master table of contents - open.alberta.ca · application for approval of the blackgold expansion...
TRANSCRIPT
Master Table of Contents
Volume 1 Project Description
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Table of Contents
SECTION 1.0 – OVERVIEW TABLE OF CONTENTS
PAGE
1.0 OVERVIEW....................................................................................................................1-1 1.1 Background ........................................................................................................1-1 1.2 Proponent...........................................................................................................1-1 1.3 Overview.............................................................................................................1-1 1.4 Public Consultation.............................................................................................1-6 1.5 Need...................................................................................................................1-9 1.6 Schedule ..........................................................................................................1-10
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Table of Contents
SECTION 2.0 – PROJECT DESCRIPTION TABLE OF CONTENTS
PAGE
2.0 PROJECT DESCRIPTION.............................................................................................2-1 2.1 Introduction.........................................................................................................2-1
2.1.1 Bitumen Recovery and Processing Components ..............................2-1 2.1.2 Site Selection and Constraints Mapping ............................................2-3
2.2 Reservoir Geology and Recovery Process.........................................................2-7 2.2.1 Geological Overview ..........................................................................2-7 2.2.2 Available Data....................................................................................2-9 2.2.3 Local Stratigraphy ............................................................................2-11 2.2.4 Reservoir Characteristics.................................................................2-16 2.2.5 Caprock Characteristics...................................................................2-22 2.2.6 Fluid Distribution ..............................................................................2-26 2.2.7 Bitumen Development......................................................................2-27 2.2.8 Production Wells and Well Pads......................................................2-37
2.3 Facilities ...........................................................................................................2-39 2.3.1 Field Facilities ..................................................................................2-39 2.3.2 Central Processing Facility ..............................................................2-41
2.4 Off-site Connections.........................................................................................2-54 2.4.1 Transportation..................................................................................2-54 2.4.2 Electrical Supply ..............................................................................2-55 2.4.3 Fuel Gas Supply ..............................................................................2-55 2.4.4 Source Water Supply and Storage ..................................................2-55 2.4.5 Diluent and Sales Oil Pipelines........................................................2-55
2.5 Air Management ...............................................................................................2-55 2.5.1 Emission Sources ............................................................................2-55 2.5.2 Greenhouse Gas Emissions ............................................................2-56
2.6 Water Management ..........................................................................................2-57 2.6.1 Volume of Process Make-up Water .................................................2-58 2.6.2 Source of Process Make-up Water ..................................................2-59 2.6.3 Potable Water Supply Requirements and Source ...........................2-60 2.6.4 Site Management.............................................................................2-60 2.6.5 Processed Water Disposal...............................................................2-61
2.7 Waste Management Plan .................................................................................2-61 2.8 Health, Safety and Environment.......................................................................2-62
2.8.1 Policies.............................................................................................2-62 2.8.2 Environmental Management ............................................................2-65 2.8.3 Health and Safety ............................................................................2-65 2.8.4 Emergency Response Plan .............................................................2-66
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Table of Contents
SECTION 3.0 – CONSERVATION AND RECLAMATION PLAN TABLE OF CONTENTS
PAGE
3.0 CONSERVATION AND RECLAMATION PLAN ...........................................................3-1 3.1 Introduction.........................................................................................................3-1
3.1.1 Environmental Protection and Enhancement Act Approval Request..............................................................................................3-1
3.1.2 Facility Overview................................................................................3-1 3.1.3 Project Evaluation and Design Level Mitigation.................................3-4 3.1.4 Ecological and Physiographic Setting................................................3-5 3.1.5 Soils and Terrain................................................................................3-5
3.2 Environmental Regional Initiatives and Stakeholder Consultation .....................3-6 3.2.1 Environmental Regional Initiatives.....................................................3-6 3.2.2 Stakeholder Consultation...................................................................3-7 3.2.3 Regional Sustainable Development Strategy ....................................3-7
3.3 Reclamation Planning Concepts ........................................................................3-8 3.3.1 Reclamation Goals and Objectives....................................................3-8 3.3.2 Reclamation Guidelines .....................................................................3-9 3.3.3 General Reclamation Procedures....................................................3-10 3.3.4 Restoration of Capability..................................................................3-11 3.3.5 Operational issues ...........................................................................3-20
3.4 Conceptual Conservation and Reclamation Plan.............................................3-27 3.4.1 Development Plan............................................................................3-28 3.4.2 Disturbances for the Project.............................................................3-28 3.4.3 Reclamation Sequencing .................................................................3-28 3.4.4 Soil Handling Plan............................................................................3-35 3.4.5 Revegetation....................................................................................3-38 3.4.6 Closure Phase Reclamation ............................................................3-42
3.5 Conclusion........................................................................................................3-45
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Table of Contents
SECTION 4.0 – PUBLIC CONSULTATION TABLE OF CONTENTS
PAGE
