MassDOT Case Studies in Tidal RestorationCrescent Marsh - Saugus, MA

Bass River – Dennis, MA

September 11, 2018

Northeastern Transportation & Wildlife Conference

Susan McArthur, MassDOT HWY Environmental

Ryan Lizewski, VHB

2

• What is tidal flow restoration?

• What are the benefits and why is it important?

• How do we do it?

Introduction

3

Crescent Marsh Culvert Replacement - Saugus

4

Crescent Marsh Culvert Replacement - Saugus

5

Crescent Marsh Culvert Replacement - Saugus

6

Crescent Marsh Culvert Replacement-Saugus

7

Crescent Marsh Culvert Replacement-Saugus

8

Crescent Marsh Culvert Replacement - SaugusVegetative

Community Area (SF)Percent

Coverage

Phragmites 550,092 56.6%

Salt Marsh 1,802 0.2%

Shrub-scrub 44,701 4.6%

Solidago 375,838 38.6%

Total 972,433 100.0%

9

Culvert Replacement Benefits

• Improve tidal flushing to the marsh

– Improve salt marsh, reduce Phragmites

– Improve quality of fishery habitat

• Resiliency

– Increase culvert size from 48-inches to 6-foot by 6-foot box

– Reconnect Crescent Marsh with Bear Creek Estuary

Crescent Marsh Culvert Replacement - Saugus

10

• No funds for project – How move forward?

– Added ~$2 million culvert replacement project to a nearby ~90+ million project.

Bundle PS&E into the nearby Belden Bly Bridge Project

– Used open services contract to develop project on accelerated schedule

• Needed to determined cost-effective replacement structure that would:

– meeting hydraulic performance standards

– Increase tidal flushing volumes to restore salt marsh

– provide greater resiliency to infrastructure in tidal environment.

Crescent Marsh Culvert Replacement - Saugus

11

Permitting:

• Bridge Exempt Project

• 404 USACE PCN

• 401 Water Quality Certification

• MassDEP Bureau of Waste Prevention SW-45

• MassDEP Bureau of Waste Prevention SW-36

Crescent Marsh Culvert Replacement - Saugus

12

Crescent Marsh Culvert Replacement - Saugus

13

Crescent Marsh Culvert Replacement - Saugus

HEC-RAS Model Framework

NFIP Flood Insurance Rate Map 14

Crescent Marsh Culvert Replacement - Saugus

15

Crescent Marsh Culvert Replacement - Saugus

HEC-RAS Profile and Calibration

16

Crescent Marsh Culvert Replacement - Saugus

Water Surface Elevation Results

17

Crescent Marsh Culvert Replacement - Saugus

Tidal Flushing and Runoff Volume Results

18

Crescent Marsh Culvert Replacement - Saugus

Culvert Design – Plan View

19

Crescent Marsh Culvert Replacement - Saugus

Culvert Design – Phasing

20

Crescent Marsh Culvert Replacement - Saugus

21

Crescent Marsh Culvert Replacement - Saugus

22

Bass River Rail Trail Bridge – Dennis -Yarmouth

23

Bass River Rail Trail Bridge – Dennis -Yarmouth

24

Bass River Rail Trail Bridge – Dennis -Yarmouth

Bass River Bridge from early 1900’s, view to north

Bass River Bridge from 1990’s view to the south

25

Bass River Rail Trail Bridge – Dennis -Yarmouth

Pre-Existing Crossing

26

Bass River Rail Trail Bridge – Dennis -Yarmouth

27

Channel Widening Benefits

• Improve tidal flushing

– Reduce nutrient concentrations w/in upstream bay & pond (evaluated by USACE in 2013)

– Improve salt marsh, reduce Phragmites,

– Improve quality of fishery habitat

• Improve navigability

– Increase 60’ channel to ~114’ channel

– Reduce velocities, improving navigability through structure

– Mariners get better alignment when approaching Route 6 bridges

Bass River Rail Trail Bridge – Dennis -Yarmouth

28

Permitting

• 404 USACE Individual Permit

• USCG Section 9 Bridge Permit

• Coastal Zone Management Consistency Review

• Section 7 – NMFS, USFWS

• 401 Water Quality Certification (dredging and filling)

• Chapter 91 Waterways License

• MA Endangered Species Program

• Essential Fish Habitat Assessment

• MA Wetlands Protection Act (Dennis and Yarmouth)

Bass River Rail Trail Bridge – Dennis -Yarmouth

29

Bass River Rail Trail Bridge – Dennis -Yarmouth

30

Bass River Rail Trail Bridge – Dennis -Yarmouth

CCRT Crossing

HEC-RAS Profile

31

Bass River Rail Trail Bridge – Dennis -Yarmouth

CCRT Crossing

BFE 6-ft

BFE 6-ft

NFIP Flood Insurance Rate Map (July 3, 1984)

32

Bass River Rail Trail Bridge – Dennis -Yarmouth

CCRT Crossing

BFE 12-ft

BFE 9-ft

NFIP Flood Insurance Rate Map (July 16, 2014)

33

Bass River Rail Trail Bridge – Dennis -Yarmouth

Bridge Design – Plan View

34

Bass River Rail Trail Bridge – Dennis -Yarmouth

Bridge Design – Section View

35

Bass River Rail Trail Bridge – Dennis -Yarmouth

36

Bass River Rail Trail Bridge – Dennis -Yarmouth

37

Bass River Rail Trail Bridge – Dennis -Yarmouth

38

Thank you

Susan [email protected]

857-368-8807

Ryan [email protected]

617-607-2684

MassDOT Case Studies in Tidal Restoration