat CERNMB2 MB2 ChamberChamberss at CERNat CERN
5 more MB2 Chambers (20–24) since 5th March Tested at CERN (HV) from 6th to 16th March and all found O.K , except one sparking strip (chamber 23). Strip and Wire disconnected, now all O.K A new mobile stand-alone chamber testing system setup at ISR:
HV: CAEN SY127 for test 1 SL. (Current Resolution:10nA)DAQ: One V767 TDC for test 1/2SL. TestPulse + Noise
It should be improved at the near future.
CIEMAT Tecnicians spent several days at ISR for gluing RPC pads
Replacement of HVB’s in chambers 7,8,9,11,12,13Depending on availability of boards and manpower
Chambers with pending HV problems at March 1st to be fixed 3,4,10,12,15 Chamber 10 repaired on March
Problems due to HVBoards.
3HVB(1 per SL) new ones (yellow type first batch) 3HVB(1 per SL) new ones (yellow type first batch)
5 MB2 + & 2 MB4/10 YB+25 MB2 + & 2 MB4/10 YB+12 MB2 - YB-1
TOTAL 10 MB2+ (Serial numb. 17,18,19,20,21,22,23,24,25,26)4 MB4/10 To be made2 MB2- (Serial numb. 10,16)
Next Chambers to be produced at CIEMAT:Next Chambers to be produced at CIEMAT:(expected to arrive at CERN before the end of 2003)
MB2- : 27,28,29 (for YB0)MB4/10: 30,31,32,33,34,35 (Need HC panels)MB2+: 36,37,38,39
First shipment in 2004First shipment in 2004MB2- : 40,41,42,43,44 (to complete YB0 and YB-2)
MB2 MB2 ChamberChamberss needed for installation in 2003needed for installation in 2003