massachusetts pressure washwater treatment demonstrations

12
Massachusetts Pressure Massachusetts Pressure Washwater Treatment Washwater Treatment Demonstrations Demonstrations Robin Lacey – MA CZM Robin Lacey – MA CZM

Upload: jarrod-eaton

Post on 31-Dec-2015

16 views

Category:

Documents


0 download

DESCRIPTION

Massachusetts Pressure Washwater Treatment Demonstrations. Robin Lacey – MA CZM. The Problem. Cape Ann Marina - Gloucester. Chemical pre-treatment for discharge to local sewer (American Cleanway) Certified operator required – Grade 2 Must remove large solids before treatment - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Massachusetts Pressure Washwater Treatment Demonstrations

Massachusetts Pressure Massachusetts Pressure Washwater Treatment Washwater Treatment

DemonstrationsDemonstrations

Robin Lacey – MA CZMRobin Lacey – MA CZM

Page 2: Massachusetts Pressure Washwater Treatment Demonstrations

The ProblemThe Problem

Page 3: Massachusetts Pressure Washwater Treatment Demonstrations
Page 4: Massachusetts Pressure Washwater Treatment Demonstrations

Cape Ann Marina - Cape Ann Marina - GloucesterGloucester• Chemical pre-treatment for discharge to Chemical pre-treatment for discharge to

local sewer (American Cleanway)local sewer (American Cleanway)• Certified operator required – Grade 2Certified operator required – Grade 2• Must remove large solids before treatmentMust remove large solids before treatment• Dried sludge = solid wasteDried sludge = solid waste• Stormwater IssuesStormwater Issues

• CostsCosts System - $25K System - $25K (system, start-up chemicals, and training)(system, start-up chemicals, and training)

Total - Total - $48K $48K (includes washpad, site work, electrical, (includes washpad, site work, electrical, plumbing…)plumbing…)

Page 5: Massachusetts Pressure Washwater Treatment Demonstrations

Wash padWash pad

Page 6: Massachusetts Pressure Washwater Treatment Demonstrations

Heated StorageHeated Storage

Page 7: Massachusetts Pressure Washwater Treatment Demonstrations

TreatmentTreatmentSystemSystem

Page 8: Massachusetts Pressure Washwater Treatment Demonstrations

Arey’s Pond Boatyard - Arey’s Pond Boatyard - ChathamChatham• Closed-loop re-circulating system (RGF Closed-loop re-circulating system (RGF

Environmental)Environmental)• Settling, physical filtration, odor controlSettling, physical filtration, odor control• No operational permitsNo operational permits• No certified operatorNo certified operator• Owner satisfied with system after 2 seasonsOwner satisfied with system after 2 seasons

• CostsCostsSystem - $16.3K System - $16.3K (system and training)(system and training)

Total - Total - $36.7K $36.7K (includes washpad, electrical, (includes washpad, electrical, plumbing…)plumbing…)

Page 9: Massachusetts Pressure Washwater Treatment Demonstrations

Wash padWash pad

Page 10: Massachusetts Pressure Washwater Treatment Demonstrations

Treatment Treatment SystemSystem

Control Panel

Page 11: Massachusetts Pressure Washwater Treatment Demonstrations

Stormwater Control in Stormwater Control in WinterWinter

Page 12: Massachusetts Pressure Washwater Treatment Demonstrations

The EndThe End

Robin LaceyRobin LaceyMassachusetts Office of Coastal Zone Massachusetts Office of Coastal Zone ManagementManagement251 Causeway Street, Suite 800251 Causeway Street, Suite 800Boston, MA 01890Boston, MA [email protected]@state.ma.us