uncwuncwmasterplan.com/wp-content/uploads/2016/11/executive-summ… · master planning in two...

21
UNCW Campus Master Plan Update 2010

Upload: dinhhanh

Post on 29-Apr-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

UNCWCampus Master Plan Update 2010

Page 2: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

2010 Campus Master Plan Update represents a

vision for campus development, focused on:

⁄ Near-term 2010-2015

⁄ Mid-Term 2016-2020

⁄ Long-Term 2020 and beyondPURP

OSE

Page 3: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

Master Planning in Two Phases:

⁄ Phase I: Information Gathering, Assessment and

Organization (April 2010 through June 2010)

⁄ Phase II: Advanced Planning―Site, Buildings and

Infrastructure (September 2010 through May 2011)PLA

NN

ING

SEQ

UEN

CE

Page 4: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

DRI

VER

: Spa

ce N

eeds ⁄ Enrollment: +-12,000 Students

⁄ Space Deficit: +-217,000 ASF

Current (2009 Data)

⁄ Enrollment: +-14,000 Students⁄ Space Deficit: +-300,000 ASF

By year 2020

Total Deficit (if unaddressed) +-517,000 ASF

Page 5: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

DRI

VER

: Spa

ce N

eeds

⁄ Physical Education (-71%)

⁄ Recreation (-48%)

⁄ Research Laboratory (-34%)

⁄ Physical Plant (-30%)

⁄ Library (-29%)

(Academic, classroom and open laboratory show significant space

needs)

Current Greatest Deficit (%)

Page 6: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

DRI

VER

: Spa

ce N

eeds ⁄ Physical Education (-120%)

⁄ Physical Plant (-80%)

⁄ Research Laboratory (-43%)

⁄ Open Laboratory (-43%)

⁄ Residence Life (-14%/+126,893ASF)

(Teaching labs, academic office, dining and library show significant

space needs)

2020 Greatest Deficit (%)

Page 7: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

GO

ALS

: CM

S Ca

mpu

s

Main Campus

Page 8: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

GO

ALS

⁄ Create a car-free campus core connecting core residential and academic areas

⁄ Create increased core campus facility density – frame open spaces and campus streets

⁄ Create an integrated system of landscape spaces/places

⁄ Create an integrated system of pedestrian circulation – connecting people to desired destinations

⁄ Create clear, simple vehicular circulation – potential loop road with neighborhood connections

⁄ Create an integrated system of bicycle routes/trails – minimize conflict with pedestrians

⁄ Create a physical parking management strategy – meet demand outside the loop

⁄ Create a stronger UNCW identity/presence at Main and CMS campuses

⁄ Improve / increase transit service routes, schedules and shelter facilities

Page 9: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

Soaring to Greatness

⁄ Create the most

powerful learning

experience possible for

students

⁄ Enhance quality of

campus and provide a

sustainable campus

⁄ Ensure adequate

resources to achieve

university goalsILLU

STRA

TIV

E PL

AN

Page 10: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

LAN

D U

SEKEY ELEMENTS:

A. Continue to consolidate

academics along

Chancellor’s Walk ,

northward to Randall

Drive

B. Create an east | south |

west crescent of

Residential, Support,

Recreation and Athletics

C. Create a Mixed-Use

Hotel, Continuing

Education and

convocation Center

Complex

D. Administrative | Support

focused in Historic

Campus Core

A

B

B

B

C

D

Page 11: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

BUIL

DIN

GS

KEY ELEMENTS:

A. Welcome | Visitor’s

Center

B. Expand | Renovate

Randall Library

C. Cultural Arts + Education

Cluster

D. Racine Cluster

E. Infill along Chancellor’s

Walk

F. Expand Physical Plant

G. Tennis Center

H. Hotel, Continuing

Education Convocation

Center Cluster

A

B

C

D

E

F

G

H

Page 12: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

GRE

EN S

PACE

KEY ELEMENTS:

A. Enhance “buffer” with

gateways |streetscape

B. New Fisher Center |

Union Quadrangle

C. Enhance Commons

D. New Library Gateway

E. New Racine Gateway

F. Enhance Chancellor’s

Walk

G. Enhance CA & Education

open space

H. New Campus-wide

storm water lake

I. New Wagoner Hall Plaza

J. Complete Health Science

Quadrangle

K. Enhance Bluethenthal

Wildflower Preserve

A

B

C

D

E

FG

H

I

J

K

Page 13: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

VEH

ICLE

CIR

CULA

TIO

NKEY ELEMENTS:

A. Enhance Wagoner Drive

B. New Loop Road (connect

Randall | Plyler and

Reigel | Hurst)

C. Limited Access

Roadways: Walton,

Cahill ,Price drive

D. Enhance CA & Education

open spaces

E. Transition all campus

roadways into ‘complete

streets’

F. Price and Cahill drives to

accommodate bicycles,

long-boarders, Seahawk

Shuttle and service

emergency vehicles

A

B

B

B

C

C

C

E

F

F

Page 14: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

PARK

ING

KEY ELEMENTS:

A. New Parking Deck at

Randall Library

B. New Parking Deck south

of Hoggard Hall

C. New Deck at the corner

of Hamilton and Hurst

D. Improved Security and

access to Cinema and

Oleander lots

E. Expansion of the Cinema

lot

A

B C

D

D

E

Page 15: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

BICY

CLE

CIRC

ULA

TIO

N

KEY ELEMENTS:

A. All campus ‘complete

streets’ to include

dedicated, continuous

bike lanes in each

direction

B. Cahill and Price to have

dedicated bike lanes

C. Bike racks located

between buildings (away

from front entrances)

D. Tie into Cross City Bike

Trail- linking UNCW to

Downtown and

Wrightsville Beach

A

B

B

C

D

D

Page 16: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

TRA

NSI

T

KEY ELEMENTS:

A. Continuous, dedicated

shuttle between the

Student Recreation

Center, Fisher University

Union and Hanover Hall

B. Locate, improved

shelters at all stops

C. Develop | provide real-

time shuttle schedule

information via online +

mobile phone

A

B

Page 17: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

ILLU

STRA

TIV

E PL

AN

Page 18: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

GO

ALS

: CM

S Ca

mpu

s

CMS Campus

Page 19: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

ILLU

STRA

TIV

E M

AST

ER P

LAN

Page 20: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

LAN

D U

SE

AcademicResidential LifeMixed-Use: Academic, Administrative, Research, +.Support Physical PlantBoat YardStorm WaterWetlands

KEY ELEMENTS:

A. Central Core of

Academic, Research and

Support

B. Create a Residential

Village

C. Relocate Boat Yard

AB

C

Page 21: UNCWuncwmasterplan.com/wp-content/uploads/2016/11/EXECUTIVE-SUMM… · Master Planning in Two Phases: ⁄Phase I: Information Gathering, Assessment and Organization (April 2010 through

UNCWCampus Master Plan Update 2010