masinsi1-000108

Upload: shruti-chapra

Post on 09-Mar-2016

213 views

Category:

Documents


0 download

DESCRIPTION

MASINSI1-000108

TRANSCRIPT

  • About this sheet:This sheet helps in capturing effort estimation for non incident categorie tickets in OTC JV.

    Version HistoryVersion

    1

    Details:S.No

    123456789

    10111213

    Note:The sheet has refernce formulas, do not change referencing else will impact your overall efforts

  • This sheet helps in capturing effort estimation for non incident categorie tickets in OTC JV.

    Version HistoryDescriptionEffort Estimation Template-OTC JV

    DescriptionFill header items referencing TOM (Eg TOM CR, TOM ticket , Details)EE sheet is divided into 6 main heading with futher sub-headings, extended across functions horizontallyOQM effort is fixed with an average of 1 hrFunctional Consultant is owner and is responsible for collecting efforts of all tracksKey Thoughts of Analysis/Estimation portion in bottom to be used to explain rationale of Efforts in case required considering complexity Completed EE template to be attached to parent TOM ticketOriginal EE should not be changed , if in case delta work is required, it will be supported with new EE template and will be addtional sheet.Please add if required, if exisitng items doesnot have relevant sub headingsTotal efforts can be obtained from G42 and H42 in mhrs and mdays respectively

    The sheet has refernce formulas, do not change referencing else will impact your overall efforts

  • Version HistoryModified byModified date

    Remarks

    Key Thoughts of Analysis/Estimation portion in bottom to be used to explain rationale of Efforts in case required considering complexity

    Original EE should not be changed , if in case delta work is required, it will be supported with new EE template and will be addtional sheet.

  • 302306871.xlsx Page 4 / 9

    Effort Estimation- MASINSI1-000108TOM CR Number

    1 Analysis1.1 Common Understanding of requirement 11.2 Consulting Solution (relevant for SR)1.3 (please add if required)

    2 Configuration/Development2.1 Customizing (Functional)2.2 Development (Development)2.3 Table Maintenance (Z*)2.4 Mass update (LSMW, SCATT etc)2.5 Interface Manager (ZIFM, ZKBC)2.6 Number range Maintenance 2

    3 Documentation3.1 Configuration Documents3.2 Functional Specification (FS)3.3 Technical Specification (TS)3.4 Test Script (UAT/UATTR)3.5 TOM CR Handling3.6 OQM Effort (Fixed) 13.7 (please add if required)

    4 Testing4.1 Screening / Test Execution (Dev and QA)4.2 Test Data Creation (in Dev & QA)4.3 (please add if required)

    5 Coordination5.1 Business/ Techical Expert Coordination 15.2 Team Coordination (SPOC/Other)5.3 (please add if required)

    6 Training6.1 Training Documents6.2 Training Execution6.3 (please add if required)

    TOTAL 5

    Key Thoughts of Analysis/Estimation:

    Functional Team(manhours)

  • 302306871.xlsx Page 5 / 9

  • 302306871.xlsx Page 6 / 9

    Effort Estimation- MASINSI1-000108TOM CR Title:

    0 0

    Key Thoughts of Analysis/Estimation:

    Development Team(manhours)

    Basis Team(manhours)

  • 302306871.xlsx Page 7 / 9

  • 302306871.xlsx Page 8 / 9

    Effort Estimation- MASINSI1-000108TOM Ticket Number MASINSI1-000108

    1.0 0.11.0 0.10.0 0.00.0 0.0

    2.0 0.30.0 0.00.0 0.00.0 0.00.0 0.00.0 0.02.0 0.3

    1.0 0.10.0 0.00.0 0.00.0 0.00.0 0.00.0 0.01.0 0.10.0 0.0

    0.0 0.00.0 0.00.0 0.00.0 0.0

    1.0 0.11.0 0.10.0 0.00.0 0.0

    0.0 0.00.0 0.00.0 0.00.0 0.0

    0 5.0 0.6

    Key Thoughts of Analysis/Estimation:

    Security Team(manhours)

    Totalman hours

    Totalman-days

  • 302306871.xlsx Page 9 / 9

    Read MeEffort Estimate