December, 2015 Air Quality Assessment (dust) JT1582 310 Gregors Creek Road AQA for Quarry 1 • Telephone 0417 727 981 • Facsimile 07 5530 7521 • ABN 68 467 757 073 Application Details Application Type Material Change of Use Extractive Industry Defined Use Extractive Industry - Quarry Street Address 310 Gregors Creek Road, Gregors Creek Client Edith Pastoral Company Date December 2015 In support of an application for Material Change of Use Development Permit for Extractive Industry Dust Assessment - (AUSPLUME MODELLING)

Upload: others

Post on 24-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December, 2015 Air Quality Assessment (dust)

JT1582 – 310 Gregors Creek Road – AQA for Quarry 1

• Telephone 0417 727 981

• Facsimile 07 5530 7521 • ABN 68 467 757 073

Application Details

Application Type Material Change of Use – Extractive Industry

Defined Use Extractive Industry - Quarry

Street Address 310 Gregors Creek Road, Gregors Creek

Client Edith Pastoral Company

Date December 2015

In support of an application for

Material Change of Use Development Permit for Extractive Industry

Dust Assessment - (AUSPLUME MODELLING)

Page 2: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

2

JT1582 – 310 Gregors Creek Road AQA for Quarry

©This document is and will remain the property of JT Environmental Pty Ltd. The document may only be used for the purposes for which it was commissioned and in accordance with the Terms of Engagement for the commissioning. Unauthorised use of this document in any form whatsoever is prohibited.

© 2015 – JT Environmental Pty Ltd ABN 64081048723

P.O Box 1057, Mudgeeraba Qld 4213P: 0417 727 981 F: 07 5530 7521

E: [email protected]

Limitations

This report was prepared for the sole use of Edith Pastoral Company in accordance with generally accepted consulting practice. No other warranty, expressed or implied, is made as to the professional advice included in this report. This report has not been prepared for use by parties other than the client, the owner and their respective consulting advisors. It may not contain sufficient information for the purposes of other parties or for other uses. It is recommended that any works planned by others and relating specifically to the content of this report be reviewed by JT Environmental Pty Ltd to verify that the intent of our recommendations is properly reflected in the final design. To the best of our knowledge, information contained in this report is accurate at the date of issue.

Document Status

Rev No. Author Reviewer Approved for Issue

Name Signature Date

A BRS TCD TCD 30.11.15

B BRS TCD TCD 03.12.15

C BRS TCD TCD 18.01.16

Page 3: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

3

JT1582 – 310 Gregors Creek Road AQA for Quarry

TABLE OF CONTENTS

1.0 INTRODUCTION ....................................................................................................................... 5

1.2 LIMITATIONS OF THE AQA (AIR QUALITY ASSESSMENT) .................................................................. 5

2.0 SITE DESCRIPTION ................................................................................................................. 6

2.1 SITE DETAILS ............................................................................................................................ 6 2.2 APPLICATION DETAILS ............................................................................................................... 6 2.3 SURROUNDING LAND USES ........................................................................................................ 6 2.4 AERIAL PHOTOGRAPH ................................................................................................................ 6 2.4 EXISTING ENVIRONMENT ........................................................................................................... 8 2.4 EXISTING ENVIRONMENT AERIALS, SEPERATION DISTANCES ........................................................ 9 2.5 PROPOSED DEVELOPMENT ENVIRONMENT ................................................................................ 10 2.6 SITE CHARACTERISTICS ............................................................................................................ 12

3.0 ASSESSMENT CRITERIA ...................................................................................................... 13

3.1 AIR QUALITY ........................................................................................................................... 13 3.1.1 Air Quality Management and Criteria – EP (AIR) POLICY 2008 ...................................... 13

4.0 AIR QUALITY ASSESSMENT - AUSPLUME MODELLING .............................................. 14

4.1 DUST ASSESSMENT MTHODOLOGY ....................................................................................... 14 4.3 MODELLING APPROACH ........................................................................................................... 15 4.4 RECEPTORS .............................................................................................................................. 15 4.5 METEOROLOGICAL DATA ......................................................................................................... 16

5.0 PROPOSED QUARRY ............................................................................................................. 17

5.1 NPI AND EMISSIONS CALCULATIONS .................................................................................... 17 5.4 MODELLING RESULTS..................................................................................................... 19 5.5 CUMULATIVE RESULTS FOR CONCRETE BATCHING PLANT & QUARRY – WORST CASE SCENARIO

........................................................................................................................................................... 20

6.0 CONCLUSION.......................................................................................................................... 21

7.0 RECOMENDATIONS .............................................................................................................. 22

8.0 APPENDIX ................................................................................................................................ 23

APPENDIX A – SITE PLAN .................................................................................................................... 23 APPENDIX B: SITE IMAGES ................................................................................................................... 31 APPENDIX C: MODELLING RESULTS ....................................................................................................... 33

LIST OF FIGURES

Figure 1: Surrounding locality - source: Lockyer Designs. ............................................... 7 Figure 2: Land zoning under the Somerset Regional Council. .......................................... 8

Figure 3: Aerial view of separation distances from proposed use to receptors - source:

Lockyer Designs ...................................................................................................... 9

Figure 4: Proposed development site - source: Lockyer Designs .................................... 11 Figure 5: Existing dam for polishing stage and water treatment irrigation. ..................... 12

Figure 6: aerial view of the identified discrete receptors that have been included in the

modelling............................................................................................................... 16

Page 4: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

4

JT1582 – 310 Gregors Creek Road AQA for Quarry

LIST OF TABLES

Table 1: Ambient Air Pollutant Concentration Measurements. ....................................... 13 Table 2: Applicable air quality objectives. ..................................................................... 13

Table 3: Receptor location coordinates. ......................................................................... 14 Table 4: Emission factors for Quarry based on relevant emissions from comparative

quarries with max possible extraction of 100,000 tonnes/year. ............................... 18 Table 5: Modelled results for Quarry (ambient included) ............................................... 19

Table 6: Cumulative Ausplume modelling results for proposed concrete batching plant

and quarry.............................................................................................................. 20

Page 5: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

5

JT1582 – 310 Gregors Creek Road AQA for Quarry

1.0 INTRODUCTION

JT Environmental has been commissioned by Edith Pastoral Company to prepare an Air Quality Assessment for the proposed extractive industry use on the site for the extraction of hard rock material, with a threshold of 5,000 tonne to 100,000 tonne per year. The site is located over land at 310 Gregors Creek Road, Gregors Creek.