4.0 PUBLIC CONSULTATION ............................................................................................4-1 4.1 Introduction.........................................................................................................4-1 4.2 Goals and Objectives .........................................................................................4-1 4.3 Program Scope ..................................................................................................4-2
4.3.1 Stakeholder Identification...................................................................4-2 4.3.2 Stakeholder Consultation...................................................................4-3
4.4 Issues and Mitigation..........................................................................................4-4 4.4.1 Aboriginal Communities .....................................................................4-4 4.4.2 Other Stakeholder Engagement ......................................................4-16
4.5 Future Consultation Plans ................................................................................4-17 S:\Project Ce\Ce03745\EIA\Vol 1\fnl rpt-Sec 4 public consult vol 1 EIA-ce03745_100-10dec09.doc
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Table of Contents
SECTION 5.0 – ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT APPROVAL REQUIREMENTS
TABLE OF CONTENTS
PAGE
5.0 ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT APPROVAL REQUIREMENTS ..........................................................................................................5-1
S:\Project Ce\Ce03745\EIA\Vol 1\fnl rpt-Sec 5 epea vol 1 EIA-ce03745_100-10dec09.doc
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Table of Contents
SECTION 6.0 – ENVIRONMENTAL IMPACT ASSESSMENT SUMMARY TABLE OF CONTENTS
PAGE
6.0 ENVIRONMENTAL IMPACT ASSESSMENT SUMMARY............................................6-1 6.1 Introduction.........................................................................................................6-1
6.1.1 Scope of the EIA ................................................................................6-1 6.1.2 Project Assessment Scenarios ..........................................................6-1 6.1.3 Study Methods ...................................................................................6-1 6.1.4 Cumulative Effects Assessment ........................................................6-2
6.2 Summary of Project Impacts and Effects ...........................................................6-2
Application for Approval of the BlackGold Expansion Project Volume 4 – EIA Addendum
March 2010
Table of Contents
SECTION 7.0 – COMMITMENTS LIST TABLE OF CONTENTS
PAGE
7.0 COMMITMENTS LIST ...................................................................................................7-1
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Table of Contents
SECTION 8.0 – LITERATURE CITED TABLE OF CONTENTS
PAGE
8.0 LITERATURE CITED.....................................................................................................8-1 S:\Project Ce\Ce03745\EIA\Vol 1\fnl rpt-Sec 8 lit cited vol 1 EIA-ce03745_100-9dec09.doc
Application for Approval of the BlackGold Expansion Project Volume 1 – Project Description
December 2009
Table of Contents
ATTACHMENTS TABLE OF CONTENTS
Attachment 1: Conceptual Conservation and Reclamation Plan Figures
Attachment 2: Consultation Attachment 2-1: Plain Language Summary Attachment 2-2: Project Summary Table Attachment 2-3: Summary of Consultation Activities S:\Project Ce\Ce03745\EIA\Vol 1\fnl rpt-Sec 8 lit cited vol 1 EIA-ce03745_100-9dec09.doc
Volume 2 Environmental Impact Assessment
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 1.0 – INTRODUCTION TABLE OF CONTENTS
PAGE
1.0 INTRODUCTION............................................................................................................1-1 S:\Project Ce\Ce03745\EIA\Vol 2\fnl rpt-Sec 1 introduction-vol 2 EIA-ce03745-dec09.doc
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 2.0 – PROJECT DESCRIPTION TABLE OF CONTENTS
PAGE
2.0 PROJECT DESCRIPTION.............................................................................................2-1 2.1 Introduction.........................................................................................................2-1 2.2 Reservoir Recovery Process ..............................................................................2-1 2.3 Schedule ............................................................................................................2-3 2.4 Project Components...........................................................................................2-3
2.4.1 Well Pads...........................................................................................2-3 2.4.2 Central Processing Facility ................................................................2-6 2.4.3 Off-site Facilities ..............................................................................2-10
2.5 Monitoring and Environmental Management....................................................2-10
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 3.0 – SCOPE OF ENVIRONMENTAL IMPACT ASSESSMENT TABLE OF CONTENTS
PAGE
3.0 SCOPE OF ENVIRONMENTAL IMPACT ASSESSMENT............................................3-1 3.1 Approach ............................................................................................................3-2 3.2 Spatial and Temporal Boundaries ......................................................................3-3
3.2.1 Spatial Boundaries.............................................................................3-3 3.2.2 Temporal Boundaries.........................................................................3-3
3.3 Public Consultation and Issue Identification.......................................................3-4 3.4 Identification and Evaluation of Impacts.............................................................3-4
3.4.1 Direction of the Impact .......................................................................3-5 3.4.2 Geographic Extent of the Impact .......................................................3-5 3.4.3 Magnitude of the Impact ....................................................................3-5 3.4.4 Duration of the Impact........................................................................3-6 3.4.5 Reversibility........................................................................................3-6 3.4.6 Confidence.........................................................................................3-6 3.4.7 Final Impact Rating ............................................................................3-7
3.5 Assessment Scenarios.......................................................................................3-7 3.5.1 Baseline .............................................................................................3-7 3.5.2 Application .........................................................................................3-7 3.5.3 Planned Development........................................................................3-7 3.5.4 Cumulative Effects Assessment (CEA)..............................................3-7
3.6 Literature Cited.................................................................................................3-15
Application for Approval of the BlackGold Expansion Project Volume 4 – EIA Addendum
March 2010
Table of Contents
SECTION 4.0 – AIR QUALITY TABLE OF CONTENTS
PAGE
4.0 AIR QUALITY ................................................................................................................4-1 4.1 Introduction.........................................................................................................4-1
4.1.1 Overview ............................................................................................4-1 4.1.2 Objectives ..........................................................................................4-1
4.2 Study Area..........................................................................................................4-1 4.2.1 Spatial Boundaries.............................................................................4-1 4.2.2 Temporal Boundaries.........................................................................4-2 4.2.3 Terrain................................................................................................4-2
