master innovation & development plan · develo p er annual tenant cost savings -11 .32 21 .87...
TRANSCRIPT
ABSTRACT
Energy modelling for the Sidewalk Toronto project: based on the project development program, projects energy use on an hour by hour basis for the annual load of all buildings and public spaces (“8760 model”).
Most relevant sections: Vol 2 (Sustainability)
TITLE: Sidewalk Toronto Energy Modelling
AUTHOR: Integral Group
Master Innovation & Development PlanTechnical Appendix
© 2019 Sidewalk Labs. The content, documents and materials contained herein are considered Sidewalk Proprietary Information.
Sidewalk Toronto Energy Modelling
8760 Load Inputs [Quayside]
2
8760 Loads Outputs [Quayside]
3
8760 Loads Outputs [Quayside]
4
Renewables [Quayside]
5Modeling results for typical summer day in June. Results vary throughout the year.
Coincident Heating and Cooling