The subject site is identified as Lots 1 and 2 on RP75267; Lot 1 on RP15328; Lot 5 on RP41543; Lot 2 on RP99954; Lot 1 on CSH2113 and Lot 3 on RP84104.

The purpose of this document is to provide a detailed Air Quality Assessment (dust) using Ausplume Air Quality Modelling to determine the impacts from emissions discharged from the proposed use to identified receptor locations.

The intent of this Amenity Report is to ensure that the proposed development does not subject existing sensitive receptors to reduced air quality from the proposal.

Therefore this AQA seeks to determine:

1. Air emissions from proposed use, primarily dust generated from on-site operations;2. Ausplume modelling:- Estimation at existing residential receptors and associated impacts where

appropriate.

The topographical characteristics of the site, location and the orientation of the site facilitate sufficient attenuation from existing sensitive receptors which are located to the south-east.

Furthermore, the report modelling has been conducted based on the details provided by the applicant regarding plant and equipment, tools, quantities of vehicles and scale of the use.

1.2 LIMITATIONS OF THE AQA (AIR QUALITY ASSESSMENT)

It is stressed that this AQA does not negate the need for site Owner/s, or Managers of the use to continue to improve the environmental performance of any pollutant emitting activity. The conclusions of this report are provided to demonstrate the Air Quality Environment of the proposed site is suitable for the new use being applied for by the Town Planning application.

Page 6: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

6

JT1582 – 310 Gregors Creek Road AQA for Quarry

2.0 SITE DESCRIPTION

2.1 SITE DETAILS

Address of Site: 310 Gregors Creek Road, Gregors Creek

Name of Owner: Edith Pastoral Company

2.2 APPLICATION DETAILS

Type of Application : MCU - Development Permit for Extractive Industry (Quarry)

Applicant : Edith Pastoral Company

Contact Person: Tyson Dodd / Bradley Stewart

Our Reference : JT1582

This proposal serves to locate a new extractive industry use (hard rock quarry) over part

of the land at 310 Gregors Creek Road.

2.3 SURROUNDING LAND USES

The subject site is located in the locality of Gregors creek, which falls with the local Government area of Esk. The site is well connected by the Brisbane Valley Highway which runs past the western boundary of the site from north to south, ultimately providing ease of access to local towns and larger cities. The area surrounding the site is used for primarily agricultural purposes, with a small number of residential sensitive receptors in the locality.

Two existing quarries are located to the north of the site, off Sinnamons Lane and to the north of Gregors Creek Road, an existing sand extraction operation is located on the Brisbane River to the north-west of the site adjacent to Gregors Creek Road, and an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense bushland within a State reserve adjoins the eastern boundary of the site as detailed in figure 1.

Based on these existing uses in the area, the reduced scale of the proposed use on the site, and the separation distances and attenuation opportunities that exist, the proposed site is considered to be suitable for the proposed use.

2.4 AERIAL PHOTOGRAPH

Below illustrates the location of the subject site in the greater context of the Gregors Creek Locality.

Page 7: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December, 2015 Air Quality Assessment (dust)

JT1582 – 310 Gregors Creek Road – AQA for Quarry 7

Figure 1: Surrounding locality - source: Lockyer Designs.

Page 8: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

8

JT1582 – 310 Gregors Creek Road AQA for Quarry

2.4 EXISTING ENVIRONMENT

The site is currently used for agricultural purposes as shown in the site photos in appendix c, with a large area of vacant land and dense bushland to the east of the site. A number of dams exist on site and as proposed by the applicant, these will be utilised as part of the new use for the plant operations.

The site is located within the Somerset Regional Council, under the former Esk local government area, and is contained in the Rural zone.

Figure 2: Land zoning under the Somerset Regional Council.

Furthermore, the closest sensitive receptor where monitoring has been conducted has the best line of sight to the area where the quarry is proposed (figure 1). As detailed by the aerial survey and confirmed from a site inspection, the locality is significantly void of sensitive receptors within a 1km radius of the site, ultimately providing adequate separation distances to attenuate dust emissions at these receptors.

Page 9: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

9

JT1582 – 310 Gregors Creek Road AQA for Quarry

2.4 EXISTING ENVIRONMENT AERIALS, SEPERATION DISTANCES

Figure 3: Aerial view of separation distances from proposed use to receptors - source: Lockyer Designs

Page 10: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

10

JT1582 – 310 Gregors Creek Road AQA for Quarry

2.5 PROPOSED DEVELOPMENT ENVIRONMENT

The following section outlines the proposed development environment to be located onsite 310 Gregors Creek Road with respect to the proposed quarry application.

The proposed site plan is shown in figure 4 and Appendix A.

This air quality assessment considers all activities to be carried out for the proposed Quarry, with an accumulative assessment included to demonstrate compliance with both the quarry and proposed concrete batching plant (separate application) in operation with respect to vehicle manoeuvring on-site and along the haul road, blasting of quarry walls, crushing and screening, and plant and equipment to be located on-site for operations. As mentioned these impacts will be assessed separately for each use and then cumulatively for a combined total assessment report of both applications.

The following outlines the equipment, various tools and machinery to be used for the Quarry.

Equipment used at 310 Gregors Creek Road

Dump trucks working in the pitwith a 30 to 40 tonne capacity.

Excavators used to load dumptrucks at the pit, with front endloaders loading raw or processedmaterial at the pit.

Graders to maintain Haul Roads

Water Truck for dust suppression.

Plant

Crushers (Jaw, Cone etc.)

Vibrating Screens for processing ofmaterial.

Conveyors

Water Pumps

Note: all plant will be driven by electric motors.

Page 11: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

11

JT1582 – 310 Gregors Creek Road AQA for Quarry

Figure 4: Proposed development site - source: Lockyer Designs

Page 12: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

12

JT1582 – 310 Gregors Creek Road AQA for Quarry

2.6 SITE CHARACTERISTICS

Extractive Industries must be located in an area where they will not pose a hazard to the environment or the amenity of the local community.

The design incorporates specific features to minimise noise and dust emissions including;

All buffer zones between the proposed uses on-site and the sensitive uses in the locality are located no less than a separation distance 1.1km (figure 3 above);

Haulage routes are to be designed and planned so as to not create unnecessary nuisance to surrounding residences;

The existing dams are to be utilised as water treatment, polishing and irrigation purposes;

The siting of the proposed development utilises the surrounding topography as a means of reducing line of sight to existing residential dwellings as shown in figure 4 below where the landform screens a large proportion of the use area; and

The proposed hard rock extraction area has been reduced significantly from the previous proposal submitted for the site.