4.3 Assessment Approach .......................................................................................4-5 4.3.1 Issues and Assessment Criteria ........................................................4-5 4.3.2 Air Quality Issues Relating to the Project...........................................4-6 4.3.3 Air Assessment Criteria .....................................................................4-6
4.4 Methods............................................................................................................4-11 4.4.1 Air Quality Impact Assessment Scenarios .......................................4-11 4.4.2 Dispersion Modelling Methods.........................................................4-11 4.4.3 Model Accuracy ...............................................................................4-14 4.4.4 Assessment of Impacts....................................................................4-16
4.5 Existing Conditions...........................................................................................4-17 4.5.1 Observed Ambient Air Contaminants in the AQRSA .......................4-17 4.5.2 Other Air Quality Observations ........................................................4-19 4.5.3 Meteorology Used in Dispersion Modelling......................................4-19 4.5.4 Baseline Emissions..........................................................................4-20 4.5.5 Estimation of Regional VOC and PAHs Emissions..........................4-25 4.5.6 Baseline Modelling Results..............................................................4-25
4.6 Potential Impacts and Mitigative Measures......................................................4-42 4.6.1 Project Emissions ............................................................................4-42 4.6.2 Project Impacts ................................................................................4-44 4.6.3 Sulphur Dioxide Emissions and Impacts..........................................4-46 4.6.4 Nitrogen Oxide Emissions and Impacts ...........................................4-52 4.6.5 Particulate Matter Emissions and Impacts.......................................4-56 4.6.6 Carbon Monoxide Emissions and Impacts.......................................4-60
Application for Approval of the BlackGold Expansion Project Volume 4 – EIA Addendum
March 2010
Table of Contents
4.6.7 Acid Deposition Emissions and Impacts ..........................................4-63 4.6.8 Nitrogen Deposition Emissions and Impacts ...................................4-66
4.7 Cumulative Effects ...........................................................................................4-68 4.7.1 Cumulative Emissions......................................................................4-68 4.7.2 Cumulative Effects ...........................................................................4-70 4.7.3 Sulphur Dioxide Emissions and Impacts..........................................4-70 4.7.4 Nitrogen Oxide Emissions and Impacts ...........................................4-76 4.7.5 Particulate Matter Emissions and Impacts.......................................4-81 4.7.6 Carbon Monoxide Emissions and Impacts.......................................4-85 4.7.7 Acid Deposition Emissions and Impacts ..........................................4-89 4.7.8 Nitrogen Deposition Emissions and Impacts ...................................4-91 4.7.9 Community and Recreational Area Location Impacts......................4-94 4.7.10 Ozone ..............................................................................................4-96 4.7.11 GHG Emissions and Impacts.........................................................4-101
4.8 Monitoring.......................................................................................................4-102 4.8.1 Local Monitoring Commitments .....................................................4-102 4.8.2 Regional Monitoring Commitments................................................4-102
4.9 Climate Change..............................................................................................4-103 4.9.1 Introduction ....................................................................................4-103 4.9.2 Project Sensitivity to Climate Change............................................4-103 4.9.3 Adaptive Management Considerations ..........................................4-104
4.10 Summary ........................................................................................................4-105 4.10.1 Overall Conclusion.........................................................................4-105 4.10.2 Changes in AQLSA and AQRSA Emissions..................................4-105 4.10.3 Ambient SO2, NO2, CO and PM2.5 Concentrations.........................4-105 4.10.4 PAI and Nitrogen Deposition..........................................................4-111 4.10.5 Community and Recreational Area Air Quality ..............................4-111 4.10.6 Ambient Ozone ..............................................................................4-112 4.10.7 GHG Emissions .............................................................................4-112 4.10.8 Climate Change .............................................................................4-112
4.11 Literature Cited...............................................................................................4-112
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 5.0 – NOISE TABLE OF CONTENTS
PAGE
5.0 NOISE ............................................................................................................................5-1 5.1 Introduction.........................................................................................................5-1 5.2 Study Area..........................................................................................................5-1 5.3 Assessment Approach .......................................................................................5-4
5.3.1 Environmental Noise Descriptors.......................................................5-4 5.3.2 Applicable Noise Guidelines ..............................................................5-4 5.3.3 Evaluation of Impact ..........................................................................5-5
5.4 Methods..............................................................................................................5-5 5.4.1 Computer Modelling...........................................................................5-5 5.4.2 Terrain................................................................................................5-5 5.4.3 Meteorology .......................................................................................5-5 5.4.4 Sound Attenuation from Buildings......................................................5-7 5.4.5 Noise Sources....................................................................................5-7
5.5 Existing Conditions...........................................................................................5-10 5.6 Potential Impacts and Mitigative Measures......................................................5-10
5.6.1 Low Frequency Noise Assessment..................................................5-13 5.7 Summary ..........................................................................................................5-13 5.8 Literature Cited.................................................................................................5-13
Application for Approval of the BlackGold Expansion Project Volume 4 – EIA Addendum
March 2010
Table of Contents
SECTION 6.0 – HYDROGEOLOGY TABLE OF CONTENTS
PAGE 6.0 HYDROGEOLOGY ........................................................................................................6-1
