John R. Kasich GovernorMary Taylor, Lt. GovernorScott J. Nally, Director
June 24, 2013
Mr. Randy TerryLiberty Land Company, LLC6306 Princeton Glendale RoadLiberty Township, OH 45011
RE: Carriage Hill Section 6; NPDES Permit #10004588*AGCompliance Inspection Findings
Dear Mr. Terry:
On Thursday, June 20, 2013, I inspected the Carriage Hill Section 6 site in Liberty Township, Ohio todetermine compliance with the site's NPDES construction site storm water discharge permit. JaredWilson was present during the inspection
Based on my observations, there were no obvious violations of the project's storm water dischargepermit. I did review the sites storm water pollution prevention plan (SWP3) before my inspection. Theinspection logs I requested to see during my inspection were not presented. Records of weeklyinspections of the erosion control BMPs are required to be kept on site.
All best management practices seem to be working efficiently at this point. Just as a recommendation,proper maintenance of silt fence and removal of accumulated sediment will reduce the maintenance ofstorm sewers and other underground piping systems that lead to the sediment ponds.
Please provide a copy of the site's SWP3 to this office for review, along with copies of sediment controlinspection logs kept since the project started. This information must be provided within 14 days of thereceipt of this letter.
If you have any questions regarding the NPDES permit, you may contact me at (937) 204-1002 or viaemail Iames.schwieterman(epa.ohio.qov.
Sincerely,
James SchwietermanStorm Water GroupDivision of Surface Water
J S/tb
Enclosed: Inspection Sheet
cc: Jared WilsonRodney Rose
Southwest District Office • 401 East Fifth Street s Dayton, OH 45402-2911wwwepa.ohio.gov . (937) 285-6357 (937) 285-6249 (fax)
Ohio EPA DSW Storm Water Section, Construction Site Visit Information Form
Inspector initials: Z3 —S Visit date: (,I20 I13/ Permit # iLGC /\6
Site Name: Ccrcijc. i1cII &CM C
Site Address: _SKD 1cr,1i' cf ce--ck tk' ' 1 Ck LVfj
People Contacted On Site:.
Phone: E-mail: -J5/3 - 3 -
1. Did you see the following on site?
ITEM YES NO Not Requested Comments
Coverage Letter
SWP3/____ _______- lt&1
Inspection Records
Contractor& Subs __.7v
signature document
2. Acreage Disturbed: 5
3. Site Status: Clearing/grubbing
(treetsi
4. Are BMPs needed:
5. Are BMPs effective? All
rjng cmsewersin
Utilities installed Final Grade Final stabilization
Some None No BMPs
Explain:/1 F ,41riW (at/j ;1bv'(4•; 9N e e,chj
6-1 What post construction controls are shown on the SWP3? %?,t'P\ Stx.ç'
7. Were Photos taken & saved? 8. Was an NOV issued?
Additional notes/comments:OC\ L'\ JceJ (i4
Li T3
(t1U- 5 '.t' . (\k. Okl'\ Lec ki
oc '/9 Jc\-I 'L 6A a