Figure 5: Existing dam for polishing stage and water treatment irrigation.

Page 13: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

13

JT1582 – 310 Gregors Creek Road AQA for Quarry

3.0 ASSESSMENT CRITERIA

3.1 AIR QUALITY

3.1.1 AIR QUALITY MANAGEMENT AND CRITERIA – EP (AIR) POLICY 2008

This air quality assessment has been completed in accordance with the Environmental Protection (Air) Policy 2008. The relevant air quality objectives from this policy are presented in table 2 below for assessment of impacts at sensitive receptors identified.

The air quality assessment of the proposed quarry requires ambient air quality data as close to the site as possible to represent the concentrations of particular matter in the area prior to development. The representative background concentrations in table 1 are added to the predicted concentrations at each receptor from on-site operations to demonstrate compliance with the relevant criteria.

The monitoring station adopted to obtain the relevant ambient air quality data for the Ausplume modelling was derived from the area of Jondaryan. This site was chosen as it best represents the subject sites rural landscape environment.

Table 1: Ambient Air Pollutant Concentration Measurements.

Ambient particulate Concentrations (ug/m3) QLD –Air Monitoring Station

Pollutant Averaging times Source Ambient (µg/m3)* (Jondaryan

Station)

TSP Annual 36.3

PM10 24-hour 15.8

PM2.5 24-hour 5.8

PM2.5 Annual 3.7

Table 2: Applicable air quality objectives.

Pollutant Averaging

times Guideline

Source

Particular matter as TSP Annual 90 µg/m3 EP (Air) P 2008

Particular matter as PM10 24-hour 50 µg/m3 EP (Air) P 2008

Particular matter as PM2.5 24-hour 25 µg/m3 EP (Air) P 2008

Particular matter as PM2.5 Annual 8 µg/m3 EP (Air) P 2008

Note: a Pm2.5

are particles that have aerodynamic diameters that are less than 2.5um. b PM10 are particles that have aerodynamic diameters that are less than 10um. c five exceedances allowed per year

Page 14: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

14

JT1582 – 310 Gregors Creek Road AQA for Quarry

4.0 AIR QUALITY ASSESSMENT - AUSPLUME MODELLING

4.1 DUST ASSESSMENT MTHODOLOGY

This air quality assessment of the proposed quarry has been completed in accordance with the techniques for dispersion modelling and emissions estimation. All air quality predictions have been derived in full accordance with the legislative requirements and assessment methodology.

The assessment has focused on the air pollutants that are to be most critical in terms of potential impacts to air quality and amenity form such a use. Pollutants include PM10, PM2.5, and TSP has been incorporated into the modelling with the results presented in section 5.4.

In order to assess the dust concentrations at the identified receptor locations from the proposed quarry operations, detailed dispersion modelling was conducted using the regulatory approved AUSPLUME 5.4 Atmospheric Dispersion model.

Air quality modelling for sensitive receiving environments is generally completed when the emissions sources are known. The location of the new proposed facility on-site can be identified in this instance and appropriate coordinates utilised for the modelling scenarios. Based on the existence of these sensitive receptors, appropriate modelling can be completed to investigate potential design ground concentrations at the receiving environments from the proposed quarry.

The AUSPLUME model has been set up to estimate emissions over a 1500-metre x 1500-metres area that encompasses the identified residential receptors within the locality.

AUSPLUMES Rolling Rural with a surface roughness of 0.4 was utilised as this best depicts the land use category at the subject site and locality. The DEHP meteorological data file for Amberley was used as is most applicable to the site.

Table 3: Receptor location coordinates.

Receptor X coordinates Y coordinates

R1 438869 7011579

R2 439190 7011357

R3 439350 7011211

R4 439645 7012524

R5 439655 7012529

Page 15: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

15

JT1582 – 310 Gregors Creek Road AQA for Quarry

4.3 MODELLING APPROACH

The AUSPLUME model has been run using the Environmental Protection Agency meteorological date file for Amberley, which is considered to be the most appropriate meteorological data for the subject site.

The modelling output files are included as Appendix B.

Ausplume is one of the preferred plume dispersion models for use in air pollution modelling of releases from emission sources in Queensland. Ausplume (version 5.4) was used in this assessment. This model is a Gaussian plume dispersion model developed by the Victorian Environmental Protection Agency for use in Australian Meteorological conditions. The Ausplume Model considers a range of parameters that are relevant to atmospheric Dispersion.

The predicted ground level concentrations of dust emissions from the proposed quarry at the sensitive receptor locations have been compared with the relevant legislation requirements from the Environmental Protection (Air) Policy 2008. Best practice procedures for the management and mitigation of emissions of air pollutants from the proposed quarry operations have been implemented and recommended for the design.

The assumptions below have been utilised for modelling purposes:

The modelling has been completed assuming a 12 hour operation day for the quarry;

The emissions identified represent a worst case emissions within each scenario duringthe above mentioned hours; and

The vehicle haulage road is approximately 800metres with approximately 30 trips perday.

The applicant has implemented specific design features and practices for the quarry to reduce emissions from operational activities. These practices have been incorporated into the dispersion modelling.

4.4 RECEPTORS

A series of gridded receptors for the proposed development site was included in the dispersion modelling. Cartesian grid spacing of approximately 10-metres was modelled, as this demonstrates the worst case scenario for the separation distance. To minimise the run time of the model the discrete receptors have generally been limited to the proposed development site only at both ground level receptors given that this represents the actual scenario.

Page 16: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

16

JT1582 – 310 Gregors Creek Road AQA for Quarry

Figure 6: aerial view of the identified discrete receptors that have been included in the modelling.

4.5 METEOROLOGICAL DATA

For the dispersion modelling, the Amberley meteorological data set development by BOM and provided by the Queensland EPA was incorporated.

R5

Page 17: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

17

JT1582 – 310 Gregors Creek Road AQA for Quarry

5.0 PROPOSED QUARRY

5.1 NPI AND EMISSIONS CALCULATIONS

A review of the potential particulate generating activities associated with the quarry operations has been completed and determined that PM2.5, PM10, and TSP will be the primary emissions from on-site activities.

A cumulative assessment of the proposed quarry together with the ambient background data has been completed to identify the worst case scenario design ground concentrations at the identified receptor locations. The following activities from the quarry have the potential to result in dust emissions:

Blasting and drilling within the pit area;

Processing – screening and crushing;

Wind erosion of raw materials from stockpiles;

Wheel generated dust associated with the haulage of raw materials; and

Excavation of raw materials – excavators/dozers etc.