6.1 Introduction.........................................................................................................6-1 6.2 Study Area..........................................................................................................6-1
6.2.1 Local Study Area................................................................................6-1 6.2.2 Regional Study Area ..........................................................................6-1 6.2.3 Groundwater Model Area...................................................................6-2 6.2.4 Temporal Boundaries.........................................................................6-2
6.3 Assessment Approach .......................................................................................6-3 6.3.1 Potential Impact from Surface Facilities.............................................6-3 6.3.2 Potential Impact from Groundwater Withdrawal ................................6-3 6.3.3 Potential Impact from Wastewater Injection.......................................6-4 6.3.4 Potential Impact from Steaming and Production................................6-5
6.4 Methods..............................................................................................................6-5 6.4.1 Baseline Geology and Hydrogeology Assessment ............................6-5 6.4.2 Assessment of Potential Impacts.......................................................6-9 6.4.3 Cumulative Effects Assessment ......................................................6-22
6.5 Existing Conditions...........................................................................................6-23 6.5.1 Physical Setting ...............................................................................6-24 6.5.2 Geology............................................................................................6-24 6.5.3 Hydrogeology...................................................................................6-36 6.5.4 Arsenic in Groundwater ...................................................................6-62 6.5.5 Groundwater-Surface Water Interaction ..........................................6-65 6.5.6 Groundwater Resource Use ............................................................6-66
6.6 Application Case ..............................................................................................6-72 6.6.1 Surface Facilities..............................................................................6-72 6.6.2 Groundwater Production ..................................................................6-77 6.6.3 Wastewater Injection........................................................................6-82 6.6.4 Production and Steaming.................................................................6-84
6.7 Planned Development Case.............................................................................6-88 6.8 Monitoring.........................................................................................................6-90
6.8.1 Surface Facilities..............................................................................6-90 6.8.2 Groundwater Withdrawal .................................................................6-91 6.8.3 Wastewater Injection........................................................................6-92 6.8.4 Production and Steaming.................................................................6-93 6.8.5 Groundwater Response Plan...........................................................6-93
6.9 Summary ..........................................................................................................6-93 6.10 Literature Cited.................................................................................................6-95
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 7.0 – HYDROLOGY TABLE OF CONTENTS
PAGE
7.0 HYDROLOGY ................................................................................................................7-1 7.1 Introduction.........................................................................................................7-1 7.2 Study Area..........................................................................................................7-1 7.3 Issues and Assessment Criteria.........................................................................7-3
7.3.1 Temporal Boundaries.........................................................................7-3 7.3.2 Definition of Environmental Impacts ..................................................7-4
7.4 Methods..............................................................................................................7-4 7.4.1 Analytical Techniques ........................................................................7-4 7.4.2 Data Sources and Fieldwork..............................................................7-5
7.5 Existing Conditions.............................................................................................7-7 7.5.1 Climate...............................................................................................7-7 7.5.2 Hydrology.........................................................................................7-10 7.5.3 Baseline Hydrological Characteristics at Assessment Nodes..........7-15
7.6 Potential Impacts and Mitigative Measures......................................................7-17 7.6.1 Project Footprint...............................................................................7-17 7.6.2 Hydrologic Impacts ..........................................................................7-18 7.6.3 Mitigation..........................................................................................7-20 7.6.4 Monitoring ........................................................................................7-21
7.7 Cumulative Effects ...........................................................................................7-21 7.8 Summary ..........................................................................................................7-21 7.9 Literature Cited.................................................................................................7-24
Application for Approval of the BlackGold Expansion Project Volume 4 – EIA Addendum
March 2010
Table of Contents
SECTION 8.0 – SURFACE WATER QUALITY TABLE OF CONTENTS
PAGE
8.0 SURFACE WATER QUALITY.......................................................................................8-1 8.1 Introduction.........................................................................................................8-1 8.2 Study Area..........................................................................................................8-1 8.3 Issues and Assessment Criteria.........................................................................8-1 8.4 Methods..............................................................................................................8-4
8.4.1 Review of Existing Information...........................................................8-4 8.4.2 Field Survey .......................................................................................8-4
8.5 Existing Conditions.............................................................................................8-5 8.5.1 Local Study Area................................................................................8-7 8.5.2 Aquatic Regional Study Area ...........................................................8-12 8.5.3 Acid Sensitivity of Lakes ..................................................................8-16 8.5.4 Summary of Guideline Exceedances in ASLA.................................8-18
8.6 Potential Impacts and Mitigative Measures......................................................8-18 8.6.1 Impact of Subsurface Operations ....................................................8-18 8.6.2 Impact from Changes in Runoff .......................................................8-18 8.6.3 Effects of Construction Activities on Local Waterbodies..................8-20 8.6.4 Effects of Runoff from the Well Pads on Surface Water ..................8-21 8.6.5 Effects of Runoff from the Roads and Utility Corridors on Local