To calculate dust emissions for the proposed on-site activities, the recognised emissions estimation technique has been used and is based on the following calculation:

= × × (1 − ) Where:

ER = dust emission rate A = activity / operations data EF = dust emission factor CF = reduction in dust emissions due to the implementation of control measures

The emissions to be utilised for the modelling have been sourced from a previous quarry project that had a threshold of 2million tonnes of material per year. On the basis that the proposal seeks to extract approximately 5,000 tonne to 100,000 tonne per year, the proposal, based on the highest throughput of 100,000 tonne will generate 5% of the previous projects emissions.

Emission estimates for the proposed quarry have been referenced from the following documents and information:

Emission factors published by the United States Environmental Protection Agency(USEPA) in the AP-42 document s and the National Pollutant Inventory (NPI) for miningand processing of minerals; and

Site specific operation characteristics, plant and equipment, hours of operation andproduction rates.

Page 18: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

18

JT1582 – 310 Gregors Creek Road AQA for Quarry

Table 4 provides the adopted emission rates for the proposed development to be incorporated into the dispersion modelling.

Table 4: Emission factors for Quarry based on relevant emissions from comparative quarries with max possible extraction of 100,000 tonnes/year.

ID Modelling

Input Activity PM10 (ug/s) PM2.5 (ug/s) TSP5 (ug/s) Source

Q1 Area

Extraction from pit

(blasting, drilling,

handling)

0.00038 0.0055 0.00091 US EPA AP-

42

Q2 area Primary crushing) 0.00084 0.003 0.00192 US EPA AP-

42

Q3 Area Secondary crushing 0.00118 0.004 0.0028 US EPA AP

Q4 Area Tertiary crushing 0.00142 0.005 0.0033 US EPA AP

Q5 Area Screening 0.00062 0.002 0.00152 US EPA AP

Q6 Point Haulage

(Wheel generated dust) 0.003 0.000028 0.4365 US EPA AP

Q7 Area Wind erosion of

stockpiles 0.00552 0.000022 0.0028

US EPA AP-

42

Page 19: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

19

JT1582 – 310 Gregors Creek Road AQA for Quarry

5.4 MODELLING RESULTS

Ausplume modeling was the program used to determine the concentrations at the discrete receptor locations for the proposed development. Table 5 presents the modelled results for each receptor and demonstrates compliance with the relevant criteria calculated from the EP (Air) Policy 2008.

This assessment includes predictions of ground-level concentrations of TSP, PM10 and PM2.5 across a Cartesian grid and at the nearest sensitive receptors locations as identified. Sensitive receptors represent residential dwellings only.

Table 5: Modelled results for Quarry (ambient included)

ID

Receptors

Predicted Concentration

(including ambient) Compliance?

TSP (Annual) PM10 (24-hr) PM2.5 (24-hr) PM2.5 (Annual)

Ambient 36.3 15.8 5.8 3.7

Receptor 1 37.7 20.7 6.51 4.75 YES

Receptor 2 38.3 24.1 6.99 5.47 YES

Receptor 3 38.3 23.8 6.94 5.37 YES

Receptor 4 37.0 22.2 6.72 5.06 YES

Receptor 5 37.0 22.4 6.74 5.09 YES

CRITERIA 90 µg/m3 50 µg/m3 25 µg/m3 8 µg/m3 YES

Page 20: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

20

JT1582 – 310 Gregors Creek Road AQA for Quarry

5.5 CUMULATIVE RESULTS FOR CONCRETE BATCHING PLANT & QUARRY – WORST CASE SCENARIO

Potential cumulative impacts are those which are generated by the combined impacts on the local environment as a consequence of the project. For the purpose of this proposed development this includes the operations of both the concrete batching plant and the quarry and their impacts while in operation together. This allows a worst case scenario to be applied to further demonstrate compliance with relevant criteria. Table 6 provides the results of the AUSPLUME model accumulative assessment.

Table 6: Cumulative Ausplume modelling results for proposed concrete batching plant and quarry

ID

Receptors

Predicted Concentration

(including ambient)

Compliance? TSP

Annual PM10 24-hr

PM2.5

24-hr

PM2.5

Annual

Ambient 36.3 15.8 5.8 3.7 Ambient

Receptor 1 37.8 21.7 13.8 7.74 Yes

Receptor 2 38.3 23.7 17.0 9.11 No

Receptor 3 38.3 25.0 18.3 9.43 No

Receptor 4 37.0 22.5 15.5 6.86 Yes

Receptor 5 37.0 22.6 15.7 6.85 Yes

CRITERIA 90 µg/m3 50 µg/m3 25 µg/m3 8 µg/m3

It is to note that for PM2.5, receptors 2 and 3 the criterion of 8µg/m3 is exceeded slightly by 1.11 µg/m3 and 1.43µg/m3 respectively. With respect to recommendation 1, the dust deposition monitoring programme will ensure that these levels are not exceeded in ACTUAL operation, and are based ONLY on the worst case monitoring scenarios adopted for the assessment. Regular checks of these monitoring results are to be conducted and will demonstrate that the identified exceedances will not occur as a result of the proposed Quarry and concrete batching plant in combined operation.

Page 21: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

21

JT1582 – 310 Gregors Creek Road AQA for Quarry

6.0 CONCLUSION

The proposed development for a concrete batching plant and a quarry at 310 Gregors Creek Road has been investigated for particular matter as – PM2.5 (24 hr and annual), PM10, and TSP for the generation of dust from all associated activities. Two modelling scenarios were completed for the site; (I) emissions from the proposed quarry (ii) and the emissions from both operations of the quarry and a separate concrete batching plant (not part of this application) as a cumulative assessment from both operations in use to provide a worst case scenario of pollutant concentrations at the receptor locations.

It is paramount to identify that a conservative approach has been applied to the emissions calculations to demonstrate further compliance with the criteria.

The modelling approach utilised for this assessment has been detailed within this report and is considered best practice. The location was established with an appropriate receptor grid in addition to discrete receptor locations at relevant receptor locations of existing receptors.

As the output file indicates, the predicted worst-case levels for the discrete receptor modelled do not exceed the criteria as stipulated within the EP (air) Policy 2008. The AUSPLUME output indicates that both the quarry and the concrete batching plant can exist at the subject site without amenity impacts or increased air quality with both operating separately and together.

Page 22: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

22

JT1582 – 310 Gregors Creek Road AQA for Quarry

7.0 RECOMENDATIONS

Based on the proposed location, siting and design features of the concrete batching plant and quarry, the following dust control measures have been recommended by this consultancy:

For proposed quarry:

1. Establishment of a dust deposition monthly monitoring programme and reporting tooperator during operation. This will provide trends and confirmation that modellinghas adopted worst case principles.

2. Visual monitoring of dust by operators on-site and reported

3. Watering of haul roads and stockpiles: the quarry operators must be aware whenwindy conditions occur and ensure watering is frequent during these times

4. Proposed 20km/hour speed limit surrounding the processing and stockpile areas,and 40kn/hr for all other areas and haul roads;

Page 23: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

23

JT1582 – 310 Gregors Creek Road AQA for Quarry

8.0 APPENDIX

APPENDIX A – SITE PLAN

Page 24: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December, 2015 Air Quality Assessment (dust)

JT1582 – 310 Gregors Creek Road – AQA for Quarry 24

Page 25: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

25

JT1582 – 310 Gregors Creek Road AQA for Quarry

Page 26: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

26

JT1582 – 310 Gregors Creek Road AQA for Quarry

Page 27: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

27

JT1582 – 310 Gregors Creek Road AQA for Quarry

Page 28: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

28

JT1582 – 310 Gregors Creek Road AQA for Quarry

Page 29: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

29

JT1582 – 310 Gregors Creek Road AQA for Quarry

Page 30: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

30

JT1582 – 310 Gregors Creek Road AQA for Quarry

Page 31: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

31

JT1582 – 310 Gregors Creek Road AQA for Quarry

APPENDIX B: SITE IMAGES

Site photos of existing quarry – similar to that being proposed.

Page 32: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

32

JT1582 – 310 Gregors Creek Road AQA for Quarry

Site photos of Proposed Plant site.

Page 33: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

33

JT1582 – 310 Gregors Creek Road AQA for Quarry

APPENDIX C: MODELLING RESULTS

TSP

310 Gregor Street TSPannual

_______________________________

Concentration or deposition Concentration

Emission rate units grams/second

Concentration units microgram/m3

Units conversion factor 1.00E+06

Constant background concentration 3.63E+01

Terrain effects None

Smooth stability class changes? No

Other stability class adjustments ("urban modes") None

Ignore building wake effects? No

Decay coefficient (unless overridden by met. file) 0.000

Anemometer height 10 m Roughness height at the wind vane site 0.300 m

Averaging time for sigma-theta values 60 min.

DISPERSION CURVES

Horizontal dispersion curves for sources <100m high Sigma-theta

Vertical dispersion curves for sources <100m high Pasquill-Gifford

Horizontal dispersion curves for sources >100m high Briggs Rural

Vertical dispersion curves for sources >100m high Briggs Rural

Enhance horizontal plume spreads for buoyancy? Yes

Enhance vertical plume spreads for buoyancy? Yes

Adjust horizontal P-G formulae for roughness height? Yes

Adjust vertical P-G formulae for roughness height? Yes Roughness height 0.400m

Adjustment for wind directional shear None

PLUME RISE OPTIONS

Page 34: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

34

JT1582 – 310 Gregors Creek Road AQA for Quarry

Gradual plume rise? Yes

Stack-tip downwash included? Yes

Building downwash algorithm: PRIME method.

Entrainment coeff. for neutral & stable lapse rates 0.60,0.60

Partial penetration of elevated inversions? No

Disregard temp. gradients in the hourly met. file? No

and in the absence of boundary-layer potential temperature gradients

given by the hourly met. file, a value from the following table (in K/m) is used:

Wind Speed Stability Class

Category A B C D E F

________________________________________________________

1 0.000 0.000 0.000 0.000 0.020 0.035

2 0.000 0.000 0.000 0.000 0.020 0.035

3 0.000 0.000 0.000 0.000 0.020 0.035

4 0.000 0.000 0.000 0.000 0.020 0.035

5 0.000 0.000 0.000 0.000 0.020 0.035

6 0.000 0.000 0.000 0.000 0.020 0.035

WIND SPEED CATEGORIES

Boundaries between categories (in m/s) are: 1.54, 3.09, 5.14, 8.23, 10.80

WIND PROFILE EXPONENTS: "Irwin Urban" values (unless overridden by met. file)

AVERAGING TIMES

average over all hours

_____________________________________________________________________________

1 _______________________________

310 Gregor Street TSPannual

SOURCE CHARACTERISTICS

_______________________________

Page 35: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

35

JT1582 – 310 Gregors Creek Road AQA for Quarry

STACK SOURCE: Q6

X(m) Y(m) Ground Elev. Stack Height Diameter Temperature Speed

440015 7012089 0m 3m 5.00m 28C 28.0m/s

No building wake effects.

(Constant) emission rate = 4.37E-01 grams/second No gravitational settling or scavenging.

AREA SOURCE: Q1

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 10m 10m

(Constant) emission rate = 9.10E-04 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q2

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 1.92E-03 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q3

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 2.80E-03 grams/second per square metre

No gravitational settling or scavenging.

Page 36: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

36

JT1582 – 310 Gregors Creek Road AQA for Quarry

AREA SOURCE: Q4

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 3.30E-03 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q5

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 1.52E-03 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q7

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 2.80E-03 grams/second per square metre

No gravitational settling or scavenging.

_____________________________________________________________________________

1 _______________________________

310 Gregor Street TSPannual

RECEPTOR LOCATIONS

_______________________________

The Cartesian receptor grid has the following x-values (or eastings):

Page 37: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

37

JT1582 – 310 Gregors Creek Road AQA for Quarry

440606.m 440616.m 440626.m 440636.m 440646.m 440656.m 440666.m

440676.m 440686.m 440696.m 440706.m 440716.m 440726.m 440736.m

440746.m 440756.m 440766.m 440776.m 440786.m 440796.m 440806.m

440816.m 440826.m 440836.m 440846.m 440856.m 440866.m 440876.m

440886.m 440896.m 440906.m 440916.m 440926.m 440936.m 440946.m

440956.m 440966.m 440976.m 440986.m 440996.m 441006.m 441016.m

441026.m 441036.m 441046.m 441056.m 441066.m 441076.m 441086.m

441096.m

and these y-values (or northings):