Waterbodies.....................................................................................8-21 8.6.6 Effects of Acid Deposition on Waterbodies of the ALSA and
ARSA ...............................................................................................8-22 8.7 Cumulative Effects Assessment .......................................................................8-24 8.8 Monitoring.........................................................................................................8-25 8.9 Summary ..........................................................................................................8-26 8.10 Literature Cited.................................................................................................8-28
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 9.0 – FISHERIES AND AQUATIC RESOURCES TABLE OF CONTENTS
PAGE
9.0 FISHERIES AND AQUATIC RESOURCES ..................................................................9-1 9.1 Introduction.........................................................................................................9-1 9.2 Study Area..........................................................................................................9-1
9.2.1 Aquatic Regional Study Area .............................................................9-1 9.2.2 Aquatic Local Study Area...................................................................9-1 9.2.3 Project Area .......................................................................................9-6
9.3 Issues and Assessment Criteria.........................................................................9-6 9.3.1 Issue Scoping ....................................................................................9-6 9.3.2 Assessment Criteria...........................................................................9-7 9.3.3 Indicator Resources ...........................................................................9-7
9.4 Methods..............................................................................................................9-8 9.5 Existing Conditions.............................................................................................9-9
9.5.1 Regional Setting.................................................................................9-9 9.5.2 Local Setting ....................................................................................9-10 9.5.3 Special Status Species ....................................................................9-18 9.5.4 Benthic Invertebrate Communities...................................................9-18
9.6 Potential Impacts and Mitigative Measures......................................................9-19 9.6.1 Changes in Sediment Loading.........................................................9-19 9.6.2 Changes in Stream Flow..................................................................9-21 9.6.3 Changes in Fishing Pressure Due to Increased Access and
Workforce.........................................................................................9-24 9.6.4 Changes in Abundance, Habitat or Health of Special Status
Species ............................................................................................9-25 9.6.5 Mitigation and Monitoring.................................................................9-26
9.7 Cumulative Effects ...........................................................................................9-26 9.8 Summary ..........................................................................................................9-27 9.9 Literature Cited.................................................................................................9-27
Application for Approval of the BlackGold Expansion Project Volume 4 – EIA Addendum
March 2010
Table of Contents
SECTION 10.0 – SOILS AND TERRAIN TABLE OF CONTENTS
PAGE
10.0 SOILS AND TERRAIN.................................................................................................10-1 10.1 Introduction.......................................................................................................10-1 10.2 Study Area........................................................................................................10-1
10.2.1 Spatial Boundaries...........................................................................10-1 10.2.2 Temporal Boundaries.......................................................................10-1
10.3 Issues and Assessment Criteria.......................................................................10-1 10.4 Methods............................................................................................................10-2
10.4.1 Biophysical Characteristics of the Local Study Area........................10-2 10.4.2 Soil Classification and Mapping .......................................................10-2 10.4.3 Sampling and Laboratory Analysis ..................................................10-5 10.4.4 Soil Suitability for Reclamation ........................................................10-5 10.4.5 Land Capability Classification for Forestry.......................................10-7 10.4.6 Soil Erosion Risk..............................................................................10-8 10.4.7 Acid Deposition ..............................................................................10-10 10.4.8 Derivation of Spatial Statistics Using GIS ......................................10-10
10.5 Existing Conditions.........................................................................................10-10 10.5.1 Baseline Regional Terrain and Soil Conditions..............................10-10 10.5.2 Baseline Terrain and Soil Conditions of the TLSA.........................10-19
10.6 Impact Assessment Mitigative Measures .......................................................10-41 10.6.1 Project Impacts on Soils, Terrain and Geology..............................10-41 10.6.2 Terrain Disturbance .......................................................................10-44 10.6.3 Soil Disturbance.............................................................................10-44 10.6.4 Soil Quality.....................................................................................10-51 10.6.5 Project Impacts on Soil Capability for Forestry ..............................10-55 10.6.6 Project Impacts on Soil Suitability for Reclamation........................10-58 10.6.7 Soil Acidification.............................................................................10-59 10.6.8 Project Impacts on Ground Heave.................................................10-64 10.6.9 Project Impacts on Unique Terrain and Soil Units .........................10-64 10.6.10 Summary of Project Specific Effects..............................................10-66 10.6.11 Management and Mitigation of Residual Impacts ..........................10-66 10.6.12 Residual Effects on Terrain and Soils............................................10-70 10.6.13 Monitoring ......................................................................................10-70
10.7 Cumulative Effects .........................................................................................10-71 10.8 Summary ........................................................................................................10-71 10.9 Literature Cited...............................................................................................10-74
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 11.0 – VEGETATION TABLE OF CONTENTS
PAGE
11.0 VEGETATION..............................................................................................................11-1 11.1 Introduction.......................................................................................................11-1 11.2 Study Area........................................................................................................11-1
11.2.1 Geographic Boundaries ...................................................................11-1 11.2.2 Temporal Boundaries.......................................................................11-1