7011782.m 7011792.m 7011802.m 7011812.m 7011822.m 7011832.m 7011842.m

7011852.m 7011862.m 7011872.m 7011882.m 7011892.m 7011902.m 7011912.m

7011922.m 7011932.m 7011942.m 7011952.m 7011962.m 7011972.m 7011982.m

7011992.m 7012002.m 7012012.m 7012022.m 7012032.m 7012042.m 7012052.m

7012062.m 7012072.m 7012082.m 7012092.m 7012102.m 7012112.m 7012122.m

7012132.m 7012142.m 7012152.m 7012162.m 7012172.m 7012182.m 7012192.m

7012202.m 7012212.m 7012222.m 7012232.m 7012242.m 7012252.m 7012262.m

7012272.m

DISCRETE RECEPTOR LOCATIONS (in metres)

No. X Y ELEVN HEIGHT No. X Y ELEVN HEIGHT

1 438869 7011579 0.0 2.0 4 439645 7012524 0.0 2.0

2 439190 7011357 0.0 2.0 5 439655 7012529 0.0 2.0

3 439350 7011211 0.0 2.0

Concentrations at the discrete receptors (No. : Value):

1:3.77E+01 2:3.83E+01 3:3.83E+01 4:3.70E+01 5:3.70E+01

Page 38: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

38

JT1582 – 310 Gregors Creek Road AQA for Quarry

PM10

310 Gregor Street

_______________________________

Concentration or deposition Concentration

Emission rate units grams/second

Concentration units microgram/m3

Units conversion factor 1.00E+06

Constant background concentration 1.58E+01

Terrain effects None

Smooth stability class changes? No

Other stability class adjustments ("urban modes") None

Ignore building wake effects? No Decay coefficient (unless overridden by met. file) 0.000

Anemometer height 10 m

Roughness height at the wind vane site 0.300 m

Averaging time for sigma-theta values 60 min.

DISPERSION CURVES

Horizontal dispersion curves for sources <100m high Sigma-theta

Vertical dispersion curves for sources <100m high Pasquill-Gifford

Horizontal dispersion curves for sources >100m high Briggs Rural

Vertical dispersion curves for sources >100m high Briggs Rural

Enhance horizontal plume spreads for buoyancy? Yes

Enhance vertical plume spreads for buoyancy? Yes Adjust horizontal P-G formulae for roughness height? Yes

Adjust vertical P-G formulae for roughness height? Yes

Roughness height 0.400m

Adjustment for wind directional shear None

PLUME RISE OPTIONS

Gradual plume rise? Yes

Stack-tip downwash included? Yes

Building downwash algorithm: PRIME method.

Entrainment coeff. for neutral & stable lapse rates 0.60,0.60

Page 39: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

39

JT1582 – 310 Gregors Creek Road AQA for Quarry

Partial penetration of elevated inversions? No

Disregard temp. gradients in the hourly met. file? No

and in the absence of boundary-layer potential temperature gradients

given by the hourly met. file, a value from the following table

(in K/m) is used:

Wind Speed Stability Class

Category A B C D E F ________________________________________________________

1 0.000 0.000 0.000 0.000 0.020 0.035

2 0.000 0.000 0.000 0.000 0.020 0.035

3 0.000 0.000 0.000 0.000 0.020 0.035

4 0.000 0.000 0.000 0.000 0.020 0.035

5 0.000 0.000 0.000 0.000 0.020 0.035

6 0.000 0.000 0.000 0.000 0.020 0.035

WIND SPEED CATEGORIES

Boundaries between categories (in m/s) are: 1.54, 3.09, 5.14, 8.23, 10.80

WIND PROFILE EXPONENTS: "Irwin Urban" values (unless overridden by met. file)

AVERAGING TIMES

24 hours

_____________________________________________________________________________

1 _______________________________

310 Gregor Street PM10 24hr

SOURCE CHARACTERISTICS

_______________________________

STACK SOURCE: Q6

Page 40: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

40

JT1582 – 310 Gregors Creek Road AQA for Quarry

X(m) Y(m) Ground Elev. Stack Height Diameter Temperature Speed

440015 7012089 0m 3m 5.00m 28C 28.0m/s

No building wake effects.

(Constant) emission rate = 1.50E-01 grams/second

No gravitational settling or scavenging.

AREA SOURCE: Q1

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 10m 10m

(Constant) emission rate = 3.80E-04 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q2

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 8.40E-04 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q3

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 1.18E-03 grams/second per square metre No gravitational settling or scavenging.

AREA SOURCE: Q4

X(m) Y(m) Ground Elevation Height Side length

Page 41: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

41

JT1582 – 310 Gregors Creek Road AQA for Quarry

440539 7011875 0m 5m 5m

(Constant) emission rate = 1.42E-03 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q5

X(m) Y(m) Ground Elevation Height Side length 440539 7011875 0m 5m 5m

(Constant) emission rate = 6.20E-04 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q7

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 5.52E-03 grams/second per square metre No gravitational settling or scavenging.

_____________________________________________________________________________

1 _______________________________

310 Gregor Street PM10 24hr

RECEPTOR LOCATIONS

_______________________________

The Cartesian receptor grid has the following x-values (or eastings):

440606.m 440616.m 440626.m 440636.m 440646.m 440656.m 440666.m

440676.m 440686.m 440696.m 440706.m 440716.m 440726.m 440736.m

440746.m 440756.m 440766.m 440776.m 440786.m 440796.m 440806.m

440816.m 440826.m 440836.m 440846.m 440856.m 440866.m 440876.m

Page 42: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

42

JT1582 – 310 Gregors Creek Road AQA for Quarry

440886.m 440896.m 440906.m 440916.m 440926.m 440936.m 440946.m

440956.m 440966.m 440976.m 440986.m 440996.m 441006.m 441016.m

441026.m 441036.m 441046.m 441056.m 441066.m 441076.m 441086.m

441096.m

and these y-values (or northings):

7011782.m 7011792.m 7011802.m 7011812.m 7011822.m 7011832.m 7011842.m

7011852.m 7011862.m 7011872.m 7011882.m 7011892.m 7011902.m 7011912.m

7011922.m 7011932.m 7011942.m 7011952.m 7011962.m 7011972.m 7011982.m 7011992.m 7012002.m 7012012.m 7012022.m 7012032.m 7012042.m 7012052.m

7012062.m 7012072.m 7012082.m 7012092.m 7012102.m 7012112.m 7012122.m

7012132.m 7012142.m 7012152.m 7012162.m 7012172.m 7012182.m 7012192.m

7012202.m 7012212.m 7012222.m 7012232.m 7012242.m 7012252.m 7012262.m

7012272.m

DISCRETE RECEPTOR LOCATIONS (in metres)

No. X Y ELEVN HEIGHT No. X Y ELEVN HEIGHT

1 438869 7011579 0.0 2.0 4 439645 7012524 0.0 2.0

2 439190 7011357 0.0 2.0 5 439655 7012529 0.0 2.0 3 439350 7011211 0.0 2.0

At the discrete receptors:

1: 2.07E+01 @Hr24,02/07/71 4: 2.22E+01 @Hr24,23/06/80

2: 2.41E+01 @Hr24,27/05/77 5: 2.24E+01 @Hr24,23/06/80 3: 2.38E+01 @Hr24,22/12/93

Page 43: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

43

JT1582 – 310 Gregors Creek Road AQA for Quarry

PM2.5-annual

310 Gregor Street

_________________________________

Concentration or deposition Concentration

Emission rate units grams/second

Concentration units microgram/m3

Units conversion factor 1.00E+06

Constant background concentration 3.70E+00

Terrain effects None

Smooth stability class changes? No

Other stability class adjustments ("urban modes") None

Ignore building wake effects? No Decay coefficient (unless overridden by met. file) 0.000

Anemometer height 10 m

Roughness height at the wind vane site 0.300 m

Averaging time for sigma-theta values 60 min.

DISPERSION CURVES

Horizontal dispersion curves for sources <100m high Sigma-theta

Vertical dispersion curves for sources <100m high Pasquill-Gifford

Horizontal dispersion curves for sources >100m high Briggs Rural

Vertical dispersion curves for sources >100m high Briggs Rural

Enhance horizontal plume spreads for buoyancy? Yes

Enhance vertical plume spreads for buoyancy? Yes Adjust horizontal P-G formulae for roughness height? Yes

Adjust vertical P-G formulae for roughness height? Yes

Roughness height 0.400m

Adjustment for wind directional shear None

PLUME RISE OPTIONS

Gradual plume rise? Yes

Stack-tip downwash included? Yes

Building downwash algorithm: PRIME method.

Entrainment coeff. for neutral & stable lapse rates 0.60,0.60

Page 44: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

44

JT1582 – 310 Gregors Creek Road AQA for Quarry

Partial penetration of elevated inversions? No

Disregard temp. gradients in the hourly met. file? No

and in the absence of boundary-layer potential temperature gradients

given by the hourly met. file, a value from the following table

(in K/m) is used:

Wind Speed Stability Class

Category A B C D E F ________________________________________________________

1 0.000 0.000 0.000 0.000 0.020 0.035

2 0.000 0.000 0.000 0.000 0.020 0.035

3 0.000 0.000 0.000 0.000 0.020 0.035

4 0.000 0.000 0.000 0.000 0.020 0.035

5 0.000 0.000 0.000 0.000 0.020 0.035

6 0.000 0.000 0.000 0.000 0.020 0.035

WIND SPEED CATEGORIES

Boundaries between categories (in m/s) are: 1.54, 3.09, 5.14, 8.23, 10.80

WIND PROFILE EXPONENTS: "Irwin Urban" values (unless overridden by met. file)

AVERAGING TIMES

24 hours

_____________________________________________________________________________

1 _________________________________

310 Gregor Street PM2.5annual

SOURCE CHARACTERISTICS

_________________________________

STACK SOURCE: Q6

Page 45: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

45

JT1582 – 310 Gregors Creek Road AQA for Quarry

X(m) Y(m) Ground Elev. Stack Height Diameter Temperature Speed

440015 7012089 0m 3m 5.00m 28C 28.0m/s

No building wake effects.

(Constant) emission rate = 1.55E-02 grams/second

No gravitational settling or scavenging.

AREA SOURCE: Q1

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 10m 10m

(Constant) emission rate = 2.55E-04 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q2

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 1.20E-04 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q3

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 1.60E-04 grams/second per square metre No gravitational settling or scavenging.

AREA SOURCE: Q4

X(m) Y(m) Ground Elevation Height Side length

Page 46: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

46

JT1582 – 310 Gregors Creek Road AQA for Quarry

440539 7011875 0m 5m 5m

(Constant) emission rate = 2.00E-04 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q5

X(m) Y(m) Ground Elevation Height Side length 440539 7011875 0m 5m 5m

(Constant) emission rate = 8.00E-05 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q7

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 8.20E-04 grams/second per square metre No gravitational settling or scavenging.

_____________________________________________________________________________

1 _________________________________

310 Gregor Street PM2.5annual

RECEPTOR LOCATIONS

_________________________________

The Cartesian receptor grid has the following x-values (or eastings):

440606.m 440616.m 440626.m 440636.m 440646.m 440656.m 440666.m

440676.m 440686.m 440696.m 440706.m 440716.m 440726.m 440736.m

440746.m 440756.m 440766.m 440776.m 440786.m 440796.m 440806.m

440816.m 440826.m 440836.m 440846.m 440856.m 440866.m 440876.m

Page 47: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

47

JT1582 – 310 Gregors Creek Road AQA for Quarry

440886.m 440896.m 440906.m 440916.m 440926.m 440936.m 440946.m

440956.m 440966.m 440976.m 440986.m 440996.m 441006.m 441016.m

441026.m 441036.m 441046.m 441056.m 441066.m 441076.m 441086.m

441096.m

and these y-values (or northings):

7011782.m 7011792.m 7011802.m 7011812.m 7011822.m 7011832.m 7011842.m

7011852.m 7011862.m 7011872.m 7011882.m 7011892.m 7011902.m 7011912.m

7011922.m 7011932.m 7011942.m 7011952.m 7011962.m 7011972.m 7011982.m 7011992.m 7012002.m 7012012.m 7012022.m 7012032.m 7012042.m 7012052.m

7012062.m 7012072.m 7012082.m 7012092.m 7012102.m 7012112.m 7012122.m

7012132.m 7012142.m 7012152.m 7012162.m 7012172.m 7012182.m 7012192.m

7012202.m 7012212.m 7012222.m 7012232.m 7012242.m 7012252.m 7012262.m

7012272.m

DISCRETE RECEPTOR LOCATIONS (in metres)

No. X Y ELEVN HEIGHT No. X Y ELEVN HEIGHT

1 438869 7011579 0.0 2.0 4 439645 7012524 0.0 2.0

2 439190 7011357 0.0 2.0 5 439655 7012529 0.0 2.0 3 439350 7011211 0.0 2.0

At the discrete receptors:

1: 4.75E+00 @Hr24,02/07/71 4: 5.06E+00 @Hr24,23/06/80

2: 5.47E+00 @Hr24,27/05/77 5: 5.09E+00 @Hr24,23/06/80

3: 5.37E+00 @Hr24,22/12/93

Page 48: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

48

JT1582 – 310 Gregors Creek Road AQA for Quarry

PM2.5-24hr

310 Gregor Street PM2.5 24hr

________________________________

Concentration or deposition Concentration Emission rate units grams/second

Concentration units microgram/m3

Units conversion factor 1.00E+06

Constant background concentration 5.80E+00

Terrain effects None

Smooth stability class changes? No

Other stability class adjustments ("urban modes") None

Ignore building wake effects? No

Decay coefficient (unless overridden by met. file) 0.000

Anemometer height 10 m

Roughness height at the wind vane site 0.300 m Averaging time for sigma-theta values 60 min.