11.3 Issues and Assessment Criteria.......................................................................11-3 11.3.1 Issues...............................................................................................11-3 11.3.2 Resource Indicator Selection ...........................................................11-5 11.3.3 Assessment Criteria.........................................................................11-6 11.3.4 Cumulative Effects Assessment Methods........................................11-6
11.4 Methods............................................................................................................11-6 11.4.1 Review of Existing Information.........................................................11-6 11.4.2 Spatial Datasets...............................................................................11-7 11.4.3 Baseline Analysis and Mapping .......................................................11-7 11.4.4 Field Surveys ...................................................................................11-7
11.5 Existing Conditions...........................................................................................11-8 11.5.1 Ecological Setting ............................................................................11-8 11.5.2 Habitat Distribution...........................................................................11-9 11.5.3 Rare Plant Species and Ecological Communities..........................11-16 11.5.4 Weeds and Non-native Plant Species ...........................................11-21 11.5.5 Traditional Use Plants....................................................................11-23
11.6 Impact Assessment and Mitigative Measures ................................................11-25 11.6.1 Impacts to Habitat Distribution .......................................................11-25 11.6.2 Impacts to Rare Plant Species and Ecological Communities ........11-35 11.6.3 Impacts Due to the Spread of Non-native Plants and Weed
Species ..........................................................................................11-37 11.6.4 Impacts to Traditional Use Plants ..................................................11-39 11.6.5 Accidents, Malfunctions and Severe Natural Environmental
Events ............................................................................................11-40 11.6.6 Mitigation and Monitoring...............................................................11-40
11.7 Cumulative Effects .........................................................................................11-43 11.8 Summary ........................................................................................................11-45 11.9 Literature Cited...............................................................................................11-46
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 12.0 – WILDLIFE TABLE OF CONTENTS
PAGE
12.0 WILDLIFE ....................................................................................................................12-1 12.1 Introduction.......................................................................................................12-1 12.2 Study Area........................................................................................................12-1
12.2.1 Spatial and Temporal Boundaries....................................................12-1 12.2.2 Baseline Characteristics ..................................................................12-3
12.3 Issues and Assessment Criteria.......................................................................12-5 12.3.1 Issues Scoping.................................................................................12-5 12.3.2 Selection of Key Wildlife Indicator Species for Assessment ............12-5
12.4 Methods............................................................................................................12-5 12.4.1 Review of Existing Information.........................................................12-5 12.4.2 Field Surveys ...................................................................................12-5 12.4.3 Habitat Suitability Modelling...........................................................12-24 12.4.4 Impact Assessment Criteria ...........................................................12-25 12.4.5 Cumulative Effects Assessment ....................................................12-26
12.5 Existing Conditions.........................................................................................12-26 12.5.1 Wildlife Species of Concern ...........................................................12-26 12.5.2 Amphibians ....................................................................................12-32 12.5.3 Reptiles ..........................................................................................12-33 12.5.4 Birds...............................................................................................12-33 12.5.5 Mammals .......................................................................................12-45 12.5.6 Baseline Habitat Suitability Modelling ............................................12-60
12.6 Potential Impacts and Mitigative Measures....................................................12-82 12.6.1 Project Mitigation Measures...........................................................12-84 12.6.2 Key Wildlife Indicatory Species......................................................12-86
12.7 Cumulative Effects .......................................................................................12-126 12.7.1 Regional Habitat Loss..................................................................12-127 12.7.2 Linear Disturbance.......................................................................12-130 12.7.3 Habitat Fragmentation .................................................................12-131 12.7.4 Regional Wildlife Impact Mitigation and Management .................12-134 12.7.5 Monitoring and Follow-up.............................................................12-137
12.8 Summary ......................................................................................................12-137 12.9 Literature Cited.............................................................................................12-142
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 13.0 – BIODIVERSITY TABLE OF CONTENTS
PAGE
13.0 BIODIVERSITY............................................................................................................13-4 13.1 Introduction.......................................................................................................13-4 13.2 Study Area........................................................................................................13-4
13.2.1 Geographic Boundaries ...................................................................13-4 13.2.2 Temporal Boundaries.......................................................................13-4
13.3 Issues and Assessment Criteria.......................................................................13-5 13.3.1 Issues and Scoping..........................................................................13-5 13.3.2 Resource Indicator Selection ...........................................................13-6 13.3.3 Assessment Criteria.........................................................................13-7 13.3.4 Cumulative Effects Assessment Methods........................................13-7
13.4 Methods............................................................................................................13-8 13.4.1 Review of Existing Information.........................................................13-8 13.4.2 Spatial Datasets...............................................................................13-8 13.4.3 Baseline Analysis and Mapping .......................................................13-8 13.4.4 Field Surveys ...................................................................................13-9
13.5 Existing Conditions...........................................................................................13-9 13.5.1 Habitat Diversity...............................................................................13-9 13.5.2 Species Diversity ...........................................................................13-14 13.5.3 Landscape Diversity.......................................................................13-16
13.6 Impact Assessment and Mitigative Measures ................................................13-28 13.6.1 Impacts to Habitat Diversity ...........................................................13-28 13.6.2 Impacts to Species Diversity..........................................................13-33 13.6.3 Impacts to Landscape Diversity .....................................................13-37 13.6.4 Accidents, Malfunctions and Severe Environmental Impacts ........13-52 13.6.5 Mitigation and Monitoring...............................................................13-52
13.7 Cumulative Effects Assessment .....................................................................13-52 13.8 Summary ........................................................................................................13-52 13.9 Literature Cited...............................................................................................13-54
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 14.0 – LAND AND RESOURCE USE TABLE OF CONTENTS
PAGE
14.0 LAND AND RESOURCE USE.....................................................................................14-1 14.1 Introduction.......................................................................................................14-1 14.2 Study Area........................................................................................................14-1 14.3 Issues and Assessment Criteria.......................................................................14-1 14.4 Methods............................................................................................................14-3
14.4.1 Existing Information .........................................................................14-3 14.5 Existing Conditions...........................................................................................14-4
14.5.1 Land Use Plans and Policies ...........................................................14-4 14.5.2 Designated, Protected or Representative Areas..............................14-8 14.5.3 Dispositions....................................................................................14-10 14.5.4 Oil Sands, Petroleum and Natural Gas Leases .............................14-14 14.5.5 Disturbance....................................................................................14-17 14.5.6 Forest Resources...........................................................................14-17 14.5.7 Access ...........................................................................................14-19 14.5.8 Consumptive Outdoor Recreation..................................................14-19 14.5.9 Non-Consumptive Outdoor Recreation..........................................14-29 14.5.10 Aggregate and Mineral Resources ................................................14-30
14.6 Impact Assessment and Mitigative Measures ................................................14-31 14.6.1 Land Use Plans and Policies .........................................................14-31 14.6.2 Designated, Protected or Representative Areas............................14-31 14.6.3 Land Use Dispositions ...................................................................14-31 14.6.4 Forestry..........................................................................................14-34 14.6.5 Access ...........................................................................................14-34 14.6.6 Consumptive Outdoor Recreation..................................................14-36 14.6.7 Impacts to Traditional Use Plants ..................................................14-38 14.6.8 Non-Consumptive Outdoor Recreation..........................................14-40 14.6.9 Aggregate and Mineral Resources ................................................14-40
14.7 Cumulative Effects .........................................................................................14-40 14.8 Summary ........................................................................................................14-40 14.9 Literature Cited...............................................................................................14-42
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 15.0 – HISTORICAL RESOURCES TABLE OF CONTENTS
PAGE
15.0 HISTORICAL RESOURCES........................................................................................15-1 15.1 Introduction.......................................................................................................15-1 15.2 Study Area........................................................................................................15-1 15.3 Issues and Assessment Criteria.......................................................................15-1 15.4 Methods............................................................................................................15-2
15.4.1 Prefield Investigations......................................................................15-2 15.4.2 Field Investigations ..........................................................................15-2 15.4.3 Postfield Investigations ....................................................................15-3
15.5 Existing Conditions...........................................................................................15-3 15.5.1 Previously Recorded Historical Resources in the Local
Study Area .......................................................................................15-4 15.6 Summary ........................................................................................................15-11 15.7 Literature Cited...............................................................................................15-11
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 16.0 – TRADITIONAL LAND USE AND TRADITIONAL ECOLOGICAL KNOWLEDGE
TABLE OF CONTENTS
PAGE
16.0 TRADITIONAL LAND USE AND TRADITIONAL ECOLOGICAL KNOWLEDGE......16-1 16.1 Introduction.......................................................................................................16-1 16.2 Study Area........................................................................................................16-1
16.2.1 Geographic Boundaries ...................................................................16-1 16.2.2 Temporal Boundaries.......................................................................16-3
16.3 Issues and Assessment Criteria.......................................................................16-5 16.4 Methods............................................................................................................16-5
16.4.1 Data Collection Methods..................................................................16-5 16.5 Existing Conditions...........................................................................................16-9
16.5.1 Beaver Lake Cree First Nation.......................................................16-10 16.5.2 Chipewyan Prairie Dene First Nation.............................................16-11 16.5.3 Heart Lake First Nation ..................................................................16-12 16.5.4 Fort McMurray First Nation #468 ...................................................16-14 16.5.5 Conklin Métis Local #193...............................................................16-15 16.5.6 Chard Métis....................................................................................16-19 16.5.7 Fort McMurray Métis Local #1935 .................................................16-19