DISPERSION CURVES

Horizontal dispersion curves for sources <100m high Sigma-theta

Vertical dispersion curves for sources <100m high Pasquill-Gifford

Horizontal dispersion curves for sources >100m high Briggs Rural

Vertical dispersion curves for sources >100m high Briggs Rural

Enhance horizontal plume spreads for buoyancy? Yes

Enhance vertical plume spreads for buoyancy? Yes

Adjust horizontal P-G formulae for roughness height? Yes

Adjust vertical P-G formulae for roughness height? Yes Roughness height 0.400m

Adjustment for wind directional shear None

PLUME RISE OPTIONS

Gradual plume rise? Yes

Stack-tip downwash included? Yes

Building downwash algorithm: PRIME method.

Entrainment coeff. for neutral & stable lapse rates 0.60,0.60

Partial penetration of elevated inversions? No

Page 49: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

49

JT1582 – 310 Gregors Creek Road AQA for Quarry

Disregard temp. gradients in the hourly met. file? No

and in the absence of boundary-layer potential temperature gradients

given by the hourly met. file, a value from the following table

(in K/m) is used:

Wind Speed Stability Class

Category A B C D E F

________________________________________________________ 1 0.000 0.000 0.000 0.000 0.020 0.035

2 0.000 0.000 0.000 0.000 0.020 0.035

3 0.000 0.000 0.000 0.000 0.020 0.035

4 0.000 0.000 0.000 0.000 0.020 0.035

5 0.000 0.000 0.000 0.000 0.020 0.035

6 0.000 0.000 0.000 0.000 0.020 0.035

WIND SPEED CATEGORIES

Boundaries between categories (in m/s) are: 1.54, 3.09, 5.14, 8.23, 10.80

WIND PROFILE EXPONENTS: "Irwin Urban" values (unless overridden by met. file)

AVERAGING TIMES

24 hours

_____________________________________________________________________________

1 ________________________________

310 Gregor Street PM2.5 24hr

SOURCE CHARACTERISTICS

________________________________

STACK SOURCE: Q6

X(m) Y(m) Ground Elev. Stack Height Diameter Temperature Speed

Page 50: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

50

JT1582 – 310 Gregors Creek Road AQA for Quarry

440015 7012089 0m 3m 5.00m 28C 28.0m/s

No building wake effects.

(Constant) emission rate = 1.55E-02 grams/second

No gravitational settling or scavenging.

AREA SOURCE: Q1

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 10m 10m

(Constant) emission rate = 5.50E-05 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q2

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 1.20E-04 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q3

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 1.60E-04 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q4

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

Page 51: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

51

JT1582 – 310 Gregors Creek Road AQA for Quarry

(Constant) emission rate = 2.00E-04 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q5

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 8.00E-05 grams/second per square metre

No gravitational settling or scavenging.

AREA SOURCE: Q7

X(m) Y(m) Ground Elevation Height Side length

440539 7011875 0m 5m 5m

(Constant) emission rate = 8.20E-04 grams/second per square metre

No gravitational settling or scavenging.

_____________________________________________________________________________

1 ________________________________

310 Gregor Street PM2.5 24hr

RECEPTOR LOCATIONS

________________________________

The Cartesian receptor grid has the following x-values (or eastings):

440606.m 440616.m 440626.m 440636.m 440646.m 440656.m 440666.m

440676.m 440686.m 440696.m 440706.m 440716.m 440726.m 440736.m

440746.m 440756.m 440766.m 440776.m 440786.m 440796.m 440806.m

440816.m 440826.m 440836.m 440846.m 440856.m 440866.m 440876.m

440886.m 440896.m 440906.m 440916.m 440926.m 440936.m 440946.m

Page 52: Material Change of Use · an approved quarry is located to the north-west of the site on Gregors Creek Road. The Brisbane Valley Highway is located to the west of the site, and dense

December 2015

52

JT1582 – 310 Gregors Creek Road AQA for Quarry

440956.m 440966.m 440976.m 440986.m 440996.m 441006.m 441016.m

441026.m 441036.m 441046.m 441056.m 441066.m 441076.m 441086.m

441096.m

and these y-values (or northings):

7011782.m 7011792.m 7011802.m 7011812.m 7011822.m 7011832.m 7011842.m

7011852.m 7011862.m 7011872.m 7011882.m 7011892.m 7011902.m 7011912.m

7011922.m 7011932.m 7011942.m 7011952.m 7011962.m 7011972.m 7011982.m

7011992.m 7012002.m 7012012.m 7012022.m 7012032.m 7012042.m 7012052.m 7012062.m 7012072.m 7012082.m 7012092.m 7012102.m 7012112.m 7012122.m

7012132.m 7012142.m 7012152.m 7012162.m 7012172.m 7012182.m 7012192.m

7012202.m 7012212.m 7012222.m 7012232.m 7012242.m 7012252.m 7012262.m

7012272.m

DISCRETE RECEPTOR LOCATIONS (in metres)

No. X Y ELEVN HEIGHT No. X Y ELEVN HEIGHT

1 438869 7011579 0.0 2.0 4 439645 7012524 0.0 2.0

2 439190 7011357 0.0 2.0 5 439655 7012529 0.0 2.0

3 439350 7011211 0.0 2.0

At the discrete receptors:

1: 6.51E+00 @Hr24,02/07/71 4: 6.72E+00 @Hr24,23/06/80

2: 6.99E+00 @Hr24,27/05/77 5: 6.74E+00 @Hr24,23/06/80

3: 6.94E+00 @Hr24,22/12/93