16.6 Potential Effects .............................................................................................16-22 16.6.1 Mitigation Measures.......................................................................16-23
16.7 Summary ........................................................................................................16-24 16.8 Literature Cited...............................................................................................16-24
Application for Approval of the BlackGold Expansion Project Volume 2 – Environmental Impact Assessment
December 2009
Table of Contents
SECTION 17.0 – SOCIO-ECONOMICS TABLE OF CONTENTS
PAGE
17.0 SOCIO-ECONOMICS ..................................................................................................17-1 17.1 Introduction.......................................................................................................17-1
17.1.1 Project Description...........................................................................17-1 17.2 Study Area........................................................................................................17-2
17.2.1 Spatial Boundaries...........................................................................17-2 17.2.2 Temporal Boundaries.......................................................................17-4 17.2.3 Socio-Economic Valued Components and Key Indicators...............17-4
17.3 Issues and Assessment Criteria.......................................................................17-4 17.3.1 Issues Identification .........................................................................17-4 17.3.2 Assessment Criteria.........................................................................17-5
17.4 Methods............................................................................................................17-6 17.4.1 Baseline Data Collection..................................................................17-6 17.4.2 Types of Effects ...............................................................................17-6 17.4.3 Effects Analysis................................................................................17-7
17.5 Existing Conditions...........................................................................................17-9 17.5.1 Regional Study Area ........................................................................17-9 17.5.2 Local Study Area............................................................................17-44
17.6 Potential Effects and Mitigative Measures .....................................................17-47 17.6.1 Introduction ....................................................................................17-47 17.6.2 Effects on the RSA.........................................................................17-47 17.6.3 Effects on the LSA .........................................................................17-60
17.7 Cumulative Effects .........................................................................................17-61 17.7.1 Regional Study Area ......................................................................17-61 17.7.2 Local Study Area............................................................................17-62
17.8 Summary ........................................................................................................17-63 17.9 Literature Cited...............................................................................................17-65
Application for Approval of the BlackGold Expansion Project Volume 4 – EIA Amendment
March 2010
Table of Contents
SECTION 18.0 – HUMAN HEALTH TABLE OF CONTENTS
PAGE
18.0 HUMAN HEALTH ........................................................................................................18-1 18.1 Introduction.......................................................................................................18-1
18.1.1 Scope of Assessment ......................................................................18-1 18.2 Study Area........................................................................................................18-2
18.2.1 Spatial Boundaries...........................................................................18-2 18.2.2 Temporal Boundaries.......................................................................18-2
18.3 Assessment Cases...........................................................................................18-4 18.4 Assessment Methods .......................................................................................18-5
18.4.1 Problem Formulation........................................................................18-5 18.4.2 Exposure Assessment ...................................................................18-20 18.4.3 Toxicity Assessment ......................................................................18-29 18.4.4 Risk Characterization.....................................................................18-35
18.5 Mitigative Measures .......................................................................................18-37 18.5.1 Air Quality ......................................................................................18-37 18.5.2 Surface Water Quality....................................................................18-41 18.5.3 Groundwater Quality ......................................................................18-42
18.6 Results ...........................................................................................................18-42 18.6.1 Acute Inhalation .............................................................................18-42 18.6.2 Chronic Inhalation ..........................................................................18-46 18.6.3 Chronic Multiple Pathway ..............................................................18-50
18.7 Monitoring.......................................................................................................18-52 18.8 Summary ........................................................................................................18-52 18.9 Literature Cited...............................................................................................18-54
Volume 3 Environmental Impact Assessment Appendices
Application for Approval of the BlackGold Expansion Project Volume 4 – EIA Addendum
March 2010
Table of Contents
TABLE OF CONTENTS
APPENDIX A FINAL TERMS OF REFERENCE – ENVIRONMENTAL IMPACT ASSESSMENT REPORT
APPENDIX B AIR QUALITY
Appendix B1 Air Quality Modelling Approach Appendix B2 Emission Sources Information – Criteria Air Contaminants Appendix B3 Air Quality and Meteorological Observations in the RSA Appendix B4 Background Emission Source Information – VOCs and PAHs Appendix B5 Baseline, Application and Planned Development Model
Predictions APPENDIX C HYDROGEOLOGY
Appendix C1 Summary of Field Investigations Appendix C2 Groundwater Chemistry Data Appendix C3 Alberta Environment Provincial Water Well Data Appendix C4 Groundwater Flow Numerical Model
APPENDIX D SURFACE WATER QUALITY APPENDIX E SOILS AND TERRAIN
Appendix E1 Profiles Appendix E2 Lab Data Appendix E3 Land Capability Rating System for Bitumount Soil Series
APPENDIX F VEGETATION
Appendix F1 Baseline Methods Appendix F2 Baseline Data Appendix F3 Vegetation and Wetland Assessment Method
APPENDIX G WILDLIFE Appendix G1 Bat Survey Capture Data Appendix G2 Songbird Point Count Survey Results
APPENDIX H BIODIVERSITY
Appendix H1 Biodiversity Assessment Methods Appendix H2 Breeding Bird Species Richness Assessment
Application for Approval of the BlackGold Expansion Project Volume 4 – EIA Addendum
March 2010
Table of Contents
APPENDIX I SOCIO-ECONOMICS Appendix I1 KNOC BlackGold Project Contact List for the SEIA
APPENDIX J HUMAN HEALTH
Appendix J1 Chemical Profiles Appendix J2 Model Description and Worked Example Appendix J2A Predicted Game Meat Concentrations Appendix J2B Multiple Pathway Exposure Model and Predicted Exposure
Point Concentration Appendix J3 Predicted Air Concentrations and Inhalation Risk Estimates Appendix J4 Health Canada’s SUM15 Approach
S:\Project Ce\Ce03745\EIA\Vol 3\Volume 3-final EIA-ce03745-dec09-dr.doc